Revision No. 02 Page 1 of 3 ADC/PM/F/27 ADC Energy Systems PROJECT NAME RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3 Reference # A015-MS-CE-005 ACTIVITY RISK ASSESSEMENT WORKSHEET GUIDELINES Date : 18.07.2011 Work Activity : FOR MOBILIZATION WORKS DCP 3 Location : DCP 3 Assessment Team : Signature Prepared By Review By Approved By RATHEESH KUMAR M R (HSE OFFICER) Ratheesh Kumar HSE Officer Thomas John Construction Manager Mr. Mohammed Aref Project Manager RISK ASSESSMENT MATRIX (RAM) POTENTIAL CONSEQUENCES Lost Time Injuries PROBABILITY A B C D E RATING Harm to People Loss or Damage to Assets Effect on the Environmen t Impact on Reputation Has occurred in worldwide industry Has occurred in another Group Company Has occurred in Saadiyat Occurs several times per year in Saadiyat Occurs several times per year in the some location or the UAE. 1 Slight injury or health effect Slight < UAE Dhs.10,000 Slight Slight 2 Minor injury or health effects Minor<UAE Dhs 100,000 Minor Minor LOW 3 Major injury or health effects Major < UAE Dhs 500,000 Major Major MEDIUM 4 1-3 fatalities or Severe <UAE Dhs 10,000,000 Severe National HIGH
Transcript
Page 1: Risk Assessment for Mobilization Works DCP 3

Revision No. 02 Page 1 of 3 ADC/PM/F/27

ADC Energy SystemsPROJECT NAME

RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3

Reference # A015-MS-CE-005 ACTIVITY RISK ASSESSEMENT WORKSHEET GUIDELINES Date : 18.07.2011Work Activity :

FOR MOBILIZATION WORKS DCP 3

Location :

DCP 3

Assessment Team : Signature Prepared By Review By Approved By

RATHEESH KUMAR M R (HSE OFFICER)

Ratheesh KumarHSE Officer

Thomas John Construction

Manager

Mr. Mohammed Aref

Project Manager

RISK ASSESSMENT MATRIX (RAM)POTENTIAL CONSEQUENCES

Lost Time Injuries PROBABILITY

A B C D E

RATING Harm toPeople

Loss orDamage to

Assets

Effect on the

Environment

Impact onReputation

Has occurred in worldwide industry

Has occurred in another Group

Company

Has occurred in Saadiyat

Occurs several times per year

in Saadiyat

Occurs several times per year in

the some location or the

UAE.

1Slight injury

or health effect

Slight < UAE Dhs.10,000 Slight Slight

2Minor injury

or health effects

Minor<UAEDhs 100,000 Minor Minor LOW

3Major injury

or health effects

Major < UAE Dhs 500,000 Major Major MEDIUM

4

1-3 fatalities or permanent total disability

Severe <UAE Dhs

10,000,000 Severe National HIGH

5 >3fatalitiesCatastrophic>UAE Dhs 10,000,000

Catastrophic

International

Page 2: Risk Assessment for Mobilization Works DCP 3

Revision No. 02 Page 2 of 3 ADC/PM/F/27

ADC Energy SystemsPROJECT NAME

RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3

Task Hazard Initial Risk Control Measures Residual Risk

Step #

Description of Task Step

Hazard Description & Effect

Who or What

might be Harmed?

Con

seq

uenc

e

Pro

bab

ility

Ris

k R

atin

g

Control Measures and / or Recovery Measures

Con

seq

uenc

e

Pro

bab

ility

Ris

k R

atin

g

*Residual Risk Level (ALARP )

1 Preparation for the task

Hand, Body injuries Eye. People,Property

33

EE

MM

1.1 Proper PPES like Safety Shoes, helmets, Safety glass, respiratory mask, Full sleeve cover roll and hand glouse are mandatory, while working time.

1.2 Tool box talk should be given before starting the work. Ensure that the scope of work is clearly communicated to the employers and make them aware of all hazards of the activity

22

2

AA

A

L L

L

LowLow

Low

2 Lifting slings and Chain block

Hand, Body injuries, property damage

PeopleProperty

33

DD

MM

2.1 Certified slings using2.2 All slings must be inspected prior to each use

22

AA

LL

LowLow

3 Unloading and pipe fixing

Body injury and Hand Injuries. property and equipment damages, Tripping hazardus.

PeopleProperty

33

EE

MM

3.1 Tools box talk to be given to reduce the risk3.2 proper ppe using3.3 planned area provided

222

AAA

L L L

LowLowLow

4 Moving vehicles Uncontrolled movement resulting in the injury of people and or damage to equipment/ property

PeopleProperty

33

EE

MM

4.1 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid4.2 planned proper area provided

2

2

A

A

L

L

Low

Low5 Using mobile

cranesUncontrolled movement resulting in the injury of people and or damage to equipment / property.

People,Property

33

EE

MM

5.1Trained banks man appointed5.2 Drivers/Operators will be given a

full induction to include the site ingress, egress and including conditions pertaining to the Saadiyat island

5.3 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid

5.4 A third party certified rigger must be available for all lifting operations.

5.5 Crane entry permit

22

2

2

AA

A

A

L L

L

L

LowLow

Low

Low

6 Electric Tools, Light fittings, Power cables

Electric Shock PeopleProperty

33

DD

MM

6.1 keep a safe distance from live/ energized equipments and cables.6.2 Proper sign board provided proper areas.6.3 All the power will isolate while

2

2

2

A

A

A

L

L

L

Low

Low

Low

Page 3: Risk Assessment for Mobilization Works DCP 3

Revision No. 02 Page 3 of 3 ADC/PM/F/27

ADC Energy SystemsPROJECT NAME

RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3

REMARKS:1. All people at site shall attend the Saadiyat island HSE Induction2. All above activites will be under the control of ADC Energy Systems.3. Full supervision by ADC Energy Systems.4. Emergency Numbers – Saadiyat Island/paragon ABD Cooling/ADC Energy Systems. Will be posted & Know to all personnel.5. Abnormal working conditions:- Work shall be stopped and Contact made with the ADC Energy Systems HSE Officer

Ratheesh Kumar M R by Telephone. +971 – 55747 6033.NidalSaleh (Supervisor) +971 -507818190, 6. The number of people on site should be limited to the minimum, control by entry passes & monitor by security.7. Four wheel drive vehicle shall be available at site during the activity.8. Escape route must be kept clear of any obstacle.


Recommended