    Schedule-B - 1Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    SCHEDULE B

    (See Clause 2.1)

    DEVELOPMENT OF THE PROJECT HIGHWAY

    1. DEVELOPMENT OF THE PROJECT HIGHWAY

    Development of the Project Highway shall include construction of the Project

    Highway as described in this Schedule-B and in Schedule-C

    2. FOUR-LANING

    Four-Laning shall include the Four-Lane Project highway as described in

    Annex-I of this Schedule-B and Annex-I of Schedule-C.

    2.2 Four Laning shall be completed by the Concessionaire in conformity with the

    Specification and Standards set forth in Annex-I of Schedule -D

  • 8/6/2019 Revised Sch B 2

    3/17

    Schedule-B - 2Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Annex IDescription of [Four Laning]

    1. Width of Carriageway

    The paved carriageway width shall be 2x8.75 m wide excluding the median.

    2. Project Facilities

    Project facilities shall be constructed in conformity with Annex-I of Schedule-C

    3. Specifications and Standards

    The Project Highway shall be constructed in conformity with the Specifications and

    Standards specified in Annex-I of Schedule-D.4. Other Features of four laning

    Cross Sections

    The Project Highway shall be widened to Four-lane dual configuration with paved

    shoulder with or without Service Roads. The entire road portion shall be 4-lane and

    the bridges and other structures shall also be 4-lane. The typical cross-section along

    with different types of cross section required to be developed in different segments of

    the project highway are indicated in Appendix BI.

    Alignment Plan and Longitudinal Section

    The Plan & Profile of project highway is given at Appendix BII in soft copy.

    Bypasses & Realignment

    There is one by pass in the project highway. The details of bypass to be provided are

    as given in Appendix BIII.

    Service Road

    Service Roads shall be provided in lengths indicated in Appendix BIV.

    Proposed Right of Way

    The details of the Proposed ROW are given in Appendix BV.

  • 8/6/2019 Revised Sch B 2

    4/17

    Schedule-B - 3Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    At Grade Intersection

    At grade intersections shall be provided at the intersection of Service roads and all

    intersecting roads at locations specified in AppendixBVI for major intersections and

    in Appendix BVII for minor intersections.

    Grade Separated Interchanges

    The Grade Separated interchanges shall be as provided as given at

    Appendix B VIII

    Underpasses

    Vehicular Underpass shall be provided at location given at Appendix B IX

    Pedestrian/Cattle Underpass shall be provided at location given at Appendix B X.

    Major Bridges

    Major bridge as listed in Appendix BXI shall be provided, widened, reconstructed, or

    extended.

    Minor Bridges

    Minor bridges as listed in Appendix BXII shall be provided, widened, reconstructed,

    or extended.

    Culverts

    Culverts shall be provided, widened, reconstructed, or extended as listed in

    Appendix B XIII

    ROB / RUB

    Details of ROB / RUB to be provided are given in Appendix B XIV. Following points

    shall be taken care of:

    i) The proposed span arrangements of the ROB is tentative and subject to change as

    per availability of Railway boundaries/ requirement of the Railways.

    ii) ROB shall be designed, constructed and maintained as per the requirements of

    Railway authorities. The construction plans shall be prepared in consultation with the

    concerned Railway authority.

  • 8/6/2019 Revised Sch B 2

    5/17

    Schedule-B - 4Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    iii) The ROB shall be constructed and maintained by the concessionaire under

    supervision of the Railways.

    iv) All expenditure related to construction, maintenance and supervision of ROB (except

    P & E charges) shall be borne by the Concessionaire.

    v) During construction, the existing level crossing shall be widened to 12 meters or two

    separate level crossings of 7 meters each shall be provided.

    Entry / Exit Ramps and Locations

    Entry / Exit Ramps for entering into or exiting from the project highway shall be

    provided wherever necessary. A list is given in Appendix B XV.

    4.14. Tentative Location of Slope Protection

    Wherever the embankment height is more than 3.0m, Slope Protection provision has

    been made. A tentative list of such locations is given in Appendix B XVI.

    4.15 Utilities

    Provision of accommodating utilities shall be made both over as well as underground

    wherever required.

