+ All Categories
Home > Documents > ripe ncc report.ppt - American Registry for Internet Numbers · RIPE Network Coordination Centre...

ripe ncc report.ppt - American Registry for Internet Numbers · RIPE Network Coordination Centre...

Date post: 21-May-2018
Category:
Upload: dinhdan
View: 218 times
Download: 1 times
Share this document with a friend
17
RIPE Network Coordination Centre Update from the RIPE NCC http://www.ripe.net ARIN XXIII, 28 April 2009, San Antonio Axel Pawlik 1
Transcript

RIPE Network Coordination Centre

Update from the RIPE NCCp

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 1

RIPE Network Coordination Centre

RIPE 57, Dubai

• Good attendance- 320 people from 50 countries320 people from 50 countries

• Focus IPv6, IPv4 depletionO t h• Outreach- Previously: Enhanced Cooperation Task Force

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik

- First meeting of Cooperation Working Group

2

RIPE Network Coordination Centre

General Meeting October

• Good Attendance72 votes- 72 votes

• Charging Scheme 2009 adoptedN h t f- No changes to fees

- Including PI in algorithm

• Draft Budget 2009: 15.3 M EUR- Approved by board in December

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 3

RIPE Network Coordination Centre

Executive Board (since May 2008)• Two open seats• Seven Candidates• Four / five rounds of elections ☺

- Calls for electronic voting since…Calls for electronic voting since…

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik

Left to right: Andreas Wittkemper, Fahad AlShirawi, Dmitry Burkov, János Zsakó, Nigel Titley

4

RIPE Network Coordination Centre

Ongoing Preparations for the Future

• Following Strategy Workshops with Executive BoardW ki th i f tt ti• Working on three main areas of attention- Role of the RIPE NCC: Community Building, Outreach, PR- Trusted Source of Data: Hardening Registry, Reporting Tools- Number Resource Lifecycle Management: Allocation, Auditing,

Reclamation CertificationReclamation, Certification

• Developing and adjusting priorities accordinglyD i i i l i i i f i l k- Deriving operational priorities from strategic outlook

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 5

RIPE Network Coordination Centre

What is keeping us busy…

• Certification• Support for Policy Development• Developing Information Services• Outreach and PR

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 6

RIPE Network Coordination Centre

Certification in the RIPE Region

• Developing with Input from Community- RIPE Certification Task Force- RIPE Certification Task Force

• Discussing processes• Have announced limited testrun at RIPE 57• Have announced limited testrun at RIPE 57

- Several dozen participants

• Plan to deploy this yearPlan to deploy this year- But…

• Coordinating with other RIRs- Semantics- Processes

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 7

- Policies

RIPE Network Coordination Centre

Policy Development Support

• 2007-01 proves more complex than expected- “Direct Internet Resource Assignments to End Users from the- Direct Internet Resource Assignments to End Users from the

RIPE NCC”- Contracts with LIRs needed

• Last resort with RIPE NCC directly- Member vs Non-Member- Accepted in October 2008, Phase 1 implemented February 2009

• 2007-08- “Enabling Methods for Reallocation of IPv4 Resources” (a.k.a

Transfer proposal)Accepted in December 2008

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik

- Accepted in December 2008

8

RIPE Network Coordination Centre

Some more Policy Development

• 2006-01, “Provider Independent (PI) IPv6 Assignments for End User Organisations”Assignments for End User Organisations- Accepted in April 2009

• 2008 08 “Initial Certification Policy for Provider• 2008-08, Initial Certification Policy for Provider Aggregatable Address Space Holders”

• 2008 06 “Use of final /8”• 2008-06, Use of final /8• 2008-07, “Ensuring Efficient Use of Historical IPv4

Resources”Resources• 2009-01, “Global Policy for the allocation of IPv4

bl k t R i l I t t R i t i ”

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik

blocks to Regional Internet Registries”

