Permit No Task No Tag ID Permit Descriptio n 17511 62244 CC-49 MECH, CR01, FRH 9nos MECH <Extension of Permit N structures, bridges, pip stands including pipe p drilling, Bolt tightening scaffolding & structura hrs ,300 Persons] 15822 57241 CC-16, CC-19 ASSET, CC-19 SCAFFOLDING ERECTION, MODIFICAT (SCAFFOLDING TOWER ASSET PROTECTION, HE ACTIVITIES) FOR CC-19 15379 59081 CC-11 MECH, CC-13 MECH, CC-18 MECH, CC-30 MECH, CC-31 MECH, CR01, CR02D MECH, FRH 9nos MECH <Extension of Permit N preassembling & erecti on sleepers/structure/p preheating, fit-up, air b materials and equipme alignment) For CC-18 [2 19264 64490 Berth-1 Manifold, CC-18, CC-18 Civil <Extension of Permit N (excavation, backfilling excess materials), reba curing works, scaffoldin unloading of material, e hrs , 100 Persons] 19639 64754 Berth-1 Manifold, CC-08, CC-20, CC-20 Civil <Extension of Permit N Earthworks(excavation and excess materials),R pouring works,concrete concrete surface,lifting facilities(ablution block works(temporary powe 20286 64500 CC-11 MECH, CC-13 MECH, CC-18 CATHODE PROTECTION, CC-18 MECH, CC-19 CATHODE PROTECTION, CC-19 Cathodic Protection, CC-19 MECH, CC-30 MECH, CC-31 MECH, CCA, CR01, CR02D MECH, FRH 9nos MECH <Extension of Permit N ANODES FOR CATHODE CABLE LAYING & TERM ELECTRICAL AND SCAFF Anode/CP Works for PB PERSONS]
Transcript
Page 1: RG Permit Rejected

Permit No Task No Tag ID

Permit

Descriptio

n

17511 62244CC-49 MECH, CR01, FRH 9nos

MECH

<Extension of Permit No.13259 => 15775> To carry out welding and erection of

structures, bridges, pipes, pipe loops, pipe supports on sleepers/structure/pipe

stands including pipe pulling, cutting, grinding, preheating, fit-up, air blowing,

drilling, Bolt tightening, loading /offloading of materials and equipment,

scaffolding & structural erection (assembly, bolting & alignment) For CC-49 [24

hrs ,300 Persons]

15822 57241CC-16, CC-19 ASSET, CC-19

SCAFFOLDING

ERECTION, MODIFICATION & DISMANTLING OF SCAFFOLDING FOR

(SCAFFOLDING TOWERS, SCAFFOLDING BRIDGES, SCAFFOLDING PLATFORMS,

ASSET PROTECTION, HEAT/ REST SHELTERS & OTHER PIPING / STRUCTURAL

ACTIVITIES) FOR CC-19 [24 HRS, 300 PERSONS]

15379 59081

CC-11 MECH, CC-13 MECH, CC-18

MECH, CC-30 MECH, CC-31

MECH, CR01, CR02D MECH, FRH

9nos MECH

<Extension of Permit No.13118> To carry out welding and assembling,

preassembling & erection of structures, bridges, pipes, pipe loops, pipe supports

on sleepers/structure/pipe stands including pipe pulling, cutting, grinding,

preheating, fit-up, air blowing, drilling, Bolt tightening, loading /offloading of

materials and equipment, scaffolding & structural erection (assembly, bolting &

alignment) For CC-18 [24 hrs, 300 Persons]

19264 64490Berth-1 Manifold, CC-18, CC-18

Civil

<Extension of Permit No.17529> Site layout and marking, Earthworks

(excavation, backfilling, grading/leveling, removal of excavated, waste and

excess materials), rebar works, formworks, concrete pouring works, concrete

curing works, scaffolding works, painting/coating on concrete surface, loading &

unloading of material, electrical works (temporary power supplies) for CC-18 [24

hrs , 100 Persons]

19639 64754Berth-1 Manifold, CC-08, CC-20,

CC-20 Civil

<Extension of Permit No.17424>

Earthworks(excavation,backfilling,grading/leveling,removal of excavated,waste

and excess materials),Removal of armor rock,f,rebar works,formworks,concrete

pouring works,concrete curing works,scaffolding works,painting/coating on

concrete surface,lifting works,installation/provision of temporary

facilities(ablution blocks,rest shelters&drinking water stations),electrical

works(temporary power supplies)for CC-20[24 H,100 P]

