+ All Categories
Home > Documents > (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21,...

(Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21,...

Date post: 10-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
56
ADMINISTRATIVE RECORD INDEX (Revised November 21, 2014) I. General Documents Administrative Record Index Interagency Agreement for Repositories A. Quarterly Reports Volume 1 – 4 th Quarter FY90 through 1 st Quarter FY97 1. September 11, 1990 – Quarterly Report #1 2. December 11, 1990 – Quarterly Report #2 3. March 13, 1991 – Quarterly Report #3 4. June 5, 1991 – Quarterly Report #4 5. September 13, 1991 – Quarterly Report #5 6. December 11, 1991 – Quarterly Report #6 7. Quarterly Report 2 nd Quarter FY92 8. Quarterly Report 3 rd Quarter FY92 9. Quarterly Report 4 th Quarter FY92 10. Quarterly Report 1 st Quarter FY93 11. Quarterly Report 2 nd Quarter FY93 12. Quarterly Report 3 rd Quarter FY93 13. Quarterly Report 4 th Quarter FY93 14. Letter from ANAD to ADEM*/EPA dated December 8, 1993 Subject: Quarterly Report Extension Request 15. Letter from ADEM to ANAD dated December 7, 1993 Subject: Quarterly Report Extension Approval 16. Letter from EPA to ANAD dated December 14, 1993 Subject: Quarterly Report Extension Approval 17. Quarterly Report 1 st Quarter FY94 18. Quarterly Report 2 nd Quarter FY94 19. Quarterly Report 3 rd Quarter FY94 20. Quarterly Report 4 th Quarter FY94 21. Quarterly Report 1 st Quarter FY95 22. Quarterly Report 2 nd Quarter FY95 23. Quarterly Report 3 rd Quarter FY95 24. Quarterly Report 4 th Quarter FY95 25. Quarterly Report 1 st Quarter FY96 26. Quarterly Report 2 nd Quarter FY96 27. Quarterly Report 3 rd Quarter FY96 28. Quarterly Report 4 th Quarter FY96 29. Quarterly Report 1 st Quarter FY97 Volume 2 – 2 nd Quarter FY97 through 1 st Quarter FY02 30. Quarterly Report 2 nd Quarter FY97 31. Quarterly Report 3 rd Quarter FY97 32. Quarterly Report 4 th Quarter FY97 33. Quarterly Report 1 st Quarter FY98 34. * Quarterly Report 2 nd Quarter FY98 35. Quarterly Report 3 rd Quarter FY98 36. Quarterly Report 4 th Quarter FY98 37. Quarterly Report 1 st Quarter FY99 38. Quarterly Report 2 nd Quarter FY99 * Indicates misplaced document Page 1
Transcript
Page 1: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

ADMINISTRATIVE RECORD INDEX (Revised November 21, 2014)

I. General Documents • Administrative Record Index • Interagency Agreement for Repositories

A. Quarterly Reports Volume 1 – 4th Quarter FY90 through 1st Quarter FY97 1. September 11, 1990 – Quarterly Report #1 2. December 11, 1990 – Quarterly Report #2 3. March 13, 1991 – Quarterly Report #3 4. June 5, 1991 – Quarterly Report #4 5. September 13, 1991 – Quarterly Report #5 6. December 11, 1991 – Quarterly Report #6 7. Quarterly Report 2nd Quarter FY92 8. Quarterly Report 3rd Quarter FY92 9. Quarterly Report 4th Quarter FY92 10. Quarterly Report 1st Quarter FY93 11. Quarterly Report 2nd Quarter FY93 12. Quarterly Report 3rd Quarter FY93 13. Quarterly Report 4th Quarter FY93 14. Letter from ANAD to ADEM*/EPA dated December 8, 1993

Subject: Quarterly Report Extension Request 15. Letter from ADEM to ANAD dated December 7, 1993

Subject: Quarterly Report Extension Approval 16. Letter from EPA to ANAD dated December 14, 1993

Subject: Quarterly Report Extension Approval 17. Quarterly Report 1st Quarter FY94 18. Quarterly Report 2nd Quarter FY94 19. Quarterly Report 3rd Quarter FY94 20. Quarterly Report 4th Quarter FY94 21. Quarterly Report 1st Quarter FY95 22. Quarterly Report 2nd Quarter FY95 23. Quarterly Report 3rd Quarter FY95 24. Quarterly Report 4th Quarter FY95 25. Quarterly Report 1st Quarter FY96 26. Quarterly Report 2nd Quarter FY96 27. Quarterly Report 3rd Quarter FY96 28. Quarterly Report 4th Quarter FY96 29. Quarterly Report 1st Quarter FY97 Volume 2 – 2nd Quarter FY97 through 1st Quarter FY02 30. Quarterly Report 2nd Quarter FY97 31. Quarterly Report 3rd Quarter FY97 32. Quarterly Report 4th Quarter FY97 33. Quarterly Report 1st Quarter FY98 34. * Quarterly Report 2nd Quarter FY98 35. Quarterly Report 3rd Quarter FY98 36. Quarterly Report 4th Quarter FY98 37. Quarterly Report 1st Quarter FY99 38. Quarterly Report 2nd Quarter FY99

* Indicates misplaced document Page 1

Page 2: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

39. Quarterly Report 3rd Quarter FY99 40. Quarterly Report 4th Quarter FY99 41. Quarterly Report 1st Quarter FY00 42. Quarterly Report 2nd Quarter FY00 43. Quarterly Report 3rd Quarter FY00 44. Quarterly Report 4th Quarter FY00 45. Quarterly Report 1st Quarter FY01 46. Quarterly Report 2nd Quarter FY01 47. Quarterly Report 3rd Quarter FY01 48. Quarterly Report 4th Quarter FY01 49. Quarterly Report 1st Quarter FY02 Volume 3 – 2nd Quarter FY02 through 4th Quarter FY10 50. Quarterly Report 2nd Quarter FY02 51. Quarterly Report 3rd Quarter FY02 52. Quarterly Report 4th Quarter FY02 53. * Quarterly Report 1st Quarter FY03 54. Quarterly Report 2nd Quarter FY03 55. * Quarterly Report 3rd Quarter FY03 56. * Quarterly Report 4th Quarter FY03 57. * Quarterly Report 1st Quarter FY04 58. * Quarterly Report 2nd Quarter FY04 59. * Quarterly Report 3rd Quarter FY04 60. * Quarterly Report 4th Quarter FY04 61. * Quarterly Report 1st Quarter FY05 62. * Quarterly Report 2nd Quarter FY05 63. * Quarterly Report 3rd Quarter FY05 64. * Quarterly Report 4th Quarter FY05 65. Quarterly Report 1st Quarter FY06 66. Quarterly Report 2nd Quarter FY06 67. Quarterly Report 3rd Quarter FY06 68. Quarterly Report 4th Quarter FY06 69. Quarterly Report 1st Quarter FY07 70. Quarterly Report 2nd Quarter FY07 71. Quarterly Report 3rd Quarter FY07 72. Quarterly Report 4th Quarter FY07 73. Quarterly Report 1st Quarter FY08 74. Quarterly Report 2nd Quarter FY08 75. Quarterly Report 3rd Quarter FY08 76. * Quarterly Report 4th Quarter FY08 77. Quarterly Report 1st Quarter FY09 78. Quarterly Report 2nd Quarter FY09 79. Quarterly Report 3rd Quarter FY09 80. Quarterly Report 4th Quarter FY09 81. Quarterly Report 1st Quarter FY10 82. Quarterly Report 2nd Quarter FY10 83. Quarterly Report 3rd Quarter FY10 84. Quarterly Report 4th Quarter FY10 85. Quarterly Report 1st Quarter FY11 86. Quarterly Report 2nd Quarter FY11 87. Quarterly Report 3rd Quarter FY11 88. Quarterly Report 4th Quarter FY11 89. Quarterly Report 1st Quarter FY 12

* Indicates misplaced document Page 2

Page 3: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

90. Quarterly Report 2nd Quarter FY 12 91. Quarterly Report 3rd Quarter FY 12 92. Quarterly Report 4th Quarter FY 12 93. Quarterly Report 1st Quarter FY 13 94. Quarterly Report 2nd Quarter FY 13 95. Quarterly Report 3rd Quarter FY 13 96. Quarterly Report 4th Quarter FY 13 97. Quarterly Report 1st Quarter FY 14 98. Quarterly Report 2nd Quarter FY 14 99. Quarterly Report 3rd Quarter FY 14 100. Quarterly Report 4th Quarter FY 14

B. Federal Facilities Agreement (FFA) 1. FFA between EPA (Region 4), ADEM, and DA for ANAD

Subject: FFA 2. Letter from EPA (Region 4) to ANAD dated May 29, 1990

Subject: Finalization of FFA 3. Letters from ANAD to ADEM/EPA dated June 5, 1990

Subject: Designation of Project Manager 4. Letter from ADEM to ANAD dated June 18, 1990

Subject: Designation of Project Manager 5. Letter from ADEM to ANAD dated July 28, 1993

Subject: Designation of Project Manager for ANAD NPL Site 6. Letter from EPA (Region 4) to ANAD dated January 21, 1994

Subject: Change in Designated Project Manager 7. Letter from EPA (Region 4) to ANAD dated March 01, 1994

Subject: Change in Designated Project Manager 8. Letter from ADEM to ANAD dated September 23, 1994

Subject: Expanded Site Inspection, Ammunition Storage Area Draft Final Report 9. Letters from ANAD to EPA (Region 4)/ADEM dated March 11, 1996

Subject: ANAD FFA Project Manager 10. Letter from EPA (Region 4) to ANAD dated August 20, 1996

Subject: EPA’s move to new address 11. Letter from ANAD to ADEM dated March 3, 1997

Subject: Installation Action Plan for ANAD 12. Letter from ADEM to ANAD dated February 11, 1998

Subject: Designation of Project Manager 13. Letter from EPA (Region 4) to ANAD/ADEM dated June 10, 1994

Subject: Change in EPA Project Manager for ANAD 14. Email from EPA (Region 4) to ANAD dated January 8, 2008

Subject: Change in EPA RPM for ANAD 15. Email from ANAD to EPA (Region 4) dated May 5, 2011

Subject: [Change in] ANAD RPM Designation 16. Email from ANAD to ADEM dated May 5, 2011

Subject: [Change in] ANAD RPM Designation

C. Site Management Plan (SMP) 1. Letter from ANAD to ADEM/EPA (Region 4) dated June 28, 1990

Subject: Site Management Plan Submittal 2. Letter from EPA (Region 4) to ANAD dated September 28, 1990

Subject: Final Schedule for the Submission of RI/FS Primary Documents pursuant to the ANAD FFA

* Indicates misplaced document Page 3

Page 4: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

3. Letter from ADEM to ANAD dated October 4, 1990 Subject: ANAD – RI/FS Primary Document Schedule

4. Letters from ANAD to ADEM/EPA (Region 4) dated October 16, 1990 Subject: ANAD Site Management Plan

5. Letters from ANAD to EPA (Region 4)/ADEM dated March 6, 1991 Subject: Revised Site Management Plan Schedule

6. Letters from ANAD to EPA (Region 4)/ADEM not dated (estimated May 30, 1991) Subject: Site Management Plan Amendment

7. Letters from ANAD to EPA (Region 4)/ADEM dated July 29, 1991 Subject: Approval of ANAD RI/FS Workplan

8. Letter from EPA (Region 4) to ANAD dated August 21, 1991 Subject: ANAD Letter of July 29, 1991 and Suggested Schedule for GW OU FS, Proposed Plan and ROD

9. Letters from ANAD to ADEM/EPA (Region 4) dated May 27, 1992 Subject: Site Management Plan Amendment

10. Letter from ADEM to ANAD dated July 13, 1992 Subject: Amendment of Site Management Plan

11. Letter from EPA (Region 4) to ANAD dated July 21, 1992 Subject: 1992 SMP Approval for ANAD NPL Site

12. Letter from ANAD to EPA (Region 4) dated July 29, 1992 Subject: 1992 SMP Approval for ANAD NPL Site

13. Letters from ANAD to ADEM/EPA (Region 4) dated January 28, 1993 Subject: Schedule of Submittal of Primary Documents

14. Letters from ANAD to ADEM/EPA (Region 4) dated May 27, 1993 Subject: 1993 Amendment to the SMP

15. Letters from ANAD to ADEM/EPA (Region 4) dated June 2, 1993 Subject: 1993 Amendment to the SMP

16. Letter from EPA (Region 4) to ANAD dated June 14, 1993 Subject: Approval of the 1993 SMP and Schedule for ANAD NPL Site

17. Letters from ANAD to ADEM/EPA (Region 4) dated June 24, 1993 Subject: Revised 1993 Amendment to the SMP

18. Letter from ADEM to ANAD dated July 28, 1993 Subject: RI Activities; June and July ANAD NPL Site Reference No. 0443

19. Letters from ANAD to ADEM/EPA (Region 4) dated January 4, 1994 Subject: Amendment to the SMP – January 1994

20. Letter from EPA (Region 4) to ANAD dated January 14, 1994 Subject: January 4, 1994 Amendment to the SMP Schedule

21. Letter from ADEM to ANAD dated January 14, 1994 Subject: ANAD SMP January 1994 Amendment

22. Letters from ANAD to ADEM/EPA (Region 4) dated May 25, 1994 Subject: 1994 Amendment to the SMP

23. Letter from EPA (Region 4) to ANAD dated June 14, 1994 Subject: 1994 Amendment to the SMP

24. Letter from ADEM to ANAD dated June 22, 1994 Subject: 1994 Amendment to the SMP

25. Letters from ANAD to ADEM/EPA (Region 4) dated June 1, 1995 Subject: 1995 Amendment to the ANAD SMP

26. Letter from ADEM to ANAD dated June 16, 1995 Subject: ANAD SIA NPL Site 1995 SMP Amendment

27. Letters from ANAD to ADEM/EPA (Region 4) dated September 18, 1995 Subject: Amendment to the SMP

* Indicates misplaced document Page 4

Page 5: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

28. Letter from ADEM to ANAD dated September 22, 1995 Subject: ANAD FFA Amendment to the SMP September 18, 1995

29. Letters from ANAD to ADEM/EPA (Region 4) dated July 1, 1996 Subject: July 1996 SMP

30. Letter from ADEM to ANAD dated July 10, 1996 Subject: ANAD SIA NPL Site 1996 SMP Amendment

31. Letters from ANAD to ADEM/EPA (Region 4) dated October 3, 1996 Subject: Amendment to the SMP, October 2, 1996

32. Letter from ADEM to ANAD dated October 10, 1996 Subject: Amendment to the SMP. October 2, 1996

33. Letters from ANAD to ADEM/EPA (Region 4) dated June 2, 1997 Subject: Amendment to the SMP, June 1, 1997

34. Letter from ADEM to ANAD dated July 3, 1997 Subject: June 1, 1997 Amendment to the SMP

35. Letters from ANAD to ADEM/EPA (Region 4) dated July 10, 1997 Subject: Proposed Amendment to the SMP

36. Letter from EPA (Region 4) to ANAD dated July 24, 1997 Subject: Comment on the Draft Sampling and Analysis Plan for the ASA RI/FS Emergency Removal Plan and the SMP for ANAD

37. Letters from ANAD to ADEM/EPA* (Region 4) dated July 28, 1998 Subject: Amendment to the SMP, July 28, 1998

38. ANAD SMP Amendment dated July 7, 1999 39. Letters from ANAD to ADEM/EPA (Region 4) dated October 17, 2000

Subject: ANAD SMP Submittal 40. ANAD SMP Amendment dated April 2003 41. ANAD SMP Amendment dated December 2005 42. Letter from ANAD to EPA (Region 4) dated May 31, 2006

Subject: Amendment to the SMP 43. Letter from ANAD to EPA (Region 4) dated May 14, 2007

Subject: Amendment to the SMP 44. Letter from ANAD to EPA (Region 4) dated May 29, 2008

Subject: Amendment to the SMP 45. Letter from ADEM to Army Environmental Command dated August 6, 2009

Subject: Notification of CERCLA ARARs, Alabama UECA and associated regulations

D. Technical Review Committee (TRC) Meeting Minutes 1. September 10, 1991 2. October 6, 1993 3. January 26, 1994 – Newspaper Article “Legal Notice of Emergency Removal Action” 4. June 23, 1994 5. February 1, 1995 6. November 21, 1995 7. June 26, 1996 8. November 7, 1996 9. May 7, 1997 10. September 18, 1997 11. December 12, 1997 12. May 21, 1998 – Discussed the conversion of the TRC into a Restoration Advisory Board

(RAB). The new RAB was scheduled for June 22, 1998

* Indicates misplaced document Page 5

Page 6: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

E. Federal Facilities Project Manager Meeting Minutes 1. ADEM Memorandum to File dated May 23, 1995 2. Minutes dated September 14, 1995 3. Letters from ANAD to EPA (Region 4)/ADEM dated August 15, 1995

Subject: FFA Project Managers Meeting 4. ADEM Memorandum to File dated September 19, 1995 5. Letters from ANAD to EPA (Region 4)/ADEM dated October 3, 1996

Subject: Minutes of Meeting Held September 17-18, 1996

F. Public Meetings 1. ANAD Memorandum for Record dated February 6, 1995

Subject: Public Availability Meeting, February 1, 1995 2. Newspaper Article dated November 25, 1996

Subject: Depot Hosts Public Availability Open House 3. * Memorandum for Record dated November 25, 1996

Subject: Public Availability Meeting, November 7, 1996 4. Memorandum for Record dated November 25, 1996

Subject: Environmental Justice Workshop on November 14 1996 5. Letter from ANAD to Mr. Lucuis H. Burton dated July 6, 2011

Subject: RAB Member Removal 6. Letter from ANAD to Mr. Keith Campbell dated July 6, 2011

Subject: RAB Member Removal 7. Letter from ANAD to Dr. Jack Boydston dated July 6, 2011

Subject: RAB Member Removal

G. Public Comments 1. Letter from Evelyn Clark dated June 24, 2004

Subject: Response to the June 15th issue in the Anniston Star about Coldwater Springs and Private Wells

2. Comments to ANAD from Donald Tibbetts dated June 26, 2004 Subject: Comments from RAB meeting on June 14, 2004

H. Partnering Team Minutes 1. May 22-23, 2001 2. August 22-23, 2001 3. October 29-31, 2001 4. February 5-6, 2002 5. April 8-9, 2002 6. August 6-7, 2002 7. November 19-20, 2002 8. February 5-6, 2003 9. May 5-8, 2003 10. August 5-6, 2003 11. November 5-6, 2003 12. February 10-11, 2004 13. June 2-3, 2004 14. August 18-20, 2004 15. October 27-28, 2004 16. February 2-3, 2005 17. May 11-12, 2005 18. August 17-18, 2005 19. November 8-9, 2005

