Date post: | 02-Jun-2018 |
Category: |
Documents |
Upload: | tssuru9182 |
View: | 228 times |
Download: | 0 times |
of 15
8/10/2019 RF Design Process v2_7
1/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 1
RF Design Process
Determining
Need
Location
Evaluation
Site
Assessment
Finalize
Search
Area
FinalizeDesign
Find
Candidates
Finalize
Candidate
Site
Development
New SiteCommissioningBuildout &EWO
Site
Engineering
Changes
Lease & Permit
8/10/2019 RF Design Process v2_7
2/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 2
Process Type
Action
Physical Item
or Output
Departments
[RF] RF Design Engineering
[Freq Plan] RF Frequency Planning
[RE] Real Estate
[F] Financial
[Const.] Construction
[FCC dept] Hanover FCC dept[QA] QA Perf. Dept
[Emissions] RF Emissions Coordinator
[Dallas] SBC Dallas FAA/FCC Dept
Other Reference Documents:
1) G\RF\RF DESIGN GROUP\RF_Document\RF-RE Processes directory for more details on the process from the RF
Department viewpoint
2) N:\Real Estate Processes directory for more details on the process from the Real Estate Department viewpoint.
3) Cell site edit procedure in Wizard, Author: Haroon Ajaz, 1 -31-2001
4) RF Procedure Naming and Giving Status in Wizard, Author: Effendi Jubilee, 10 -24-2001
5) Section 5: Responsibilities of the RF Engineering Group,
6) Radio Fundamentals Manual
7) Construction Timeline 1999
This document presents work flow diagrams focused on two of the major tasks provided by the RF Design Department:
1) New cell site design
2) Engineering changes to existing sites.Many other departments, of course, are integral part of these processes and the interaction with them is detailed.
Key:
Introduction
NEPA = National Environmental Policy Act. Requires government agencies (Cingular via FCC) to study if any impact on
wetlands, floodplanes, historical areas, native american territory, etc)
SHIPO = State Historic Preservation Office. (They look for impact and visibility of towers from historic areas)
ASTM = American Society for Testing and Materials (Organization that sets hazardous materials handling standards. Report
documents risk level of litigation and possible financial burdens for a particular property)
8/10/2019 RF Design Process v2_7
3/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 3
RF selects a
Search Area
Site (Grid center)
RF analyzes
Search Area
Site
RF performs
Capacity, Coverage
& Complaints
Analysis
RF creates searchArea Map & Legend
(Street Atlas > Word)
Search
Area
Map with
Purpose Legend
(Word)
If a Construction #
does not exist RF fills
out a Location
Request Form
Location
Request
Form
(Excel)
If applciable
RF sends form to
System Engineering
Coverage plot
of
current area
(Wizard)
Coverage plot
of Search
Area Site
(Wizard)
Coverage plot
of only Search
Area Site
(Wizard)
Search
Area
Criteria
Email form to Mike Bowldes
(Finance Dept)
Opt.
FAA Study
(Airspace)
Determine Need
Start
Finance
determine
Search Area Site
Construction No.
RF determines
Search Area Site
Name
Non-Requested
Candidate ?
[RE]
8/10/2019 RF Design Process v2_7
4/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 4
Deliver copy of
Search Area Map with Legend
to Site Acquisition
Office Manager
[RF]
CreateBrown Folder
[RF]
Search
Area
Map with Legend
(Word)
Hand deliver to
Elaine Barrs
ATC Office Manager
Finalize Search Area
Brown Folder
(paper documents)
Existing Coverage plot (Wizard)Theoretcial Search Area Coverage plot (Wizard)
Search Area Map with Legend (Word)
Capacity or Inteference Site Request Form
Green Hanging Folder
RF createsSearch Area entry
in Remedy
New_CT_Search_Area
or
CT_Modify_Search_Area
Form
(Remedy)
RF finalizesfinal Wizard
Search Area
entry
RF createsSearch Area entity
in Wizard
The Wizard entity for
should have Search Area
status. See Naming
procedurefor more details.
