+ All Categories
Home > Documents > Revision 4 - Fall, 2005 Phase II RI Sampling Soil Vapor, Surface Drainage …€¦ ·  ·...

Revision 4 - Fall, 2005 Phase II RI Sampling Soil Vapor, Surface Drainage …€¦ ·  ·...

Date post: 30-May-2018
Category:
Upload: doancong
View: 218 times
Download: 0 times
Share this document with a friend
12
Revision 4 - Fall, 2005 Phase II RI Sampling Soil Vapor, Surface Drainage Water, and Background Soil November 18, 2005
Transcript

Revision 4 - Fall, 2005 Phase II RI Sampling Soil Vapor, Surface Drainage Water, and Background Soil

November 18, 2005

CASMALIA SITE REMEDIATION PROJECT Corey Bertelsen Project Manager November 18, 2005 To: Russell Mechem – EPA

Lynda Deschambault – EPA Subject: Revision 4 - Fall, 2005 Phase II RI Sampling Soil Vapor, Surface Drainage Water, and Background Soil As requested by EPA in their November 17, 2005 email, the Casmalia Steering Committee (CSC) has revised an earlier October 24, 2005 memorandum summarizing the Phase II RI Soil Vapor, Surface Water, and Background Soil sampling. This revised memorandum discusses the Phase II RI sampling that was requested by EPA in their September 26, 2005 comments on the Interim Progress Report (IPR) and the additional Background Soil sampling CSC expects to complete this Fall, 2005. The memorandum is formatted to include the same information that we had provided EPA in the revised Final RI/FS Work Plan (dated June 3, 2004) that described the previous Phase I soil vapor, surface drainage water, and background soil sampling. The memorandum summarizes the sampling program, sampling locations, expected analytical program for all samples, and refers back to the applicable SOPs, SAP, and QAPP of the revised Final RI/FS Work Plan. The memorandum does not include the Geophysical Survey work that the CSC is currently performing at the site as the details of this work was previously documented in the Final Geophysical Survey Plan (dated September 6, 2005). EPA previously approved the details of that work which was completed in October. The memorandum also does not include the additional MNA or ground water analytes that EPA requested in their September 26, 2005 comments on the IPR. The CSC has discussed that sampling with EPA and has summarized that sampling via a separate memorandum submitted to EPA. The schedule for the Fall sampling work discussed in this memorandum is listed below:

• Soil vapor work was completed from November 11 through November 15, 2005. • Surface water sampling will occur according to available rain fall. • Background soil sampling is scheduled to begin November 28, 2005 and take less than

one week. Soil Vapor Samples The CSC will collect soil vapor samples at sixteen locations that were requested by EPA in their IPR comments which include three locations to the east of the Liquids Treatment Area, three step out locations on the north and east boundary of the site which are approximately 75 to 100 feet

Page 2 outside three previous Phase I soil vapor probes, two locations along the western boundary of the Burial trench Area, and five locations in the Central Drainage Area. EPA had also requested that the CSC sample three deeper probes on the north and east boundary of the site at the same locations as three previous Phase I probes. The CSC noted in a letter dated October 7, 2005 sent to EPA that we wanted to discuss these three locations further with EPA. We have subsequently agreed to include in the proposed sampling. The locations of all sixteen soil vapor sample locations are shown on Figure 4.1-P2 attached to this memorandum. The figures shows two possible locations for RISVCL-08C. As agreed with EPA in the field, we will sample the location which is approximately 75 feet away from the previous RISVCL-08 location. The soil vapor data will be used to complement existing data to address the potential vapor migration from areas of the site where wastes may be present and may be used in the HHRA and ERA to evaluate potential exposures to chemicals in soil gas. The sampling locations shown on Figure 4.1-P2 were selected to incorporate EPA’s September 26, 2005 comments on the IPR (specifically Section III-Appendix C-Comment #1-#4 of the letter). The CSC and representatives for EPA walked the proposed locations in the field on October 10, 2005 to agree on these final locations. The soil vapor samples will be collected using temporary driven probes which will be advanced to a depth of 7.5 feet (the midpoint of the depth range of 5 to 10 feet) using a direct-push probe for all but the three “deep” probe locations. The “deep” soil vapor locations will also be collected using temporary driven probes which will be advanced to a depth of approximately 20 feet using a direct-push probe (or if the probe cannot penetrate to that depth as deep as possible). Soil vapor samples will be collected as detailed in SOP 1-9 of the June 3, 2004 revised Final RI/FS Work Plan which uses the guidelines from the advisory on active soil gas investigations prepared by the DTSC and Los Angeles RWQCB (DTSC and LARWQCB, January 2003). The sample will be collected in SUMMA canisters provided by a certified laboratory and will be analyzed for VOCs using USEPA Method TO-15. The Phase II soil vapor work will adhere to the same laboratory requirements for analytical work for this type of sampling as was required by the June 3, 2004 revised Final RI/FS Work Plan (this can be found in Appendix B QAPP of the Work Plan). The CSC has summarized the soil vapor sampling in Table 4.4-P2 attached to this memorandum. The table does not yet include the survey coordinates for all of the soil vapor locations as they were just recently selected. The CSC will survey the locations and provide all of those coordinates as part of our final reporting of the data. Additional details on soil vapor sampling can also be found in Section A6.5.10 of the SAP (Appendix A) of the June 3, 2005 revised Final RI/FS Work Plan.