20286 64500

CC-11 MECH, CC-13 MECH, CC-18

CATHODE PROTECTION, CC-18

MECH, CC-19 CATHODE

PROTECTION, CC-19 Cathodic

Protection, CC-19 MECH, CC-30

MECH, CC-31 MECH, CCA, CR01,

CR02D MECH, FRH 9nos MECH

<Extension of Permit No.18516> TO CARRY OUT INSTALLATION OF SACRIFICIAL

ANODES FOR CATHODE PROTECTION, DRILLING, EXCAVATION, BACKFILLING,

CABLE LAYING & TERMINATION, CAD WELD DYE (MOLD), OTHER GENERAL

ELECTRICAL AND SCAFFOLDING WORKS for the Drilling and Installation of

Anode/CP Works for PB-CC19 FOUNDATION GRID LINE 2 & 3[24 HRS, 100

PERSONS]

Page 2: RG Permit Rejected

20305 65410Berth-1 Manifold, CC-08, CC-11,

CC-19 CIVIL, CR-02D

<Extension of Permit No.18386> Site layout and marking, Earthworks

(excavation, backfilling, grading/leveling, removal of excavated, waste and

excess materials), rebar works, formworks, concrete pouring works, concrete

curing works, scaffolding works, painting/coating on concrete surface, loading &

unloading of material, electrical works (temporary power supplies) for CC-19 [24

hrs , 100 Persons]

21311 66773RAMP CR02C, Temporary

Construction Ramp

<Extension of Permit No.13990 => 16021 => 17558 => 19633>

cutting/grading/levelling and compaction of existing ground, removal of

unusable excav material, lifting work for loading / unloading of construction

materials, installation of precast VBU and TTS structure. Painting works,

excavation works, concreting works, formwork, rebar works, erection and

dismantling of temporary scaffolding working platforms for TTS Post for Installing

Temporary Construction Ramp at North of Aysha St

21589 65666

2 INCH IA MECH BERTH-2, 2"

INSTRUMENT AIRLINE MECH,

2INCH IA MECH B3, berth-2

nitrogen line, Berth-5 IA 2" line,

BERTH-5 NITROGEN LINE, CC54,

CR02A, CR03, CR03 MECH

Transportation, unloading and erection of 2” pipe including pipe supports,

cutting, grinding, fit-up, welding of pipe joints, supports, cleaning of pipe joints,

touchup paint work included. Air blowing of pipe included for fit- up. Drilling of

pipe supports also included. Tie-in activities including cold cutting of pipes, fitup

and welding of joints, installation of isolation valves and blind. for Tie-In(s) and

Routing of Nitrogen Pipeline 2 Dia at Berth 2 [24 hrs, 100 persons]

23056 68813CC-49 MECh, CR01, FRH 9nos

MECH

To carry out welding and erection of structures, bridges, pipes, pipe loops, pipe

supports on sleepers/structure/pipe stands including pipe pulling, cutting,

grinding, preheating, fit-up, air blowing, drilling, Bolt tightening, loading

/offloading of materials and equipment, scaffolding & structural erection

(assembly, bolting & alignment) For CC-49 [24 hrs ,300 Persons]

23682 69485

Berth-1 Manifold, CC-08, CC-11,

CC-27 CIVIL, CC-29 CIVIL, CC-30

CIVIL, CC-31 CIVIL, CC-34 CIVIL,

CC-36 CIVIL, CC-40 CIVIL, CR-02D

EARTHWORKS (EXCAVATION, BACKFILLING, GRADING/LEVELING, REMOVAL OF

EXCAVATED, WASTE AND EXCESS MATERIALS), REBAR WORKS, FORM WORKS,

CONCRETE POURING WORKS, CONCRETE CURING WORKS, SCAFFOLDING

WORKS, PAINTING/COATING ON CONCRETE SURFACE, LIFTING WORKS,

INSTALLATION/PROVISION OF TEMPORARY FACILITIES (ABLUTION BLOCKS, REST

SHELTERS AND DRINKING WATER STATIONS), ELECTRICAL WORKS (TEMPORARY

POWER SUPPLIES) FOR CC-29 [24 HOURS, 500 PERSONS]

