RFP for Network Cabling Installation for Two-Story Building Questions and Answers Question El Rio Response 1. Regarding Communications structured cabling. a) Are there any speaker locations besides the bathrooms that are hardlid? b) In the RFP documents it is stated that El Rio will provide 2 post racks and wire management. Does that include the horizontal wire management as well? c) Are wrap around labels required behind the faceplates and patch panels? d) Does the cabling need to be plenum rated? A. I am including the Ceiling plans, this should answer this question B. El Rio will provide the 2-post rack and vertical cable management. We will not be using horizontal wire management C. Wrap around labels are not required, cables need to be marked and wrap around labels are preferred D. Riser cable will be used at this building 2. F.III.a-Will El Rio supply the contractor with AutoCAD backgrounds for their use in documentation? Yes 3. F.VII.b- The completion penalty clause calls for a 50% penalty per working day post agreed completion date. Is this correct? .5% per working day 4. F.VIII.a Will El Rio also supply and install the rack and cable management on the 2 nd floor IDF? Yes we will provide and install the rack and vertical cable management in the MDF and IDF 5. F.VIII.g-Shall the spare cables be terminated with White jacks for them to be certified? Yes, terminated with white jacks 6. General – Will El Rio provide Rack Elevations for the Contractors use for termination the cabling? Yes, we will provide rack elevations 7. General – Will El Rio publish the Reflected Ceiling Plans for our use in Estimation? Ceiling Plans have been attached 8. General – Will Riser, (CMR,) or Plenum, (CMP,) cabling be required for use in the facility.? If determined by the mechanical system, are the Mechanical Plans available? Riser Cable will be used at this building
Transcript
Page 1: RFP for Network Cabling Installation for Two- Story ...

RFP for Network Cabling Installation for Two-Story Building Questions and Answers

Question El Rio Response 1. Regarding Communications structured

cabling. a) Are there any speaker locations

besides the bathrooms that are hardlid?

b) In the RFP documents it is stated that El Rio will provide 2 post racks and wire management. Does that include the horizontal wire management as well?

c) Are wrap around labels required behind the faceplates and patch panels?

d) Does the cabling need to be plenum rated?

A. I am including the Ceiling plans, this should answer this question

B. El Rio will provide the 2-post rack and vertical cable management. We will not be using horizontal wire management

C. Wrap around labels are not required, cables need to be marked and wrap around labels are preferred

D. Riser cable will be used at this building

2. F.III.a-Will El Rio supply the contractor with AutoCAD backgrounds for their use in documentation?

Yes

3. F.VII.b- The completion penalty clause calls for a 50% penalty per working day post agreed completion date. Is this correct?

.5% per working day

4. F.VIII.a Will El Rio also supply and install the rack and cable management on the 2nd floor IDF?

Yes we will provide and install the rack and vertical cable management in the MDF and IDF

5. F.VIII.g-Shall the spare cables be terminated with White jacks for them to be certified?

Yes, terminated with white jacks

6. General – Will El Rio provide Rack Elevations for the Contractors use for termination the cabling?

Yes, we will provide rack elevations

7. General – Will El Rio publish the Reflected Ceiling Plans for our use in Estimation?

Ceiling Plans have been attached

8. General – Will Riser, (CMR,) or Plenum, (CMP,) cabling be required for use in the facility.? If determined by the mechanical system, are the Mechanical Plans available?

Riser Cable will be used at this building

Page 2: RFP for Network Cabling Installation for Two- Story ...

7 - 8' - 6" Ceiling - 878 SF

8 - 8' - 3" Ceiling - 236 SF

1st Floor Ceiling.pdf (98% of Scale); Takeoff in Active Area: All Areas; Ceiling Types; 5-22-2019 9-56-9; 5/6/2021 02:23 PM

Page 3: RFP for Network Cabling Installation for Two- Story ...

1 2 3 4 5 6 7 8

A

B

C

D

E

F

2

A5.2

2

A5.2

1

A5.2

1

A5.2

4

A5.2

4

A5.2

3

A5.2

3

A5.2

LAB

211

DENTALSTERILIZATION

208

IMAGING

203

EQUIP.

202

D.O. 1

204

D.O. 2

206

D.O. 3

210

D.O. 4

213

D.O. 5

214

D.O. 6

212

D.O. 7

207

D.O. 8

205

DENTALSTORAGE

209

RECEPTION

201

WAITING

200

WOMEN'SRR

229

MEN'S RR

228

UNISEX RR

225 UNISEX RR

226

LOCKERS

227

IDF

220

VENDING

224C

ELECT.

223

CUSTODIAL

219

OPENOFFICE

218 CORRIDOR

216A

BREAKROOM

224

MOM'SROOM

221

DENTALMGR.

215

CORRIDOR

224B

GWB8' - 9" AFF

GWB8' - 9" AFF

ACP-19' - 6" AFF

BOTTLESTORAGE

217

PRINTING &DEVELOPING

216

E.T.S.

E.T.S.

E.T.S.

16

A8.1

ACP-19' - 6" AFF

3

A3.3

7

A3.3

4

A3.3

7

A3.3

3

A3.3

3

A3.3

3' - 0"

3' -

0"

CEILING TYPES:

A

B E.T.S.