Page 3 Surface Water Samples The CSC will collect surface water samples at three locations to supplement existing data. The three locations include two previous or Phase I RI surface water locations (one in the RCRA Canyon or RISWRC-01 and one in the North drainage or RISWOF-02), and a new location further north in the North drainage. The surface water sample locations are shown on Figure 4.1-P2 attached to this memorandum.

Surface water samples will be collected at two time intervals in the North and RCRA Canyon Drainages. The sampling will be conducted during the initial rainy season (October/November) and during the height of the rainy season (March/April), if possible. If the drainages are continuing to run during the summer months they will be sampled at that time also. Note however, that historically these locations have not had any running water to sample in the summer. Surface water samples will be analyzed for full Appendix IX analyses. The sampling locations as shown on Figure 4.1-P2 were chosen after the CSC and representatives for EPA walked the locations in the field on October 10, 2005. Samples will be collected using SOP 3-4 of the June 3, 2005 revised Final RI/FS Work Plan by submerging laboratory provided containers just under the surface of the water until the container is full. The Phase II surface water sampling will adhere to the same laboratory requirements for analytical work as was required by the June 3, 2004 revised Final RI/FS Work Plan for this type of sampling (this can be found in Appendix B QAPP of the Work Plan). The CSC has summarized the planned surface water sampling in Table 4.4-P2 attached to this memorandum. The table does not yet include survey coordinates for the new north drainage locations as it were just recently selected. The CSC will survey the location and provide all of those coordinates as part of our final reporting of the data. Additional details on surface water sampling can also be found in Section A6.5.11 of the SAP (Appendix A) of the June 3, 2005 revised Final RI/FS Work Plan. Background Soil Samples The CSC will collect background soil samples at additional depths at the same ten previous offsite soil locations that we had collected Phase I background soil samples to supplement existing data (locations RISSBK-13 through 22). The background soil sample locations are shown on Figure 4.1-P2 attached to this memorandum. The CSC has elected to gather additional background soil samples to augment the Phase I RI background soil samples we had collected earlier. We are specifically looking to add information to the database regarding herbicides for surface background soils (which were not included in the original sampling suites) and to gather additional background soil inorganic constituent data at different depths so we may evaluate whether different depths have statistically significant variations in inorganic constituents.