Page 3: RG Permit Rejected

Permit

StatusStart Date

27/09/2012 10:30

<Extension of Permit No.13259 => 15775> To carry out welding and erection of

structures, bridges, pipes, pipe loops, pipe supports on sleepers/structure/pipe

stands including pipe pulling, cutting, grinding, preheating, fit-up, air blowing,

drilling, Bolt tightening, loading /offloading of materials and equipment,

scaffolding & structural erection (assembly, bolting & alignment) For CC-49 [24

hrs ,300 Persons]

  Live 26/12/2012 14:02

ERECTION, MODIFICATION & DISMANTLING OF SCAFFOLDING FOR

(SCAFFOLDING TOWERS, SCAFFOLDING BRIDGES, SCAFFOLDING PLATFORMS,

ASSET PROTECTION, HEAT/ REST SHELTERS & OTHER PIPING / STRUCTURAL

ACTIVITIES) FOR CC-19 [24 HRS, 300 PERSONS]

  Live 15/10/2012 21:04

<Extension of Permit No.13118> To carry out welding and assembling,

preassembling & erection of structures, bridges, pipes, pipe loops, pipe supports

on sleepers/structure/pipe stands including pipe pulling, cutting, grinding,

preheating, fit-up, air blowing, drilling, Bolt tightening, loading /offloading of

materials and equipment, scaffolding & structural erection (assembly, bolting &

alignment) For CC-18 [24 hrs, 300 Persons]

  Live

19/03/2013 21:30

<Extension of Permit No.17529> Site layout and marking, Earthworks

(excavation, backfilling, grading/leveling, removal of excavated, waste and

excess materials), rebar works, formworks, concrete pouring works, concrete

curing works, scaffolding works, painting/coating on concrete surface, loading &

unloading of material, electrical works (temporary power supplies) for CC-18 [24

hrs , 100 Persons]

  Live 11/3/2013 14:49

<Extension of Permit No.17424>

Earthworks(excavation,backfilling,grading/leveling,removal of excavated,waste

and excess materials),Removal of armor rock,f,rebar works,formworks,concrete

pouring works,concrete curing works,scaffolding works,painting/coating on

concrete surface,lifting works,installation/provision of temporary

facilities(ablution blocks,rest shelters&drinking water stations),electrical

works(temporary power supplies)for CC-20[24 H,100 P]

  Live

<Extension of Permit No.18516> TO CARRY OUT INSTALLATION OF SACRIFICIAL

ANODES FOR CATHODE PROTECTION, DRILLING, EXCAVATION, BACKFILLING,

CABLE LAYING & TERMINATION, CAD WELD DYE (MOLD), OTHER GENERAL

ELECTRICAL AND SCAFFOLDING WORKS for the Drilling and Installation of

Anode/CP Works for PB-CC19 FOUNDATION GRID LINE 2 & 3[24 HRS, 100

PERSONS]

  Live 11/4/2013 14:49

Page 4: RG Permit Rejected

14/04/2013 12:25

<Extension of Permit No.18386> Site layout and marking, Earthworks

(excavation, backfilling, grading/leveling, removal of excavated, waste and

excess materials), rebar works, formworks, concrete pouring works, concrete

curing works, scaffolding works, painting/coating on concrete surface, loading &

unloading of material, electrical works (temporary power supplies) for CC-19 [24

hrs , 100 Persons]

  Live

5/6/2013 14:55

<Extension of Permit No.13990 => 16021 => 17558 => 19633>

cutting/grading/levelling and compaction of existing ground, removal of

unusable excav material, lifting work for loading / unloading of construction

materials, installation of precast VBU and TTS structure. Painting works,

excavation works, concreting works, formwork, rebar works, erection and

dismantling of temporary scaffolding working platforms for TTS Post for Installing

Temporary Construction Ramp at North of Aysha St

  Live 27/05/2013 13:02

Transportation, unloading and erection of 2” pipe including pipe supports,

cutting, grinding, fit-up, welding of pipe joints, supports, cleaning of pipe joints,

touchup paint work included. Air blowing of pipe included for fit- up. Drilling of

pipe supports also included. Tie-in activities including cold cutting of pipes, fitup

and welding of joints, installation of isolation valves and blind. for Tie-In(s) and

Routing of Nitrogen Pipeline 2 Dia at Berth 2 [24 hrs, 100 persons]