C

D

GWB

EXPOSED TO

STRUCTURE

CEILING EQUIPMENT:

LIGHT FIXTURE - RECESSED IN

CEILING.

LIGHT FIXTURE - CEILING OR

PENDENT MOUNT.

LIGHT FIXTURE - WALL MOUNT.

LIGHT FIXTURE - RECESSED IN

CEILING.

GENERAL NOTES:

1. CEILING HEIGHTS SHOWN IN PLAN ARE NOMINAL AND SHOULD BE COORDINATED WITH DETAILS AND

SECTIONS

E

2x2 SUSPENDED

ACCOUSTICAL CEILING

MECH - SUPPLY DIFFUSER

MECH - RETURN DIFFUSER

MECH - EXHAUST

EXTERIOR LIGHT FIXTURE - WALL

MOUNT.

EXIT LIGHT

CEILING EQUIPMENT:

EB

EMERGENCY BATTERY PACK -

WALL MOUNT.

LED EXIT FIXTURE - CEILING MOUNT.

LED EXIT FIXTURE - WALL MOUNT.

LIGHT FIXTURE - WALL MOUNT.

LIGHT FIXTURE - SURFACE,

PENDANT OR CHAIN MOUNT FROM

CEILING.

UNDERCOUNTER FIXTURE -

SURFACE MOUNT.

2x4 SUSPENDED

ACCOUSTICAL CEILING

LIGHT FIXTURE - RECESSED IN

CEILING.

LIGHT FIXTURE - RECESSED IN

CEILING.

DENTAL LIGHTS ATTACHMENT POINT

HEXAGONAL

ACOUSTICAL CEILING

CLOUD

1. SEE GENERAL NOTES ON SHEET G1.1 FOR SUSPENDED CEILING GRID

LAYOUT AND PLACEMENT OF CEILING MOUNTED DEVICES.

2. SEE FLOOR PLAN FOR PARTITION TYPES.

3. COORDINATE CEILING PLANS WITH MECHANICAL, FIRE PROTECTION AND

ELECTRICAL PLANS.

4. ALL GWB CEILINGS AND SOFFITS SHALL BE TEXTURED AND PAINTED.

5. REFER TO SHEET A3.3 FOR CEILING DETAILS.

6. CEILING HEIGHTS SHALL BE 9'-0" AFF, U.N.O.

7. CENTER LIGHT FIXTURES IN CEILING, U.N.O.

8. "CJ" INDICATES A GWB CONTROL JOINT - TO BE INDICATED IN FINAL SPEC.

SOUNDSCAPES HEX 5444 - STONE

SOUNDSCAPES HEX 5444 - SKY

SOUNDSCAPES HEX 5444 - WHITE

1/8" = 1'-0"102 - CEILING PLAN - SECOND FLOOR

REG

ISTERED ARCHITECT

A

RI Z O N A , U . S

.

A.

Da t e S ig n ed . . .

.

...

CERTIFICATE NO.23533

ROBIN A.SHAMBACH

EXPIRES 06/30/2022

ARCHITECTS

JOB NO:

DATE:

REVISIONS

DRAWN BY:

CO

NSU

LTA

NTS

261

Nor

th C

ourt

Ave

nue

Tucs

on, A

rizo

na 8

5701

520.

795.

2705

Fa

x 52

0.79

5.61

71

ww

w.b

wsa

rchs

.com

BU

RN

S W

ALD

-H

OP

KIN

S S

HA

MB

AC

HA

RC

HIT

EC

TS

3/29

/202

1 1

2:47

:00

PM

CONSTRUCTION DOCUMENTS

A3.2

REFLECTED CEILING PLAN -

SECOND FLOOR

25 JAN 2021

2003.000

El

Rio

Healt

h

Gra

nt

Road C

linic

CIV

IL

Per

ry E

ngin

eeri

ng

501

W. W

etm

ore

Roa

d

Tucs

on, A

Z 85

716

Pho

ne: 5

20.6

20.9

870

LAN

DS

CA

PE

Nor

ris

Des

ign

418

N. T

oole

Ave

Tucs

on, A

Z 85

701

Pho

ne: 5

20.6

22.9

565

STR

UC

TUR

AL

Turn

er S

truc

tura

l

Engi

neer

ing

Co

3026

N. C

ount

ry C

lub

Roa

d

Tucs

on, A

Z 85

716

Pho

ne: 5

20.3

23.3

422

MEC

HA

NIC

AL

Ada

ms

& A

ssoc

iate

s

6422

E. S

peed

way

#13

0

Tucs

on, A

Z 85

712

Pho

ne: 5

20.3

23.3

858

ELEC

TRIC

AL

M3

Engi

neer

ing

& T

echn

olog

y

2051

W. S

unse

t Roa

d, S

uite

101

Tucs

on, A

Z 85

716.

Pho

ne: 5

20.2

93.1

488

3655

E G

rant

Roa

d, T

ucso

n, A

Z

Author

3/29/

21

REFLECTED CEILING PLAN LEGEND 2

REFLECTED CEILING PLAN GENERAL NOTES

0' 4' 8' 16'

PLANNORTH

1 ASI 01 03/29/21

1

ACOUSTIC PANEL LEGEND


Recommended