Page 4 The sampling locations as shown on Figure 4.1-P2 were chosen prior to Phase I RI activities after the CSC and representatives for EPA walked the locations in the field. Samples will be collected using SOP 1-1 of the June 3, 2005 revised Final RI/FS Work Plan. The Phase II background soils sampled at depths below the surface soil will be analyzed for metals (EPA Method 200.8, 6010B, 6020, and the 7000 series) and will adhere to the same laboratory requirements for this analytical work as was required by the June 3, 2004 revised Final RI/FS Work Plan for this type of sampling (this can be found in Appendix B QAPP of the Work Plan). The surface background soil samples will be analyzed for chlorinated herbicides (EPA Method 8151A) and will also adhere to the same laboratory requirements for this analytical work as was required by the June 3, 2004 revised Final RI/FS Work Plan for this type of sampling (this can be found in Appendix B QAPP of the Work Plan). The background soil samples will be sent to Sequoia Laboratory (Morgan Hill). Phase I soil samples were also analyzed at Sequoia Lab but at their Petaluma location. That lab location has since been converted to a distribution and administration center and the lab functions and equipment transferred to Morgan Hill. The Morgan Hill facility will adhere to all of the same laboratory MDL and QA/QC requirements that the Petaluma facility met. The CSC has summarized the planned background soil sampling in Table 4.4-P2 attached to this memorandum. Additional details on background soil sampling can also be found in Section A6.5.2 of the SAP (Appendix A) of the June 3, 2005 revised Final RI/FS Work Plan. Documentation The CSC will document the Phase II RI data using the same procedures and requirements as were required by the June 3, 2004 revised Final RI/FS Work Plan. The project documentation requirements are specifically discussed in Section 11.2 of the June RI/FS Work Plan. The data from this sampling will be included in the electronic database and copies of that will be provided to EPA. In the case of the soil vapor sampling at the three step out locations, the CSC will make every effort to provide the results of that sampling to EPA within 4 weeks (as was requested in EPA’s September 26th letter). The critical path for being able to meet that request will be the VOC analysis of the summa canisters collected as part of the soil vapor sampling. Field Supervision and Coordination with EPA The CSC expects that the soil vapor work will be performed by GeoSyntec (using the same staff as we used to complete the previous soil vapor sampling). As required, the CSC’s Project Coordinator will provide supervision of GeoSyntec while they are in the field. The CSC expects to collect the surface water samples using current URS site staff (who collected the previous Phase I surface water samples). The CSC expects to collect background soil samples with URS (using the same staff as we had used for the Phase I soil sampling).

Page 5 In all cases we will notify EPA’s on site representative of our plans to conduct the sampling at least 48 hours in advance of beginning the work. In the case of the surface water sampling, since this obviously depends on rain, we may not be able to provide that 48 hours notice. The CSC will coordinate any field work with EPA using the same guidelines that are discussed in Section 11 of the June RI/FS Work Plan which we had established for the Phase I RI work. That coordination specifically includes the requirements to coordinate with EPA as discussed in Section 11.3 of the Work Plan (and in Section A6.1 of the Sampling Analysis Plan or Appendix A of the Work Plan) and to hold daily status meetings as discussed in Section 11.5 of the Work Plan. In addition, the CSC will continue to use the management of change procedures that we had agreed with EPA prior to beginning the Phase I RI work (please see Section 11.7 of the Work Plan). Any change in sampling procedures or analytical reporting that were documented in an approved RICH form for Phase I RI sampling will also apply to the Phase II RI sampling. regards, Corey Bertelsen Casmalia Project Coordinator Attachments Table 4.4-P2 Figure 4.1-P2 Table A.2-P2 cc Jim Dragna – BM

Dave Roberson - ExxonMobil Paul Taylor - ConocoPhillips

Dan Niles – RWQCB Caroline Rudolph – DTSC Mark Wuttig – CH2MHill Casmalia Office San Luis Obispo Office 3401 NTU Road 868 Greystone Place Casmalia, CA 93429 SLO, CA 93401 (805) 934-5951 (805) 784-0803

A

ppro

x.D

efau

lt#

# pe

rB

orin

gSa

mpl

ePe

st/

Mod

Dio

xin/

Phys

ical

Gen

eral

Min

eral

s /

Are

aLo

c'ns

Loc'

nTo

tal

Type

Dep

thD

epth

sM

etal

sVO

CSV

OC

PCB

Her

bTP

H g

,dA

ppx

IX*

Fura

ns(2

)Pr

oper

ties

(3)

EDB

/DB

CP

Cap

ped

Land

fills

Are

aSo

il Va

por S

ampl

ing

31

31

20*

-X

--

--

--

-S

ampl

e ID

Nor

thin

gE

astin

gTy

peG

S E

lev

Wat

er E

lev

RIS

VC

L-3B

5059

8912

3876

6TY

PE

166

760

0R

ISV

CL-

5B50

6733

1238

315

TYP

E1

648

600

RIS

VC

L-8B

5073

5212

3700

3TY

PE

172

568

03

13

17.