  Live

10/9/2013 12:24

To carry out welding and erection of structures, bridges, pipes, pipe loops, pipe

supports on sleepers/structure/pipe stands including pipe pulling, cutting,

grinding, preheating, fit-up, air blowing, drilling, Bolt tightening, loading

/offloading of materials and equipment, scaffolding & structural erection

(assembly, bolting & alignment) For CC-49 [24 hrs ,300 Persons]

  Live 18/08/2013 09:46

EARTHWORKS (EXCAVATION, BACKFILLING, GRADING/LEVELING, REMOVAL OF

EXCAVATED, WASTE AND EXCESS MATERIALS), REBAR WORKS, FORM WORKS,

CONCRETE POURING WORKS, CONCRETE CURING WORKS, SCAFFOLDING

WORKS, PAINTING/COATING ON CONCRETE SURFACE, LIFTING WORKS,

INSTALLATION/PROVISION OF TEMPORARY FACILITIES (ABLUTION BLOCKS, REST

SHELTERS AND DRINKING WATER STATIONS), ELECTRICAL WORKS (TEMPORARY

POWER SUPPLIES) FOR CC-29 [24 HOURS, 500 PERSONS]

  Live

Page 5: RG Permit Rejected

27/09/2012 10:30

26/12/2012 14:02

15/10/2012 21:04

19/03/2013 21:30

11/3/2013 14:49

11/4/2013 14:49

Page 6: RG Permit Rejected

14/04/2013 12:25

5/6/2013 14:55

27/05/2013 13:02

10/9/2013 12:24

18/08/2013 09:46

Page 7: RG Permit Rejected

Location Infrastructure

Edmedio Ebarle - Logout

English

Locations > Permitboard

 

Permi

t

Board

(Filter

ed)

Permit No Task No Tag ID

1-Jan

Clipboard

21311 66773RAMP CR02C, Temporary

Construction Ramp

/wEPDwUKL

/wEWNAL19Z

Clear Clipboard

Search Remove Filter Archived PermitsTask List Return

Page 8: RG Permit Rejected

Job

Number

Task No

Permit

No.

Permit

Descriptio

n

Start Date

End Date

Performin

g

Authority

Operating

Authority

Icon

Selection

Permit

Status

Conditions

Activities

Tools

Current

Selections

:

Username

Loading Nodes...

Loading Nodes...Tag ID

I confirm that I am

taking control as the

co-ordinator

Search Remove Filter Archived PermitsTask List Return

66773

None Specified

None Specified

None Specified

Search Cancel Search

Page 9: RG Permit Rejected

Password

Username

Password

Username

Password

Add a

comment

Username

Password

Add a

comment

I confirm that the

work is on hold on

the above mentioned

equipment, that all

personnel have been

informed, and the

work area left in a

safe and tidy

condition.

  

I confirm that the

work area has been

inspected and that

plant conditions are

acceptable

  

  

I confirm that I am

taking control of area

awareness

  

NoParams

NoParams

Sign CompleteClose

Page 10: RG Permit Rejected

Username

Password

Add a

comment

Start Date

Performin

g

Authority

  

Number

Of

Workers

Lastname 

I confirm that work is

complete on the

above mentioned

equipment, that all

personnel have been

so warned, that all

tools and equipment

have been removed

and the work area

restored to a safe and

tidy condition.

  

Do you still wish to

archive the permit?

Please be aware that

the following

isolations are

attached to the

permit

Sign CompleteClose

NoParams

None Specified

Cancel

Page 11: RG Permit Rejected

Username

Password

Username

Password

Username

Password

  

Ref. Indicator

Ref. Indicator

please enter your report below

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

  

Information Box

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

NoParams

NoParams

Page 12: RG Permit Rejected

REQUIRED DOCUMENTS

   

Complete

Permit

Handback

Permit

Search

Permit

Board

Reason

For Delay

Accept

Shift Area -

Other

User

Accept

Shift Co-

ordinator -

Other

User

Edit

Permit

Informati

on

O² Result

Lower

Explosive

Limit

Gas Results

Loading Nodes...

Tag ID

Equal To

Equal To

Equal To

Page 13: RG Permit Rejected

% Volume

Flammabl

e

Toxic

MaterialPPM

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Toxic

Material

PPM

Copyright © 2004–2013 Rap International Limited

PERMITS

TASKS

ISOLATIONS

*

Chemical ReadingsLoading Nodes...

