  • RIB iTWO 5D End-to-End Enterprise Solution for Construction Planning and Execution

  • 2Discover planning and construction at a new level: RIB iTWO 5D End-to-End Approach

    n With iTWO, RIB takes its place at the head of a global

    trend towards using an integrated model-based work

    method in the field of construction. The model-based

    development and production process is already the basis for

    innovation and a competitive edge in many sectors with

    regard to time-to-market, costs, design and quality.

    For the construction and process industry too, virtual

    construction management is the key to being able to

    manage high pressure scheduling and cost confines

    effectively.1

    The planning and construction process using RIB iTWO with

    BIM 5D standard gives you faster, more accurate informati-

    on about the project status and further project progress than

    conventional work methods. 1 Nearly three-quarters (74%) of BIM users in Western Europe have rated the ROI

    (from BIM) positively. Source: Mc Graw Hill Construction Smart Market Report:

    The Business Value of BIM in Europe, 2010.

    The basis for this is the systematic integration of all

    information from all the various CAD and specialist

    applications into the 5D model and its continuous

    visualisation.

    As the project progresses, the geometric data is

    complemented with updated information. This includes

    quantities and equipment, costs and revenue as well as

    procedures with equipment, materials and personnel

    deployment. The quality and consistency of the

    information throughout all project phases improves the

    coordination among all the involved parties and is the

    basis for planning, calculation, work preparation,

    logistics and additional processes. The clearly illustra-

    ted numbers, work procedures, and correlations are

    interpreted much more easily and with greater certainty.

    Method evolution in planning and construction

    3D 3D building model (geometric)

    4D Geometric model + resources (quantities, costs, revenues)

    5D Geometric model + resource control + timing (virtual construction site) throughout all

    project phases

    Building Information Modelling (BIM) in the 5th dimension

  • 3Source: Stanford University, Dr Martin Fischer and project results from clients

    Benefits for customers who use BIM 5D:

    Data consistency and quality throughout the

    entire planning and execution process = with RIB

    iTWO you verifiably improve the quality and

    cost-effectiveness of your projects through all

    phases.

    Improving cost-effectiveness

    0% 20% 40% 60% 80% 100%

    1. Project analysis

    2. Supplements

    3. Material costs

    4. Project duration

    n Expense with BIM 5D n 2D work method n Benefit with 5D BIM

    20%

    20%

    80%20%

    80%

    100%

    100%

    100%

    100%

  • 4Draft, planning, CAD model integration

    Complete control, right from the very start

    n Control the costs right where it is best for you: in

    project development and planning. With the graphic

    sample and equipment, the model-based quantity

    calculation and collision testing, you have powerful

    tools to sustainably improve planning and project

    quality and to realise significant savings in time and

    money.

    Conflict-free planning

    n The CAD integration into the BIM 5D model makes

    coordination and communication among all project

    participants easier on the basis of a joint model. Less

    data loss and consistent data enhancement lower the

    customary project risks in terms of quantities or

    feasibility. The construction process is safer and the

    pre-planning phase can be significantly optimised.

    Collision test: the integration of planning-related and specialised data brings potential collisions and problems with construction progress to light.

    Integration and qualification of the CAD data in an iTWO project model: sample with cross-section view in the 3D viewer.

    Your benefits:

    Better planning quality and certainty in

    terms of quantities and costs, for less

    investment

    Fewer plan revisions and supplements

    Sustainable optimisation due to plan

    variations and simulation

    Faster decision-making processes

    Improved coordination and networking

    Using certified interfaces, iTWO combines

    all available CAD data into one consistent

    model

  • 5Specifications, estimating, awarding

    Complete, clear and always up to date

    n When it comes to describing, testing or analysing

    planning and construction-related services, the superior-

    ity of the BIM 5D platform is evident: because a geomet-

    ric model, quantities, specifications and schedules are

    communicated and updated transparently at every

    planning and contract stage instead of being repeat-

    edly transmitted.