5R

ISV

CL-

3CTB

DTB

DTY

PE

1R

ISV

CL-

5CTB

DTB

DTY

PE

1R

ISV

CL-

8CTB

DTB

DTY

PE

1R

CR

A C

anyo

n A

rea

Surf

ace

Wat

er1

11

90

0-

--

--

X-

--

Sam

ple

IDN

orth

ing

Eas

ting

Type

GS

Ele

vW

ater

Ele

vC

onta

ct E

leva

tion

DTW

DTC

RIS

WR

C-1

5057

9812

3555

6TY

PE

946

547

846

0-1

35

Cen

tral

Dra

inag

e A

rea

Soil

Vapo

r Sam

plin

g5

15

17.

5*

-X

--

--

--

-S

ampl

e ID

Nor

thin

gE

astin

gTy

peG

S E

lev

Wat

er E

lev

RIS

VC

D-4

TBD

TBD

TYP

E1

RIS

VC

D-5

TBD

TBD

TYP

E1

RIS

VC

D-6

TBD

TBD

TYP

E1

RIS

VC

D-7

TBD

TBD

TYP

E1

RIS

VC

D-8

TBD

TBD

TYP

E1

Bur

ial T

renc

h A

rea

Soil

Vapo

r Sam

plin

g2

12

17.

5*

-X

--

--

--

-S

ampl

e ID

Nor

thin

gE

astin

gTy

peG

S E

lev

Wat

er E

lev

RIS

VB

C-7

TBD

TBD

TYP

E1

RIS

VB

C-8

TBD

TBD

TYP

E1

Liqu

ids

Trea

tmen

t Are

aSo

il Va

por S

ampl

ing

31

31

7.5

*-

X-

--

--

--

Sam

ple

IDN

orth

ing

Eas

ting

Type

GS

Ele

vW

ater

Ele

vR

ISV

LT-1

TBD

TBD

TYP

E1

RIS

VLT

-2TB

DTB

DTY

PE

1R

ISV

LT-3

TBD

TBD

TYP

E1

Offs

ite A

rea

Surf

ace

Wat

er2

12

9S

urfa

ce0

--

-X

-S

ampl

e ID

Nor

thin

gE

astin

gTy

peG

S E

lev

Wat

er E

lev

Con

tact

Ele

vatio

nD

TWD

TCR

ISW

OF-

250

7384

1238

927

TYP

E9

470

462

458

812

RIS

WO

F-6

TBD

TBD

TYP

E9

Bac

kgro

und

Soils

(1)

103

305

200,

5,10

X (d

epth

soi

ls

only

)-

--

X (s

urfa

ce

soils

onl

y)-

--

-S

ampl

e ID

Nor

thin

gE

astin

gTy

peG

S E

lev

Wat

er E

lev

Con

tact

Ele

vatio

nD

TWD

TCR

ISS

BK

-13

5067

8812

3415

1TY

PE

247

30

448

473

25R

ISS

BK

-14

5072

8312

3401

0TY

PE

248

50

455

485

30R

ISS

BK

-15

5078

8212

3384

4TY

PE

249

50

467

495

28R

ISS

BK

-16

5085

8512

3412

9TY

PE

252

30

490

523

33R

ISS

BK

-17

5083

4512

3411

9TY

PE

269

50

703

695

-8R

ISS

BK

-18

5086

5312

3617

0TY

PE

284

266

074

218

210

0R

ISS

BK

-19

5089

2912

3649

1TY

PE

277

562

067

515

510

0R

ISS

BK

-20

5089

4112

3733

1TY

PE

257

055

555

015

20R

ISS

BK

-21

5082

6312

3753

5TY

PE

256

553

552

730

38R

ISS

BK

-22

5079

6812

3771

3TY

PE

253

852

550

213

36

Sam

ple

Dep

th /

Sam

ple

Col

lect

ion

Not

es:

Ant

icip

ated

dril

ling

met

hods

- Ty

pe 1

Sam

ples

: Dire

ct P

ush

Rig

(1

)M

axim

um B

ackg

roun

d S

ampl

ing

Dep

th to

20

feet

if n

eede

d to

obt

ain

clay

ston

e sa

mpl

eTy

pe 2

Sam

ples

: Man

ual S

ampl

ing

Tool

s S

urfa

ce s

ampl

es a

naly

zed

only

for h

erbi

cide

sTy

pe 3

, 4, 5

, 6 S

ampl

es: D

irect

Pus

h R

ig (d

efau

lt) o

r Hol

low

Ste

m A

uger

Rig

(if n

eces

sary

)Ty

pe 7

Bor

ings

: CP

T R

ig

Tabl

e 4-

4-P2

Soi

l Vap

or, S

urfa

ce W

ater

, and

Bac

kgro

und

Soil

Sam

plin

g Pr

ogra

m S

umm

ary

(rev

10.

