Rh d Il dS Rhode Island Stormwater Design and Installation Design and Installation Standards Manual RIDOT W kh RIDOT Workshop Case Study Exercises July 13 2011 July 13, 2011 Horsley Witten Group, Inc. Horsley Witten Group, Inc.
Transcript
Page 1: Rh d I l d SRhode Island Stormwater Design and ...

Rh d I l d SRhode Island Stormwater Design and InstallationDesign and Installation

Standards Manual

RIDOT W k hRIDOT WorkshopCase Study Exercises

July 13 2011July 13, 2011

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 2: Rh d I l d SRhode Island Stormwater Design and ...

Introduction• Three case study exercises :

1. Route 138: Major Intersection2. East Main Rd, Portsmouth: Sidewalk and Parking3. Waterfront Dr, East Providence: New Road

ConstructionConstruction

• Real project examples – but we’ve made some assumptionssome assumptions

• Thanks to designers for allowing us to use h i l !their plans!– BETA Group, GRA Designers/Green International,

Maguire Group

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Maguire Group

Page 3: Rh d I l d SRhode Island Stormwater Design and ...

Case Study No. 1: Route 138

R t 138 (b/ R t 2 d R t 108)R t 138 (b/ R t 2 d R t 108)Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Route 138 (b/w Route 2 and Route 108)Route 138 (b/w Route 2 and Route 108)A Redevelopment ProjectA Redevelopment Project

Page 4: Rh d I l d SRhode Island Stormwater Design and ...

Route 138 Reconstruction

• Redevelopment Project– Approx 3 mile stretch;Approx. 3 mile stretch;– New Roundabouts;

Drainage and Stormwater Improvements;– Drainage and Stormwater Improvements;– Drains to both Cold and Warm Water Fisheries;

Design is being modified to meet new – Design is being modified to meet new requirements.• 75% design was done based on early draft of revised • 75% design was done based on early draft of revised

manual;• 90% design is now being finalized using final version

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

– Still a work in progress

Page 5: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 6: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 7: Rh d I l d SRhode Island Stormwater Design and ...

Stormwater Management CriteriaImportant Questions/Informationp Q

• Redevelopment Project– Need impervious cover analysis (existing vs proposed);p y ( g p p )

• Define Site Area (for Redev. Criteria)– If > 40% I, then need to manage 50% of existing I + all of

Inew I;

• Required Design Criteria;– Recharge (50% of exist + all new Imp );Recharge (50% of exist. + all new Imp.);– Water Quality (50% of exist. + all new Imp.);– Channel Protection (only new development where

)necessary);– Overbank Control (Qp) – 10 and 100 Yr Storms (only new

dev where necessary)

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 8: Rh d I l d SRhode Island Stormwater Design and ...

Stormwater Management Criteria(continued)(continued)

• Channel Protection Criteria:N if I 1 0 d – Necessary if new Imp area > 1.0 acre and > 2.0 cfs peak inflow rate;

– No practical way to separate new from No practical way to separate new from existing impervious cover.

• Overbank Flood ProtectionOverbank Flood Protection– Compare peaks to existing, not natural

conditions;– Downstream analysis may allow for

elimination of practices.

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 9: Rh d I l d SRhode Island Stormwater Design and ...

LID Site Planning and Design Criteria

• Avoid ImpactsG di / l d ll t id di t b– Grading/slopes and walls to avoid disturbance;

– Maximize protection of waterways and wetlands (crossing locations, angle, location of BMPs);(crossing locations, angle, location of BMPs);

– Minimize clearing and grading/soil compaction (location of sidewalks, construction access/staging, l ti f BMP )location of BMPs).

• Reduce ImpactsP id l i t g t ti– Provide low maintenance vegetation;

– Minimize impervious surfaces (Pervious Pavements –alternatives for traffic islands);

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

);– Maximize runoff time of travel (tc).

Page 10: Rh d I l d SRhode Island Stormwater Design and ...

LID Site Planning and Design Criteria

• Manage Impacts– Infiltrate precipitation near the source;– Disconnect impervious cover; – Smaller drainage areas to practices; and– Source controls to minimize or prevent

exposure of pollutants

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 11: Rh d I l d SRhode Island Stormwater Design and ...

Additional Considerations

• Cold Water Fishery– No WVTS for treatment within 200’ (special ( p

outlets beyond);– No WVTS or detention basins for CPv & QP

within 200’ (special outlets beyond);• Warm Water Fishery

N t i ti– No restrictions• High Groundwater Table

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 12: Rh d I l d SRhode Island Stormwater Design and ...

BMP Selection Criteria

• Cold Water FisheryS l Hi h G d T bl• Seasonal High Groundwater Table– Recharge: (infiltration, filtering, open

h lchannels);– Water Quality: (infiltration, filtering, open

h l )channels);– Conveyance, Channel Protection and

Overbank Flood Protection (may not be Overbank Flood Protection (may not be necessary)

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 13: Rh d I l d SRhode Island Stormwater Design and ...

New Manual Considerations

• Water Quality Swales:– Pretreatment forebay?y– Adequate treatment area?– Slopes (< 4%)?Slopes (< 4%)?– Dry Swales: Soil (bio soil mix) spec & depth above

gw (3 feet)?gw (3 feet)?

• Infiltration:Separation distance to gw (3 feet)?– Separation distance to gw (3 feet)?

– Pretreatment?Design infiltration rate?

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

– Design infiltration rate?– Groundwater mounding?

Page 14: Rh d I l d SRhode Island Stormwater Design and ...

New Manual Considerations(continued)(continued)

• Bioretention:P t t t f b ? G h l ?– Pretreatment forebay? Grass channels?

– Adequate treatment area?– Soil (bio soil mix) specs & depth above gw (3 feet)?– On-line design

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 15: Rh d I l d SRhode Island Stormwater Design and ...

Infiltration

Wet Swales, typ

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 16: Rh d I l d SRhode Island Stormwater Design and ...

Existing Swale Maintenance

Bioretention and Wet Swale

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 17: Rh d I l d SRhode Island Stormwater Design and ...

Swales

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 18: Rh d I l d SRhode Island Stormwater Design and ...

Wet Swale

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 19: Rh d I l d SRhode Island Stormwater Design and ...

Infiltration

W S lWet Swales, typ

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 20: Rh d I l d SRhode Island Stormwater Design and ...

Dry Swale

InfiltrationWet Swale

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 21: Rh d I l d SRhode Island Stormwater Design and ...

Infiltration

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 22: Rh d I l d SRhode Island Stormwater Design and ...

Diversion Manhole

InfiltrationInfiltrationBasinBasin

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 23: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 24: Rh d I l d SRhode Island Stormwater Design and ...

Large TreesLarge Trees

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 25: Rh d I l d SRhode Island Stormwater Design and ...

Diversion Manhole

Bioretention? Bioretention? Work around existing treesWork around existing trees

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 26: Rh d I l d SRhode Island Stormwater Design and ...

Wet Swale

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 27: Rh d I l d SRhode Island Stormwater Design and ...

Lessons Learned

• Project shifted from dry detention to the WQ BMPs in Chapter 5WQ BMPs in Chapter 5

• WQ BMPs actually allowed more flexibility in some cases (High gw) and fit in the same in some cases (High gw) and fit in the same footprint or even smaller

• WQ BMPs worked better with the natural contours (less grading)

• Critical to set up design templates at the beginning of project to keep track of

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

information.

Page 28: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 29: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.

Page 30: Rh d I l d SRhode Island Stormwater Design and ...

Horsley Witten Group, Inc.Horsley Witten Group, Inc.