* Indicates misplaced document Page 6

Page 7: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

20. August 15-16, 2006 21. March 7-8, 2007 22. August 21-22, 2007 23. December 12-13, 2007 24. April 2-3, 2008 25. August 6-7, 2008 26. February 10-11, 2009 27. May 27-28, 2009 28. June 22-23, 2009 29. July 28-29, 2009 30. November 3-4, 2009 31. January 6-7, 2010 32. March 16-17, 2010 33. April 28-30, 2010 34. June 9-10, 2010 35. July 28-29, 2010 36. September 14-15, 2010 37. November 2-3, 2010 38. January 5-6, 2011 39. February 8-9, 2011 40. April 6-7, 2011 41. May 24-25, 2011 42. December 8-9, 2011 43. February 1-2, 2012 44. March 1-2, 2012 45. June 11-12, 2012 46. September 10-11, 2012 47. October 23, 2012 48. August 13, 2013

I. Restoration Advisory Board (RAB) Meeting Minutes 1. Activities Supporting Attempt to Form a RAB Revision 2 dated July 11, 1997 2. RAB Agenda and Minutes dated June 22, 1998 3. RAB Minutes dated August 24, 1998 4. RAB Agenda and Minutes dated October 5, 1998 5. RAB Agenda and Minutes dated November 23, 1998 6. RAB Minutes dated December 7, 1998 7. RAB Agenda and Minutes dated January 25, 1999 8. RAB Agenda and Minutes dated April 12, 1999 9. RAB Agenda and Minutes dated June 28, 1999 10. RAB Agenda and Minutes dated October 4, 1999 11. RAB Agenda and Minutes dated December 6, 1999 12. RAB Agenda and Minutes dated January 24, 2000 13. RAB Agenda and Minutes dated May 1, 2000 14. RAB Agenda and Minutes dated July 10, 2000 15. RAB Agenda and Minutes dated November 6, 2000 16. RAB Minutes dated February 5, 2001 17. RAB Agenda dated April 9, 2001 18. RAB Minutes dated August 11, 2001 19. RAB Minutes dated December 10, 2001 20. RAB Agenda dated March 11, 2002 21. RAB Minutes dated July 8, 2002

* Indicates misplaced document Page 7

Page 8: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

22. RAB Minutes dated November 4, 2002 23. RAB Minutes dated February 3, 2003 24. RAB Minutes dated June 9, 2003 25. RAB Minutes dated March 8, 2004 26. RAB Minutes dated September 20, 2004 27. RAB Minutes dated December 6, 2004 28. RAB Minutes dated March 7, 2005 29. RAB Minutes dated June 12, 2005 30. RAB Minutes dated September 12, 2005 31. RAB Minutes dated December 5, 2005 32. RAB Minutes dated March 13, 2006 33. RAB Minutes dated September 11, 2006 34. RAB Minutes dated December 11, 2006 35. RAB Minutes dated March 12, 2007 36. *RAB Minutes dated September 10, 2007 37. RAB Minutes dated June 9, 2008 38. RAB Minutes dated March 16, 2009 39. RAB Minutes dated June 22, 2009 40. RAB Minutes dated September 14, 2009 41. RAB Minutes dated December 14, 2009 42. RAB Minutes dated June 14, 2010 43. RAB Minutes dated December 13, 2010 44. RAB Minutes dated June 13, 2011 45. RAB Minutes dated March 12, 2012 46. RAB Minutes dated June 11, 2012 47. RAB Minutes dated October 23, 2012 48. RAB Minutes dated September 9, 2013

J. Restoration Advisory Board (RAB) Court Reporter’s Minutes Volume 1 1. Court Reporter Minutes dated June 28, 1999 2. Court Reporter Minutes dated October 4, 1999 3. Court Reporter Minutes dated December 6, 1999 4. Court Reporter Minutes dated January 24, 2000 5. Court Reporter Minutes dated May 1, 2000 6. Court Reporter Minutes dated July 10, 2000 7. Court Reporter Minutes dated August 1, 2000 8. Court Reporter Minutes dated November 6, 2000 9. Court Reporter Minutes dated February 5, 2001 Volume 2 10. Court Reporter Minutes dated April 9, 2001 11. Court Reporter Minutes dated August 13, 2001 12. Court Reporter Minutes dated December 19, 2001 13. Court Reporter Minutes dated March 11, 2002 14. Court Reporter Minutes dated July 8, 2002 15. Court Reporter Minutes dated November 4, 2002 Volume 3 16. Court Reporter Minutes dated February 3, 2003 17. Court Reporter Minutes dated June 9, 2003 18. Court Reporter Minutes dated December 8, 2003 19. Court Reporter Minutes dated March 8, 2004

* Indicates misplaced document Page 8

Page 9: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

20. Court Reporter Minutes dated June 14, 2004 21. Court Reporter Minutes dated September 20, 2004 Volume 4 22. Court Reporter Minutes dated December 6, 2004 23. Court Reporter Minutes dated March 7, 2005 24. Court Reporter Minutes dated June 13, 2005 25. Court Reporter Minutes dated September 12, 2005 26. Court Reporter Minutes dated December 5, 2005 27. Court Reporter Minutes dated March 13, 2006 28. Court Reporter Minutes dated September 11, 2006 29. Court Reporter Minutes dated December 11, 2006 Volume 5 30. Court Reporter Minutes dated March 12, 2007 31. Court Reporter Minutes dated September 10, 2007 32. Court Reporter Minutes dated June 9, 2008 33. Court Reporter Minutes dated March 16, 2009 34. Court Reporter Minutes dated June 22, 2009 35. Court Reporter Minutes dated September 14, 2009 36. Court Reporter Minutes dated December 14, 2009 37. Court Reporter Minutes dated June 14, 2010 38. Court Reporter Minutes dated December 13, 2010 Volume 6 39. Court Reporter Minutes dated June 13, 2011 40. Court Reporter Minutes dated March 12, 2012 41. Court Reporter Minutes dated June 11, 2012 42. Court Reporter Minutes dated October 23, 2012 43. Court Reporter Minutes dated September 9, 2013 44. Court Reporter Minutes dated September 8, 2014

K. Installation Action Plan (IAP) Volume 1 1. Letter from ANAD to ADEM dated March 3, 1997

Subject: IAP for ANAD 2. IAP for ANAD dated February 1998 3. IAP for ANAD dated February 1999 Volume 2 4. IAP for ANAD dated March 2000 Volume 3 5. IAP for ANAD dated March 2001 Volume 4 6. IAP for ANAD dated January 2002 Volume 5 7. IAP for ANAD dated January 2003 Volume 6 8. IAP for ANAD FY05 as of January 2004 Volume 7 9. IAP for ANAD FY05 as of August 2004

* Indicates misplaced document Page 9

Page 10: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 8 10. IAP for ANAD FY06 as of December 21, 2005 Volume 9 11. IAP for ANAD FY06 as of July 31, 2006 Volume 10 12. IAP for ANAD FY07 as of November 19, 2007 Volume 11 13. IAP for ANAD FY08 as of October 20, 2008 Volume 12 14. IAP for ANAD FY09 as of August 26, 2009 Volume 13 15. IAP for ANAD FY10 as of September 17, 2010 Volume 14 16. IAP for ANAD FY11 as of May 31, 2011 Volume 15 17. IAP for ANAD FY12 as of October 9, 2012

L. Environmental Indicators 1. Letter from ADEM to ANAD dated March 8, 2005

Subject: Environmental Indicator Evaluations EPA ID No. AL3210020027 2. Letter from C. H. Cox, ADEM to Stephen A. Cobb, ADEM dated March 8, 2005

Subject: Evaluation of status under the RCRA Info Corrective Action Environmental Indicator Event Codes (CA 725 and CA 750) for ANAD EPA ID No. AL3210020027

3. Letter from ADEM to ANAD dated June 15, 2005 Subject: Environmental Indicator Evaluations EPA ID No. AL3210020027

M. Community Relations 1. Letter from ADEM to ANAD dated April 21, 1998

Subject: Draft Final Community Relations Plan Update ANAD 2. Final Community Relations Plan Update dated May 1998 3. EPA Community Involvement Plan Guidance dated September 2002 4. Community Involvement Plan Addendum dated August 2004 5. Emergency Response Plan for Private Wells dated August 2004 6. Emergency Response Plan for Coldwater Spring Public Water Supply dated August 2004 7. Letter from EPA to ANAD dated October 21, 2011

Subject: EPA Comment Draft Community Involvement Plan 8. Letter from EPA to ANAD dated October 21, 2011

Subject: EPA Comment Draft Emergency Response Plan for Private Wells 9. Community Involvement Plan for ANAD dated April 2012

II. Remedial Investigation (RI) under the FFA A. Groundwater (GW) Operable Unit 1 (OU-1)

1. Dye Trace Study a. News Articles Concerning Dye Trace Study

1. News Release from ANAD date April 13, 1992 Subject: Dye Trace Study

2. Newspaper Article from the “Daily Home” dated April 21, 1992 Title: Depot to test for flow of groundwater

* Indicates misplaced document Page 10

Page 11: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

3. Newspaper Article from the “Anniston Star” dated April 22, 1992 Title: AAD uses dye to track path of groundwater

b. Correspondence Concerning Dye Trace Study 1. Letter to ANAD from EWC dated March 10, 1992

Subject: MSDS and Total Organic Halogens Package for Possible Dyes 2. Letter from ANAD to US Fish and Wildlife Service dated March 17, 1992

Subject: Dye Trace Study at ANAD 3. Letter from ANAD to ADEM/EPA Region 4 dated March 18, 1992

Subject: ANAD’s Forthcoming Dye Trace Study 4. Letter from US Fish and Wildlife Service to ANAD dated March 24, 1992

Subject: ANAD’s March 17, 1992 Letter concerning Dye Trace Study 5. Memo from Fort McClellan to ANAD dated March 25, 1992

Subject: Groundwater Investigation 6. Memo from ANAD to Fort McClellan dated March 30, 1992

Subject: Dye Trace Study 7. Letter from ANAD to ADEM/EPA Region 4 dated March 31, 1992

Subject: Dye Trace Study 8. Memo from ADEM to ANAD dated April 2, 1992

Subject: Dye Trace Study Interruption of Pump and Treatment Operation 9. Letter from ANAD to ADEM/EPA Region 4 dated April 9, 1992

Subject: Dye Trace Study Information Showing Detector Locations 10. Letter from ANAD to US Fish and Wildlife Service dated April 9, 1992

Subject: Dye Trace Study at ANAD 11. Letter from ADEM to ANAD dated April 10, 1992

Subject: Dye Trace Study 12. Letter from ADEM to ANAD dated April 13, 1992

Subject: Dye Trace Study 13. Letter from ANAD to the Calhoun County Health Dept. dated May 4, 1992

Subject: Dye Trace Study at ANAD 14. Letter from ANAD to US Fish and Wildlife Service dated June 19, 1992

Subject: Dye Trace Study at ANAD 15. Faxed Memo from Ewers dated June 23, 1992

Subject: Eosin Toxicity Data, ANAD Dye Trace Study 16. Letter from EPA Region 4 to ANAD dated June 26, 1992

Dye Trace Study for ANAD NPL Site 17. Letter from ANAD to ADEM/EPA* Region 4 dated July 17, 1992

Subject: Request to use Optical Brightener and Eosin 18. Letter from US Fish and Wildlife Service to ANAD dated July 20, 1992

Subject: Permission to use Eosin and Optical Brightener 19. Letter from ADEM to ANAD dated July 23, 1992

Subject: Dye Trace Study 20. Letter from ANAD to ADEM/EPA Region 4 dated January 23, 1993

Subject: Dye Trace Study 21. Letter from ANAD to ADEM/EPA Region 4 dated July 12, 1993

Subject: Groundwater Tracing Studies, ANAD – Report on Investigations Conducted March 1992 through January 1993

22. Letter from ANAD to ADEM/EPA Region 4 dated February 14, 1994 Subject: Draft Final Groundwater Tracing Studies, February 7, 1994

23. Letter from ANAD to ADEM/EPA Region 4 dated February 28, 1994 Subject: Proposed Scopes of Work for Test Pumping and Extraction Design for Well 81B18 and Remediation of Existing GW Extraction System and the Draft Final GW Tracing Studies

* Indicates misplaced document Page 11

Page 12: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

24. Letter from EPA Region 4 to ANAD dated April 20, 1994 Subject: Review Comments on the Dye Trace Study and Proposed Scopes of Work for Test Pumping and Extraction Design, and Remediation of Existing Extraction Systems

25. Letter from the HHS to ANAD dated April 26, 1994 Subject: Comments on the Draft Final Groundwater Tracing Studies for ANAD

26. Letter from ADEM to ANAD dated June 22, 1994 Subject: Draft Final Groundwater Tracing Studies Comments

27. Letter from ANAD to ADEM/ATSDR/EPA dated July 25, 1994 Subject: Final Report, Groundwater Tracing Studies, ANAD dated June 30, 1994 (missing 2nd page to EPA letter)

28. Letter from ANAD to ADEM/EPA Region 4 dated December 12, 1996 Subject: Field Sampling Plan for Groundwater Tracer at ANAD SIA

29. Letter to USACE dated January 30, 1997 Subject: Response to Comments and Transmittal of Report of Findings for the Groundwater Tracer Test at ANAD SIA

30. Letter from ANAD to ADEM/EPA Region 4 dated April 24, 1997 Subject: Extension of the Post Injection Sampling of the Dye Tracer Study

c. Documents Concerning Dye Trace Study 1. Document from Ewers Water Consultants dated February 24, 1992

Subject: Preliminary Work Plan, Dye Tracing Study, ANAD 2. Document from Ewers Water Consultants dated April 1992

Subject: Work Plan #2, Dye Tracing Study, ANAD 3. Document from Ewers Water Consultants dated June 30, 1994

Subject: Final Report, Groundwater Tracing Studies, ANAD 4. Document from SAIC for USACE dated November 1996

Subject: Field Sampling Plan for the Groundwater Tracer Test at ANAD SIA 5. Document from SAIC for USACE dated May 1998

Subject: Final Report of Findings for the Groundwater Tracer Test at ANAD SIA 6. Document from SAIC to USACE dated January12, 2000

Subject: Draft Report Results of Extended Monitoring Period Groundwater Tracer Test at ANAD

2. Remedial Investigations (RI) a. Phase I Volume 1

1. Letter from ANAD to ADEM/EPA Region 4 dated December 6, 1990 Subject: Submission of Draft Plans related to the RI at ANAD

2. Letter from ADEM to ANAD dated February 11, 1991 Subject: Draft RI Documents

3. Letter from EPA Region 4 to ANAD dated February 13, 1991 Subject: Review Comments on Draft RI Documents Submitted

4. Letter from ANAD to EPA Region 4 dated February 26, 1991 Subject: Comments on Draft Documents Submitted for RI

5. Document, Draft Final Quality Control Plan, dated April 1991 6. Letter from ANAD to ADEM/EPA Region 4, dated April 11, 1991

Subject: Submission of Draft Final Documents 7. Letter from ANAD to ADEM/EPA Region 4 dated April 12, 1991

Subject: Submission of RI/FS Work Plan and Community Relations Plan Final Draft Documents

8. Letter from ANAD to ADEM/EPA Region 4 dated May 1, 1991 Subject: Submission of Draft Final Documents for RI

* Indicates misplaced document Page 12

Page 13: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

9. Letter from EPA Region 4 to ANAD dated May 21, 1991 Subject: Primary Documents for the RI/FS at ANAD

10. Letter from EPA Region 4 to ANAD dated May 30, 1991 Subject: Extension for Concurrence Draft Final RI/FS Work Plan

11. Letter from ADEM to ANAD dated June 14, 1991 Subject: Draft Final Documents for the RI/FS at ANAD, the Site Investigation for the Ammunition Storage Area (ASA)

12. Letter from EPA Region 4 to ANAD dated June 14, 1991 Subject: Approval of ANAD RI/FS Work Plan

13. Memorandum from EPA Region 4 to ANAD dated June 14, 1991 Subject: Document Review RI/FS Work Plan and Request for Waiver in the use of Stainless Steel Well Casing and Screen

14. Letter from ANAD to EPA Region 4 dated June 18, 1991 Subject: Approval of RI/FS Work Plan

15. Letter from ANAD to EPA Region 4 not dated estimated July 1, 1991 Subject: Extension for Concurrence Draft Final RI/FS Work Plan

16. Letter from ANAD to ADEM/EPA Region 4 dated July 29, 1991 Subject: Approval of ANAD RI/FS Work Plan

17. Letter from EPA Region 4 to ANAD dated August 12, 1991 Subject: ANAD Letter of July 19, 1991 and Suggested Schedule for GW OU FS – Proposed Plan and ROD

18. Letter from ADEM to ANAD dated August 28, 1991 Subject: ANAD Letter of July 19, 1991 – Public Notice for GW OU Proposed Plan, GW OU FS SIA RI/FS Work Plan

19. Document, Work Plan – RI/FS for ANAD SIA, dated September 1991 Volume 2

20. Document, Health and Safety Plan, dated September 1991 21. Document, Health and Safety Plan Appendices, dated September 1991 22. Document, Final Report – Public Involvement and Response Plan, dated October

1991 23. Memorandum from EPA Region 4 to ANAD dated June 22, 1992

Subject: Interim Bulletin “Calculating the Concentration Term” 24. Document, Estimate of Dilution Factor for ANAD SIA, dated June 1993 25. Document, Final RI/FS Work Plan Addendum, dated October 1994 26. Letter from ANAD to ADEM/EPA Region 4 dated November 8, 1994

Subject: RI Phase I, SIA, Draft Final Report 27. Letter from ADEM to ANAD dated December 16, 1994

Subject: RI Phase I, SIA, Draft Final Report Volume 3

28. Document, Final Phase I RI Report, Volume I, Report & Appendices A-D, dated January 1995

Volume 4 29. Document, Final Phase I RI Report, Volume II, Appendix E, dated January 1995

Volume 5 30. Document, Final Phase I RI Report, Volume III, Appendices F-J, dated January 1995

Volume 6 31. Letter from EPA Region 4 to ANAD dated January 11, 1995

Subject: Draft Final Phase I, RI for the SIA 32. Letter from ANAD to ADEM/EPA Region 4 dated February 27, 1995

Subject: Transmittal of Covers and Spines for the Final Phase I RI Report

* Indicates misplaced document Page 13

Page 14: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

33. Document, Final Site Safety and Health Plan for Phase I of the Offpost RI for Hydrogeologic Characterization of the Jacksonville Thrust Fault at ANAD, dated August 1999

34. Document, Final Work Plan for Phase I of the Offpost RI for Hydrogeologic Characterization of the Jacksonville Thrust Fault at ANAD, dated August 1999