    4.16 Rainwater Harvesting

    As per Ministry of Environment and Forest Notification, New Delhi dated 14.01.1997

    (as amended on 13.01.1998, 05.01.1999 and 06.11.2000), the construction of Rain

    Water, Harvesting structure is mandatory in and around water crisis area, notified by

    the Central Ground Water Board.

  • 8/6/2019 Revised Sch B 2

    6/17

    Schedule-B - 5Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B ITypical Cross-Sections

    Appendix B II

    Plan and Profile are enclosed in digital form in CD marked as Appendix B II.

    Sl. No

    StretchesCross Section

    TypeExisting Chainage Design Chainage

    From To From To1 298.075 298.350 298.075 298.375 Type-C

    2 298.350 302.910 298.225 302.975 Type-A

    3 302.910 303.549 302.975 303.615 Type-C

    4 303.549 303.786 303.615 303.840 Type-D

    5 303.786 304.045 303.840 304.100 Type-C

    6 304.045 308.440 304.100 308.500 Type-A

    7 308.440 309.265 308.500 309.325 Type-C

    8 309.265 311.445 309.325 311.525 Type-A

    9 311.445 312.130 311.525 312.200 Type-C

    10 312.130 315.450 312.200 315.450 Type-A

    11 Palsana Bypass 315.450 316.775 Type-A1

    12 Palsana Bypass 316.775 318.000 Type-C1

    13 Palsana Bypass 318.000 318.336 Type-A1

    14 Palsana Bypass 318.336 318.876 Type-C1

    15 Palsana Bypass 318.876 319.456 Type-F

    16 Palsana Bypass 319.456 320.875 Type-C1

    17 Palsana Bypass 320.875 321.411 Type-F

    18 Palsana Bypass 321.411 323.050 Type-A1

    19 322.025 322.838 323.050 324.188 Type-A

    20 322.838 323.738 324.188 325.088 TOLL PLAZA

    21 323.738 327.213 325.088 328.661 Type-A

    22 327.213 328.054 328.661 329.404 Type-F

    23 328.054 328.461 329.404 329.836 Type-C

    24 328.461 329.571 329.836 330.911 Type-A

    25 329.571 329.701 330.911 331.036 Type-B

    26 329.701 330.436 331.036 331.786 Type-A

    27 330.436 332.374 331.786 333.724 Type-B

    28 332.374 332.998 333.724 334.334 Type-F

    29 332.998 333.683 334.334 335.011 Type-D

    30 333.683 334.871 335.011 336.186 Type-B

    31 334.871 335.071 336.186 336.386 Type-D

    32 335.071 335.334 336.386 336.661 Type-C

    33 335.334 335.886 336.661 337.211 Type-A

    34 335.886 337.071 337.211 338.386 Type-C

    35 337.071 338.481 338.386 339.761 Type-A

    36 338.481 339.043 339.761 340.356 Type-C

    37 339.043 339.397 340.356 340.719 Type-F

    38 339.397 341.047 340.719 341.962 Type-A

  • 8/6/2019 Revised Sch B 2

    7/17

    Schedule-B - 6Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix- B III

    Details of Bypasses / Realignment

    1. Bypass

    Name of Bypass Existing Chainage Design Chainage Length

    From To From To (Km)

    Palsana By-Pass 315.450 322.025 315.450 323.050 7.600

    2. Realignment

    Name ofRealignment

    Existing Chainage Design Chainage Length

    From To From To (Km)

    NO REALIGNMENT IN THE PROJECT STRETCH

    Appendix B IVDetails of Service Roads

    Sl.No.