9

RIPE Network Coordination Centre

Even More Policy Development

• 2008-05, “Anycasting Assignments for TLDs and Tier 0/1 ENUM”0/1 ENUM

• 2009-02, “Allocating/Assigning Resources to the RIPE NCC”RIPE NCC

• 2009-03, “Run Out Fairly”2009 04 “IP 4 All ti d A i t t• 2009-04, “IPv4 Allocation and Assignments to Facilitate IPv6 Deployment”2009 05 “M l i l IP 6 /32 All i f LIR ”• 2009-05, “Multiple IPv6 /32 Allocations for LIRs”

http://www.ripe.netARIN XXIII, 28 April 2009, San Antonio 10Axel Pawlik

RIPE Network Coordination Centre

Information services

• RIPE NCC Information services- http://is-portal.ripe.net

• Routing Information Service (RIS)htt // i t/ i- http://www.ripe.net/ris

• Test Traffic Measurements (TTM)- http://www ripe net/ttmhttp://www.ripe.net/ttm

• DNSMON- http://dnsmon.ripe.net/

• NCC Science Group analysis- http://www.ripe.net/projects/reports/2008cable-cut

htt // i t/ / t d t b hij ki ht l

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 11

- http://www.ripe.net/news/study-youtube-hijacking.html

RIPE Network Coordination Centre

Membership & Regional Outreach

• Exceeded 6.064 members by the end of 2008- Noticing lower conversion rate (application -> member)

• RIPE NCC Regional Meetings 2008- Salmiya, Kuwait, 15-17 April- Moscow, Russia, 23-24 September

• Middle East Operators Group (MENOG)- MENOG 4 / RIPE 57 Meeting in Dubai- MENOG 5 / RIPE NCC Regional Meeting, Bahrain, 6-9 April

• Membership SurveyMembership Survey- Results at: http://www.ripe.net/news/2008-survey.html

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 12

RIPE Network Coordination Centre

PR / Outreach

• Working closely with PR agency• Racepoint / LondonRacepoint / London

• Campaigns on IPv6 uptake and ASN32Press releases and sustained briefings- Press releases and sustained briefings

• Support for eventsOECD S l- OECD, Seoul

- ITU Telecom Africa, Cairo, with AfriNICITU T l A i B k k i h APNIC- ITU Telecom Asia, Bangkok, with APNIC

• Developing Branding for Information Services

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 13

RIPE Network Coordination Centre

Governments & “Enhanced Cooperation”

• RIPE Cooperation Working Group- Resulting from Enhanced Cooperation Task Forceg p- Co-chaired by Maria Häll / Martin Boyle

• External Relations- Activities targeted towards and with governments- Continued Cooperation with the OECD

RIPE NCC R dt bl f G t d R l t• RIPE NCC Roundtable for Governments and Regulators- 29 September 2008, Amsterdam- 16 February 2009 Amsterdam16 February 2009, Amsterdam

• Workshop with Law Enforcement Agents- 17 February 2009, Amsterdam

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 14

y ,- Demand for better understanding and closer cooperation

RIPE Network Coordination Centre

RIPE 58

RIPE 58, Amsterdam, 4-8 May 2009

RIPE 59, Lisbon, Portugal, 5-9 October 2009

For 2010, preparing Prague and Rome ☺

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 15

RIPE Network Coordination Centre

Oh, and one more thing…• The Challenge…• … came to me from APNIC:

- “We are challenging the staff of the NCC to try to beat the APNIC staff in the Global Corporate Challenge!”

- “APNIC would understand if you’d have to decline taking this up, competing against super fit Queenslanders would be daunting! At least the weather would be on your side,be daunting! At least the weather would be on your side, you’ll soon have a European summer! “

• RIPE NCC mustered 5 teams so far…• 125 days, 10.000 steps / day

• So, the RIPE NCC staff is challenging ARIN staff!

http://www.ripe.netARIN XXIII, 28 April 2009, San Antonio 16Axel Pawlik

• See www.gettheworldmoving.com

RIPE Network Coordination Centre

Questions?

http://www.ripe.netARIN XXIII, 28 April 2009, San AntonioAxel Pawlik 17


Recommended