35. Letter from ADEM to ANAD dated April 27, 2001 Subject: Emergency Removal for SWMU-12 Soils, Emergency GW Treatment Addendum for SWMU-12, Phase I Off-Post RI

36. Letter from EPA Region 4 to ANAD dated May 10, 2001 Subject: Draft Phase I Off-Post RI, Hydrogeologic Characterization of the Jacksonville Thrust Fault at ANAD Volumes I and II dated January 2001

37. Document, Final Phase I of the Offpost RI for Hydrogeologic Characterization of the Jacksonville Thrust Fault, Volume I – Main Text, dated December 2001

38. Document, Final Phase I of the Offpost RI for Hydrogeologic Characterization of the Jacksonville Thrust Fault, Volume II – Appendices and Data CD, dated December 2001

b. Phase II Volume 1

1. Letter from ANAD to ADEM/EPA Region 4 dated March 26, 1997 Subject: Preliminary Draft Report for the SIA Phase 2 Remedial Investigation

2. Letter from ADEM to ANAD dated May 27, 1997 Subject: Phase 2 Remedial Investigation

3. Letter from EPA Region 4 to ANAD dated May 27, 1997 Subject: SIA Phase 2 Remedial Investigation Comments

4. Letter from ADEM to ANAD dated June 30, 1997 Subject: SIA Draft Phase 2 Remedial Investigation Comments

5. Letter from ANAD to ADEM/EPA* Region 4 dated July 25, 1997 Subject: Response to Comments on Draft Phase 2 Remedial Investigation

6. Letter from ANAD to ADEM/EPA* Region 4 dated October 31, 1997 Subject: Extension Request for Draft Final Phase 2 Remedial Investigation Report

7. Letter from ADEM to ANAD dated November 6, 1997 Subject: SIA RI/FS Report Request for Extension

8. Letter from EPA Region 4 to ANAD dated April 7, 1998 Subject: SIA Phase II RI Report Approval

9. Letter from ADEM to ANAD dated August 3, 1998 Subject: SIA Final Phase II RI Document Acceptance

10. Letter from ADEM to ANAD dated August 3, 1998 Subject: SIA NPL Site Assessment of ARARs for GW OU

11. Letter from EPA Region 4 to ANAD dated August 18, 1998 Subject: SIA Final Phase 2 RI Report Approval

12. Document, Final ANAD Industrial Sewer Line System Upgrade Plan Volume I: Technical Report

Volume 2 13. Document, Final ANAD Industrial Sewer Line System Upgrade Plan

Volume II: Sewer Line Project Maps Volume 3

14. Document, Final Report SIA Phase II RI dated May 1998 Volume I of III: Report

* Indicates misplaced document Page 14

Page 15: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 4 15. Document, Final Report SIA Phase II RI dated May 1998

Volume II of III: Baseline Risk Assessment Volume 5

16. Document, Final Report SIA Phase II RI dated May 1998 Volume III of III: Appendices

c. Combined Groundwater Remedial Investigation Volume 1

1. Letter from ADEM to ANAD dated September 17, 2001 Subject: Work Plan for Combined GW RI

2. Document dated 24 September, 2001 Subject: Final SSHP for the Combined GW RI ANAD

3. Document dated September 2001 Subject: Final Work Plan for Combined GW RI at ANAD

4. Document dated February 21, 2002 Subject: Draft Final Private Well Sampling Results for August 2001 Sampling Event - Combined GW RI ANAD

5. Letter from EPA to ANAD dated September 9, 2004 Subject: Final Combined GW RI SIA ANAD

6. Document dated October 2004 Subject: Final Extended Data Summary Addendum to the Work Plan for the Combined GW RI at ANAD

Volume 2 7. Document: Final Combined Groundwater Remedial Investigation dated June 2004

(Comments) d. Phase III/Comprehensive Groundwater (CGW) Remedial Investigation (RI) Volume 1

1. Letter from ADEM to ANAD dated September 22, 2003 Subject: ADEM Review Comments, Draft Report-CGW RI SIA ANAD dated April 2003

2. Letter from ADEM to ANAD dated February 13, 2004 Subject: ADEM Review Comments, Draft Work Plan Addendum for CGW RI ANAD dated September 2003

3. Letter from EPA to ANAD dated March 8, 2004 Subject: Draft CGW RI Extended Data Summary Report for 2004 SIA

4. Letter from EPA to ANAD dated November 4, 2004 Subject: Draft Work Plan Addendum CGW RI, Phase III SIA GW OU, August 17, 2004

5. Letter from EPA to ANAD dated January 6, 2005 Subject: CGW RI Extended Data Summary Report for 2003 SIA ANAD

6. Letter from EPA to ANAD dated May 25, 2005 Subject: SIA CGW Draft Feasibility Study OU1, February 2006

7. Letter from EPA to ANAD dated July 21, 2005 Subject: Draft CGW RI, Phase III SIA, ANAD, April 2005

8. Letter from ADEM to ANAD dated August 15, 2005 Subject: ADEM Review Comments, SIA CGW RI, Phase III, ANAD, dated April 2005

9. Letter from ADEM to ANAD dated November 7, 2005 Subject: ADEM Review Comments of Army’s Responses, SIA CGW RI, Phase III, ANAD, dated April 2005

* Indicates misplaced document Page 15

Page 16: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

10. Letter from ANAD to ADEM/EPA dated March 2, 2006 Subject: Submittal of Draft SIA CGW FS Report (OU-1)

11. Letter from ADEM to ANAD dated March 23, 2006 Subject: ADEM Review of Draft SIA CGW FS Report (OU-1) dated February 2006

12. Letter from ADEM to ANAD dated July 21, 2006 Subject: ADEM Review Comments, Draft SIA CGW RI, Phase III, ANAD, dated April 2005

13. Letter from ADEM to ANAD dated August 11, 2006 Subject: ADEM Review Comments, Draft SIA CGW FS for OU1 ANAD dated February 2006

14. Document dated April 2004 Subject: Final Work Plan Addendum for the CGW RI at ANAD

15. Document dated July 2004 Subject: Final Letter Work Plan Addendum for Soil Gas Sampling, CGW RI Phase III at ANAD

16. Document dated January 2005 Subject: Draft CGW FS Work Plan SIA ANAD

17. Document dated January 2005 Subject: Final CGW RI Extended Data Summary Report for 2003, SIA at ANAD

Volume 2 18. Document dated February 2005

Subject: Draft CGW RI Extended Data Summary Report for 2004, SIA at ANAD 19. Document dated March 2005

Subject: Final Work Plan Addendum for the CGW RI, Phase III at ANAD 20. Document dated November 2006

Subject: Final Work Plan Addendum for OU-1 GW Sampling at ANAD 21. Letter from ADEM to ANAD dated July 13, 2007

Subject: ADEM Review Comments, Draft SIA CGW FS 22. Letter from ADEM to ANAD dated August 20, 2007

Subject: ADEM Review Comments, Draft Final SIA CGW RI Phase III 23. Letter from EPA to ANAD dated August 20, 2007

Subject: SIA CGW RI/FS 24. Letter from ADEM to ANAD dated September 28, 2007

Subject: ADEM Review Comments, Draft Final SIA CGW RI Phase III 25. Letter from EPA to ANAD not dated

Subject: SIA CGW RI/FS Volume 3

26. Document dated January 2008 Subject: Final ANAD SIA CGW RI, Phase III at ANAD

Volume 4 27. Letter from ADEM to ANAD dated December 11, 2009

Subject: ADEM Comment: Work Plan Addendum for SIA GW Sampling 28. Letter from ADEM to ANAD dated December 15, 2009

Subject: ADEM Comment: Appendix “A” Scope of Work, OU-1 Monitoring

* Indicates misplaced document Page 16

Page 17: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

e. Correspondence Concerning Remedial Investigation 1. Letter from ANAD to EPA dated April 27, 1992

Subject: Possibility of Extension for Submittal of the Risk Assessment Section of the RI 2. Letter from ANAD to ADEM dated May 18, 1992

Subject: Possibility of Extension for Submittal of the Risk Assessment Section of the RI 3. Letter from ANAD to ADEM/EPA dated June 11, 1992

Subject: Official Submittal of the RI 4. Letter from EPA to ANAD dated July 7, 1992

Subject: Extension of the SIA Draft RI Report Review Period 5. Letter from EPA to ANAD dated September 3, 1992

Subject: Draft SIA RI Report for ANAD NPL Site, AL 6. Letter from ADEM to ANAD dated September 10, 1992

Subject: Draft RI 7. Letter from ANAD to ADEM/EPA dated October 28, 1992

Subject: Request for Extension for Submission of the Draft Final RI for ANAD 8. Letter from EPA to ANAD dated November 3, 1992

Subject: Request for Extension for Submission of the Draft Final RI Report for ANAD, NPL Site, Anniston, AL

9. Letter from ANAD to ADEM/EPA dated November 30, 1992 Subject: Extended Schedule for RI

10. Letter from EPA to ANAD dated December 8, 1992 Subject: Request for Extension for Submission of the Draft Final RI Report and Extended Schedule-Anniston Army Depot, NPL Site, Anniston, AL

11. Letter from ADEM to ANAD dated December 16, 1992 Subject: ANAD letter of November 30, 1992

12. Letter from ANAD to EPA dated December 16, 1992 Subject: EPA Comments on the Draft RI

13. Letter from ANAD to EPA dated December 21, 1992 Subject: Request for Extension for Submission of the Draft Final RI Report and Extended Schedule ANAD, NPL Site, Anniston, AL

14. Letter from EPA to ANAD dated December 23, 1992 Subject: Explanations to the December 16, 1992 letter from ANAD, NPL Site Anniston, AL

15. Letter from ANAD to EPA dated January 26, 1993 Subject: EPA Comments on the Draft RI

16. Letter from EPA to ANAD dated February 8, 1993 Subject: Letter dated January 26, 1993, Concerning the Draft RI Report Comments for the ANAD Site

17. Letter to EPA from ANAD dated March 29, 1993 Subject: February 24, 1993 Meeting with EPA/ADEM to Discuss Comments on RI/FS

18. Letter to ANAD from EPA dated April 21, 1993 Subject: Letter dated March 29, 1993 Concerning February 24, 1993 Meeting with EPA/ADEM to Discuss Comments on the RI/FS at ANAD NPL Site

19. Letter to ANAD from EPA dated June 9, 1993 Subject: Issues in EPA’s letter of April 21, 1993

* Indicates misplaced document Page 17

Page 18: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

20. Letter from ANAD to ADEM*/EPA dated July 15, 1993 Subject: Army Comments to Dilution Factor Estimates

21. Letter to ADEM/ATSDR/EPA dated March 28, 1994 Subject: Draft RI/FS Work Plan Addendum, SIA Supplemental Investigation

22. Letter to ANAD from ADEM dated May 31, 1994 Subject: Draft RI/FS Work Plan Addendum March 1994 SIA Supplemental Investigation and Comments

23. Letter to ANAD from EPA dated June 2, 1994 Subject: Draft RI/FS Work Plan Addendum, March 1994, SIA Supplemental Investigation

24. Letter from ANAD to ADEM/EPA dated August 1, 1994 Subject: Draft Final RI/FS Work Plan Addendum SIA Supplemental Investigation, ANAD

25. Letter to ANAD from EPA dated September 28, 1994 Subject: Approval and Comments for the Draft Final Work Plan Addendum for the SIA

26. Letter to ANAD from ADEM dated September 30, 1994 Subject: Draft Final RI/FS Work Plan Addendum - August 1994 SIA Supplemental Investigation

27. Letter from ANAD to EPA dated November 16, 1994 Subject: RI/FS Work Plan Addendum for the SIA Supplemental Investigation, Final Report

28. Letter from ANAD to ADEM dated November 16, 1994 Subject: RI/FS Work Plan Addendum for the SIA Supplemental Investigation, Final Report

29. Letter from ANAD to ADEM/EPA dated March 7, 1995 Subject: Changes to the Final RI/FS Work Plan Addendum SIA Supplemental Investigation October 1994

30. Fax dated March 7, 1995 Subject: ANAD SIA Phase II RI/FS Work Plan Addendum - Revision 1

31. *Letter from ADEM to ANAD dated March 20, 1995 Subject: Changes to the final RI/FS Work Plan Addendum, letter dated March 7, 1995

32. Letter from ANAD to ADEM/EPA dated March 6, 1997 Subject: Request for Second Extension to RI/FS Submittal

33. Letter from ADEM to ANAD dated March 7, 1997 Subject: Soils and GW OUs - RI Document

34. Letter from ANAD to ADEM (library)/EPA dated July 25, 1997 Subject: Ecological Risk Assessment for SIA RI

35. Letter from ANAD to ADEM/EPA* dated September 5, 1997 Subject: Request for Extension on Submittal of RI Draft Final Report

36. Letter from ADEM to ANAD dated September 15, 1997 Subject: SIA RI/FS Report - Request for Extension (Approval)

3. Feasibility Study a. Correspondence Concerning Feasibility Study

1. Letter from ANAD to EPA dated March 29, 1993 Subject: February 24, 1993 Meeting with EPA/ADEM to Discuss Comments on RI/FS

* Indicates misplaced document Page 18

Page 19: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

2. Letter from EPA to ANAD dated April 21, 1993 Subject: Letter dated March 29, 1993 concerning February 24, 1993 Meeting with ADEM/EPA to Discuss Comments on the RI/FS at ANAD NPL Site

3. Letter from EPA to ANAD dated June 9, 1993 Subject: Issues in EPA’s letter of April 21, 1993

4. Letter from ANAD to ADEM/ATSDR/EPA dated March 28, 1994 Subject: Draft RI/FS Work Plan Addendum, SIA Supplemental Investigation

5. Letter from ADEM to ANAD dated May 31, 1994 Subject: Draft RI/FS Work Plan Addendum March 1994 SIA Supplemental Investigation

6. Letter from EPA to ANAD dated June 2, 1994 Subject: Draft RI/FS Work Plan Addendum March 1994, SIA Supplemental Investigation

7. Letter from ANAD to ADEM/EPA dated August 1, 1994 Subject: Draft Final RI/FS Work Plan Addendum SIA Supplemental Investigation, ANAD

8. Letter from EPA to ANAD dated September 28, 1994 Subject: Approval and Comments for the Draft Final Work Plan Addendum for the SIA

9. Letter from ADEM to ANAD dated September 30, 1994 Subject: Draft Final RI/FS Work Plan Addendum - August 1994 SIA Supplemental Investigation

10. Letter from ANAD to EPA dated November 16, 1994 Subject: RI/FS Work Plan Addendum for the SIA Supplemental Investigation, Final Report

11. Letter from ANAD to ADEM dated November 16, 1994 Subject: RI/FS Work Plan Addendum for the SIA Supplemental Investigation, Final Report

12. Letter from ANAD to ADEM/EPA dated March 7, 1995 Subject: Changes to the Final RI/FS Work Plan Addendum SIA Supplemental Investigation dated October 1994

13. Fax dated March 7, 1995 Subject: ANAD SIA Phase 2 RI/FS Work Plan Addendum - Revision 1

14. Letter from ADEM to ANAD dated March 20, 1995 Subject: Changes to the final RI/FS Work Plan Addendum, letter dated March 7, 1995*

15. Letter from ANAD to ADEM/EPA dated March 6, 1997 Subject: Request for Second Extension to RI/FS Submittal

16. Letter from ADEM to ANAD dated May 27, 1997 Subject: Phase II RI

17. Letter from ANAD to ADEM/EPA* dated September 5, 1997 Subject: Request for Extension on Submittal of Draft Final SIA RI/FS

18. Letter from ADEM to ANAD dated September 15, 1997 Subject: SIA RI/FS Report - Request for Extension

19. Letter from ANAD to ADEM/EPA* dated October 31, 1997 Subject: Request for Extension of Submittal of SIA RI/FS

20. Letter from ADEM to ANAD dated November 6, 1997 Subject: SIA RI/FS Report Request for Extension

* Indicates misplaced document Page 19

Page 20: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

21. Letter from EPA to ANAD dated December 24, 1998 Subject: Revised SIA GW OU FS Comments November 1998

22. Letter from ADEM to ANAD dated January 4, 1999 Subject: ANAD SIA GW OU FS

23. Letter from EPA to ANAD dated December 7, 2004 Subject: GW Modeling Report - Work in Progress FS OU1 - SIA GW

24. Letter from EPA to ANAD dated May 25, 2005 Subject: SIA CGW Draft FS OU1

25. Letter from EPA to ANAD dated May 31, 2005 Subject: CGW FS Draft Work Plan OU1 SIA Groundwater

26. Letter from ADEM to ANAD dated August 11, 2006 Subject: ADEM Review Comments - Draft SIA CGW FS for OU1 dated February 2006

27. Letter from ADEM to ANAD dated July 13, 2007 Subject: ADEM Review Comments: Draft SIA, CGW FS, ANAD

28. Letter from ANAD to ADEM/EPA dated May 27, 2008 Subject: ANAD SIA CGW FS Report for OU-1

29. Letter from SAIC to ANAD dated May 29, 2008 Subject: Submittal of Final ANAD SIA CGW FS for OU-1, Anniston Army Depot.