    ExistingChainage

    Design ChainageLength(Km)

    Width(m)

    Side Crosssection

    TypeFrom To From To

    1 298.075 298.348 298.075 298.375 0.300 2x7.00 Both Type-C

    2 302.900 304.050 302.975 304.100 1.125 2x7.00 Both Type-C

    3 308.420 309.290 308.500 309.325 0.825 2x7.00 Both Type-C

    4 311.450 312.165 311.525 312.200 0.675 2x7.00 Both Type-C

    5 Palsana Bypass 316.775 318.000 1.225 2x7.00 Both Type-C1

    6 Palsana Bypass 318.336 318.876 0.540 2x7.00 Both Type-C1

    7Palsana Bypass

    318.876 319.456 0.580 2x7.00 Both Type-F

    8Palsana Bypass

    319.456 320.875 1.419 2x7.00 Both Type-C1

    9

    Palsana Bypass320.875 321.411 0.536 2x7.00 Both Type-F

    10 327.048 327.625 328.086 328.661 0.575 1x7.00 Right Type-C

    11 327.625 328.000 328.661 329.036 0.375 1x7.00 Right Type-F

    12 327.625 328.265 328.661 329.404 0.743 1x7.00 Left Type-F

    13 328.265 328.800 329.404 329.836 0.432 1x7.00 Left Type-C

    14 332.815 333.325 333.836 334.334 0.498 2x7.00 Both Type-F

    15 333.325 334.010 334.334 335.011 0.677 2x7.00 Both Type-D

  • 8/6/2019 Revised Sch B 2

    8/17

    Schedule-B - 7Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    16 335.188 335.363 336.186 336.361 0.175 1x7.00 Left Type-C

    17 335.188 335.663 336.186 336.661 0.475 1x7.00 Right Type-D

    18 336.120 337.295 337.211 338.386 1.175 1x7.00 Left Type-C

    19 336.195 337.295 337.286 338.386 1.100 1x7.00 Right Type-C

    20 338.785 339.535 339.761 340.511 0.750 2x7.00 Both Type-C

    The total length of Service Road on both side of project highway is 23.350Km.

    Appendix B VDetails of Proposed ROW

    Sl.No.

    Design Chainage Proposed ROW(In meters)

    1 298.075 to 324.338 602 324.338 to 324.938 1503 324.938 to 341.962 60

    Appendix B VI

    Major Intersections

    Sl. No.Existing

    ChainageDesign

    ChainageCategory of

    RoadType of

    JunctionRemarks

    1 340.197 341.211Bituminous

    RoadY Junction

    As perprovision inmanual for

    specificationand

    standards for4-laning of

    nationalhighways onBOT basis,the junction

    warrantsprovision ofinterchange

  • 8/6/2019 Revised Sch B 2

    9/17

    Schedule-B - 8Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B VII

    Minor JunctionsThe carriageway width shall be 3.75 m wide excluding 2x1.0m Earthen shoulder

    Sl. No.

    Existing

    chainage (KM) Category

    Carriageway

    Width (M)

    Side (Left /

    Right))

    1 298+050 W. B. M Road 3.75 Left

    2 298+300 C. C Road 3.75 Right

    3 298+325 Bituminous Road 3.75 Left

    4 298+600 Bituminous Road 3.75 Left

    5 298+750 Earthen Road 3.75 Right

    6 298+800 Bituminous Road 3.75 Left

    7 299+175 C. C Road 3.75 Right

    8 299+300 Earthen Road 3.75

    Left9 300+710 Bituminous Road 3.75 Left

    10 300+770 Earthen Road 3.75 Right

    11 303+425 Bituminous Road 3.75 Left

    12 303+500 C. C Road 3.75 Right

    13 305+300 C. C Road 3.75 Left

    14 306+600 Earthen Road 3.75 Right

    15 307+150 Earthen Road 3.75 Left

    16 308+650 Bituminous Road 3.75 Right

    17 308+655 Earthen Road 3.75 Left

    18 309+500 C. C Road 3.75 Left

    19 309+750 Gravel Road 3.75 Right

    20 310+800 Earthen Road 3.75 Right

    21 311+500Bituminous Road

    (PMGSY)3.75 Left

    22 311+500Bituminous Road

    (PMGSY)3.75 Right

    23 313+250 Bituminous Road 3.75 Left

    24 314+350 Earthen Road 3.75

    Right25 314+500 Earthen Road 3.75 Left

    26 316+050 Earthen Road 3.75 Left

    27 316+200 Bituminous Road 3.75 Right

    28 316+375 Bituminous Road 3.75 Left

  • 8/6/2019 Revised Sch B 2

    10/17

    Schedule-B - 9Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Sl. No.Existing

    chainage (KM)Type of Cross Road

    CarriagewayWidth (M)