Instrument ID

Tag ID

% Volume Flammable

Gas Results

Toxic Material

Chemical Readings

Loading Nodes...

Loading Nodes...

O² Result

Lower Explosive Limit

Gas Results

Chemical Readings

Tag ID

Loading Nodes...

Loading Nodes...

Instrument ID

Equal To

None

None

None

Page 14: RG Permit Rejected

There are pending notifications.View

There are no messages at this time.

Hide NotificationClose

Correct

Closure

Refusal

View

Permit

View

Comments

& Refusals

View

Attachmen

t

Task /

Permit

History

Location Infrastructure

Edmedio Ebarle - Logout

English

Locations > Permitboard

 

Permi

t

Board

(Filter

ed)

Permit No Task No Tag ID

Clipboard

/wEPDwUKL

/wEWNAL19Z

Clear Clipboard

Page 15: RG Permit Rejected

Job

Number

Task No

Permit

No.

Permit

Descriptio

n

Start Date

End Date

Performin

g

Authority

1-Jan

21589 65666

2 INCH IA MECH BERTH-2, 2"

INSTRUMENT AIRLINE MECH,

2INCH IA MECH B3, berth-2

nitrogen line, Berth-5 IA 2" line,

BERTH-5 NITROGEN LINE, CC54,

CR02A, CR03, CR03 MECH

Loading Nodes...

Loading Nodes...Tag ID

Search Remove Filter Archived PermitsTask List Return

65666

None Specified

None Specified

Page 16: RG Permit Rejected

Operating

Authority

Icon

Selection

Permit

Status

Conditions

Activities

Tools

Current

Selections

:

Username

Password

Username

Password

I confirm that I am

taking control as the

co-ordinator

  

I confirm that I am

taking control of area

awareness

  

None Specified

None Specified

Search Cancel Search

Page 17: RG Permit Rejected

Username

Password

Add a

comment

Username

Password

Add a

comment

Username

I confirm that the

work is on hold on

the above mentioned

equipment, that all

personnel have been

informed, and the

work area left in a

safe and tidy

condition.

  

I confirm that the

work area has been

inspected and that

plant conditions are

acceptable

  

I confirm that work is

complete on the

above mentioned

equipment, that all

personnel have been

so warned, that all

tools and equipment

have been removed

and the work area

restored to a safe and

tidy condition.

NoParams

NoParams

Sign CompleteClose

NoParams

Page 18: RG Permit Rejected

Password

Add a

comment

Start Date

Performin

g

Authority

  

Number

Of

Workers

Lastname 

Username

Password

  

Do you still wish to

archive the permit?

Please be aware that

the following

isolations are

attached to the

permit

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

NoParams

None Specified

Cancel

NoParams

Page 19: RG Permit Rejected

Username

Password

Username

Password

  

Ref. Indicator

Ref. Indicator

please enter your report below

REQUIRED DOCUMENTS

   

Complete

Permit

Handback

Permit

Search

Permit

Board

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

  

Information Box

NoParams

Page 20: RG Permit Rejected

Reason

For Delay

Accept

Shift Area -

Other

User

Accept

Shift Co-

ordinator -

Other

User

Edit

Permit

Informati

on

O² Result

Lower

Explosive

Limit

% Volume

Flammabl

e

Toxic

MaterialPPM

*

Gas Results

Chemical Readings

Loading Nodes...

Loading Nodes...

Tag ID

Instrument ID

Loading Nodes...

Loading Nodes...

Tag ID

Equal To

Equal To

Equal To

None

Page 21: RG Permit Rejected

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Toxic

Material

PPM

Copyright © 2004–2013 Rap International Limited

PERMITS

TASKS

ISOLATIONS

There are pending notifications.View

There are no messages at this time.

Hide NotificationClose

Correct

Closure

Refusal

View

Permit

View

Comments

& Refusals

View

Attachmen

t

Task /

Permit

History

Tag ID

% Volume Flammable

Gas Results

Toxic Material

Chemical Readings

O² Result

Lower Explosive Limit

Gas Results

Chemical ReadingsLoading Nodes...

Loading Nodes...