    Quantities as the key element

    n Quantities are the key element as a basis for

    services and costs: The construction-related informa-

    tion from the CAD data is transferred to a comprehen-

    sive quantitative framework, which is used by staff from

    planning through billing and beyond by the manage-

    ment.

    Your benefits:

    Optimised risk management for

    contract awarding and offer

    processing

    Reduced need for supplements

    Improved offer quality as a valid

    competitive factor

    Systematically reduced quantity risk

    for planning, calculation or bill of

    quantities

    Reduced process costs through BIM

    workflow for calculation, work

    preparation, acquisition, etc.

    Simpler and more transparent

    documentation of contract and

    awarding documents

    Above: A comprehensive quantity model visually assessable lowers quantity-related risks in planning, tender specifications, calculations and controlling. Right: Tender documents in a new quality: Contract packages include all the necessary information in terms of the service to be provided and price determination. Illustrative, visually assessable, plausible and paperless.

  • 6Construction process and logistics

    Increased efficiency through lean production

    n If the relevant model data is put onto a timeline, the

    construction progress, procedures, costs and quantities

    can be simulated and visualised for a period of days,

    weeks or months. A detailed simulation enables a

    significant increase in efficiency without sacrificing

    quality, because waiting or idle periods due to insuf-

    ficient collaboration or delivery delays are reduced.

    Problems in the construction process with the coordina-

    tion of crews and suppliers are recognised in advance

    and eliminated.

    Planning just in time

    n iTWO has a procedure model that you can freely

    define or create and enhance based on BoQ or

    calculations. Using the iTWO internal calendar or in

    PowerProject, Primavera or MS Project, a procedure

    and schedule can be created for the construction site.

    Alternatively, you can import entire complex

    external schedules into the RIB iTWO procedural

    model.

    Your benefits:

    Increased efficiency in construction

    Minimal disruptions to construction

    process

    Targeted advance control of changes

    in the construction process

    Just in time production and logistics

    with the involvement of ERP/PP

    Model-based control of machines and

    production systems

    Above: A simulation of the construction progress on a timeline with schedule and cost overviews graphically illustrates the continuing project progress.

    Right: Overview of production control, e.g. as machinery control for road construction or the production of components based on the geometric model.

  • 7Transparent preview of excess quantities and shortages.

    Cost control, monitoring

    100 % transparency at all times

    n The model representation in the BIM 5D model

    provides continuous monitoring in terms of technical

    and commercial issues with work performance,

    forecasting or the simulation of excess quantities and

    shortages and of analyses based on construction

    material qualities (steel, masonry, concrete, etc.).

    With the model-based simulation, you can monitor

    and "adjust" target values in the very early project

    stages.

    Hand in hand: Technical and commercial

    budget monitoring

    n The monitoring process with RIB iTWO transparently

    combines the technical project perspective and the

    commercial, business-related perspective. In this way,

    you can break down the commercial perspective at the

    management level all the way down to the detailed

    technical resources. And conversely, the technical

    resources or structures can be applied to the commer-

    cial view of the acquisition or billing department.

    Your benefits:

    Transparent evaluation and projection

    possibilities with various levels of

    detail (drill down)

    Continuous testing and optimisation of

    project objectives based on the

    simulation

    Deriving key values from the BIM 5D

    simulations for future planning

    processes

    Continuous graphic feasibility testing

    in terms of quantities and performance

    with the model

    Model-based performance status of the concrete work.

  • Take the next step.Take advantage of planning and construction at a new level:

    RIB iTWO is a registered trademark of RIB Software AG. Other product names mentioned in this document may be the property of other trademark-holders and are used solely for identification purposes.Image credits: fotolia.com, shutterstock.com, Novk & Partner s.r.o., RIB Software AG

    RIB Software AG

    Vaihinger Strasse 151

    70567 Stuttgart

    Germany

    [email protected]

    www.rib-software.com

    Improved transparency of all information

    Better communication

    Lower processing costs

    Improved planning quality

    Minimisation of construction-related changes

    Risk minimisation (budgets, costs, scheduling)

    Shorter project duration