Rig Stacking Strategies Ship & Offshore Finance Forum Oslo 25 May 2016 Chip Keener Integrated Rig Stacking Solutions LLC www.keener-consulting.com 1
Transcript

Rig Stacking Strategies Ship & Offshore Finance Forum

Oslo 25 May 2016

Chip Keener Integrated Rig Stacking Solutions LLC

www.keener-consulting.com 1

Industry Cycles The Risks Warm Stack vs Cold Stack The Cost of Responsibly Stacking

Rig Stacking Strategies

0

10

20

30

40

50

60

70

80

90

100

19

70

19

71

19

72

19

73

19

74

19

75

19

76

19

77

19

78

19

79

19

80

19

81

19

82

19

83

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

Oil Price vs Industry Build

Jackup

Floater

$/bbl Inflation adjusted

3

1. Corrosion – hull, machinery, piping, electrical systems • VCI’s, dehumidification, cathodic protection

2. Mold – accommodations 3. Weather Events – particularly cyclonic storms 4. Certification – dates of reference

• IMO MODU Code / Flag State – keel laying • CLASS – shipyard contract … or reactivation

5. Control Systems – drilling, well control, vessel management, power management, dynamic positioning • 1000’s of parameters (software & several 100 PLC’s) • 3-6 months of commissioning with the OEM’s

Layup Risks – Startup Time / Asset Valuation

Rig Systems – A Holistic View

Anchor Winches

Bulk Controls

Cement Controls

Mud Controls

Drilling Switch Gear

Load & Stability

Safety & Automation

Gyros & Transducers

SCR Monitoring

Riser Tensioners

Blowout Preventers

Dynamic Positioning

Power Mgmt

Drilling VFD/VSD

CCTV Drilling Controls

Drawworks Top Drive Rotary Power Slips Pipe Handler Fingerboard Roughneck Manipulator Guide Arm Tongs Trolleys Riser Catwalk

Rig Systems – Software & Integrations

Stewart & Stevenson GE Siemens

Cables & Terminations

Networks & Protocols

Dependencies, Interconnections, Configurations

Engines RTDS Multillin Controller

PLC Controller

Remote Console

Bridge Panel / PC

L-3

1. Documentation 2. Inventory & Capital Spares 3. System Commissioning & Validation 4. Infant Mortality

Added Burdens & Risks – New Construction

Warm Stacking correlates with a sustained crew component, and expectation of vessel readiness … though not always. Cold Stacking implies unmanning of a vessel, and presumption of neglect … though not necessarily.

Cold Stack vs Warm Stack

Responsible Stacking – Jackups

~ $600,000 Setup Cost (excludes ~ 4 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring

Equipment, Accommodation Module

~ $4,800 Daily Run Cost • Labor (3 rotators), Generator, Fuel, R&M, Insurance,

Class - COC Compliance , Local Permits

Incremental Nested Jackups ~ $500,000 Setup Cost ~ $2,400 Daily Run Rate

~ $1,100,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring

Equipment, Accommodation Module

~ $6,000 Daily Run Cost • Labor (4 rotators), Generator, Fuel, R&M, Insurance,

Class - COC Compliance , Local Permits

Incremental Unmanned Semis in Proximity ~ $1,200,000 Setup Cost (includes SOLUS boat & davit) ~ $3,000 Daily Run Rate

Responsible Stacking – Moored Semis

~ $1,800,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring

Equipment, Accommodation Module

~ $20,000 Daily Run Cost • Labor (8 rotators), Generator, Fuel, R&M, Insurance,

Class - COC Compliance , Local Permits • ~ $3,500/day additional for tri-catenary moorings

Incremental Unmanned DP Rigs in Proximity

~ $2,000,000 Setup Cost (includes SOLUS boat & davit) ~ $7,500 Daily Run Rate (inclusive of tri-catenary moorings)

Responsible Stacking – DP Floaters

DP Floaters – Warm vs Cold Stack

Months

$’s millions

Assumptions – Cold Stacking $ 3,000,000 setup fee per rig (VCIs, dehumidification, monitoring, mooring) $ 3,500/day mooring rental per rig $ 1,800/day insurance per rig $ 18,000/day 8 man response team & services amortized across all the rigs

Assumptions – Warm Stacking $ 50,000/day per rig

$36.5

$20.6

$10.7

$14.0

12

Management & support services:

• project management & staffing • guidance in maintaining sensitive equipment

(e.g. volatile memory, software management) • counsel in the maintenance & suspension of

class & flag state certification • underwriter engagement on insurance risk • commissioning services on startup