30. Letter from ADEM to ANAD dated July 2, 2009 Subject: ADEM Comment: Draft Focused GW FS Work Plan for SIA (OU-1), dated April 2009

31. Letter from ADEM to ANAD dated February 25, 2010 Subject: ADEM Comment: Draft Vapor Intrusion Monitoring Work Plan for SIA (OU-1), dated October 2009 and Response to Comments for the Vapor Intrusion Monitoring Work Plan Briefing, ANAD Partnering Team Meeting Comments, dated November 2009

32. Letter from ADEM to ANAD dated January 31, 2011 Subject: ADEM Comment: Draft Uniform Federal Policy – QAPP for Vapor Intrusion Assessment, SIA (OU-1), dated December 2010

33. Letter from Tetra Tech to USACOE dated February 18, 2011 Subject: Vapor Intrusion Monitoring Work Plan SIA (OU-1)

34. Letter from Tetra Tech to USACOE dated February 18, 2011 Subject: Uniform Federal Policy QAPP Vapor Intrusion Assessment SIA (OU-1)

35. Letter from EPA to ANAD dated July 21, 2011 Subject: EPA Comment: Draft Focused FS for SIA (OU-1), May 2011

36. Letter from ADEM to ANAD dated August 5, 2011 Subject: ADEM Comment: Draft Focused FS for SIA (OU-1), May 2011

37. Letter from EPA to ANAD dated August 12, 2011 Subject: EPA Comment: Draft VI Assessment for SIA (OU-1), June 2011

38. Letter from ADEM to ANAD dated August 23, 2011 Subject: ADEM Comment: Draft VI Assessment for SIA (OU-1), June 2011

39. Letter from ANAD to EPA dated September 26, 2011 Subject: Responses to Comments for the Draft Focused FS for SIA (OU-1)

40. Letter from ANAD to ADEM dated September 26, 2011 Subject: Responses to Comments for the Draft Focused FS for SIA (OU-1)

* Indicates misplaced document Page 20

Page 21: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

41. Letter from ANAD to EPA dated October 20, 2011 Subject: Responses to Comments for the Draft VI Assessment for SIA (OU-1)

42. Letter from ANAD to ADEM dated October 20, 2011 Subject: Response to Comments for the Draft VI Assessment for SIA (OU-1)

43. Letter from ADEM to ANAD dated December 2, 2011 Subject: ADEM Comments: OU-1 Draft FFS Review Comments to Army’s Response

44. Letter from EPA to ANAD dated December 2, 2011 Subject: Responses to Comments for the Draft FFS for OU-1

45. Letter from ANAD to ADEM dated January 5, 2012 Subject: ANAD Response to ADEM Comments of OU-1 Draft FFS

46. Letter from ANAD to EPA dated January 5, 2012 Subject: ANAD Response to EPA Comments of OU-1 Draft FFS

47. Letter from ADEM to ANAD dated March 23, 2012 Subject: Proposed Potential ARARs Table for Focused FS Study Document

48. Letter from ANAD to ADEM dated March 30, 2012 Subject: ANAD Response to ADEM Letter for Proposed Potential ARARs Table for Focused FS Study Document

49. Letter from EPA to ANAD dated April 10, 2012 Subject: EPA Review: Final FS SIA OU-1 dated April 2012

50. Letter from ADEM to ANAD dated April 27, 2012 Subject: Final Focused FS Document

b. Documents Concerning Feasibility Study Volume 1 1. Document: Final RI/FS Work Plan Addendum SIA dated October 1994 2. Document: Final ANAD SIA GW OU FS dated November 1998 3. Document: ANAD SIA Draft GW OU FS Final Comment/Responses dated June 28,

2001 4. Meeting Minutes for the Scoping Meeting for FFS dated May 23 & 24, 2007 Volume 2 5. Document: Final ANAD SIA CGW FS for OU-1 dated April 2008 Volume 3 6. Document: Final Focused GW FS Work Plan for SIA (OU-1) of ANAD, dated August

2009 Volume 4 7. Document: Final Vapor Intrusion Monitoring Work Plan for SIA (OU-1) of ANAD, dated

February 2011 8. Document: Final Uniform Federal Policy QAPP for Vapor Intrusion Assessment SIA

(OU-1) dated February 2011 Volume 5 9. Document: Final VI Assessment Report OU-1 ANAD dated February 28, 2012 Volume 6 10. Document: Final Focused FS for SIA (OU-1) ANAD dated April 6, 2012

* Indicates misplaced document Page 21

Page 22: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

4. Groundwater Treatment Plant (GWTP) a. Correspondence Concerning the GWTP

1. Letter from ANAD to ADEM/EPA dated December 7, 1992 Subject: Emergency Removal Action of Sludge in the Abandoned Steam Cleaning Pit in the IWTP at ANAD

2. Letter from ANAD to ADEM/EPA dated February 16, 1993 Subject: Emergency Removal Action of Sludge in the Abandoned Steam Cleaning Pit in the IWTP at ANAD

3. Letter from ANAD to ADEM/EPA dated June 4, 1993 Subject: GW Extraction System Optimization Study (GESOS)

4. Letter from EPA to ANAD dated July 14, 1993 Subject: Comments on the GESOS Report dated May 1993 for ANAD NPL Site

5. Letter from ANAD to EPA dated July 20, 1993 Subject: GESOS Report dated May 1993

6. Letter from ANAD to ADEM/EPA dated February 28, 1994 Subject: Proposed SOW for Test Pumping and Extraction Design for Well 81B18 and Remediation of Existing GW Extraction System and the Draft Final GW Tracing Studies

7. Letter from ANAD to ADEM/ATSDR/EPA and dated April 8, 1994 Subject: GW Extraction System at ANAD

8. Letter from EPA to ANAD dated April 20, 1994 Subject: Review Comments on the Dye Trace Study and the Proposed SOW for Test Pumping and Extraction Design and Remediation of Existing Extraction Systems

9. Letter from ANAD to EPA dated April 28, 1994 Subject: EPA Comments on the Proposed SOW for Test Pumping and Extraction Design and Remediation of Existing Extraction Systems

10. Letter from ANAD to ADEM/EPA dated July 12, 1994 Subject: Summary of July 7, 1994 Meeting Between ADEM, EPA, AEC, COE, and ANAD Concerning GW Treatment Units Renovation Project

11. Letter from ANAD to ADEM/EPA dated February 14, 1995 Subject: Modification of GW Monitoring Well (81B18) to GW Extraction Well

12. Letter from ADEM to ANAD dated March 24, 1995 Subject: Remediation of GW Extraction System (September 1994), Pilot Testing for the GW Extraction Wells and Pretreatment

13. Letter from ANAD to ADEM/EPA dated July 25, 1995 Subject: Modification of GW Monitoring Well (81B18) to GW Extraction Well

14. Letter from ANAD to ADEM/EPA dated January 30, 1997 Subject: Pilot Chemical Processing Study for Extraction System

15. Letter from ANAD to ADEM dated October 1, 1997 Subject: Status of GW Treatment Systems

16. Email from SAIC to ANAD dated July 15, 1999 Subject: SWMU 24 Borings for new GWTP

17. Letter from IT Corporation to USACE dated April 3, 2000 Subject: Plant Hydraulic Capacity

* Indicates misplaced document Page 22

Page 23: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

18. Email from USACOE to Anna Jalbert (cc ANAD) dated June 4, 2001 Subject: ANAD Approval Letter for GWTP

19. Letter from ADEM to ANAD dated August 29, 2001 Subject: ANAD Centralized Treatment Plant

20. Letter from IT Corporation to USACE dated September 25, 2001 Subject: Permit Data

21. Letter from IT Corporation to USACE dated November 21, 2001 Subject: Variances to the Sampling and Analysis Plan

22. Letter from IT Corporation to USACE dated November 21, 2001 Subject: Turnover Punch List

23. Letter from IT Corporation to USACE dated November 21, 2001 Subject: Reports of Chemical Optimization from Jar Tests and Other Chemical Information

24. Letter from IT Corporation to USACE dated November 27, 2001 Subject: October Air Emission Test Results

25. Email from ADEM to partnering team dated August 30, 2002 Subject: Revised Draft Work Plan for the ANAD Extraction Wells Project

26. Staff Action Memo to ANAD Commander dated March 10, 2003 Subject: Request to Increase Staffing Level in MEO for Water Treatment Plants due to Increased Workload at GWIS

27. Memorandum for ANAD Directors dated March 10, 2003 Subject: Service Agreement between DR, DPW, DPE, and the IRP at ANAD

28. Letter from EPA to ANAD dated July 7, 2003 Subject: Extraction Test and GW Extraction Wells Report for the SIA at ANAD

29. Letter from ADEM to ANAD dated September 22, 2003 Subject: ADEM Review Comments, Draft Report - Extraction Test and GW Extraction Wells SIA ANAD dated May 2003

30. Letter from BHATE to USACE dated November 18, 2003 Subject: Draft Work Plan Equipment Building Construction

31. Letter from ADEM to ANAD dated December 1, 2003 Subject: Groundwater Interceptor System (GWIS)

32. Letter from BHATE to USACE dated April 2, 2004 Subject: Onsite Report, Revere Control Systems Centralized GWTP

33. Letter from ADEM to ANAD dated August 31, 2004 Subject: ADEM Review Comments, 2nd Five Year Review Report for Interim Action ROD, Shallow GW OU dated May 2004

34. Letter from EPA to ANAD dated November 4, 2004 Subject: 2nd Five Year Review SIA Shallow GW OU

35. Letter from ANAD to EPA dated January 24, 2007 Subject: Submittal of Draft Final IROD Amendment for SIA Shallow GW OU

b. Analytical Reports 1. GWTP Analytical Report dated October 30, 2001 2. GWTP Analytical Report dated December 13, 2001 3. GWTP Analytical Report dated February 16, 2002 4. GWTP Analytical Report dated April 4, 2002

* Indicates misplaced document Page 23

Page 24: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

5. GWTP Analytical Report dated July 23, 2002 c. Electronic Reports

1. GWTP Electronic Report January 2002 2. GWTP Electronic Report May 2002 3. GWTP Electronic Report June 2002 4. GWTP Electronic Report July 2002 5. GWTP Electronic Report September 2002 6. GWTP Electronic Report October 2002 7. GWTP Electronic Report November 2002 8. GWTP Electronic Report December 2002 9. GWTP Electronic Report January 2003 10. GWTP Electronic Report February 2003 11. GWTP Electronic Report March 2003 12. GWTP Electronic Report April 2003

d. Quarterly Emission Reports 1. Quarterly Emission Report #1 dated March 2002 2. Quarterly Emission Report #2 dated October 2002 3. Quarterly Emission Report #3 dated August 2003 4. Quarterly Emission Report #4 dated August 2003 5. Quarterly Emission Report #5 dated September 2003 6. Quarterly Emission Report #6 dated September 2003 7. Letter from ANAD to ADEM dated October 21, 2003

Subject: Quarterly Emission Reports for the GWIS e. Building 114

1. Letter from ANAD to ADEM dated July 20, 1999 Subject: Request for Approval to Modify Current Chromium Treatment Facility for Use as New Groundwater Facility

2. Letter from ANAD to ADEM dated January 31, 2002 Subject: Notification of Un-permitted Discharge to Groundwater Building 114 Sump

3. Letter from ANAD to ADEM dated February 24, 2002 Subject: Notification of Un-permitted Discharge to Groundwater Building 114 Sump

4. Email from Steven Guthrie to Pat Smith dated August 1, 2002 Subject: Chrome in Groundwater

5. Email from David Parks dated December 3, 2002 Subject: Hexavalent Chromium

6. Email from Jim and Bonnie McGrath to Pat Smith dated December 4, 2002 Subject: Environmental Health Perspectives Volume 108, Number 9 September 2000

7. Email from Susan Abston dated December 4, 2002 Subject: RE: DSN 002 - Hexavalent Chromium

8. Letter/Email from Seon Farris dated March 31, 2003 Subject: Carbon Reactor Costs for Chromium Treatment

9. Document: Technical Proposal - Carbon Reactor for Chromium Treatment, not dated 10. Document: Ambient Water Quality Criteria for Chromium (not dated)

* Indicates misplaced document Page 24

Page 25: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

11. Decision Document (not dated) Subject: Conversion of Chromium Treatment Plant into the New Groundwater Treatment Facility

12. Document: ANAD Bldg 114, Near-Term Chromium Cleanup Action Plan - Carbon Filtration (not dated)

13. Document: Work Plan Carbon Adsorption of Hexavalent Chromium Benchscale Treatability & Conceptual Design Study, July 2003

14. Document: Carbon Adsorption of Hexavalent Chromium Benchscale Treatability Report & Conceptual Design, October 2003

15. Report: Pump Data Sheet dated June 1, 2004 16. Powerpoint: DRK-Environmental Briefing on Clean Water Act - Regulatory Action

dated October 6, 2006 17. Information Sheet - Carbon Adsorption of Hexavalent Chromium

f. Documents Concerning Groundwater Treatment Plant Volume 1 1. Document: GW Extraction System Optimization Study Final Report, ANAD, Anniston,

AL May 1993 Volume 2 2. Document: Remediation of GW Extraction System, ANAD Volume I Main Report,

Appendices A-G, April 1995 by USACE Mobile District~Available at JSU information repository

Volume 3 3. Document: Remediation of GW Extraction System ANAD Volume II Appendix H, April

1995 by USACE Mobile District~Available at JSU information repository Volume 4 4. Document: Pilot Chemical Processing Study for Extraction System dated November

1996 5. Document: Five Year Review - Interim Action ROD Shallow GW OU GW Treatment

System ANAD dated October 1998 6. Document: Design Report - Anniston GWTP Design, Thirty-Five Percent dated

February 1999 7. Document: Design Report Anniston GWTP Design, Thirty-Five Percent, Appendix B

dated February 1999 8. Document: Conversion of the Chromium Treatment Plant into the New GW Treatment

Facility (not dated) Volume 5 9. Document: Final Project Work Plan for the Centralized GWTP at ANAD dated

February 2000 (Comments) Volume 6 10. Document: Final SHP Centralized GW Treatment Plant at ANAD, dated February 2000 Volume 7 11. Document: Final Environmental Plan for the Centralized GWTP at ANAD dated

February 2000

* Indicates misplaced document Page 25

Page 26: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 8 12. Document: Final Demolition Plan for the Centralized GWTP at ANAD dated February

2000 Volume 9 13. Document: Final Contractor’s Quality Control (CQC) Plan for the Centralized GWTP at

ANAD dated February 2000 Volume 10 14. Document: Hazard Study Report for the Centralized GW Treatment Plant Retrofit,

dated May 18, 2000 15. Document: Conversion of a Chromium Reduction Process to an Organics Treatment

Facility (not dated) 16. Document: Contractor Data Collection Requirements for Subsurface Performance

Evaluation GW Extraction, dated August 2, 2000 17. Document: Project Work Plan for Operation and Maintenance of the Centralized

GWTP at ANAD, Revision A dated April 2001 18. Document: Environmental Plan for the Operation and Maintenance of the Centralized

GWTP at ANAD, Revision 0 dated April 2001 19. Document: Safety and Health Plan (SHP) for the Operation and Maintenance of the

Centralized GWTP at ANAD, Revision 0 dated April 2001 20. Document: Contractor’s Quality Control (CQC) Plan for Operation and Maintenance of

the Centralized GWTP at ANAD, Revision 0 dated April 2001 21. Document: Sampling and Analysis Plan for Operations of the Centralized GWTP at

ANAD (Comments), Revision A dated April 2001 22. Document: ANAD GWTP Process Manual, dated February 5, 2002 23. Document: Final Work Plan for the Extraction Test and GW Extraction Wells, SIA,

ANAD dated September 2002 24. *Document: Final Work Plan for the Extraction Test and GW Extraction Wells, SIA

Comments* 25. Document: Final Work Plan GWTP Effectiveness and Efficiency Study, ANAD dated

July 2003 Volume 11 26. Document: Draft Work Plan for Equipment Building Construction at ANAD GWTP,

dated November 2003 27. Document: Final Extraction Test and GW Extraction Wells SIA ANAD dated December

2003 28. Document: Final Five-Year Review Report: Second Five-Year Review for IROD

Shallow GW OU GW Treatment System ANAD dated September 2004 (Comments/Changes)

29. Document: Draft Final Interim Record of Decision Amendment for SIA GW OU 1 ANAD September 2004

30. Document: GWTP Effectiveness & Efficiency Study Report ANAD dated February 2006

31. Letter from EPA to ANAD dated August 22, 2005 Subject: SIA OU 1- GW Draft IROD Amendment. July 2006

* Indicates misplaced document Page 26

Page 27: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 12 32. Document: Operation & Maintenance Manual for Air Stripper & GAC System at ANAD,

dated April 2007 33. Document: Final Focused GW FS Work Plan for SIA (OU-1) dated August 2009 34. Document: Project Plans, GWIS Treatment Plant Blower and Controls

Additions/Alterations, ANAD, dated December 2010 35. Document: Final Construction Complete Report, GWIS Treatment Plant Blower and

Controls Additions/Alterations, ANAD, dated September 2011 Volume 13 36. Document: QC and Accident Prevention Plan GWIS dated February 24, 2012 37. Document: Historical Data Eval for GWIS ANAD dated September 2012

5. Tennessee Valley Authority (TVA) Field Demonstration for Biofiltration Technology a. Correspondence

1. Letter from ANAD to ADEM*/EPA dated July 10, 1996 Subject: TVA Field Demonstration on Biofiltration Technology for Remediation of Air Streams Contaminated with Trichloroehtene (TCE)

2. Letter from ADEM to ANAD dated September 20, 1996 Subject: TVA Field Demonstration on Biofiltration Technology

3. *Letter from ADEM to ANAD dated April 23, 1997 Subject: TVA Field Demo Approval *

4. Letter from ANAD to ADEM dated April 29, 1997 Subject: Use of an Artificially Contaminated Air Stream of TCE

5. Letter from ANAD to EPA dated May 14, 1997 Subject: Use of TCE in the Start up Phase of the Biofilter Demonstration

6. Letter from ANAD to TVA dated May 28, 1997 Subject: Permission to Use Artificially Created Contaminated Air Stream into Biofilter at ANAD

b. Documents 1. Document: Demonstration Plan for Remediation of Air Streams Contaminated with

TCE using Biofiltration at ANAD, dated September 1996 6. Off-Post Groundwater Monitoring

a. Correspondence 1. *Letter from ANAD to ADEM/EPA dated September 25, 1994

Subject: Chemical Data Reports, ANAD Off-Post GW Monitoring and ERP* 2. Letter from ANAD to ADEM/EPA dated January 18, 1995

Subject: Final Work Plan, ANAD, Off-Post GW Monitoring and ERP, December 1994 3. Letter from ATSDR to ANAD dated February 22, 1995

Subject: Site Summary and Ranking for ANAD 4. Letter from ANAD to ATSDR dated April 25, 1995

Subject: Results of Off-Post Monitoring Wells and Springs 5. Letter from ATSDR to ANAD dated May 22, 1995

Subject: 1st Quarter Monitoring Report

* Indicates misplaced document Page 27

Page 28: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

6. Letter from ANAD to ATSDR dated June 13, 1995 Subject: Chemical Data Monitoring Report No. 1 - First Quarter, ANAD, Off-Post GW Monitoring and ERP

7. Letter from U.S. Army Topographic Engineering Center to U.S. Army Environmental Center Installation Restoration Division dated June 14, 1995 Subject: Copy of Photogeologic Analysis of ANAD

8. Letter from ANAD to ADEM/EPA dated June 16, 1995 Subject: April 3, 1995 Final Chemical Data Report No. 1 - First Quarter ANAD - Off-Post GW Monitoring and ERP

9. Letter from ANAD to ADEM/EPA dated September 25, 1995 Subject: Chemical Data Reports, ANAD, Off-post GW Monitoring and ERP

10. Letter from ANAD to ATSDR dated September 26, 1995 Subject: Results of Off-Post GW Monitoring Wells and Springs

11. Letter from ANAD to ADEM/ATSDR/EPA dated September 27, 1995 Subject: Chemical Data Reports, ANAD, Off-post GW Monitoring and ERP