    Side (Left /Right))

    29 316+700 C. C Road 3.75 Right

    30 318+200 Gravel Road 3.75 Left

    31 318+200 Gravel Road 3.75 Right

    32 318+650 C. C Road 3.75 Left

    33 318+900 C. C Road 3.75 Right

    34 319+300 C. C Road 3.75 Left

    35 319+300 Earthen Road 3.75 Right

    36 319+500 Bituminous Road 3.75 Left

    37 319+850 Bituminous Road 3.75 Left

    38 320+100 Bituminous Road 3.75 Left

    39 322+850 Bituminous Road 3.75 Right

    40 323+125 C. C Road 3.75 Left

    41 326+600 Earthen Road 3.75 Right

    42 327+200 Earthen Road 3.75 Right

    43 327+850 Bituminous Road 3.75 Right

    44 328+300 C. C Road 3.75 Left

    45 328+600 Earthen Road 3.75 Right

    46 329+400 Earthen Road 3.75 Right

    47 329+450 Earthen Road 3.75

    Left48 329+950 Bituminous Road 3.75 Left

    49 330+200 Earthen Road 3.75 Left

    50 332+900 Bituminous Road 3.75 Right

    51 332+975 Bituminous Road 3.75 Left

    52 333+100 Bituminous Road 3.75 Left

    53 334+200 Earthen Road 3.75 Right

    54 335+250 Bituminous Road 3.75 Left

    55 335+650 Bituminous Road 3.75 Right

    56 336+200 C. C Road 3.75 Left

    57 336+260 Bituminous Road 3.75 Right

    58 336+850 C. C Road 3.75 Right

    59 337+200 C. C Road 3.75 Right

    60 337+450. Earthen Road 3.75 Left

  • 8/6/2019 Revised Sch B 2

    11/17

    Schedule-B - 10Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B VIII

    Details of Proposed Grade Separated Interchanges

    Sl.No.

    Location

    Existing

    Chaina

    ge

    Desig

    n

    Chaina

    ge

    Name

    of

    Intersec

    ting

    Road

    s

    Propos

    ed

    Structu

    ral

    configuration

    Propos

    ed

    Structure

    type

    Propos

    ed

    Span

    arrangement

    Totalwidth

    Ofth

    e

    structu

    re

    ClearHe

    ight

    1At

    Gokulpura

    340.197 341.211

    Connectivity to SikarTown &Sikar

    Bikaneersection ofNH11 withnecessary

    ramps

    New 1x2-Lane(9.0mC/W)

    R.C.CGirder& R.CPier &Abutm

    entwithPile

    2 x21.0m

    As perManual

    5.5m(Min)

    Appendix B IXDetails of Proposed Vehicular Underpasses

    Sl.No.

    Existing

    Chaina

    ge

    Desig

    n

    Chaina

    ge

    Name

    of

    Intersec

    ting

    Road

    s

    Propos

    ed

    Structu

    ral

    Configur

    ation

    Propos

    ed

    Structu

    ral

    Type

    Propos

    ed

    Span

    Arrangement

    Totalwidth

    Ofth

    e

    Structure

    ClearHe

    ight

    1 Bypass 319.186

    Gouty VillageRoad &

    BolsingpuraVillage Road

    New 4-Lane

    R.C.C Slabwith R.CAbutment

    1 x 10.5 2x12m5.0m(Min)

    2 327.725 328.961Sishu Village

    Road &Ranoli Market

    New 4-Lane

    R.C.C Slabwith R.CAbutment

    1 x 10.5 2x12m5.0m(Min)

    3 333.065 334.011

    Khandala

    Village Road,Surjabas

    Village Road& Ginmata

    Mandir

    New 4-Lane

    R.C.C Slabwith R.CAbutment

    1 x 10.5 2x12m5.0m(Min)

  • 8/6/2019 Revised Sch B 2

    12/17

    Schedule-B - 11Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B X

    Details of Proposed Pedestrian / Cattle Underpasses

    Sl.No.