Instrument ID

None

None

Page 22: RG Permit Rejected

Location Infrastructure

Edmedio Ebarle - Logout

English

Locations > Permitboard

 

Permi

t

Board

(Filter

ed)

Permit No Task No Tag ID

Job

Number

Task No

Clipboard

1-Jan

23056 68813CC-49 MECh, CR01, FRH 9nos

MECH

/wEPDwUKL

/wEWNAL19Z

Clear Clipboard

Search Remove Filter Archived PermitsTask List Return

68813

Page 23: RG Permit Rejected

Permit

No.

Permit

Descriptio

n

Start Date

End Date

Performin

g

Authority

Operating

Authority

Icon

Selection

Permit

Status

Conditions

Activities

Tools

Current

Selections

:

Username

Password

Loading Nodes...

Loading Nodes...Tag ID

I confirm that I am

taking control as the

co-ordinator

  

68813

None Specified

None Specified

None Specified

Search Cancel Search

Page 24: RG Permit Rejected

Username

Password

Username

Password

Add a

comment

Username

Password

Add a

comment

I confirm that the

work is on hold on

the above mentioned

equipment, that all

personnel have been

informed, and the

work area left in a

safe and tidy

condition.

  

I confirm that the

work area has been

inspected and that

plant conditions are

acceptable

  

I confirm that I am

taking control of area

awareness

  

NoParams

NoParams

Sign CompleteClose

Page 25: RG Permit Rejected

Username

Password

Add a

comment

Start Date

Performin

g

Authority

  

Number

Of

Workers

Lastname 

I confirm that work is

complete on the

above mentioned

equipment, that all

personnel have been

so warned, that all

tools and equipment

have been removed

and the work area

restored to a safe and

tidy condition.

  

Do you still wish to

archive the permit?

Please be aware that

the following

isolations are

attached to the

permit

Sign CompleteClose

NoParams

None Specified

Cancel

Page 26: RG Permit Rejected

Username

Password

Username

Password

Username

Password

  

Ref. Indicator

Ref. Indicator

please enter your report below

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

  

Information Box

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

NoParams

NoParams

Page 27: RG Permit Rejected

REQUIRED DOCUMENTS

   

Complete

Permit

Handback

Permit

Search

Permit

Board

Reason

For Delay

Accept

Shift Area -

Other

User

Accept

Shift Co-

ordinator -

Other

User

Edit

Permit

Informati

on

O² Result

Lower

Explosive

Limit

Gas Results

Loading Nodes...

Tag ID

Equal To

Equal To

Equal To

Page 28: RG Permit Rejected

% Volume

Flammabl

e

Toxic

MaterialPPM

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Toxic

Material

PPM

Copyright © 2004–2013 Rap International Limited

PERMITS

TASKS

ISOLATIONS

*

Chemical ReadingsLoading Nodes...

Instrument ID

Tag ID

% Volume Flammable

Gas Results

Toxic Material

Chemical Readings

Loading Nodes...

Loading Nodes...

O² Result

Lower Explosive Limit

Gas Results

Chemical Readings

Tag ID

Loading Nodes...

Loading Nodes...

Instrument ID

Equal To

None

None

None

Page 29: RG Permit Rejected

There are pending notifications.View

There are no messages at this time.

Hide NotificationClose

Correct

Closure

Refusal

View

Permit

View

Comments

& Refusals

View

Attachmen

t

Task /

Permit

History

Location Infrastructure

Edmedio Ebarle - Logout

English

Locations > Permitboard

 

Permi

t

Board

(Filter

ed)

Permit No Task No Tag ID

Clipboard

/wEPDwUKL

/wEWNAL19Z

Clear Clipboard

Page 30: RG Permit Rejected

Job

Number

Task No

Permit

No.

Permit

Descriptio

n

Start Date

End Date

1-Jan

23682 69485

Berth-1 Manifold, CC-08, CC-11,

CC-27 CIVIL, CC-29 CIVIL, CC-30

CIVIL, CC-31 CIVIL, CC-34 CIVIL,

CC-36 CIVIL, CC-40 CIVIL, CR-02D

Loading Nodes...