12. Letter from ADEM to ANAD dated October 22, 1996 Subject: Draft Field Sampling Plan, GW Tracer Test ANAD

13. Letter from ANAD to ADEM/EPA dated December 9, 1996 Subject: Emergency Response Plan

14. Letter from ANAD to Surrounding City Water Boards (Southern Bottled Water Company, Anniston Water Works and Sewer Board, Oxford Water Board, City of Lincoln and Talladega Water and Sewer Board) dated December 16, 1996 Subject: Development of an ERP

15. Letter from ANAD to the Bussey’s dated April 17, 1997 Subject: Annual Sampling

16. Memorandum for Record dated April 18, 1997 Subject: Bussey Well Annual Sampling in April

17. Letter from ADEM to ANAD dated November 21, 2003 Subject: ADEM Review Comments, Draft Reports - ERP for CWS Public Water Supply and ERP for PWs dated September 2003

18. Letter from ADEM to ANAD dated January 6, 2006 Subject: ADEM Review and Notice of Concurrence - SIA Remedial Action Post-Construction Report and Operation and Maintenance Plan dated December 2005

19. Letter from ADEM to USACE dated March 6, 2006 Subject: ADEM Review Comments - Draft SIA Remedial Action Post-Construction Report and Operation and Maintenance Plan dated December 2005

20. Letter from ADEM to ANAD dated December 13, 2006 Subject: ADEM Review Comments - Draft ASA Remedial Action Post-Construction Report

21. Letter from SAIC to U.S. Army Corps of Engineers dated July 18, 2007 Subject: Data Summary Report for 2005 CWS and PW Sampling Events ANAD, Contract No. DACA21-02-D-004

22. Letter from SAIC to ANAD Partnering Team dated Jan 21, 2008 Subject: Results of December 2007 Monthly Coldwater Spring Sampling

23. Letter from SAIC to ANAD Partnering Team dated Feb15, 2008 Subject: Results of January 2008 Monthly Coldwater Spring Sampling

* Indicates misplaced document Page 28

Page 29: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

24. Letter from SAIC to ANAD Partnering Team dated March 31, 2008 Subject: Results of February 2008 Monthly Coldwater Spring Sampling

25. Letter from ADEM to ANAD dated October 5, 2012 Subject: ADEM Comments: Draft Coldwater Springs and Cooper Well Monthly Sampling Report for 2011, dated August 2012

26. Letter from ANAD to ADEM/EPA dated October 8, 2013 Subject: Draft Coldwater Springs and Cooper Well Monthly Sampling Report for 2012

27. Letter from ADEM to ANAD dated February 6, 2014 Subject: Review CWS & Cooper Well Monthly Sampling Report dtd September 2013

28. Letter from ANAD to ADEM/EPA dated May 22, 2014 Subject: Submittal of Final CWS and Cooper Well Monthly Sampling DSR for 2012

29. Letter from ANAD to Mrs. Mindy Moore dated April 25, 2014 Subject: Contamination Concerns at her property next to former Cooper Property

30. Letter from EPA to ANAD dated July 30, 2014 Subject: CWS and Cooper Well Monthly Sampling Summary Report (2013)

b. Documents Volume 1 1. Document: A Natural-Potential Vector Survey at Coldwater Spring, Calhoun County,

Alabama for Anniston Water Works, dated January 12, 1994 2. Document: Final Management/Resource Plan for ANAD Off-Post GW Monitoring and

ERP, dated December 1994 3. Document: Final Work Plan ANAD, Off-Post GW and ERP dated December 1994 4. Document: Final Chemical Data Report. No. 1 - First Quarter Off-Post GW Monitoring

and ERP dated April 3, 1995 5. Document: Revised Final Chemical Data Report No. 1 - First Quarter ANAD - Off-Post

GW Monitoring and ERP dated June 1995 6. Document: Final Chemical Data Report No. 2 - Second Quarter ANAD Off-Post GW

Monitoring and ERP dated June 1995 7. Document: ANAD Photogeologic dated June 1995 8. Document: Final Chemical Data Report No. 3 - Third Quarter ANAD Off-Post GW

Monitoring and ERP dated September 1995 Volume 2 9. Document: Final Chemical Data Report No. 4 - Fourth Quarter, ANAD, Off-Post GW

Monitoring and ERP dated December 1995 10. Document: Revised Final ERP ANAD Off-Post GW Monitoring and ERP dated October

1996 11. Document: Geophysical Investigations, SIA, ANAD dated May 1999~Available at JSU

Information Repository 12. Document: ANAD SIA Screening Level Ecological Risk Assessment for Off-Post GW

dated October 1999 13. Document: Health Consultation by HHS, SIA, ANAD, dated December 26, 2000 14. Document: IROD for SIA Offpost GW OU ANAD dated March 2001 15. Document: Data Summary Report For 2005 Coldwater Spring and Private Well

Sampling Events, dated July 2007

* Indicates misplaced document Page 29

Page 30: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

16. Document: Final Coldwater Spring Monthly Sampling Summary Report for 2006; ANAD, dated November 2007

17. Document: Final Coldwater Spring Monthly Sampling Summary Report for 2007; ANAD, dated July 2008

Volume 3 18. Document: Coldwater Spring Flow Data from Anniston Water Works, dated October 7,

2008 19. Document: Coldwater Spring Flow Data from Anniston Water Works, dated November

5, 2008 20. Document: Final Coldwater Spring Monthly Sampling Summary Report for 2008;

ANAD, dated April 2010 21. Document: Final Coldwater Spring and Cooper Well Monthly Sampling Summary

Report for 2009; ANAD, dated June 2011 22. Document: Final Coldwater Spring and Cooper Well Monthly Sampling Summary

Report for 2010, ANAD, dated October 2011 23. Document: Final Coldwater Spring and Cooper Well Monthly Sampling Summary

Report for 2011, dated January 2013 24. Document: Final Coldwater Spring and Cooper Well Monthly Sampling Summary

Report for 2012, dated May 2014 7. On-Post Groundwater Monitoring

a. Correspondence 1. Letter from ANAD to ADEM/EPA dated June 13, 1994

Subject: Boundary Well #81B18 with Elevated TCE 2. Letter from ADEM to ANAD dated July 26, 1994

Subject: Boundary Well 81B18, Addition to National Pollutant Discharge Elimination System (NPDES)

3. Letter from ANAD to ADEM dated December 5, 1994 Subject: Boundary Well 81B18, Addition to NPDES Permit

4. Letter from ADEM to ANAD dated April 28, 1997 Subject: Request for use of low-flow sampling*

5. Letter from ADEM to ANAD dated June 5, 1997 Subject: Approval for low-flow sampling*

6. Letter from ANAD to ADEM dated March 17, 2000 Subject: Notification of Modification in Sample Location of GW Collected

7. Letter from EPA to ANAD dated June 28, 2001 Subject: Explanation of Significant Differences for SIA, On-Post GW OU ANAD dated March 2001

8. Letter from ADEM to ANAD dated June 29, 2001 Subject: IROD and Explanation of Significant Differences for SIA On-post GW OU

9. Letter from EPA to ANAD dated February 21, 2002 Subject: IROD for SIA On-post GW OU (October 2001)

10. Letter from ADEM to ANAD dated January 16, 2004 Subject: ADEM Review Comments Final Draft – IROD for SIA On-post GW OU, the Explanation of Significant Differences, and Fact Sheet dated August 2003

* Indicates misplaced document Page 30

Page 31: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

11. Letter from ADEM to ANAD dated February 17, 2005 Subject: ADEM Review of RODs - Draft Final SIA Soil ROD dated September 2004 - Draft Final SIA IROD for On-Post GW dated September 2004 - Draft ASA Soils ROD dated July 30, 2004

12. Letter from ADEM to ANAD dated April 4, 2008 Subject: ADEM Review Comments: Draft OU-1 GW Sampling Data Summary for 2006-2007, ANAD

13. Letter from SAIC to USACE dated March 24, 2011 Subject: Final Well Redevelopment Work Plan for OU-1 at ANAD

14. Letter from ADEM to ANAD dated November 6, 2012 Subject: ADEM Comments: Draft OU-1 GW Sampling Data Summary Report for 2011 SIA dated September 2012

15. Letter from EPA to ANAD dated January 7, 2013 Subject: EPA Comments: Draft OU-1 GW Sampling Data Summary Report for 2011 SIA dated September 2012

16. Letter from SAIC to USACE dated May 16, 2013 Subject: GIS Data for 2011 OU-1 Monitoring

17. Letter from ADEM to ANAD dated May 17, 2013 Subject: Review Draft Final Addendum #1 to QAPP OU-1 GW Monitoring 2013 dated May 2013

18. Letter from ANAD to ADEM dated June 5, 2013 Subject: Final Addendum to QAPP OU-1 GW Monitoring for 2012 for OU-1 2013 Monitoring

19. Letter from ANAD to EPA dated June 5, 2013 Subject: Final Addendum to QAPP OU-1 GW Monitoring for 2012 for OU-1 2013 Monitoring

20. Letter from ANAD to ADEM/EPA dated December 20, 2013 Subject: Submittal of Well Repair and Rehabilitation Summary Report

21. Letter from ANAD to ADEM/EPA dated February 28, 2014 Subject: Submittal of Draft OU-1 GW Sampling DSR for 2012

22. Letter from ADEM to ANAD dated March 24, 2014 Subject: Regulation Review Concerning Contamination in OU-1

23. Letter from EPA to ANAD dated May 9, 2014 Subject: Draft OU-1 GW Sampling DSR for 2012 dtd January 2014

24. Letter from ANAD to ADEM dated May 23, 2014 Subject: Extension Request for Regulation Review Concerning 1,4 Dioxane Detections

25. Letter from ADEM to ANAD dated June 5, 2014 Subject: Approval of Extension Request Concerning 1,4 Dioxane Detections

26. Letter from ANAD to EPA, USFWS, & Dept of Conservation and Natural Resources dated August 21, 2014 Subject: Submittal of Draft WP for Banded Sculpin Evaluation for OU-1

27. Letter from ANAD to ADEM&EPA dated August 28, 2014 Subject: Submittal of Draft RD Implementation Plan for Interim RA for OU-1

28. Letter from EPA to ANAD dated September 29, 2014 Subject: Review of Draft WP for Banded Sculpin Data Eval for OU-1

* Indicates misplaced document Page 31

Page 32: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

29. Letter from ADEM to ANAD dated October 9, 2014 Subject: Review of RDIP for Interim RA CGW Operation OU-1

30. Letter from EPA to ANAD dated October 10, 2014 Subject: Review of RDIP for Interim RA CGW OU-1

31. Letter from ANAD to ADEM dated October 23, 2014 Subject: RTC date October 9, 2014 on Draft RDIP for OU-1

32. Letter from ADEM to ANAD dated November 4, 2014 Subject: RTC on RDIP for Interim RA CGW OU-1

33. Letter from ANAD to ADEM&EPA dated November 12, 2014 Subject: Submittal of Draft Final RDIP for Interim RA for OU-1

b. Documents Volume 1 1. Document: Proposed Plan for the Cleanup of GW within the SIA, ANAD dated

September 1999 (Comments) 2. Document: Draft Work Plan Addendum for Baseline GW Sampling at ANAD, dated

July 2005 3. Document: Final Baseline Sampling Data Summary for 2005-2006, SIA at ANAD,

dated July 2007 4. Document: Final OU-1 GW Sampling Data Summary for 2006-2007, SIA at ANAD,

dated July 2008 5. Document: Final OU-1 GW Sampling Data Summary for CY2008, SIA at ANAD, dated

April 2010 6. Document: Final Monitoring Well Inventory Work Plan for ANAD, dated August 2010 Volume 2 7. Document: Final Well Redevelopment Work Plan for OU-1 at ANAD, dated March

2011 8. Document: Final OU-1 GW Sampling Data Summary for 2009, SIA at ANAD, dated

May 2011 9. Document: Well Redevelopment Plan Memorandum for OU-1 at ANAD, dated July

2011 10. Document: Final Work Plan Addendum for CY 2011 OU-1 GW Sampling at ANAD,

dated October 2011 11. Document: Final Letter WP Addendum for CY10 OU-1 GW Sampling dated December

2011 12. Document: Final Addendum to the Monitoring Well Inventory WP dated June 2012 13. Document: Revised Final OU-1 GW Sampling Data Summary for 2010 dated July

2012 14. Document: Final QAPP OU-1 GW Monitoring for 2012 dated November 2012 Volume 3 15. Document: Final OU-1 GW Sampling Data Summary for 2011 SIA dated April 2013 16. Document: Final Addendum #1 to QAPP OU-1 GW Monitoring for 2012, for OU-1 2013

Monitoring dated May 2013 17. Document: Final Well Repair and Rehabilitation Report for ANAD dated December

2013 18. Document: Final QCP for ERS at 29 CERCLA Sites dated August 2014

* Indicates misplaced document Page 32

Page 33: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

19. Document: Final PMP for ERS at 29 CERCLA Sites dated August 2014 20. Document: Final SSHP for ERS at 29 CERCLA Sites dated August 2014

8. Technical Memorandum a. Correspondence

1. Letter from ADEM to ANAD dated September 11, 2009 Subject: ADEM Review Comments: Draft Technical Memoranda 1, 4, &5 (OU-1), ANAD

2. Letter from ADEM to ANAD dated December 24, 2009 Subject: ADEM Comments: Draft Technical Memoranda 2, 3, 6, 7, &8 for the FFS Report, dated August 2009

3. Letter from ADEM to ANAD dated November 5, 2012 Subject: ADEM Comments: Draft Technical Memorandum for Refinement of Chemicals of Concern of OU-1 dated August 2012

4. Letter from ADEM to ANAD dated January 30, 2013 Subject: ADEM Comments: Final Technical Memorandum for Refinement of Chemicals of Concern of OU-1 dated September 2012

b. Documents Volume 1 1. Document: Final Technical Memoranda (TM) for SIA (OU-1) of ANAD, dated

December 2010 Volume 2 2. Document: Final TM for Refinement COCs of OU-1 for SIA of ANAD dated September

2012 9. Miscellaneous

a. Correspondence 1. Letter from ANAD to EPA dated June 28, 1993

Subject: SCAP Notes for GW OU. 2. Memo from ADEM to ANAD dated August 17, 1993

Subject: ANAD Technical Meeting Concerning Current CERCLA Activities 3. Letter from ANAD to ADEM/EPA* dated September 9, 1993

Subject: Minutes from FFA PM’s Meeting in Atlanta, August 17, 1993 4. Letter from ANAD to EPA dated October 24, 1993

Subject: Project Managers Meeting 5. Letter from EPA to ANAD dated December 28, 1993

Subject: Soil Sampling in the SIA at ANAD NPL Site 6. Letter from EPA to ANAD dated December 29, 1993

Subject: Modification to EPA letter of December 28, 1993 on the Soil Sampling in the SIA at the ANAD NPL Site

7. Military Interdepartmental Purchase Request dated December 20, 2002 8. Letter from Charles Bailey dated January 9, 2003

Subject: Contact Information 9. Letter from ANAD to ADEM dated March 17, 2008

Subject: Suspected Area of Concern (AOC) at the ANAD Ball Field

* Indicates misplaced document Page 33

Page 34: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

10. Letter from ANAD to ADEM/EPA dated May 30, 2008 Subject: Preliminary Assessment of AOC at the ANAD Ball Field

11. Letter from EPA to ANAD dated March 7, 2012 Subject: Third Five Year Review Recommendations

b. Documents 1. Document: Final Work Plan Optimization of Well Placement for Plume Delineation,

September 2003 2. Document: Age and Source of Water in Springs Associated with the Jacksonville

Thrust Fault Complex, Calhoun County, Alabama 3. Document: Five-Year Review Report for OU-1 SIA GW Interim Remedial Action, OU-2

SIA Soils, and OU-3 ASA Soils and GW, dated September 2010 10. Interim Record of Decision (IROD)

a. Correspondence 1. Letter from ADEM to ANAD dated September 19, 2012

Subject: ADEM Comments: Proposed Plan OU-1 dated September 2012 2. Letter from EPA to ANAD dated August 1, 2013

Subject: Request for Comment Period Extension for Draft IROD 3. Letter from ADEM to ANAD dated January 6, 2014

Subject: Review for Draft IROD Amendment for SIA (OU-1) dated June 2013 4. Letter from ADEM to ANAD dated August 20, 2013

Subject: Review Draft IROD Amendment for SIA (OU-1) dated June 2013 5. Letter from EPA to ANAD dated August 23, 2013

Subject: Review Draft IROD Amendment for SIA (OU-1) dated June 2013 6. Letter from ANAD to ADEM dated February 6, 2014

Subject: IROD Status Update 7. Letter from ADEM to ANAD dated February 14, 2014

Subject: Approval of Request for Extension of the IROD Amendment 8. Letter from EPA to ANAD dated February 26, 2014

Subject: Approval of Request for Extension of the IROD Amendment 9. Letter from ANAD to ADEM\EPA dated March 14, 2014

Subject: Draft Final IROD Amendment for OU-1 Submittal 10. Letter from EPA to ANAD dated May 6, 2014

Subject: Draft Final IROD Amendment for OU-1 dtd March 2014 11. Letter from ADEM to ANAD dated May 27, 2014

Subject: Review Draft Final IROD Amendment for OU-1 dtd March 2014 12. Letter from EPA to ANAD dated June 30, 2014

Subject: Draft-Final IROD Amendment for SIA OU-1 13. Letter from ANAD to ADEM&EPA dated July 14, 2014

Subject: Receipt of Comments for the Draft-Final IROD Amendment for SIA OU-1 14. Letter from ADEM to ANAD dated July 18, 2014

Subject: Approval of Extension for Submittal of Final IROD Amendment for OU-1 15. Letter from EPA to ANAD dated July 21, 2014

Subject: Approval of Extension for Submittal of Final IROD Amendment for OU-1 16. Letter from ANAD to ADEM&EPA dated September 8, 2014

Subject: Receipt of Comments for Draft Final IROD Amendment for OU-1

* Indicates misplaced document Page 34

Page 35: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

17. Letter from EPA to ANAD dated September 11, 2014 Subject: Approval of Extension for Draft Final IROD Amendment for OU-1

18. Letter from ADEM to ANAD dated September 12, 2014 Subject: Approval of Extension Request for RTC on Draft IROD Amendment

19. Letter from ANAD to ADEM&EPA dated October 9, 2014 Subject: Submittal of Final IROD for OU-1

b. Documents 1. Document: Final Proposed Plan OU-1 dated October 2012

B. Soils Operable Unit 2 (OU2) 1. Remedial Investigation/Feasibility Study

a. Correspondence Concerning Soils Operable Unit 1. Letter from ANAD to ADEM/EPA dated December 17, 1996

Subject: RI for the Soils and GW OUs 2. Letter from SAIC to USACE dated July 28, 1999

Subject: Final FS of Seven SWMUs for ANAD SIA 3. Letter from ADEM to ANAD dated April 27, 2001