    Existing

    Chain

    age

    Design

    Chain

    age

    Nam

    eof

    Interse

    cting

    Roa

    ds

    Proposed

    Struc

    tural

    Config

    urati

    on

    Proposed

    Struc

    tural

    Type

    Proposed

    Span

    Arrangeme

    nt

    Totalwidth

    Ofthe

    Struc

    ture

    Cle

    ar

    Height

    1 Bypass 321.425Ladhana

    Village RoadNew 4-Lane

    R.C.CBox

    1 x 4.00 2x12m 4.5m

    2 322.962 324.011

    KrishnaPuraVillage Road &

    Aekha PuraVillage Road

    New 4-Lane

    R.C.CBox

    1 x 4.00 2x12m 4.5m

    3 333.268 334.286Goriya Village

    RoadNew 4-Lane

    R.C.CBox

    1 x 4.00 2x12m 3.0m

    4 339.515 340.511

    SobhasariaEngineeringCollege &

    Shree ShyamGreen Cottage

    Boys Hostel

    New 4-Lane

    R.C.CBox

    1 x 4.00 2x12m 4.5m

    Appendix B XI

    A. Construction of New Major Bridges

    Sl.No.

    Nameof

    Bridge

    BridgeNo.

    Existing

    Chainage

    Design

    Chainage

    Typeof

    Crossing

    Proposed

    Structural

    Configuration

    Proposed

    Structure

    Type

    Proposed

    Span

    Arrangement

    Totalwidth

    Ofthe

    structure

    1 Bridgeon RiverSowaboti

    332/1

    330.404 331.429 Rightanglecrossing

    New 1 x2-Lane

    R.C

    Abutment,R.C Pier &R.C Girder

    5 x 21.00 As perManual

  • 8/6/2019 Revised Sch B 2

    13/17

    Schedule-B - 12Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    B. Rehabilitation / Repair / Widening of Existing Major Bridges

    Sl.No.

    NameofBridge

    BridgeNo.

    Chainage(Km)

    Width(P

    roposed/

    Existing)

    Span

    Arran

    gement

    Type of Structure

    FoundationSub

    structureSuper

    Structure

    1

    Bridge onRiver

    Sowaboti(Existing)

    331/1 330.404

    8.3/8.325x4.200m

    TTL =105.00m

    No defectobserved in

    visible portionof foundation

    Stonemasonrywall typepier & no

    defect

    R.C.C SolidSlab

    superstructureover tar paper

    bearing. RepairR.C.C Railing &Expansion joint

    Bridge onRiver

    Sowaboti(Proposed)

    As per

    Manual

    5x21.00m

    TTL =105.00m

    R.C.C Pile

    Foundation

    R.C.C walltype

    Abutment& Pier

    R.C.C T Beam

    * The proposed span arrangement is tentative and the same shall be finalized in consultationwith Irrigation Authority & IC. Any change in span arrangement shall not be treated as changein scope of work.

    ** Note: Existing Major Bridge at Km 330.404 having 2-Lane carriageway configuration.Another New 2-Lane configuration Bridge adjacent to the Existing Bridge has been proposed.

    Appendix B XII

    A. Construction of new Minor Bridges

    Sl.No.

    Nameof

    Bridge

    BridgeNo.

    Existing

    Chainage

    Design

    Chainage

    Typeof

    Crossing

    Proposed

    Structural

    Configuration

    Proposed

    Structure

    Type

    Proposed

    Span

    Arrangement

    Totalwidth

    Ofthe

    Structure

    1

    Bridge onWater

    LoggedArea

    310/1 309.627 309.680

    Right

    anglecrossing

    New 1 x2-Lane

    R.C.CSolid Slab& Open

    Foundation3 x 7.00

    As perManual

    2

    Bridge onWater

    LoggedArea

    338/1 335.709 336.721Rightangle

    crossing

    New 1 x2

    R.C.CSolid Slab& Open

    Foundation

    3 x 7.00As perManual

    3

    Bridge onWater

    LoggedArea

    340/1 338.224 339.226

    Rightangle

    crossing

    New 1 x2

    R.C.CSolid Slab& Open

    Foundation

    3 x 7.00As perManual

  • 8/6/2019 Revised Sch B 2

    14/17

    Schedule-B - 13Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    B. Rehabilitation / Repair / Widening of Existing Minor Bridges

    Sl.No.