Loading Nodes...Tag ID

Search Remove Filter Archived PermitsTask List Return

69485

None Specified

Page 31: RG Permit Rejected

Performin

g

Authority

Operating

Authority

Icon

Selection

Permit

Status

Conditions

Activities

Tools

Current

Selections

:

Username

Password

Username

Password

I confirm that I am

taking control as the

co-ordinator

  

I confirm that I am

taking control of area

awareness

  

None Specified

None Specified

None Specified

Search Cancel Search

Page 32: RG Permit Rejected

Username

Password

Add a

comment

Username

Password

Add a

comment

Username

I confirm that the

work is on hold on

the above mentioned

equipment, that all

personnel have been

informed, and the

work area left in a

safe and tidy

condition.

  

I confirm that the

work area has been

inspected and that

plant conditions are

acceptable

  

I confirm that work is

complete on the

above mentioned

equipment, that all

personnel have been

so warned, that all

tools and equipment

have been removed

and the work area

restored to a safe and

tidy condition.

NoParams

NoParams

Sign CompleteClose

NoParams

Page 33: RG Permit Rejected

Password

Add a

comment

Start Date

Performin

g

Authority

  

Number

Of

Workers

Lastname 

Username

Password

  

Do you still wish to

archive the permit?

Please be aware that

the following

isolations are

attached to the

permit

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

NoParams

None Specified

Cancel

NoParams

Page 34: RG Permit Rejected

Username

Password

Username

Password

  

Ref. Indicator

Ref. Indicator

please enter your report below

REQUIRED DOCUMENTS

   

Complete

Permit

Handback

Permit

Search

Permit

Board

I have read and fully

understand the above

numbered Permit to

Work and will comply

with the control

conditions specified

and precautions to be

observed

  

  

Information Box

NoParams

Page 35: RG Permit Rejected

Reason

For Delay

Accept

Shift Area -

Other

User

Accept

Shift Co-

ordinator -

Other

User

Edit

Permit

Informati

on

O² Result

Lower

Explosive

Limit

% Volume

Flammabl

e

Toxic

MaterialPPM

*

Gas Results

Chemical Readings

Loading Nodes...

Loading Nodes...

Tag ID

Instrument ID

Tag ID

Loading Nodes...

Loading Nodes...

Equal To

Equal To

Equal To

None

Page 36: RG Permit Rejected

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Lower

Bound

Upper

Bound

Toxic

Material

PPM

Copyright © 2004–2013 Rap International Limited

PERMITS

TASKS

ISOLATIONS

There are pending notifications.View

There are no messages at this time.

Hide NotificationClose

Correct

Closure

Refusal

View

Permit

View

Comments

& Refusals

View

Attachmen

t

Task /

Permit

History

Gas Results

Chemical ReadingsLoading Nodes...

Loading Nodes...

Tag ID

% Volume Flammable

Gas Results

Toxic Material

Chemical Readings

O² Result

Lower Explosive Limit

Instrument ID

None

None

Page 37: RG Permit Rejected

Permit

Descriptio

n

Permit

StatusStart Date

<Extension of Permit No.13990

=> 16021 => 17558 => 19633>

cutting/grading/levelling and

compaction of existing ground,

removal of unusable excav

material, lifting work for loading

/ unloading of construction

materials, installation of precast

VBU and TTS structure. Painting

works, excavation works,

concreting works, formwork,

rebar works, erection and

dismantling of temporary

scaffolding working platforms for

TTS Post for Installing Temporary

Construction Ramp at North of

Aysha St

  Live 27/05/2013 13:02

Page 38: RG Permit Rejected

None Specified

None Specified

Page 39: RG Permit Rejected
Page 40: RG Permit Rejected

None Specified

Page 41: RG Permit Rejected
Page 42: RG Permit Rejected
Page 43: RG Permit Rejected
Page 44: RG Permit Rejected

Permit

Descriptio

n

Permit

StatusStart Date

Page 45: RG Permit Rejected

Transportation, unloading and

erection of 2” pipe including pipe

supports, cutting, grinding, fit-up,

welding of pipe joints, supports,

cleaning of pipe joints, touchup

paint work included. Air blowing

of pipe included for fit- up.