Subject: Emergency Removal for SWMU-12 Soils, Emergency GW Treatment Addendum for SWMU-12, Phase I Off-Post RI, Hydrogeologic Characterization of the Jacksonville Fault

4. Soil OU Draft ROD Comments and Responses Recommended for Discussion dated June 2001

5. Letter from ADEM to ANAD dated July 12, 2001 Subject: Draft Design Report of Dry Creek (SWMU 44) 35%

6. Letter from ADEM to ANAD dated September 25, 2001 Subject: Draft ROD - SIA Soil OU

7. Letter from EPA to ANAD dated October 1, 2001 Subject: Draft ROD SIA Soil OU June 28, 2001

8. Email from Linda A. Meredith to Corrine M. Shia dated October 25, 2001 Subject: ANAD - SIA Soil ROD

9. Letter from EPA to ANAD dated March 21, 2002 Subject: Draft ROD for SIA Soils OU (June 2001)

10. Comments to ROD SIA Soil OU ANAD (no date) 11. Letter from ADEM to ANAD dated May 16, 2002

Subject: ADEM’s Review Comments Draft Final Design Report for Dry Creek (SWMU 44)

12. Comments and Responses Draft ANAD Soil ROD dated December 2003 13. PowerPoint Presentation of Draft Soil OU ROD dated February 10, 2004 14. Letter from ADEM to ANAD dated July 7, 2004

Subject: ADEM Review Comments - Final ROD for SIA Soil OU, dated December 2003

15. Letter from ANAD to ADEM dated September 7, 2004 Subject: Comments on SIA Soils OU

* Indicates misplaced document Page 35

Page 36: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

16. Letter from ADEM to ANAD dated February 17, 2005 Subject: ADEM Review of RODs - Draft Final SIA Soil ROD dated September 2004 - Draft Final SIA Interim ROD for On-Post GW dated September 2004 - Draft ASA Soils ROD dated July 30, 2004

17. Letter from EPA to ANAD dated June 3, 2005 Subject: Revised-Draft Remedial Design and Remedial Action Work Plan for the SIA OU-2 (Soils)

18. Letter from ANAD to EPA dated October 11, 2005 Subject: Update Regarding Dirt Disposal as Part of Remedial Actions for OU2 and OU3 at ANAD

19. Letter from ANAD to EPA dated January 24, 2007 Subject: Submission of Draft ROD for SIA Soil OU

20. Letter from ADEM to ANAD dated March 10, 2008 Subject: ADEM Review Comments: Corrective Actions for SWMUs 9/12 Breach of LUC, ANAD

21. Letter from ANAD to ADEM dated June 17, 2008 Subject: Annual Site Inspection on May 26, 2008, IAW the LUC SOP

22. Letter from ANAD to ADEM dated July 12, 2008 Subject: Final ROD for SIA Soil OU-2

23. Letter from ADEM to ANAD dated July 29, 2008 Subject: ADEM Review and Comment: Final ROD for SIA, dated July 2008

24. Letter from EPA to ANAD dated August 21, 2008 Subject: Final ROD, SIA, Soils OU-2, ANAD, dated August 14, 2008

25. Letter from EPA to ANAD dated September 29, 2008 Subject: Final SIA, Soils OU-2, CERCLIS OU-2, Post-Construction Report and Operation and Maintenance Plan, ANAD, dated September 2008

26. Letter from ANAD to ADEM dated June 29, 2009 Subject: Annual Site Inspection on June 1, 2009, IAW the LUC SOP

27. Letter from ANAD to ADEM/EPA dated June 5, 2013 Subject: Annual Site Inspection May 16-20, 2013, IAW the LUC SOP

28. Letter from ANAD to ADEM/EPA dated June 26, 2014 Subject: Annual Site Inspection April 16-17, 2014, IAW the LUC SOP

b. Documents Concerning Soil Operable Unit Volume 1 1. Document: Final SWMU #12 Supplemental Investigation, SIA ANAD, dated October

1994 Volume 2 2. Document: Addendum to Closure Plan, ANAD Sanitary Landfill, dated September

1998 Volume 3 3. Document: Final ANAD SIA FS of Seven SWMUs and Comments, dated July 1999 4. Document: Final Proposed Plan for ANAD Remedial Action On-Post Soil OU dated

July 2000 (Comments) 5. Document: Final Work Plan for Ecological Toxicity Evaluation in Support of the

Remedial Design for SWMU 44 at ANAD dated November 2000 (Comments)

* Indicates misplaced document Page 36

Page 37: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

6. Document: Responses to the Draft Report from the Independent Technical Review Committee (May 2000) dated February 2001

7. Document: Final Design Quality Control Plan SWMU 44, (Dry Creek) ANAD dated March 2001

Volume 4 8. Document: Final Ecotoxicity Evaluation Report for SWMU 44 (Dry Creek) dated July

2001 (Comments) Volume 5 9. Document: Final Design Report ANAD Dry Creek (SWMU 44) and Comments, dated

September 2002 Volume 6 10. Document: Soil Survey of ANAD issued May 2003 11. Document: Draft Final ROD for SIA Soil OU-2 ANAD dated September 2004 12. Document: Standard Operating Procedure for ANAD Land use Controls (LUC) dated

March 2006 13. Document: Revised Proposed Plan for SIA Soil OU-2 dated January 2007 14. Document: Final ROD SIA Soil OU-2, dated July 2008 Volume 7 15. Document: Final SIA Remedial Action Post-Construction Report and Operation and

Maintenance Plan for ANAD, dated September 2008 2. Emergency Removal of Solid Waste Management Unit Twelve (SWMU 12)

a. Correspondence 1. Letter from ANAD to ADEM/EPA dated October 3, 1996

Subject: Emergency Removal of SWMU 12 2. Letter from ANAD to ADEM/EPA dated October 7, 1996

Subject: Preliminary Draft ADEM Class V Underground Injection Control Information Package for Injection Well Installation

3. Meeting minutes of March 27, 1997 with ESE, ANAD, EPA and ADEM Subject: Risk Based Soil Clean-up Levels/Performance Demonstration

4. Letter from ANAD to ADEM/EPA dated June 9, 1997 Subject: Emergency Removal Action at SWMU 12

5. *Letter from ANAD to Community Members dated June 30, 1997 Subject: Community Interviews for CRP*

6. Letter from EPA to ANAD dated July 24, 1997 Subject: Comments on the Draft SAP for the ASA, Emergency Removal Plan, and the SMP for ANAD

7. *Letter from EPA to ANAD dated September 2, 1997 Subject: EPA Comments to Draft Community Relations Plan, QST Environmental*

8. Letter from ANAD to ADEM/EPA dated September 5, 1997 Subject: Transmittal of Preliminary Draft Community Relations Plan Update, dated September 2, 1997

9. Letter from EPA to ANAD dated October 22, 1997 Subject: Response to Response Comments on the Draft Emergency Removal Plan, SWMU 12

* Indicates misplaced document Page 37

Page 38: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

10. Letter from EPA to ANAD dated February 27, 2001 Subject: ANAD Draft Summary Report Emergency Removal for SWMU12 Soils, December 2000

11. Letter from EPA to ANAD dated March 6, 2001 Subject: ANAD Draft Summary Report Emergency Groundwater Treatment Addendum Removal for SWMU12 (Former Facility 414 Lagoons) December 2000

b. Documents Volume 1 1. Document: Final SWMU #12 Supplemental Investigation SIA dated October 1994 Volume 2 2. Document: Draft Quality Assurance Project Plan and Health and Safety Plan for the

Emergency Removal of SWMU 12 ANAD, dated May 1996 Volume 3 3. Document: Draft Resource Management Plan for the Emergency Removal of SWMU

12 dated May 1996 4. Document: Preliminary Draft Risk Based Soil Cleanup Levels Protective of Onsite GW,

dated October 1996 Volume 4 5. Document: Final Emergency Removal Plan for SWMU 12 dated October 1998 Volume 5 6. Document: Final Health and Safety Plan for the Emergency Removal of SWMU 12

ANAD - dated October 1998 Volume 6 7. Document: Final Interim Emergency Groundwater Treatment Addendum Removal

Plan for SWMU12 (Former Facility 414 Lagoons) dated September 1999 (Comments) 8. Document: Final Summary Report - Emergency Removal for SWMU12 Soils (Former

Facility 414 Lagoons) dated June 2001 (Comments) 9. Document: Final Summary Report - Emergency Groundwater Treatment Addendum

Removal for SWMU12 (Former Facility 414 Lagoons) dated June 2001 3. Emergency Removal Action

a. Correspondence 1. Letter from ANAD to ADEM/EPA dated October 4, 1993

Subject: Emergency Removal Action of Construction Excavation near the Old Facility 414 Lagoons

2. Letter from ANAD to ADEM/EPA dated December 30, 1993 Subject: Emergency Removal Action of Construction Excavation near the Old Facility 414 Lagoons

3. Analytical Reports: Data from Emergency Removal Action, dated October 1993 4. Document: Draft – for Regulatory Review (not dated)

Subject: Emergency Removal Action

* Indicates misplaced document Page 38

Page 39: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

4. Remedial Design and Remedial Action a. Correspondence

1. Letter from ADEM to ANAD dated July 14, 2006 Subject: ADEM Review Comments for the Final SIA Remedial Design and Remedial Action Work Plan

b. Documents 1. Documents: Final SIA Remedial Design and Remedial Action Work Plan dated

September 2005 C. Southeast Industrial Area (SIA) Supplemental Data

1. Supplemental Data a. Correspondence

1. Letter from EPA to ANAD dated January 6, 1997 Subject: Request for Extension

2. Letter from ADEM to ANAD dated January 7, 1997 Subject: ANAD NPL Site RI Documents

3. Letter from ANAD to ADEM/EPA dated February 25, 1997 Subject: Monitoring Well Inventory and Well Assessment Report

4. *Letter from ANAD to ADEM/EPA dated March 17, 1997 Subject: SAP and SSHP for TNT Washout

5. Letter from EPA to ANAD dated March 17, 1997 Subject: Request for Second Extension

6. Letter from ANAD to ADEM/EPA dated September 29, 1997 Subject: Disturbance of SWMU #29 (Wood Waste Landfill)

7. Memorandum from SAIC dated October 9, 1997 Subject: Recommended Groundwater Cleanup Levels at the ANAD SIA Boundary

8. Letter from ANAD to ADEM/EPA dated October 17, 1997 Subject: Recommended Groundwater Cleanup Levels

9. Letter from EPA to ANAD dated September 30, 1998 Subject: Five Year Review Work Plan (Approval)

10. Letter from Department of Health and Human Services to ANAD dated January 15, 1999 Subject: ANAD Public Health Assessment

b. Documents Volume 1 1. Document: Final Monitoring Well Inventory Well Assessment Report for ANAD, dated

January 1997 - Volume 1of 4 Volume 2 2. Document: Final Monitoring Well Inventory Well Assessment Report for ANAD, dated

January 1997 - Volume 2 of 4 Volume 3 3. Document: Final Monitoring Well Inventory Well Assessment Report for ANAD, dated

January 1997 - Volume 3 of 4

* Indicates misplaced document Page 39

Page 40: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 4 4. Document: Final Monitoring Well Inventory Well Assessment Report for ANAD, dated

January 1997 - Volume 4 of 4 Volume 5 5. Document: Monitoring Well Rehabilitation Report for ANAD: Main Report and

Appendix dated September 1997 6. Document: Regulatory Draft, Assessment of Applicable or Relevant and Appropriate

Requirements (ARARs) for Remediation of the GW OU, SIA, ANAD, dated December 5, 1997

7. Document: Evaluation of Geophysical Technologies for Hydrogeologic Framework Characterization at the SIA ANAD dated February 1998

8. Document: Public Health Assessment for ANAD dated September 14, 1998 for Public Comment

9. Document: Public Health Assessment for ANAD dated January 12, 1999 Final Release 10. Document: ANAD Monitoring Well Abandonment Report and Analysis, dated June

2003 D. Ammunition Storage Area Operable Unit (OU3)

1. Expanded Site Inspection (ESI) a. Correspondence Concerning ESI

1. Letter from ANAD to ADEM/EPA dated December 6, 1990 Subject: Submission of Draft Work Plans (RI/FS SIA, ASA ESI, Health and Safety Plan, Health and Safety Plan Appendices, Quality Control Plan, Public Involvement and Response Plan)

2. Letter from ANAD to ADEM/EPA dated April 11, 1991 Subject: Extension of Deadlines of Submission of Draft Final Documents (RI/FS Work Plan, ESI Work Plan, SIA Quality Control Plan, Community Relations Plan, and Health and Safety Plan)

3. Letter from ANAD to ADEM/EPA dated May 1, 1991 Subject: The Submission of the following Draft Final Documents: RI/FS Work Plan, ESI Work Plan, SIA Quality Control Plan, Community Relations Plan and the Health and Safety Plan

4. Letter from EPA to ANAD dated May 21, 1991 Subject: Primary Documents: RI/FS Work Plan and Community Relations Plan; Secondary Documents: ASA ESI Work Plan, SIA Quality Control Plan, and Health and Safety Plan

5. Letter from ADEM to ANAD dated June 14, 1991 Subject: Draft Final Documents: The RI/FS Work Plan, the ESI Work Plan, SIA Quality Control Plan, the Community Relations Plan, and the Health and Safety Plan. The Site Investigation for the ASA.

6. *Letter from ANAD to ADEM/EPA dated June 8, 1992 Subject: Extension of Deadline to Submit ESI Document

7. Letter from ADEM to ANAD dated June 11, 1992 Subject: ESI, ASA

8. Letter from ANAD to ADEM/EPA dated September 11, 1992 Subject: Official Submittal of draft ESI document

* Indicates misplaced document Page 40

Page 41: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

9. Letter from ANAD to ADEM/EPA dated November 2, 1992 Subject: Draft ESI Report

10. Letter from EPA to ANAD dated November 19, 1992 Subject: Draft ASA ESI Report September 1992 (Comments)

11. Letter from ADEM to ANAD dated December 9, 1992 Subject: Draft ESI Report, ASA

12. Letter from ANAD to ADEM/EPA dated November 15, 1993 Subject: Draft Final ESI Report, ASA

13. Letter from EPA to ANAD dated January 5, 1994 Subject: Draft Final ASA, ESI Report, November 1993 for the ANAD NPL Site

14. Letter from ADEM to ANAD dated March 31, 1994 Subject: Draft Final ASA, ESI Report

15. Letter from ANAD to ADEM/EPA dated August 18, 1994 Subject: ESI ASA Draft Final Report

16. Letter from ADEM to ANAD dated September 23, 1994 Subject: ESI, ASA Draft Final Report

17. Letter from EPA to ANAD dated October 13, 1994 Subject: Approval for the ESI of the ASA

18. Letter from ANAD to ADEM/EPA dated November 8, 1994 Subject: ESI, ASA Final Report

19. Letter from ANAD to ADEM/EPA dated October 6, 1997 Subject: Submittal of ESI for TNT Washout Facility Leaching Beds SWMU 11

20. Email from ADEM to Partnering Team dated April 25, 2000 Subject: SWMU 35 – Deactivation Furnace

21. Letter from Black & Veatch to USACOE dated May 5th, 2008 Subject: Rev. 0 Work Plan Addendum and HASP for ANAD OU3

22. Letter from Black & Veatch to USACOE dated May 23rd 2008 Subject: Rev. 1 Work Plan Addendum for ANAD OU 3

b. Documents Concerning ESI 1. Document: ANAD Work Plan ESI ASA, dated September 1991 2. Document: Final ESI ASA, including Appendices A-J, dated November 15, 1994 3. Document: HASP Revision 0 Continued OU-3 Monitoring ASA, dated May 2008

2. Remedial Investigation/Feasibility Study ASA a. Correspondence

1. Letter from ANAD to ADEM/EPA dated June 6, 1994 Subject: Draft RI/FS Work Plan, ASA

2. Letter from EPA to ANAD dated July 28, 1994 Subject: Review Comments on the RI/FS Work Plan for the ASA

3. Letter from ADEM to ANAD dated August 2, 1994 Subject: Review Comments on the RI/FS Work Plan for the ASA

4. Letter from ANAD to ADEM/ EPA dated October 3, 1994 Subject: RI/FS Study Work Plan, ASA, Draft Final Report

5. Letter from ANAD to ADEM/EPA dated October 19, 1994 Subject: RI/FS Work Plan, ASA, Draft Final Report

* Indicates misplaced document Page 41

Page 42: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

6. Letter from EPA to ANAD dated November 22, 1994 Subject: Approval of the Draft Final RI/FS Work Plan for the ASA at ANAD

7. Letter from ADEM to ANAD dated November 22, 1994 Subject: RI/FS Work Plan, ASA, ANAD

8. Letter from ANAD to ADEM/EPA dated February 16, 1995 Subject: RI/FS Work Plan, Ammunition Storage Area, Final Report

9. Memo to ANAD dated November 27, 1996 Subject: Comments to Proposed Investigation Strategy for TNT Washout Facility Leaching Beds

10. Letter from EPA to ANAD dated March 17, 1997 Subject: Request for Second Extension

11. Letter from ANAD to ADEM/EPA dated March 17, 1997 Subject: Copies of the Sampling and Analysis Plan and SSHP for the TNT Washout Facility Leaching Beds (SWMU 11) in ASA

12. Letter from ANAD to EPA dated April 4, 1997 Subject: Resubmittal of Plan for ASA RI/FS

13. Letter from ANAD to ADEM/EPA* dated April 21, 1997 Subject: Request that Site Contamination at Deactivation (Popping) Furnace be addressed under RCRA and CERCLA

14. Letter from ADEM to ANAD dated April 23, 1997 Subject: ANAD Popping Furnace

15. Memo from ANAD to US Army Technical Center for Explosive Safety dated June 5, 1997 Subject: Site Plan Safety Submission for Intrusive Sampling of TNT Leaching Beds

16. Letter from ANAD to ADEM/EPA dated June 9, 1997 Subject: Submittal of ASA RI/FS Work Plans

17. Letter from EPA to ANAD dated July 24, 1997 Subject: Comments on the Draft Sampling and Analysis Plan for the ASA RI/FS Emergency Removal Plan and Site Management Plan for ANAD

18. Letter from EPA to ANAD dated August 8, 1997 Subject: Ammunition Storage Area Part III, Risk Assessment Plan

19. Letter from ANAD to ADEM/EPA dated August 22, 1997 Subject: Cover Letter for Responses for the ASA Work Plan Comments

20. Letter from ADEM to ANAD dated September 3, 1997 Subject: ASA RI/FS Work Plans - Response to Comments

21. Letter from ANAD to ADEM/EPA dated September 23, 1997 Subject: Submittal of Draft Final Sampling and Analysis Plan, ASA, RI/FS Completed by SAIC

