Revision No. 02 Page 1 of 3 ADC/PM/F/27
ADC Energy SystemsPROJECT NAME
RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3
Reference # A015-MS-CE-005 ACTIVITY RISK ASSESSEMENT WORKSHEET GUIDELINES Date : 18.07.2011Work Activity :
FOR MOBILIZATION WORKS DCP 3
Location :
DCP 3
Assessment Team : Signature Prepared By Review By Approved By
RATHEESH KUMAR M R (HSE OFFICER)
Ratheesh KumarHSE Officer
Thomas John Construction
Manager
Mr. Mohammed Aref
Project Manager
RISK ASSESSMENT MATRIX (RAM)POTENTIAL CONSEQUENCES
Lost Time Injuries PROBABILITY
A B C D E
RATING Harm toPeople
Loss orDamage to
Assets
Effect on the
Environment
Impact onReputation
Has occurred in worldwide industry
Has occurred in another Group
Company
Has occurred in Saadiyat
Occurs several times per year
in Saadiyat
Occurs several times per year in
the some location or the
UAE.
1Slight injury
or health effect
Slight < UAE Dhs.10,000 Slight Slight
2Minor injury
or health effects
Minor<UAEDhs 100,000 Minor Minor LOW
3Major injury
or health effects
Major < UAE Dhs 500,000 Major Major MEDIUM
4
1-3 fatalities or permanent total disability
Severe <UAE Dhs
10,000,000 Severe National HIGH
5 >3fatalitiesCatastrophic>UAE Dhs 10,000,000
Catastrophic
International
Revision No. 02 Page 2 of 3 ADC/PM/F/27
ADC Energy SystemsPROJECT NAME
RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3
Task Hazard Initial Risk Control Measures Residual Risk
Step #
Description of Task Step
Hazard Description & Effect
Who or What
might be Harmed?
Con
seq
uenc
e
Pro
bab
ility
Ris
k R
atin
g
Control Measures and / or Recovery Measures
Con
seq
uenc
e
Pro
bab
ility
Ris
k R
atin
g
*Residual Risk Level (ALARP )
1 Preparation for the task
Hand, Body injuries Eye. People,Property
33
EE
MM
1.1 Proper PPES like Safety Shoes, helmets, Safety glass, respiratory mask, Full sleeve cover roll and hand glouse are mandatory, while working time.
1.2 Tool box talk should be given before starting the work. Ensure that the scope of work is clearly communicated to the employers and make them aware of all hazards of the activity
22
2
AA
A
L L
L
LowLow
Low
2 Lifting slings and Chain block
Hand, Body injuries, property damage
PeopleProperty
33
DD
MM
2.1 Certified slings using2.2 All slings must be inspected prior to each use
22
AA
LL
LowLow
3 Unloading and pipe fixing
Body injury and Hand Injuries. property and equipment damages, Tripping hazardus.
PeopleProperty
33
EE
MM
3.1 Tools box talk to be given to reduce the risk3.2 proper ppe using3.3 planned area provided
222
AAA
L L L
LowLowLow
4 Moving vehicles Uncontrolled movement resulting in the injury of people and or damage to equipment/ property
PeopleProperty
33
EE
MM
4.1 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid4.2 planned proper area provided
2
2
A
A
L
L
Low
Low5 Using mobile
cranesUncontrolled movement resulting in the injury of people and or damage to equipment / property.
People,Property
33
EE
MM
5.1Trained banks man appointed5.2 Drivers/Operators will be given a
full induction to include the site ingress, egress and including conditions pertaining to the Saadiyat island
5.3 Drivers will have their documents checked and recorded to ensure all test certificates and licenses valid
5.4 A third party certified rigger must be available for all lifting operations.
5.5 Crane entry permit
22
2
2
AA
A
A
L L
L
L
LowLow
Low
Low
6 Electric Tools, Light fittings, Power cables
Electric Shock PeopleProperty
33
DD
MM
6.1 keep a safe distance from live/ energized equipments and cables.6.2 Proper sign board provided proper areas.6.3 All the power will isolate while
2
2
2
A
A
A
L
L
L
Low
Low
Low
Revision No. 02 Page 3 of 3 ADC/PM/F/27
ADC Energy SystemsPROJECT NAME
RISK ASSESSMENT (RA) FOR SAADIYAT DCP 3
REMARKS:1. All people at site shall attend the Saadiyat island HSE Induction2. All above activites will be under the control of ADC Energy Systems.3. Full supervision by ADC Energy Systems.4. Emergency Numbers – Saadiyat Island/paragon ABD Cooling/ADC Energy Systems. Will be posted & Know to all personnel.5. Abnormal working conditions:- Work shall be stopped and Contact made with the ADC Energy Systems HSE Officer
Ratheesh Kumar M R by Telephone. +971 – 55747 6033.NidalSaleh (Supervisor) +971 -507818190, 6. The number of people on site should be limited to the minimum, control by entry passes & monitor by security.7. Four wheel drive vehicle shall be available at site during the activity.8. Escape route must be kept clear of any obstacle.