Rice University Data Center Update Administrators Forum 6-12-07. New Data Center FAQ. “What’s a data center?” “Why are we building one?” “Where is it?” “Why off-campus?” “How big is it?” “When will it be done?” “What color is it?” “How does it connect to Rice?” - PowerPoint PPT Presentation
Popular Tags:
17
Rice University Data Center Update Administrators Forum 6-12-07
Transcript
Page 1: Rice University Data Center Update Administrators Forum 6-12-07

Rice University Data Center UpdateAdministrators Forum

6-12-07

Page 2: Rice University Data Center Update Administrators Forum 6-12-07

New Data Center FAQ

• “What’s a data center?”• “Why are we building one?”• “Where is it?”• “Why off-campus?”• “How big is it?”• “When will it be done?”• “What color is it?”• “How does it connect to Rice?”• “How are you going to move all the stuff?”

Page 3: Rice University Data Center Update Administrators Forum 6-12-07

What’s a data center?

• Formerly known as “the computer room”• Now, considered a highly specialized,

critical infrastructure facility designed to support and hold computing systems– Includes emergency power-systems to

eliminate downtime–Uses specialized cooling to keep systems

performing reliably and properly– Provides secure and durable physical protection

Page 4: Rice University Data Center Update Administrators Forum 6-12-07

Why are we building one?

• To ensure that Rice University has the appropriate infrastructure to support education, research, and operations

• To increase our capacity for advanced research computing systems

• To improve the reliability and security of Rice’s critical IT infrastructure

Page 5: Rice University Data Center Update Administrators Forum 6-12-07

Where is it?

11620 Main Street, Houston, Texas, 77025

Page 6: Rice University Data Center Update Administrators Forum 6-12-07

Why off campus?

• It’s a big building with a very large equipment yard

• Important to maximize capacity(80%+ of project cost is MEP)

• 65 ft. elevation(it’s practically on a mountain top)

• Room to grow

• Leaves valuable on-campus space for facilities that must be close by (like Willy’s Pub)

Page 7: Rice University Data Center Update Administrators Forum 6-12-07

How big is it?

• Not to big, not to small, just right– “Scaleable Modularity”

• Allows for growth without re-design

• New infrastructure capacity can be added in a“plug-n-play” fashion

– 20,000 s.f. facility

– 8,000 s.f. data center space

– 6 megawatts of electrical service

– 4 megawatts of generator capacity

– N+1 redundancy throughout the infrastructure

– Shell space for heroic cooling requirements

Page 8: Rice University Data Center Update Administrators Forum 6-12-07

When will it be done?

• Soon, we start move-in by mid-July• Current status

– Major construction activities are complete– Electrical services installed and on-line– Chillers and CRAC units installed and on-line– Generators on-site, connected– 12,000 gallon diesel fuel tank relocated from Naylor– Functional commissioning to start June 18th– New computing equipment racks on-site– Office space nearly complete– Landscaping taking root (even growing)

Page 9: Rice University Data Center Update Administrators Forum 6-12-07

Construction as of November 28, 2006

Page 10: Rice University Data Center Update Administrators Forum 6-12-07

Construction as of December 12, 2006

Page 11: Rice University Data Center Update Administrators Forum 6-12-07

Construction as of February 15, 2006

Page 12: Rice University Data Center Update Administrators Forum 6-12-07

Interior as of June 6, 2007

Page 13: Rice University Data Center Update Administrators Forum 6-12-07

What color is it?

Page 14: Rice University Data Center Update Administrators Forum 6-12-07

How does it connect to Rice?

• Via redundant,10 gigabit/second fiber-optic network between Rice and data center

• Also has backup circuit between sites via AT&T fiber

• Will have redundant Internet Service Provider connection

• Both network ends protected by emergency generators

Page 15: Rice University Data Center Update Administrators Forum 6-12-07

How are you going to move all that stuff?

• Complete inventory for all systems• Plan move on paper• Schedule relocation of systems• Pre-verify services (power/data)• Move systems

– Start July 16, 2007– Complete major moves before O-week– Minimize disruption to campus operations

• Verify proper operation of systems• Return systems to production status

Page 16: Rice University Data Center Update Administrators Forum 6-12-07

Migration Schedule (subject to change)

Page 17: Rice University Data Center Update Administrators Forum 6-12-07

Thank you

To Rice Trustees, Rice Administration, FE&P, my fellow IT staff, and everyone that has worked to make this building a reality

Questions, comments, or corrections to

William DeigaardDirectorNetworking, Telecommunications, and Data Center [email protected]


Recommended