+ All Categories
Home > Documents > Review of existing CTF3 BPM’s and related data acquisition

Review of existing CTF3 BPM’s and related data acquisition

Date post: 14-Jan-2016
Category:
Upload: marcel
View: 31 times
Download: 0 times
Share this document with a friend
Description:
Review of existing CTF3 BPM’s and related data acquisition. BPE. Electrostatic PU. Ceramic tube containing 4 electrodes. 4 feed-thru 2 units in Linac High impedance buffer followed by standard acquisition system. BPI. WCM type PU using current transformers . Racetrack vacuum chamber. - PowerPoint PPT Presentation
Popular Tags:
11
12/07-2006 Lars Søby CTF3-CLEX meeting 1 Review of existing CTF3 BPM’s and related data acquisition
Transcript
Page 1: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 1

Review of existing CTF3 BPM’s and related data

acquisition

Page 2: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 2

BPE

Electrostatic PU.Ceramic tube containing 4 electrodes. 4 feed-thru2 units in Linac High impedance buffer followed by standard acquisition system

Page 3: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 3

BPI

WCM type PU using current transformers.Racetrack vacuum chamber.4 electrodes, no feed-thru.Delay loop + Linac 19 units. No analogue electronics.CR +TL1 27 units is foreseen. Standard acquisition system.TL2 ??

Page 4: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 4

BPM

WCM type PU using current transformers.Circular vacuum chamber.8 electrodes, no feed-thru.23 units in the Linac.CR +TL1 6 units is foreseen. TL2 ??Standard acquisition system.

Page 5: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 5

BPR

Button PU and wave guide port.Circular vacuum chamber.4 buttons with feed-thru.2 units in the Linac, 1 in the CT line.CR 1 unit is foreseen. TL2 ??Down mixing using 3GHz referenceWave guide detector.Standard acquisition system.

Page 6: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 6

WCM

7GHz WCM. Circular vacuum chamber.2 mm air gap. 8 feed thrus3 units in the Linac.1 unit at exit of delay loop. 1 is foreseen for TL2 Standard acquisition system for low frequencies.

Page 7: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 7

Layout of BPM acquisition system

Tunnel Equipment Room

Page 8: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 8

Front-end electronics

Page 9: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 9

Layout of BPM acquisition system

Tunnel Equipment Room

Page 10: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 10

Acquisition Hardware

SIS 3300/20 VME module

8 channels @ 100/200 MHz12 Bits (-2.5 2.5 V)Ext triggerExt 96/192 MHz clock

Page 11: Review of existing CTF3 BPM’s and related data acquisition

12/07-2006 Lars Søby CTF3-CLEX meeting 11

Thank you for your attention


Recommended