8/10/2019 RF Design Process v2_7
5/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 5
RE creates Search Area
Candidate Files:
Pink Sheets
Candidate File
Pink SheetCandidate Information
Initial Pictures of Site
Search Area Map
Update the Electronic
Pink Sheet
[RE]
Identify candidates
within Search Area
[RE]Search Area Candidate Files
(Paper documents)
Modify_CT
Search Area
Form
(Remedy)
Find Candidates
Within 2 weeks
8/10/2019 RF Design Process v2_7
6/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 6
Location Evaluation
Rank &
Accept or Reject
Candidates
[RF]
EvaluatePink Sheet
Candidates
[RF]
Verify FCC / FAA /
Airport / AM
requirements are Met
[RF]
Final
Candidate
Review
[RF]
Existing
Coverage plot
(Wizard)
Theoretical
Search Area
Coverage plot(Wizard)
Candidate
Coverage plots
(Wizard)
Traffic
Analysis
(if required)
Site Only
Coverage plot(Wizard)
-85 & -105 dBm
RF creates Wizardentities for each
candidate
Possible
Site visit with RE
(& Construction if site
is a bldg) to narrow
selection of top candidates
[RF]
Each Wizard entity for each candidate
should have Pinksheet Candidate status.
8/10/2019 RF Design Process v2_7
7/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 7
Create Blue
Folders for allCandidates
[RF]
Deliver Final
Candidate File
to RE
Best Candidate(s) File
Pink Sheet (copy)
Candidate Info (copy)
Site Picturesm (copy)
Search Area Map (copy)
Coverage Plots (originals)
Final Candidate File
Pink Sheet (original)
Candidate Info (original)
Site Pictures (original)
Search Area Map (original)
Rejected Candidate File (s)
Pink Sheet
Candidate Information
Site Pictures
Search Area Map
Coverage Plots
Update
RemedyPink Sheet
[RF]
Blue Folders
Modify_CT
Search Area
Form
(Remedy)Comments
Check Assigned
Accept / Reject / Pend
Change Wizard entity status for
each candidate from Pinksheet
Candidate to Pinksheet Selectedor Pinksheet Rejected as
appropriate.
Update
Candidate Tracking
Sheet
[RF]Candidate
Tracking
Sheet
(Excel)
Comments
Why Reject
Future Considerations
To ATC Office Manager
Elaine Barrs
Finalize Candidate
8/10/2019 RF Design Process v2_7
8/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 8
RE schedules
Site Assessment
Meeting (SAM)
Send SAM
Packet
to RF
RF takes pictures of site
FCC looks for its enviromental concens
Const. May do a rough site plan for proposal
Consider need for signs or barricades
SAM
Packet
(Paper)
RE holdsSite Assessment Meeting
(at candidate location)with
RF, FCC group, RE,
Const., and QA (if applicable)
If site is water tower
or building, RF to fill out
Site Survey Form
Site
Survey
Form
(Paper)
Create
SAM Sketch
[RE]SAM
Sketch(paper)
RF Approves
SAM Sketch(s)
Site Assessment
RF Creates
Yellow
Sheet
Deliver original to Elaine (RE), keep a copy
Due two weeks after Buildout Forecast
Change Wizard entity status from
Pinksheet Selected to Yellowsheet
RF and RE jointly
decide on final
candidate to pursue
RF and RE decide
Buildout Forecast
for candidate
RE seeks
owner approval
of SAM sketch
RE
negotiates
Leasewith
owner
RE provides
owner with
boiler-plate lease
To leased
signed
8/10/2019 RF Design Process v2_7
9/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 9
Site Development
FCC Group
delivers Surveyresults to RF Site
Survey
(Paper)
RE releases
SDP
Owner Info Sheet
Pink Sheet
Yellow Sheet
Directions with Map ?
Tower info (if co-locate)
Foundation design
Zoning requirements
Copy of Survey
FAA / FCC if required
Approved SAM sketch
Site Development Package
(SDP)
Contractors create
Site drawings
FCC group
ordersSite Survey
FCC group
orders
NEPA study
Consultant
studies area and
produces NEPA
and SHIPO report
FCC
group delivers historic
impact study
to SHIPO
Const calls
Site DevelopmentMeeting (SDM)
at site
Internal review of
Site drawings
Contractors create
official owner approval
drawings
Const Eng, Site
Acq, Elect Eng
and possibly civil,
structural,
architectural
engineers
FCC group
orders
ASTM report
ASTM Report
sent to Dallas
Airspace highlights any conflicting
structures in red
To Greensheet
FCC dept performs
Airspace study to check for
airport and radio station issues.
