Rigging Training
Description 2 x 8 jam
Satu Dua
Rigging Engineering 1. Planning by Rigging Engineer Rigging Procedure 2. Organizing by Rigging Supervisor Site Coordination 3. Actuating by Crane Operator and Rigger Crew Lift + Swing + Move + Down 4. Controlling by Safety Rigging Rigging Report
5. Rigging Procedure Prepare Rigging Procedures: (1) Method Of Work, (2) Job Safety Assessment Procedures, (3) Safe Work Method Statements, (4) Risk Management Safe Work Method Statement (SWMS), (5) Rigging Plans, (6) Rigging Tools, (7) Critical Lift Worksheet, (8) Lift Study, (9) Crane Lift Study, (10) General Scaffolding Safety Checklists).
6. CAD Analysis * Stress Analysis * Frame Analysis
Rigging Study
3
4
Rigging Study
Lifting Study
Installation Sequence
Project Management5
6
R i g g i n g S t u d y1. Weight of Material2. Dimension of Material3. Center Gravity
1. Sling Dimension2. Lifting Lug
3. Shackle4. Spreader Beam
7
Rigging Study
8
L i f t i n g S t u d y1. Site Arrangement2. Site Elevation3. Free Space4. Ground and Access
1. Type of LiftingSolo Crane / Duo Crane
2. Type of CraneRough Terrain / Truck Crane / Crawler / Tower Crane
/ SPECIAL CRANE9
Rigging Basics - Hitches
10
Rigging Basics - Hitches
• Choker hitches are not suited to long loose bundles
11
Rigging Basics - Hitches• Double Wrap Basket Hitch
– adjustment of slings is required while taking up slack to avoid overloading one side of the sling (this applies to all basket hitches)
12
Rigging Basics – Sling Angle
13
Rigging Basics – Sling Angle
14
Sling angle has a dramatic effect on the actual load on the sling. Take a sling that has a 1000 pound vertical lifting capacity in a basket hitch:
As angle decreases - tension on each leg increases - increasing the strain on each leg
Rigging Basics – Sling Angle
A different look, with the same load and sling, changing the angle has a similar dramatic effect
15
Rigging Basics
16
17
Sling Angle Example
Rigging Basics – D/d Ratio
• D/d ratio is the ratio of the diameter around which the sling is bent divided by the body diameter of the sling. Whenever a sling body is bent around a diameter, the strength of the sling is decreased.
Application: 6x19 and 6x37 Class rope, may not apply to cable laid or braided slings
18
Rigging Basics – D/d Ratio
19
Rigging Basics-Sling Winch
20
Rigging Attachments
21
Rigging Attachments
• Turnbuckles
Turnbuckles can be used to adjust sling length.
Be sure to use only load rated components
22
Lifting Study
23
Rigging Study
Lifting Study
Installation Sequence
Project Management24
25
R i g g i n g S t u d y1. Weight of Material2. Dimension of Material3. Center Gravity
1. Sling Dimension2. Lifting Lug
3. Shackle4. Spreader Beam
26
L i f t i n g S t u d y1. Site Arrangement2. Site Elevation3. Free Space4. Ground and Access
1. Type of LiftingSolo Crane / Duo Crane
2. Type of CraneRough Terrain / Truck Crane / Crawler / Tower Crane
/ SPECIAL CRANE27
28
29
30
31
32
LIFT
ING
TO
OLS
IN S
PEC
IAL
CO
ND
ITIO
N
LIFTING TOOLS IN SPECIAL CONDITION
33
Type 1A
34
Type 1B
35
Type 2
36
37
Safety in Rigging EngineeringCrawler Bearing Reaction
38
39
40
41
42
43
LiftingProcedure
44
45
Procedures: (1) Method Of Work,(2) Job Safety Assessment Procedures,(3) Safe Work Method Statements,(4) Risk Management Safe Work Method Statement (SWMS),(5) Rigging Plans,(6) Rigging Tools,(7) Critical Lift Worksheet,(8) Lift Study,(9) Crane Lift Study,(10) General Scaffolding Safety Checklists).
46
METHOD OF INDUCTION IN THE PROCESS OF
MASTERING LIFTING ENGINEERING
47
AKTIVITAS PEMBELAJARAN YANG DILAKUKAN1. Menonton peragaan proses suatu keahlian.2. Mengulangi langkah kerja, DENGAN bimbingan langsung
dari instruktur.3. Mengulangi langkah kerja, TANPA bimbingan langsung dari
instruktur.4. Membuat suatu rancangan sendiri, proses pembuatan nya
DENGAN bimbingan langsung dari instruktur.5. Membuat suatu rancangan sendiri, proses pembuatan nya
TANPA bimbingan langsung dari instruktur.
RIGGING DEPARTMENT LOGO.LIFT
SWINGMOVE
DOWN
In safety corridor
THINK SAFEDO SAFELYSAFETY FIRST
48