Drilling of pipe supports also

included. Tie-in activities

including cold cutting of pipes,

fitup and welding of joints,

installation of isolation valves

and blind. for Tie-In(s) and

Routing of Nitrogen Pipeline 2

Dia at Berth 2 [24 hrs, 100

persons]

  Live 5/6/2013 14:55

None Specified

None Specified

Page 46: RG Permit Rejected

None Specified

Page 47: RG Permit Rejected
Page 48: RG Permit Rejected

None Specified

Page 49: RG Permit Rejected
Page 50: RG Permit Rejected
Page 51: RG Permit Rejected
Page 52: RG Permit Rejected

Permit

Descriptio

n

Permit

StatusStart Date

To carry out welding and

erection of structures, bridges,

pipes, pipe loops, pipe supports

on sleepers/structure/pipe

stands including pipe pulling,

cutting, grinding, preheating, fit-

up, air blowing, drilling, Bolt

tightening, loading /offloading of

materials and equipment,

scaffolding & structural erection

(assembly, bolting & alignment)

For CC-49 [24 hrs ,300 Persons]

  Live 18/08/2013 09:46

Page 53: RG Permit Rejected

None Specified

None Specified

Page 54: RG Permit Rejected
Page 55: RG Permit Rejected

None Specified

Page 56: RG Permit Rejected
Page 57: RG Permit Rejected
Page 58: RG Permit Rejected
Page 59: RG Permit Rejected

Permit

Descriptio

n

Permit

StatusStart Date

Page 60: RG Permit Rejected

EARTHWORKS (EXCAVATION,

BACKFILLING,

GRADING/LEVELING, REMOVAL

OF EXCAVATED, WASTE AND

EXCESS MATERIALS), REBAR

WORKS, FORM WORKS,

CONCRETE POURING WORKS,

CONCRETE CURING WORKS,

SCAFFOLDING WORKS,

PAINTING/COATING ON

CONCRETE SURFACE, LIFTING

WORKS,

INSTALLATION/PROVISION OF

TEMPORARY FACILITIES

(ABLUTION BLOCKS, REST

SHELTERS AND DRINKING WATER

STATIONS), ELECTRICAL WORKS

(TEMPORARY POWER SUPPLIES)

FOR CC-29 [24 HOURS, 500

PERSONS]

  Live 10/9/2013 12:24

None Specified

Page 61: RG Permit Rejected

None Specified

None Specified

Page 62: RG Permit Rejected
Page 63: RG Permit Rejected

None Specified

Page 64: RG Permit Rejected
Page 65: RG Permit Rejected
Page 66: RG Permit Rejected
Page 67: RG Permit Rejected

Comment

sIcons

                         

Page 68: RG Permit Rejected
Page 69: RG Permit Rejected
Page 70: RG Permit Rejected
Page 71: RG Permit Rejected
Page 72: RG Permit Rejected
Page 73: RG Permit Rejected
Page 74: RG Permit Rejected

Comment

sIcons

Page 75: RG Permit Rejected

                     

Page 76: RG Permit Rejected
Page 77: RG Permit Rejected
Page 78: RG Permit Rejected
Page 79: RG Permit Rejected
Page 80: RG Permit Rejected
Page 81: RG Permit Rejected
Page 82: RG Permit Rejected

Comment

sIcons

                      

Page 83: RG Permit Rejected
Page 84: RG Permit Rejected
Page 85: RG Permit Rejected
Page 86: RG Permit Rejected
Page 87: RG Permit Rejected
Page 88: RG Permit Rejected
Page 89: RG Permit Rejected

Comment

sIcons

Page 90: RG Permit Rejected

                      

Page 91: RG Permit Rejected
Page 92: RG Permit Rejected
Page 93: RG Permit Rejected
Page 94: RG Permit Rejected
Page 95: RG Permit Rejected
Page 96: RG Permit Rejected
Page 97: RG Permit Rejected
Page 98: RG Permit Rejected
Page 99: RG Permit Rejected
Page 100: RG Permit Rejected
Page 101: RG Permit Rejected
Page 102: RG Permit Rejected
Page 103: RG Permit Rejected
Page 104: RG Permit Rejected
Page 105: RG Permit Rejected
Page 106: RG Permit Rejected
Page 107: RG Permit Rejected
Page 108: RG Permit Rejected
Page 109: RG Permit Rejected
Page 110: RG Permit Rejected
Page 111: RG Permit Rejected
Page 112: RG Permit Rejected
Page 113: RG Permit Rejected
Page 114: RG Permit Rejected
Page 115: RG Permit Rejected
Page 116: RG Permit Rejected
Page 117: RG Permit Rejected
Page 118: RG Permit Rejected
Page 119: RG Permit Rejected
Page 120: RG Permit Rejected

Recommended