    NameofBridge

    BridgeNo.

    Chainage(Km)

    Width(P

    roposed/

    Existing)

    Span

    Arran

    gement

    Type of Structure

    FoundationSub

    structureSuper

    Structure

    1

    (Existing)

    310/1 309.627

    8.3/8.33x6.90m

    TTL =20.700m

    No defectobserved in

    visible portionof foundation

    Stonemasonrywall typepier & no

    defect

    R.C.C SolidSlab

    superstructureover tar paper

    bearing. RepairR.C.C Railing &Expansion joint

    (Proposed)

    As per

    Manual

    3x7.00m

    TTL =21.00m

    R.C.C Open

    Foundation

    R.C.C walltype

    Abutment& Pier

    R.C.C Solid

    Slab

    2

    (Existing)

    336/1 335.709

    8.3/8.33x6.90m

    TTL =20.700m

    No defectobserved in

    visible portionof foundation

    Stonemasonrywall typepier & no

    defect

    R.C.C SolidSlab

    superstructureover tar paper

    bearing. RepairR.C.C Railing &Expansion joint

    (Proposed)As perManual

    3x7.00mTTL =

    21.00m

    R.C.C OpenFoundation

    R.C.C walltype

    Abutment& Pier

    R.C.C SolidSlab

    3

    (Existing)

    339/1 338.224

    8.4/8.43x6.90m

    TTL =20.700m

    No defectobserved in

    visible portionof foundation

    Stonemasonrywall typepier & no

    defect

    R.C.C SolidSlab

    superstructureover tar paper

    bearing. RepairR.C.C Railing &Expansion joint

    (Proposed)As perManual

    3x7.00mTTL =

    21.00m

    R.C.C OpenFoundation

    R.C.C walltype

    Abutment& Pier

    R.C.C SolidSlab

    ** Note: Existing Minor Bridges at Km 309.627, Km 335.709 & Km 338.224 having 2-Lanecarriageway configuration. Another New 2-Lane configuration Bridges adjacent to the ExistingBridges has been proposed.

  • 8/6/2019 Revised Sch B 2

    15/17

    Schedule-B - 14Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B XIIIImprovement proposal for culverts

    A. Reconstruction / Widening Scheme for Culverts

    Sl.No.

    Existing

    CDNo.

    Existing

    Chainage

    Design

    Chainage

    Type of

    Structure

    Recommenda

    tion

    Span

    Arrangement

    Proposed

    Total

    Width(m)

    Existing

    Proposed

    Existing

    (m)

    Proposed

    (m)

    1 300/1 299.046 299.046 Pipe Pipe Reconstruction 2x900 2x1200 4-Lane

    2 325/1 324.634 325.681 Slab Slab Widening 1 x 2.0 1 x 2.0 4-Lane3 325/2 324.862 325.908 Slab Slab Widening 1 x 1.729 1 x 2.0 4-Lane4 326/1 325.986 327.030 Slab Slab Widening 1 x 1.85 1 x 2.0 4-Lane5 327/1 326.189 327.230 Slab Slab Widening 1 x 2.0 1 x 2.0 4-Lane

    6 331/1 330.875 331.901 Slab Slab Widening 1 x 2.43 1 x 2.5 4-Lane7 332/1 331.158 332.181 Slab Slab Widening 1 x 2.418 1 x 2.5 4-Lane

    8 334/1 333.740 334.759 Slab Slab Widening 1 x 3.840 1 x 4.0 28.50

    9 335/1 334.546 335.557 Slab Slab Widening 1 x 3.917 1 x 4.0 4-Lane

    10 335/2 334.854 335.864 Slab Slab Widening 1 x 3.968 1 x 4.0 4-Lane

    11 338/1 337.277 338.284 Slab Slab Reconstruction 1 x 5.517 1 x 6.0 42.00

    B. Proposed New Culverts

    Sl. No. Existing

    Chainage

    Design

    Chainage

    Proposed

    Structure

    Proposed

    Sizearrangement

    Proposed

    Total width(m)