22. Letter from EPA to ANAD dated October 27, 1997 Subject: Draft Final Sampling and Analysis Plan ASA, RI/FS

23. Letter from ADEM to ANAD dated November 6, 1997 Subject: ASA RI/FS Sampling and Analysis Workplan - Response to Comments

24. Letter from ANAD to ADEM/EPA dated April 11, 2000 Subject: Extension Request on Submittal of the ASA RI

25. Letter from EPA to ANAD dated May 2, 2000 Subject: Work Plan for the Ecological Risk Assessment for the ASA March 16, 2000

* Indicates misplaced document Page 42

Page 43: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

26. Memo from Department of the Army to ANAD dated June 20, 2000 Subject: Final Work Plan for the Ecological Risk Assessment, ASA, ANAD

27. Letter from EPA to ANAD dated March 27, 2002 Subject: ASA Draft Proposed Plan, March 2002 (Comments)

28. Letter from ADEM to ANAD dated April 30, 2002 Subject: Review Comments - Draft Proposed Plan for ASA at ANAD

29. Letter from ADEM to ANAD dated May 6, 2002 Subject: Review Comments - Draft Proposed Plan for ASA at ANAD

30. Letter from EPA to ANAD dated October 2004 Subject: Draft ROD for the ASA Operable Unit

31. Memorandum for ANAD from US Army Environmental Center dated November 7, 2004 Subject: Review of Draft Record of Decision for the ASA

32. Letter from EPA to ANAD dated November 23, 2004 Subject: Draft Plans for Baseline GW Sampling and Delineation Soil Sampling at the ASA

33. Letter from EPA to ANAD dated February 17, 2005 Subject: Revised - Draft ROD (Revision 1) for the ASA Operable Unit

34. Letter from ADEM to ANAD dated February 17, 2005 Subject: ADEM Review of RODs - Draft Final SIA Soil ROD dated September 2004 - Draft Final SIA IROD for On-Post GW dated September 2004 - Draft ASA Soils ROD dated July 30, 2004

35. Letter from EPA to ANAD dated May 31, 2005 Subject: Draft-Final ROD (Revision 2) Operable Unit 3 ASA

36. Letter from ADEM to ANAD dated June 23, 2005 Subject: ADEM Review Comments - Draft ROD (Revision 2) for ASA dated February 2005, Redlined March 2005

37. Letter from ADEM to ANAD dated July 26, 2005 Subject: ADEM Review and Comment - ASA Remedial Design and Remedial Action Work Plan dated March 2005

38. Email from C.H. Cox to Pat Smith dated May 3, 2006 Subject: ASA ROD

39. Letter from ADEM to ANAD dated May 15, 2006 Subject: ADEM Review Comments - Draft ASA Remedial Design Addendum/Baseline Sampling Analysis Report

40. Letter from ADEM to ANAD dated May 18, 2006 Subject: Draft ASA Long-Term Groundwater Monitoring Plan, dated February 2006

41. Letter from STEP to USACE dated June 21, 2006 Subject: Final ASA Remedial Design and Remedial Action Work Plan

42. Letter from ADEM to ANAD dated July 14, 2006 Subject: Final ASA Remedial Design and Remedial Action Work Plan

43. Email from Leslie Ware to Pat Smith dated July 19, 2006 Subject: Final Record of Decision

44. Email from Janessa Tollett to Pat Smith dated July 20, 2006 Subject: Final Record of Decision

* Indicates misplaced document Page 43

Page 44: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

45. Letter from ADEM to ANAD dated September 11, 2006 Subject: ADEM Review and Comment -- Final ROD for ASA dated July 2006

46. Memo from EPA to ANAD dated September 27, 2006 Subject: ASA Remedial Action Final Inspection

47. Letter from EPA to ANAD dated September 27, 2006 Subject: Remedial Action Post-Construction Report ASA

48. Letter from EPA to ANAD dated September 27, 2006 Subject: Final Remedial Design and Remedial Action Work Plan ASA

49. Letter from EPA to ANAD dated September 27, 2006 Subject: Final Record of Decision ASA

50. Letter from ADEM to ANAD dated December 13, 2006 Subject: ADEM Review Comments -- Draft ASA Remedial Action Post-Construction Report

51. Letter from EPA to ANAD dated December 14, 2006 Subject: Draft Work Plan Addendum for Groundwater Monitoring Remedial Action ASA

52. Memo from AMSTA-AN-RKR to for ANAD Commander, not dated Subject: Final Record of Decision for the ASA

53. Letter from ADEM to ANAD dated January 16, 2007 Subject: Draft Baseline Sampling Data Summary for 2005-2006 SIA

54. Letter from ADEM to ANAD dated March 22, 2007 Subject: Draft Final ASA Natural Attenuation Monitoring Plan

55. Letter from ADEM to ANAD dated March 22, 2007 Subject: Work Plan Addendum for OU-3 GW Monitoring for the ASA

56. Letter from SpecPro Environmental Services (SES) to USACOE dated October 10, 2007 Subject: Final Addendum, October 2007, to the Final Plans for Baseline GW Sampling and Delineation Soil Sampling at the ASA, January 2005

57. Letter from ADEM to ANAD dated April 1, 2008 Subject: ADEM Review Comments: Final ASA Natural Attenuation Monitoring Plan, ANAD

58. Letter from SES to USACOE. Dated May 20, 2008 Subject: Final ASA Natural Attenuation Monitoring Plan, ANAD

59. Letter from SES to USACOE Dated May 21, 2008. Subject: Final Remedial Design Addendum/Baseline Sampling Analysis Report, ASA, ANAD

60. Letter from ADEM to ANAD dated July 22, 2008 Subject: ADEM Review Comments: OU-3 GW Monitoring Report, ASA ANAD, dated January 2008

61. Letter from ADEM to ANAD dated August 5, 2008 Subject: ADEM Review Comments: OU-3 Natural Attenuation Monitoring Plan Addendum, ASA ANAD, dated May 2008

62. Letter from ADEM to ANAD dated August 5, 2008 Subject: ADEM Review Comments: OU-3 Natural Attenuation Monitoring Plan – Final, ASA ANAD, dated May 2008

* Indicates misplaced document Page 44

Page 45: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

63. Letter from ADEM to ANAD dated August 5, 2008 Subject: ADEM Review Comments: OU-3 Remedial Design Addendum/Baseline Sampling Analysis Report, ASA ANAD, dated May 2008

64. Letter from EPA to ANAD dated October 21, 2008 Subject: Comments on the Annual Monitored Natural Attenuation Report, Year 3 for OU-3 (ASA), Rev 0, dated September 2008

65. Letter from ADEM to ANAD dated June 17, 2009 Subject: ADEM Comment: ASA Long Term GW Monitoring Plan Addendum and ASA HASP, dated March 2009

66. Letter from ADEM to ANAD dated June 18, 2009 Subject: ADEM Comment: Annual Monitored Natural Attenuation Report Year 3 (Revision 2), dated March 2009

67. Letter from ADEM to ANAD dated March 1, 2010 Subject: ADEM Comment: Annual Monitoring Natural Attenuation Report, Year 4, OU-3 ASA, dated October 2009

68. Letter from ADEM to ANAD dated January 7, 2011 Subject: ADEM Comment: Draft Annual Monitored Natural Attenuation Report for OU- 3, Year 5, dated September 2010

69. Letter from Black & Veatch to USACOE dated May 17th 2011 Subject: Rev. 0 HASP for ANAD OU 3

70. Letter from ADEM to ANAD dated February 27, 2012 Subject: ADEM Comments: MNA Report, Year 6 for OU-3, dated October 2011

71. Letter from ADEM to ANAD dated November 7, 2012 Subject: ADEM Comments: Draft Annual MNA Report, Year 7 for OU-3, dated September 2012

72. Letter from EPA to ANAD dated January 8, 2013 Subject: EPA Comments: Draft Annual MNA Report, Year 7 for OU-3, dated October 2012

73. Letter from ANAD to EPA dated April 26, 2013 Subject: Submittal of Final Annual MNA Report, Year 7 for OU-3, dated April 2013

74. Letter from ADEM to ANAD dated May 2, 2013 Subject: Final ASA MNA Plan dated May 2008

75. Letter from ADEM to ANAD dated June 12, 2013 Subject: Final WP Addendum to ASA Long Term GW Monitoring dated May 2013

76. Letter from ANAD to ADEM/EPA dated February 11, 2014 Subject: Draft WP for OU-3 Submittal

77. Letter from EPA to ANAD dated March 14, 2014 Subject: Draft Remedial Action Operations WP for OU-3

78. Letter from ADEM to ANAD dated March 21, 2014 Subject: Draft Remedial Action Operations WP for OU-3

79. Letter from ANAD to ADEM/EPA dated May 23, 2014 Subject: Response to Comments for OU-3 WP

80. Letter from ADEM to ANAD dated June 6, 2014 Subject: Review Memo to Address Review Comments from the Draft Remedial Action Operations WP for OU-3 letter dtd May 23, 2014

* Indicates misplaced document Page 45

Page 46: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

81. Letter from ANAD to ADEM/EPA dated July 2, 2014 Subject: Submittal of Draft Annual MNA Report, Year 8 for OU-3, dated June 2014

82. Letter from EPA to ANAD dated October 22, 2013 Subject: Review of OU-3 Year 7 Monitoring Report dated April 2013

83. Letter from ADEM to ANAD dated June 12, 2013 Subject: Review Comments Final WP Addendum to ASA LTM Plan dated May 2013

84. Letter from ADEM to ANAD dated August 12, 2014 Subject: Review Final RA-Operations WP for OU-3

b. Documents Volume 1 1. Document: Draft Final RI/FS Work Plan ASA ANAD dated October 1994 Volume 2 2. Document: Draft Final Quality Assurance Project Plan, RI/FS Plans, ASA dated

October 1994 3. Document: Draft Final Health and Safety Plan, RI/FS Plans, ASA dated October 1994 4. Document: Work Plan RI/FS Plans ASA date January 1995 5. Document: Expanded Site Inspection for TNT Washout Facility Leaching Beds (SWMU

11) ANAD dated September 30, 1996 6. Document: Proposed Investigation Strategy for TNT Washout Facility Leaching Beds

(SWMU 11), ANAD dated September 30, 1996 Volume 3 7. Document: Site Safety and Health Plan for TNT Washout Facility Leaching Beds

(SWMU 11) ANAD dated March 7, 1997 8. Document: Sampling and Analysis Plan and Quality Assurance Project Plan for TNT

Washout Facility Leaching Beds (SWMU 11) ANAD dated March 7, 1997 9. Analytical Results for Groundwater Samples SWMU 11, ANAD 10. Map of SWMU 11 Sites 11. Reservation map of ANAD dated June 9, 1987 12. Storage Limitations and Restrictions; Quantity for class 1.1. 13. Document: Final Sampling and Analysis Plan ASA, RI/FS dated September 1997

(Comments) 14. Document: Final Work Plan for the Ecological Risk Assessment for ASA at ANAD

dated June 2000 (Comments) Volume 4 15. Document: Final ANAD ASA RI Report Volume I - Report (Comments), dated August

2001 Volume 5 16. Document: Final ANAD ASA RI Report Volume II - Appendices (Comments), dated

August 2001 Volume 6 17. Document: Final ANAD ASA FS Report dated March 2002 18. Document: Final ANAD ASA Proposed Plan dated May 2002 19. Document: Final Plans for Baseline GW Sampling and Delineation Soil Sampling at

the ASA, ANAD, dated January 2005 (Comments)

* Indicates misplaced document Page 46

Page 47: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 7 20. Document: Final ASA Remedial Design and Remedial Action Work Plan ANAD dated

September 2005 (Comments) Volume 8 21. Document: Final ROD for ASA ANAD dated July 2006 22. Document: Final ASA Remedial Action Post Construction Report dated March 2007 23. Document: HASP, Continued OU-3 Monitoring, ASA, Revision 0, dated May 2008 Volume 9 24. Document: Work Plan Addendum to: ASA Long-Term Groundwater Monitoring Plan.

Revision 0. Dated May 2008 25. Document: Work Plan Addendum to: ASA Long-Term Groundwater Monitoring Plan.

Revision 1. Dated May 2008 26. Document: Final ASA Natural Attenuation Monitoring Plan dated May 2008 27. Document: Final Remedial Design Addendum Baseline Sampling Report, ASA ANAD,

dated May 2008 Volume 10 28. Document: Final Remedial Design Addendum Baseline Sampling Report, ASA ANAD,

Appendicies, dated May 2008 Volume 11 29. Document: Final OU-3 GW Monitoring Report at the ASA, dated March 2009 30. Document: Annual Monitored Natural Attenuation Report Year 3 for OU-3, Revision 2,

dated March 2009 31. Document: HASP, Continued OU-3 Monitoring, ASA, Revision 0, dated May 2009 Volume 12 32. Document: Final Work Plan Addendum to ASA Long-Term GW Monitoring Plan,

Revision 1, dated June 2009 33. Document: Final Work Plan Addendum to ASA Long-Term GW Monitoring Plan,

Revision 0, dated April 2010 34. Document: Final Annual Monitored Natural Attenuation Report Year 4 for OU-3,

Revision 1, dated January 2011 Volume 13 35. Document: HASP, Continued OU-3 Monitoring, ASA, Revision 0, dated May 2011 Volume 14 36. Document: Final Work Plan Addendum to ASA Long-Term GW Monitoring Plan,

Revision 2, dated June 2011 Volume 15 37. Document: Final Annual MNA Report Year 5 for OU-3, Rev 2 dated February 2012 Volume 16 38. Document: HASP Continued OU-3 Monitoring ASA ANAD dated April 2012 39. Document: Final WP Addendum ASA Long Term GW Monitoring Plan dated May

2012 40. Document: Annual MNA Report Year 6 for OU-3 Rev 1 dated September 2012 Volume 17 41. Document: Annual MNA Report Year 7 for OU-3 Rev 1 dated April 2013 42. Document: Final WP Addendum to ASA Long Term Monitoring Rev 2 dated May 2013

* Indicates misplaced document Page 47

Page 48: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

43. Document: Annual MNA Report Year 8 for OU-3 Rev 1 dated June 2014 44. Document: Final RA Operations WP for OU-3 dated September 2014

III. Military Munitions Response Program (MMRP)

A. Ammunition Storage Area Operable Unit 4 (OU4)

1. MMRP a. Correspondence

1. Letter from EPA to ANAD dated June 10, 2004 Subject: Draft Historical Records Review MMRP (Comments)

2. Letter from EPA to ANAD dated September 28, 2004 Subject: Draft Site Investigation Work Plan MMRP (Comments)

3. Letter from Malcolm Pirnie to USACE dated November 17, 2004 Subject: Final Historical Records Review MMRP Site Inspection

4. Letter from EPA to ANAD dated January 6, 2005 Subject: Final Historical Records Review (November 2004) MMRP

5. PowerPoint Presentation dated March 7, 2005 Subject: ANAD MMRP Site Inspection Report Technical Project Planning Meeting

6. Letter from EPA to ANAD dated March 9, 2005 Subject: Final Site Inspections Work Plan - MMRP

7. Letter from EPA to ANAD dated March 25, 2005 Subject: Stakeholder Draft Site Inspection Report - OU4 MMRP Sites (Comments)

8. Letter from Department of the Army to ADEM dated June 6, 2005 Subject: ANAD MMRP Site Inspection

9. Letter from ADEM to ANAD dated June 16, 2005 Subject: ADEM Review Comments: Stakeholder Draft Inspection Report, MMRP dated January 2005

10. Letter from EPA to ANAD dated September 28, 2005 Subject: Final Site Inspection Report (July 2005) MMRP

11. Letter from ADEM to ANAD dated October 14, 2005 Subject: ADEM Review Comments: Review of Responses to ADEM Comments on the Stakeholder Draft Inspection Report, MMRP dated July 2005

12. Letter from ANAD to ADEM/EPA/Dr. Barry Cox dated August 10, 2007 Subject: Munitions Response Site Prioritization Protocol (MRSPP)

13. Letter from HGL to USACE dated May 5, 2011 Subject: Explosive Site Plan (ESP) for MRSs [Transmittal Letter]

14. Letter from ANAD to USACE dated May 25, 2011 Subject: Safety Office Explosive Site Plan (ESP) Approval

15. Letter from EPA to ANAD dated September 29, 2011 Subject: EPA Comment: Draft Final RI Work Plan dated August 2011

16. Letter from ADEM to ANAD dated October 6, 2011 Subject: ADEM Comment: Draft Final RI Work Plan dated August 2011

17. Memorandum for Director, US Army Defense Ammunition Center dated October 20, 2011, Subject: DDESB Approval of Explosive Site Plan (ESP)

18. Memorandum for USACE, EM-CX dated October 20, 2011 Subject: DDESB Approval of Explosive Site Plan (ESP)

* Indicates misplaced document Page 48

Page 49: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

19. Letter from ADEM to ANAD dated August 3, 2012 Subject: ADEM Comments: Draft Action Memo LUC ANAD MMRP dated June 2012

20. Letter from ADEM to ANAD dated October 22, 2012 Subject: ADEM Comments: Draft Non-Time Critical Removal Action LUC Plan ANAD MMRP dated August 2012

21. Letter from EPA to ANAD dated December 19, 2012 Subject: LUC Documents for ANAD MMRP dated February and August 2012

22. Letter from EPA to ANAD dated December 20, 2012 Subject: EPA Comments: Draft Non-Time Critical Removal Action LUC Plan ANAD MMRP dated August 2012

23. Letter from URS to ANAD dated February 27, 2013 Subject: Geospatial Data for MMRP LUC Plan

24. Letter from ANAD to ADEM/EPA dated September 3, 2013 Subject: Submittal of Draft Remedial Investigation Report for MMRP

25. Letter from ADEM to ANAD dated October 31, 2013 Subject: Review of Draft Remedial Investigation Report for MMRP

26. Letter from EPA to ANAD dated December 12, 2013 Subject: Comments for Draft Remedial Investigation Report for MMRP

27. Letter from HGL to ANAD dated December 19, 2013 Subject: Submittal of Draft Final Technical Project Planning for MMRP

28. Letter from ADEM to ANAD dated December 30, 2013 Subject: Review of Annual GW Monitoring Report for OB/OD Units

29. Letter from ANAD to ADEM/EPA dated January 14, 2014 Subject: Submittal of Draft Technical Project Planning for MMRP

30. Letter from ANAD to ADEM/EPA dated January 16, 2014 Subject: Submittal of Draft Technical Project Planning for OD Buffer Area MMRP Site