24.0

5)

App

roxi

mat

e #

Sam

ples

CSC

S:\_

Pro

j\Cas

mal

ia\D

raft

RI R

epor

t\App

endi

ces\

Apx

Y\R

evis

ion

4 - F

all,

2005

Pha

se II

RI S

ampl

ing\

Tabl

e 4-

4-P

2_re

v10.

24.0

57/

2/20

09Pa

ge 1

of 1

RI/F

S W

ork

Plan

����

����

���

����

����

�� ��

���

����

�����

�����

����

�����

����

����

����

�����

��� �

� ���

�����

���

���

���

���

���

���

������

���

������

���

������

��

��

���

���

���

���

��� ���

������

������

����

��

���

���

���

��

��

���

���

��� ��� ���

������

���

���

���

���

���

���

���

���

���

���

���

���

�����

���

���

���

��� ��

��� ��

���

��

��

��

��

���

���

���

���

���

������

���

���

���

���

������

���

���

���

������������

��

��

���

���

���

������

���

���

���

���

���

��

�� �

���

��

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

��

��

���

���

���

���

���

���

�����

���

�����

���

���

���

���

���

���

���

���

���

���

���

���

��� ���

���

��

���

��

��

���

���

���

���

���

���

���

���

���

���

������

���

���

���

���

���

���

���

���

���

���

���

��

��

��

��

��

��

���

���

������

���

���

���

������

������

������

���

��� ���

���

��� ���

���

��

��

��

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

��

���

���

���

���

���

���

���

������

���

������

������

��

�� ��� ���

������

���

���

���

���

���

���

��

��

���

������

���

���

���

��� ���

���

���

���

��

�����

���

������

���

��

���

��� ���

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

���

���

���

���

������

������

���

���

���

���

���

���

���

���

���

���

�����

��

��

������

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

���

���

���

���

���

����� ���

������

��

���

��

������

��

���

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

��

��

��

��

���

���

���

���

���

���

���

���

���

������

���

���

���

���

���

���

���

���

���

��

��

��

��

��

��

��

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

���

�!"#$�%&

�!"#$�%'�!"#$'

�!"#$&�!"#$(

�!"#$)

�!"#$'��!"#$''

�!"#$'&

�!"#$&�

�!"#$�

��#$*�

�!"#$+

��,#-$'

�!"#$�%(

�!"#$�%)

��#$'� �!"#$'*

�!"#$.

�!"#$�

�!"#$�

�!"#$/

�!"#$�

�!"#$�

��#$/0

��#$/��!"#$1

�!"#$'/

��#$'�0��#$'��

��,#-$&

��#$'�-

�!"#$&&

��#$'�

�!"#$�

�!"#$#

2��0

�!"#$*

��#$'�3

��#$'��

��#$+�

��#$+�

��#$+0

�!"#$4

�!"#$0

�!"#$�

�!"#$�

�!"#$�%1

��#$)�

�!"#$'�

�!"#$'1

�!"#$-

��#$'+

�!"#$') �!"#$�

�!"#$&(

��3$�!"#

�!"#$'+

�!"#$�%�

�%�-�-�$�!"#

�!"#$'(

� �

��

� �

��

��

��

��

0,���-��0,���-��

�!"#$4

�!"#$�

�� ��� ����

��������

���������

������������

����������������

��������

��������

����� �

��������

��������

��������

����� �

����� ��

���������

���������

���������

������������� !"#� !$

��������

��������

��������

��������

����������������

����������������

�������

�������

� ���������

�������������� ������������������

���������

���������

����������������� �����������

������������������

� ��� ����������

���������� ������

����� ���������������

�������������������

����������������

�����������������

���������������������

����������������

����������������������������

��������������������������

��������

� ��� �� �!!