    1 300.540 300.600 Slab 1 x 2.0 4-Lane2 302.558 302.625 Slab 1 x 2.0 4-Lane3 303.190 303.295 Slab 1 x 2.0 4-Lane4 304.040 304.100 Slab 1 x 2.0 42.005 304.807 304.870 Slab 1 x 2.0 4-Lane6 305.093 305.150 Slab 1 x 2.0 4-Lane7 305.465 305.545 Slab 1 x 2.0 4-Lane8 306.045 306.100 Slab 1 x 2.0 4-Lane9 306.465 306.510 Slab 1 x 2.0 4-Lane10 306.890 306.950 Slab 1 x 2.0 4-Lane

    11 307.720 307.775 Slab 1 x 2.0 4-Lane12 308.444 308.525 Slab 1 x 2.0 42.0013 311.200 311.200 Slab 1 x 2.0 4-Lane14 311.813 311.847 Slab 1 x 2.0 4-Lane15 312.300 312.325 Slab 1 x 2.0 4-Lane17 313.330 313.350 Slab 1 x 2.0 4-Lane18 By-Pass 315.608 Slab 1 x 2.0 4-Lane19 By-Pass 315.822 Slab 1 x 2.0 4-Lane20 By-Pass 316.186 Slab 1 x 2.0 4-Lane

  • 8/6/2019 Revised Sch B 2

    16/17

    Schedule-B - 15Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    21 By-Pass 316.674 Slab 1 x 2.0 4-Lane22 By-Pass 316.931 Slab 1 x 2.0 42.0023 By-Pass 317.211 Slab 1 x 2.0 42.0024 By-Pass 317.637 Slab 1 x 2.0 42.0025 By-Pass 318.736 Slab 1 x 2.0 42.0026 By-Pass 319.461 Slab 1 x 2.0 42.00

    27 By-Pass 320.236 Slab 1 x 2.0 42.0028 330.045 331.072 Slab 1 x 2.0 4-Lane29 332.116 333.136 Slab 1 x 2.0 4-Lane30 337.845 338.848 Slab 1 x 2.0 4-Lane31 340.336 341.250 Slab 1 x 2.0 4-Lane32 340.872 341.786 Slab 1 x 2.0 28.50

    Details of Culvert for Interchange

    CulvertA

    -

    341.786 (ForMain Road),342.183 (for

    Ramp A)

    Slab 1 x 2.0 28.50

    CulvertB - 342.725 (forRamp B) Slab 1 x 2.0 9.50

    CulvertC

    -341.825 (forLeft & Rightside Road

    Slab 1 x 2.0 4-Lane

    CulvertD

    -

    343.000 (forRamp B),

    342.100 (forLeft & Rightside Road

    Slab 1 x 2.0 28.50

    Appendix B XIV

    Details of Proposed ROB / RUB

    S.No.

    Lo

    cation

    ROB/RUB

    Existing

    Chainage/Design

    Chainage

    Nameof

    Crossing

    Existing

    Structure

    Proposed

    Structural

    Configuration

    Proposed

    Structuretype

    Proposed

    span

    ar

    rangement

    To

    talwidthof

    Th

    estructure

    NO ROBS / RUBS IN THE PROJECT STRETCH

  • 8/6/2019 Revised Sch B 2

    17/17

    Schedule-B - 16Four Laning of Reengsu to Sikar Section of NH-11 from existing chainage km. 298.075 (design chainage Km. 298.075) toexisting chain age 341.047 (design chain age Km. 341.962) ) (design length 43.887 Km.) on BOT (Annuity) project on DBFOTpattern under NHDP Phase III Project

    Appendix B XV

    Entry / Exit Ramps and locations

    NO ENTRY & EXIT RAMPS IN THE PROJECT STRETCH

    Appendix B XVI

    Tentative Location of Slope Protection

    Sl. No. LocationDesign Chainage Length

    (m)From To

    1Near Palsana Village at Palsana By-

    Passes 319.900 320.000 100

    2Near Palsana Village at Palsana By-

    Passes320.300 320.500 200

    3 Near Sisio Village 324.200 324.500 300

    4 Near Trilokpura Village 331.500 332.100 600

    5 Near Malkeda Village 340.900 341.100 100


Recommended