REVISED PERT-CPM DIAGRAM
BAR CHART
S-CURVE
1
1
N
LFES
L E G E N D:
CRITICAL PATH
ACTIVITY
DUMMY
EVENT NO. - N
EARLY START - ES
LATE FINISH - LF
REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM
REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY, MARIKINA CITY
(DUE TO VARIATION ORDER NO. 2)
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL REGION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
2ND STREET, PORT AREA MANILA
CONSTRUCTION DIVISION
PROJECT AND LOCATION:
REHABILITATION/MAJOR REPAIR OF PERMANENT
BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG
MARCOS HIGHWAY, MARIKINA CITY
SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:
SHEET No.:
CEFERINO A. LONDINA
AUTHORIZED MANAGING OFFICER
EDGARDO S. RAMOS
ENGINEER III
PROJECT ENGINEER III
EDWIN M. LUZON
CHIEF, CONSTRUCTION DIVISION
ADOR G. CANLAS, CESO IV
REGIONAL DIRECTOR
SUBMITTED BY:
JUBY B. CORDON
ASSISTANT REGIONAL DIRECTOR
1
1 1
S
0 0
2
33 33
1
1 1
3
48 48
5
94 94
4
64 94
6
199199
7
215215
8
230230
9
245245
10
276276
13
337337
11
306337
12
306337
14
368368
15
390390