If structure
height is raised
then FCC dept asks
Dallas to request
FAA/FCC approval
8/10/2019 RF Design Process v2_7
10/15
8/10/2019 RF Design Process v2_7
11/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 11
Buildout & EWO
RF Create
New Site
EWO
Telco Dept
orders
Telco
Progress tracked in Weekly
Project PlanningSwitch
Provisioned
[Network]
Cell_1_EWO(Remedy)
J Drive Folder
Powersheet attached
RCF layout attached
DSO/Vocoder assignments attached
Const.
RequestsBlue Sheet
from RFPower
Provisioned
Const.
Tri Meeting withTelco &
Power reps
Const.
begins site
construction
Freq PlanDept
creates work
EWO
Save copy of power sheet in EWO directory
RF requestsExtension
Agreements
if any?
8/10/2019 RF Design Process v2_7
12/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 12
FCC dept prepares
and delivers
RFF to Dallas
FCC Contours
Request For Filing
(RFF)
SBC Dallas
FAA/FCC dept
sends SAS to
FCC dept
Const.
Places
Antennas
Site Authorization
Sheet (SAS)(authorization
to hang antenna
and go on-air
when ready)
Contractor performs
Tape Drop Survey
to obtain exact
Antenna RCRF performs
Post-Construction
Inspection
Emissions
Performs
MPE
Study
Emissions
Coordinator
fills out RF Emissions
Survey Form
See Post-Construction Inspection procedure
Maximum
Permissable
Emissions
Study
(MPE)FCC dept corrects
wizard entities with
Tape Drop data
if necessary
RF finalize design
and update
Blue Sheet
(MS Access)
RF calls
Blue Sheet
Meeting with QA
See Blue Sheet Meeting outline for more details.
Purpose is to Obtain cell requirements
in detail from QA and discuss design issues
Blue Sheet
hardcopy
Attachments
RF Supv.
Reviews andSigns Blue
Sheet
Give copy to Front Desk
for general distribution
Finalize Design
8/10/2019 RF Design Process v2_7
13/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 13
QA optimizes
site with On-Air
tests
QA performs
SiteCommissioning
andplace On-Air
QA Assesses
Performance
QA calls
Post-Commissioning
Meeting with RFafter two weeks
on-air
Present Drive Coverage Data
Present Call Statistics
Evaluate site performance
Identify needed changes
Vendors install
equipment
QA calls
Pre-Commissioning
Meeting with RFATP
[Vendors]
Existing coverage Pre-Drive
Test signal strength
Test Channel performance
Voice circuit performance
Handoff optimization
For details see the Pre-
Commissioning
Meeting Outline
On-Air
Form
RF?
releases site
files to archives
Site
File
Completed
Contractor
Punch
List
New Site Commissioning
Freq Planning
creates
Channel
Plan
Frequency
Plan
(Wizard)
8/10/2019 RF Design Process v2_7
14/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 14
Site Engineering Changes
Change
requested
RF evaluates
and
determines change
specifications
RF Creates
Owners Approval
(OA) EWO
RE requests Owner
Approval
Const. Requests
structural analysisif necessary
OA EWOCompleted
RF creates Yellow
Sheet for site
Give original to Elaine (RE) for general distribution
RF
confers with QAregarding site
specific design
RF creates
engineering change
EWO
Wizard EWO entity create for
specific cell site
FCC dept
requests
SAS
RF calls Blue Sheet
Meeting with QA
before
site work started
RE or
QA requests
Blue Sheet
from RF
Site work
started
RF creates
Wizard EWO
entries
Include fake switch ID
RF creates
powersheet for
EWO
RF copies data
to EWO
directoryPower
Sheet
Site
Config
8/10/2019 RF Design Process v2_7
15/15
2/5/2002
Ver 2.7Cingular Wireless
Baltimore / Washington
Network Operations Center
Send revisions to S. Remington 15
Capacity Add Changes
VCF RunRF evaluates
the capacity
growth requirements
RF determines
growth frame
requirements
RF determines lac
add and/or antenna
swap requirements
RF forwards T1
requirements totransmission
RF forwards
Packet Pipe req
to Switch engg
Switch and field
operations completeworkRF releases EWOfor capacity add
Performance
verifies work
RF closes EWO
updates Wizard