31. Letter from EPA to ANAD dated March 3, 2014 Subject: Draft Technical Project Planning for MMRP

32. Letter from ANAD to ADEM\EPA dated March 5, 2014 Subject: Draft RI for MMRP Submittal

33. Letter from ADEM to ANAD dated March 10, 2014 Subject: Draft Final Technical Project Planning

34. Letter from ANAD to ADEM\EPA dated March 14, 2014 Subject: Draft Historical Records Review Submittal

35. Letter from HGL to ANAD dated March 25, 2014 Subject: Final Technical Project Planning Submittal

36. Letter from ADEM to ANAD dated April 4, 2014 Subject: Draft RI Report for MRSs Response to Comments

37. Letter from EPA to ANAD dated April 7, 2014 Subject: Review of Draft Final Technical Project Planning-2

38. Letter from ANAD to ADEM/EPA dated April 9, 2014 Subject: Submittal of Final Technical Project Planning-2

39. Letter from HGL to ANAD dated April 17, 2014 Subject: Submittal of Final RI Report for MRSs with Response to Comments

40. Letter from ANAD to ADEM/EPA dated April 24, 2014 Subject: Submittal of Final RI Report for Military Munition Response Sites

* Indicates misplaced document Page 49

Page 50: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

41. Letter from ANAD to ADEM/EPA dated April 24, 2014 Subject: Submittal of Draft Addendum to Multiple MMRP documents

42. Letter from ANAD to ADEM/EPA dated April 24, 2014 Subject: Submittal of Draft SI WP for OD Buffer Area MMRP Site

43. Letter from ADEM to ANAD dated April 29, 2014 Subject: Draft Final TPP-2 OD Buffer Area MMRP Site

44. Letter from EPA to ANAD dated May 6, 2014 Subject: Review of Final Technical Project Planning-2

45. Letter from EPA to ANAD dated May 16, 2014 Subject: Review of Multiple Draft Documents for MMRP

46. Letter from ADEM to ANAD dated May 28, 2014 Subject: Final TPP-2 Memo and Associated Documentation

47. Letter from HGL to ANAD dated June 13, 2014 Subject: Submittal of Final TTP Memo for Former OD Buffer Area

48. Letter from ADEM to ANAD dated June 19, 2014 Subject: Draft Addendum to Final EE/CA LUC dtd February 2012

49. Letter from ADEM to ANAD dated June 19, 2014 Subject: Draft Addendum to Final Action Memo LUC dtd September 2012

50. Letter from ADEM to ANAD dated June 19, 2014 Subject: Draft Addendum to Final Non-Time Critical Removal Action LUC Plan

51. Letter from ANAD to ADEM/EPA dated June 19, 2014 Subject: Submittal of Final TTP-2 Memo and Associated Documentation

52. Letter from ADEM to ANAD dated July 2, 2014 Subject: Draft Historical Record Review OD Buffer Area

53. Letter from ADEM to ANAD dated July 2, 2014 Subject: Final RI Report for MRSs

54. Letter from EPA to ANAD dated June 9, 2014 Subject: Draft SI WP, Remedial Facilities Investigation and Draft HRR, OD Buffer Area

55. Letter from ADEM to ANAD dated July 15, 2014 Subject: Final TPP – 2 OD Buffer Area dated June 19, 2014

56. Letter from ADEM to ANAD dated July 15, 2014 Subject: Draft SI WP OD Buffer Area dated April 2014

57. Letter from HGL to ANAD dated July 17, 2014 Subject: Slip Page Revisions for Final RI Report for MRSs

58. Letter from ANAD to ADEM&EPA dated July 30, 2014 Subject: Submittal of Final HRR for OD Buffer Area MMRP Site

59. Letter from ANAD to ADEM&EPA dated August 1, 2014 Subject: RTC on Draft SI WP for OD Buffer Area MMRP Site dated June 2014

60. Letter from ANAD to ADEM&EPA dated August 19, 2014 Subject: Submittal of Draft Interim LUC WP for Four OU-4 MRSs

61. Letter from ADEM to ANAD dated August 27, 2014 Subject: Final RI Report for MRSs Response to Comments

62. Letter from ADEM to ANAD dated August 27, 2014 Subject: Final HRR OD Buffer Area dated July 2014

63. Letter from ADEM to ANAD dated August 28, 2014 Subject: RTC for Draft SI WP OD Buffer Area dated August 1, 2014

* Indicates misplaced document Page 50

Page 51: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

64. Letter from ANAD to ADEM&EPA dated September 25, 2014 Subject: Submittal of Final Addendum to EE/CA, AM, and LUCIP for OU-4

65. Letter from EPA to ANAD dated October 10, 2014 Subject: Review of Interim LUC WP for Four MRSs OU-4

66. Letter from ANAD to ADEM dated October 23, 2014 Subject: RTC dated August 27, 2014 on Final RI Report for Three MMRP Sites

67. Letter from ANAD to ADEM dated October 23, 2014 Subject: RTC dated August 28, 2014 on Draft SI WP for OD Buffer Area

68. Letter from ANAD to ADEM&EPA dated November 12, 2014 Subject: Submittal of Final SI WP for OD Buffer Area

b. Documents Volume 1 1. Document: Final Historical Records Review, Malcolm Pirnie, and comments,

November 2004 Volume 2 2. Document: Final Site Inspection Work Plan, Malcolm Pirnie, November 2004 Volume 3 3. Document: Final Site Inspection Report, Malcolm Pirnie, July 2005 Volume 4 4. Document: Final Project Management Plan for Remediation Services for Munitions

Response Sites, ANAD dated August 2011 5. Document: ESP RI/CA Recoilless Rifle Range dated December 20, 2011 6. Document: Final RI/CA WP OU-4 ANAD dated February 14, 2012 Volume 5 7. Document: Final EE/CA LUC ANAD MMRP dated February 22, 2012 8. Document: Final MMRP CIP Addendum ANAD dated March 08, 2012 9. Document: Final Action Memo LUC MMRP ANAD dated September 2012 10. Document: Final LUC Plan ANAD MMRP dated January 2013 11. Document: Final Technical Project Planning – 2 Memorandum and Associated

Documentation in Support of RI/FS at MMRP dated March 2014 Volume 6 12. Document: Final RI Report for MRS: Recoilless Rifle Range, Burning Ground Buffer

Area, and Pistol Range dated April 2014 Volume 7 13. Document: Final Addendum to Final EE/CA Land Use Controls dated June 2014 14. Document: Final Addendum to Final Action Memo LUC dated June 2014 15. Document: Final Addendum to Final NTCRA LUC Plan dated June 2014 16. Document: Final TPP Memo for SI OD Buffer Area dated June 2014 17. Document: Final HRR ANAD Former OD Buffer Area dated July 2014

* Indicates misplaced document Page 51

Page 52: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

IV. Western Industrial Area (WIA)

A. Operable Unit 5 (OU5) 1. Plans/Reports

a. Correspondence 1. Letter from EPA to ANAD dated November 20, 2006

Subject: Draft Site Investigation Work Plan OU5 WIA - July 2006 2. Letter from ADEM to ANAD dated December 7, 2006

Subject: ADEM Review Comments - Sampling and Analysis Plan for ANAD 3. Letter from ADEM to ANAD dated December 7, 2006

Subject: ADEM Review Comments - Sampling and Analysis Plan Supplement for OU 5 WIA Site Investigation

4. Letter from ADEM to ANAD dated December 7, 2006 Subject: ADEM Review Comments - Quality Assurance Project Plan for ANAD

5. Letter from ADEM to ANAD dated December 7, 2006 Subject: ADEM Review Comments - Quality Assurance Project Plan Supplement for OU 5 WIA Site Investigation

6. Letter from ADEM to ANAD dated August 1, 2007 Subject: ADEM Review Comments - Draft Site Investigation Report for the WIA OU-5 dated April 2007

7. Letter from EPA to ANAD dated October 4, 2007 Subject: Draft Site Investigation Report OU 5 WIA April 2007

8. Letter from SAIC to U.S. Army Corps of Engineers dated April 15, 2008 Subject: Final Site Investigation Report for the WIA (OU 5, ANAD)

9. Letter from ADEM to ANAD dated May 28, 2009 Subject: ADEM Comment: Draft Expanded Site Investigation Work Plan for WIA OU-5, dated March 2009

10. Letter from ADEM to ANAD dated July 1, 2009 Subject: ADEM Comment: Draft Expanded Site Investigation Work Plan for WIA OU-5, dated March 2009

11. Letter from ADEM to ANAD dated September 18, 2009 Subject: ADEM Comment – ESI WP for WIA (OU5) dated August 2009

12. Letter from EPA to ANAD dated October 15, 2009 Subject: Final ESI Work Plan for WIA OU-5 dated August 2009 and Final ESI SAP, QAPP for WIA OU-5 dated August 2009

13. Letter from ADEM to ANAD dated October 13, 2009 Subject: ADEM Comment: Building 6 ARBCA GW Compliance Monitoring Report, dated May 2009

14. Letter from ADEM to ANAD dated May 7, 2010 Subject: ADEM Comment: ARBCA GW Compliance Monitoring Report for Building 6, September 2008 and March 2009 Sampling Events, dated September 2009

15. Letter from ADEM to ANAD dated June 25, 2010 Subject: ADEM Comment: ESI Report, dated April 2010

16. Letter from ADEM to ANAD dated August 30, 2011 Subject: ADEM Response to Extension Request for Additional Investigation of Increased Benzene GW Concentrations at Building 6, dated August 24, 2011

* Indicates misplaced document Page 52

Page 53: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

17. Letter from ADEM to ANAD dated August 28, 2012 Subject: ADEM Comments: Draft SAP, Building 6 Investigation dated July 2012

18. Letter from ADEM to ANAD dated October 25, 2012 Subject: ADEM Comments: Final SAP Building 6 Investigation dated September 2012

19. Letter from EPA to ANAD dated May 6, 2014 Subject: Draft RI for the WIA OU-5 WP dtd March 2014

20. Letter from ADEM to ANAD dated June 9, 2014 Subject: Draft RI WP for OU-5 dated March 2014

21. Letter from ADEM to ANAD dated June 17, 2014 Subject: Draft UFP-QAPP Environmental Services for OU-5 dated February 2014

22. Letter from ADEM to ANAD dated August 29, 2014 Subject: Review of Draft UFP-QAPP Environmental Services for OU-5

23. Letter from ADEM to ANAD dated October 17, 2014 Subject: Review of RI WP WIA OU-5

b. Documents Volume 1 1. *Document: Final Site Investigation [Plans] of DRMO, dated September 2003

(electronic copy only) (e.g. APP, DMP, PMP, SAP, SSHP) Volume 2 2. Document: Final Site Investigation Report for DRMO, dated November 2004 Volume 3 3. Document: Tier I/II ARBCA Risk Assessment for Building 6, Volume 1 of 2, dated

March 2005 Volume 4 4. Document: Tier I/II ARBCA Risk Assessment for Building 6, Volume 2 of 2, dated

March 2005 Volume 5 5. Document: Draft Sampling and Analysis Plan for WIA OU-5, dated July 2006

(Comments) 6. Document: Draft Sampling and Analysis Plan Supplement for OU-5 WIA Site

Investigation dated July 2006 7. Document: Historical Records Review Report for the WIA at ANAD dated September

2006 8. Document: Preliminary Passive Soil-Gas Survey OU-5 dated September 12, 2006 Volume 6 9. Document: ARBCA GW Compliance Monitoring Report for Building 6 (September

2005 & April 2006 Sampling Events), dated September 2006 Volume 7 10. Document: Final SSHP for OU-5 WIA Site Investigation, dated October 2006 11. Document: Final SSHP Supplement for OU5 WIA Site Investigation dated October

2006 12. Document: Final QAPP for OU5 WIA Site Investigation dated December 2006

(Comments)

* Indicates misplaced document Page 53

Page 54: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

Volume 8 13. Document: Final QAPP Supplement for OU5 WIA Site Investigation dated December

2006 14. Document: ARBCA GW Compliance Monitoring Report for Building 6 (September

2006 & March 2007 Sampling Events), dated September 2007 15. Document: Final Site Investigation Report For the WIA OU-5 dated, April 2008 Volume 9 16. Document: ARBCA GW Compliance Monitoring Report for Building 6 (September

2007 & March 2008 Sampling Events), dated May 2009 Volume 10 17. Document: Expanded Site Investigation Work Plan for WIA OU-5, dated August 2009 Volume 11 18. Document: ARBCA GW Compliance Monitoring Report for Building 6 (September

2008 & March 2009 Sampling Events), dated September 2009 Volume 12 19. Document: Final Expanded Site Investigation Report for WIA OU-5, dated November

2010 Volume 13 20. Document: ARBCA GW Compliance Monitoring Report for Building 6 (September

2009 & March 2010 Sampling Events), dated October 2011 Volume 14 21. Document: HASP Bldg 6 Investigation Rev 0 dated August 2012 22. Document: SAP Bldg 6 Investigation Rev 1 dated September 2012

V. Remedial Investigations and Remedial Actions Prior to the Federal Facility Agreement

A. US Army Toxic and Hazardous Materials Agency (USATHAMA) Remedial Investigation

Volume 1 1. Document: Remedial Investigation ANAD, Volume 1, dated January 1989 2. Document: Remedial Investigation ANAD, Volume 2, dated January 1989 Volume 2 3. Document: Remedial Investigation ANAD, Volume 3, dated January 1989 4. Document: Remedial Investigation ANAD, Volume 4, dated January 1989

B. USATHAMA Feasibility Study

1. Document: USATHAMA Feasibility Study for ANAD, dated January 1989 C. ANAD Feasibility Study

1. Document: ANAD Feasibility Study, GW OU dated August 1991 D. ANAD Proposed Plan

1. Document: ANAD Proposed Plan for Interim Remedial Action, dated August 1991 E. Installation Restoration Data Management

1. Document: Installation Restoration Data Management Information System (IRDMIS) Data Package for ANAD (from January 1, 1975 to March 19, 1991), dated March 19, 1991

* Indicates misplaced document Page 54

Page 55: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

F. Public Meeting, Anniston Army Depot

1. Document: Public Meeting Minutes, ANAD, dated September 10, 1991 G. Groundwater Operable Unit

1. Document: US Army Installation Restoration Program, Superfund ROD, ANAD - GW OU, dated September 1991

2. Memorandum: From ANAD to Deputy Assistant Secretary of the Army (Environmental, Safety, and Occupational Health), dated September 24, 1991 Subject: Request for Coordination and Approval of ROD, GW OU for ANAD

3. Letter from EPA to Deputy Assistant Secretary of the Army (Environmental, Safety, and Occupational Health), dated September 25, 1991 Subject: Interim Remedial Action ROD for GW Extraction OU at ANAD NPL Site

H. Other Documents Leading to RI/FS

Volume 1 1. Document: Installation Assessment of ANAD, Report No. 119, USATHAMA, dated

April 1978 2. Document: Final Report, Geophysical and Geohydrologic Investigation of ANAD, dated

September 1981 3. Document: Containment Migration Survey, ANAD, dated March 4, 1981 4. Document: ANAD Resource Conservation and Recovery Act (RCRA) Studies, Final

Engineering Report, dated March 1981 5. Document: GW Quality Assessment Plan for the Southeast Area, ANAD dated

September 1981 Volume 2 6. Document: Status Report - GW Quality Assessment of the Southeast Area, ANAD

dated October 1982 7. Document: Remedial Action of Hazardous Waste Sites, ANAD, dated January 1984 Volume 3 8. Source Identification, Contaminant Transport Simulation, and Remedial Action

Analysis for ANAD, dated June 1984 8.a - Appendix A: Development of Flow and Transport Models 8.b - Appendix B: Feasibility Study and Remedial Action Analysis 8.c - Appendix C: Hydrogeologic Field Investigations 8.d - Appendix D: Sampling and Analysis 8.e - Appendix E: Waste Process and Source Identification Studies 8.f - Appendix F: Environmental Chemistry and Fate of Contaminants

Volume 4 8.g. Appendix G: Hydrogeologic and Chemical Data

Volume 5 9. Document: Investigation of Possible Paleochannels at the ANAD, dated December

1985 10. Document: Concept Design Report GW Withdrawal and Treatment Systems at Three

Contaminated Sites, dated November 14, 1986 11. Document: Offpost Investigation at ANAD, Summary of Preliminary Results, dated

December 1986

* Indicates misplaced document Page 55

Page 56: (Revised November 21, 2014) - Anniston Army Depot€¦ · 21-11-2014  · (Revised November 21, 2014) I. General Documents ... Subject: Site Management Plan Submittal . 2. Letter

12. Document: RCRA Facility Assessment Report, ANAD, dated February 1987 13. Document: Feasibility Study for ANAD, Draft Sampling Design Plan A004, dated May

20, 1987 14. Document: Photogeologic Study of Potential GW Pollution Pathways between ANAD

and Coldwater Spring, June 1987 15. Document: Three Sources Groundwater Collection and Treatment System, ANAD,

Design Analysis, Preliminary Review, 60% (not dated) 16. Document: Three Sources Groundwater Collection and Treatment System, ANAD,

Specifications, Final Review, 95%, dated June 15, 1987 Volume 6 17. Document: Remedial Action Technical Support and Services - Draft ANAD

Endangerment Assessment, dated October 9, 1987 18. Document: Three Sources GW Collection and Treatment System, ANAD, Design

Analysis, Final (100%), dated October 21, 1987 19. Document: Remedial Action Technical Support and Services ANAD Endangerment

Assessment, dated January 14, 1988 20. Document: Feasibility Study for ANAD Endangerment Assessment, ATSDR Submittal,

dated February 5, 1988 21. Document: Feasibility Study for ANAD Endangerment Assessment, USATHAMA dated

April 8, 1988 22. Document: Anniston Army Depot GW Extraction Optimization Technical Plan, Data

Item A005, dated July 1988 23. Document: Anniston Army Depot GW Extraction Optimization Phase 1 Interim Report,

dated July 8, 1988 24. Document: Final Report Assessment of Applicable or Relevant and Appropriate

Requirements (ARARs) for ANAD, dated January 30, 1989 25. Document: Final Report, GW Extraction Optimization, ANAD, Data Item A011, dated

April 1989 Volume 7 26. Document: ANAD GW Extraction Optimization Monitoring Plan, dated October 1990 27. Document: GW Consultation No. 38-26-1363-86, Evaluation of SWMUs, ANAD, July,

28 - August 1, 1986, dated September 4, 1986. 28. Document: Geohydrologic Study No. 38-26-0342-89, ANAD dated September 12-30,

1988, dated February 23, 1989 29. Document: Work Plan for Definition of Hydrogeologic Characteristics to Support

Implementation of Recovery of Contaminated GW, ANAD (not dated) Volume 8 30. Document: Mathematical Simulation and Optimization of Subsurface Environmental

Contamination Events - A Draft Dissertation by Larry M. Deschaine - January 12, 2004

* Indicates misplaced document Page 56


Recommended