39
SUBMITTAL REVIEW APPROVED REVISE AND RESUBMIT NOT APPROVED BY DATE chardison 8/5/2019 APPROVAL OF SHOP DRAWINGS AND SUBMITTALS BY CONSTRUCTION MANAGER, ARCHITECT, OR ENGINEER WILL NOT RELIEVE SUPPLIER OF RESPONSIBILITY FOR DIMENSIONAL ACCURACY, QUANTITIES, OR CONFORMANCE TO THE CONTRACT DOCUMENTS. CHANGES INVOLVING EXTRA COST DUE TO REVIEW COMMENTS REQUIRE WRITTEN APPROVAL PRIOR TO PROCESSING. REVIEWED APPROVED AS NOTED FOR REVIEW AND COMMENT NO EXCEPTIONS TAKEN REVISE & RESUBMIT REJECTED APPROVED AS NOTED Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project. The contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner CT CONSULTANTS, INC. PROJECT #: DATE: BY: C. Knight 8/26/2019 160681 133419-1.0
Transcript
Page 1: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by

SUBMITTAL REVIEW

APPROVED

REVISE ANDRESUBMIT

NOT APPROVED

BY DATEchardison 8/5/2019

APPROVAL OF SHOP DRAWINGS AND SUBMITTALS BY CONSTRUCTIONMANAGER, ARCHITECT, OR ENGINEER WILL NOT RELIEVE SUPPLIER OFRESPONSIBILITY FOR DIMENSIONAL ACCURACY, QUANTITIES, ORCONFORMANCE TO THE CONTRACT DOCUMENTS. CHANGES INVOLVINGEXTRA COST DUE TO REVIEW COMMENTS REQUIRE WRITTEN APPROVALPRIOR TO PROCESSING.

REVIEWED

✔ APPROVED ASNOTEDFOR REVIEWAND COMMENT

NO EXCEPTIONSTAKEN

REVISE & RESUBMIT

REJECTEDAPPROVED ASNOTED

Corrections or comments made on the shop drawings during this review donot relieve contractor from compliance with requirements of the drawingsand specifications. This check is only for review of general conformancewith the design concept of the project. The contractor is responsible forconfirming and correlating all quantities and dimensions; selectingfabrication processes and techniques of construction; coordinating his workwith that of all other trades; and performing his work in a safe andsatisfactory manner

CT CONSULTANTS, INC.

PROJECT #:

DATE: BY:

C. Knight8/26/2019

160681 133419-1.0

Page 2: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by

This is from a past RFI and only is listed to provide an understanding of material procurement

Page 3: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 4: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 5: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 6: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 7: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 8: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 9: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 10: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by

2.9-B6

Page 11: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 12: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 13: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 14: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 15: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 16: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 17: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 18: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 19: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 20: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 21: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 22: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 23: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 24: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 25: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 26: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 27: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 28: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 29: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 30: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 31: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 32: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 33: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 34: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 35: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 36: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 37: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 38: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by
Page 39: REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not approved by date chardison 8/5/2019 approval of shop drawings and submittals by

Recommended