�%��!�&#��!! �����������

��'(��&���& !��!(!)&����#*!' &+� &,#

������������������������������������������������������������������ ����!��������

-.�'!�����������(/�&#+�-",+"�(��'(��&���& !��!(!)&����#*!' &+� &,#

�% ,0!"����

����������������� ������������� �������������� ������

������������� ������ ���������������

�������������������������������������� �!"��#���$%������$%���������"���&���#����'�������(�)(�����(�)*���+���),� ��#���--�

'����!���.�����������,�����������"��!�,��

� /�0�����12������������� �3����������� ,��.����������������

�����������������

-$5$�$ $�$�$�$�$�$�$�

�,1"%!2�� ,/,+"�/.&%�0�'!�(�/�/",*&)!)�03�-�%&4&%��#+&#!!"&#+5��#%6�4",(��!"&���'1"*!3�)� !)�7�"%.��5����6

Table A-2Proposed Sampling and Analytical Program

PHASE II OCTOBER 2005Appendix A SAP/FSP

;

Table A.2-P2Fall 2005 Phase II RI Sampling

Temperature 4o Celsius

Comments

Study AreaStation Number Matrix

Sample Number Station Description

Sample Depth (ft)

Sample Type V

OC

s (E

PA

826

0B/5

04.1

)

Poo

r pur

ging

org

anic

com

poun

ds

(EP

A 8

015

Dire

ct In

ject

)

BTE

X (E

PA

802

1B)

TPH

g (E

PA

801

5B)

TPH

d (E

PA

801

5B)

SV

OC

s (E

PA

827

0C)

Org

anoc

hlor

ine

Pes

ticid

es/P

CB

s (E

PA

808

1A/8

082)

Met

als

(EP

A 2

00.8

, 601

0B/6

020

and

7000

Ser

ies)

Mod

ified

App

endi

x IX

* (A

ppen

dix

IX w

ith a

dditi

onal

CO

PC

s le

ss

diox

ins

and

fura

ns) (

e)

App

endi

x IX

(Mod

App

endi

x IX

pl

us a

dditi

onal

CO

PC

s an

d di

oxin

s an

d fu

rans

) (e)

Dio

xins

and

Fur

ans

(EP

A 8

290)

Org

anoc

hlor

ine

Pes

ticid

es o

nly

(E

PA

808

1A)

Chl

orin

ated

Her

bici

des

only

(E

PA

815

1A)

Gen

eral

Min

eral

s (C

atio

ns 6

010B

, TD

S 1

60.1

, Sul

fide

9030

B, A

nion

s 30

0.0

and

Alk

alin

ity S

M 2

320)

Phy

sica

l Pro

perti

es (f

)

Per

chlo

rate

(EP

A 3

14.0

)

Hyd

razi

ne (E

PA

831

5)

Exp

losi

ves

(Nitr

oaro

mat

ics

and

Nitr

osam

ines

) EP

A 8

330

pCB

SA

(LC

/MS

/MS

)

C14

and

Trit

ium

CO

D, B

OD

, and

DO

(EP

A 4

10.4

/405

.1)

Den

sity

, Vis

coci

ty, D

NA

PL-

Wat

er

Inte

rfaci

al T

ensi

on

Soil 3 Encr 2 oz jar 3 Encr 1-16 oz jar or ss-sleeve NA1-16 oz jar or ss-

sleeve NA NA NA NA NA NA NA

Sediment NA NA NA NA 16 oz G 16 oz G 16 oz G 16 oz G 16 oz G NA 16 oz G 16 oz G NA 8 oz G NA NA NA NA NA NA NA

Air SUMMA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Aqueous3 x 40 mL VOA HCl

3 x 40 mL VOA HCl 3 x 40 mL VOA HCl 2 x 1L G 2 x 1L G 2 x 1L G

0.5L Pl; Nitric Acid

See bottle list in Appendix B, Table B-1

See bottle list in Appendix B, Table B-1 2 x 1L G 2 x 1L G 2 x 1L G

0.5 L Pl HNO3

0.5 L Pl; 1-1L Pl

ZnAcetate/NaOH; 1-1L Pl

NA 0.5L Pl 2x1L G 2x1L G 2x1L G 1-1L Pl; 0.5L Pl1 x 50ml Pl

H2SO4; 1 L G 1 L G

Off-Site Area Background Soils Evaluation a

RISSBK-13 soil surface soil (T4) 0-0.5 primary xRISSBK-13 soil shallow soil (T4) 5-5.5 primary xRISSBK-13 soil shallow soil (T4) 5-5.5 duplicate xRISSBK-13 soil shallow soil (T4) 10-10.5 primary xRISSBK-14 soil surface soil (T4) 0-0.5 primary xRISSBK-14 soil shallow soil (T4) 5-5.5 primary xRISSBK-14 soil shallow soil (T4) 10-10.5 primary xRISSBK-15 soil surface soil (T4) 0-0.5 primary xRISSBK-15 soil shallow soil (T4) 5-5.5 primary xRISSBK-15 soil shallow soil (T4) 10-10.5 primary xRISSBK-16 soil surface soil (T4) 0-0.5 primary xRISSBK-16 soil shallow soil (T4) 5-5.5 primary xRISSBK-16 soil shallow soil (T4) 10-10.5 primary xRISSBK-17 soil surface soil (T4) 0-0.5 primary xRISSBK-17 soil surface soil (T4) 0-0.5 duplicate xRISSBK-17 soil surface soil (T4) 5-5.5 primary xRISSBK-17 soil surface soil (T4) 10-10.5 primary xRISSBK-18 soil surface soil (T4) 0-0.5 primary xRISSBK-18 soil surface soil (T4) 5-5.5 primary xRISSBK-18 soil surface soil (T4) 10-10.5 primary xRISSBK-19 soil surface soil (T4) 0-0.5 primary xRISSBK-19 soil surface soil (T4) 5-5.5 primary xRISSBK-19 soil surface soil (T4) 10-10.5 primary xRISSBK-20 soil surface soil (T4) 0-0.5 primary xRISSBK-20 soil surface soil (T4) 5-5.5 primary xRISSBK-20 soil surface soil (T4) 10-10.5 primary xRISSBK-21 soil surface soil (T4) 0-0.5 primary xRISSBK-21 soil surface soil (T4) 5-5.5 primary xRISSBK-21 soil surface soil (T4) 10-10.5 primary xRISSBK-21 soil surface soil (T4) 10-10.5 duplicate xRISSBK-22 soil surface soil (T4) 0-0.5 primary xRISSBK-22 soil surface soil (T4) 5-5.5 primary xRISSBK-22 soil surface soil (T4) 10-10.5 primary xSurface WaterRISWOF-2 water surface water (T9) 0-0.5 primary x x x x x x xRISWOF-6 water surface water (T9) 0-0.5 primary x x x x x x x

Capped Landfills Area Soil Vapor SamplingRISVCL-3B air soil vapor (T1) 20 primary x RISVCL-5B air soil vapor (T1) 20 primary xRISVCL-8B air soil vapor (T1) 20 primary xRISVCL-3C air soil vapor (T1) 7.5 primary xRISVCL-5C air soil vapor (T1) 7.5 duplicate x RISVCL-5C air soil vapor (T1) 7.5 primary x RISVCL-8C air soil vapor (T1) 7.5 primary x

Central Drainage Area Soil Vapor SamplingRISVCD-4 air soil vapor (T1) 7.5 primary x RISVCD-5 air soil vapor (T1) 7.5 primary xRISVCD-6 air soil vapor (T1) 7.5 primary xRISVCD-7 air soil vapor (T1) 7.5 primary xRISVCD-8 air soil vapor (T1) 7.5 primary x

Burial Trench Area Soil Vapor SamplingRISVBC-7 air soil vapor (T1) 7.5 primary x RISVBC-8 air soil vapor (T1) 7.5 primary x

Liquids Treatment Area Soil Vapor SamplingRISVLT-1 air soil vapor (T1) 7.5 primary x RISVLT-2 air soil vapor (T1) 7.5 primary xRISVLT-3 air soil vapor (T1) 7.5 primary x

RCRA Canyon Surface WaterRISWRC-1 water surface water (T9) 0-0.5 primary x x x x x storm water diversion pipe

a 10-foot samples will be collected at 10 feet or in claystone,whichever is deeper GW Groundwater sample.to a maximum depth of 20-feet bgs. soil Soil sample.

sed Sediment sampleVOCs Volatile organic compounds

G Glass. BTEX Benzene, toluene, ethylbenzene, and xylenesoz Ounce. TPHg Total petroleum hydrocarbons as gasoline.L Liter. TPHd Total petroleum hydrocarbons as diesel.Pl Plastic. SVOCs Semivolatile organic compounds.mL Milliliter. PCBs Polychlorinated biphenyls.HCL Hydrochloric acid. TOC Total organic carbon.

CSC Table_A.2-P2-FINAL10.27.05-CasmaliaOCTOBER 2005 Page 1 of 1

RI/FS Work PlanAppendix A


Recommended