Risk Management
www.intertek.com1
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 1
LET US SEE WHAT IS
www.intertek.com2Issue 2 © Intertek QATAR www.intertek.com 2
Risk Management
www.intertek.com2
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 2
Information Security RisksInformation Security RisksCONFIDENTIALITY RisksINTEGRITY RisksAVAILABILITY RisksBusiness Continuity RisksBusiness Continuity RisksHealth & Safety RisksProduct RisksProcess RisksInformation Security RisksEnvironmental RisksProcess RisksFinancial RisksFood Safety RisksLogistic RisksAccounting RisksCapacity RisksCompetency RisksEtc.
STOCK MARKET INSURANCE CATOSTROPHIES PRODUCT PROCESSESHUMAN
DEPENDANCY
LOGISTICS LEGAL INDUSTRYSTANDARDS & ACCEPTANCE
CRITERIA
PRINCIPLES / VISION /
POLICIES / STRATEFIES
IT
COMPETITORS NEIGHBOURS PRESSURE GROUPS
TRANSPARANCY CULTURE COMPETENCY
EXTERNAL FACTORS INTERNAL FACTORS
www.intertek.com3Issue 2 © Intertek QATAR www.intertek.com 3
Risk Management
www.intertek.com3
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 3
www.intertek.com4Issue 2 © Intertek QATAR www.intertek.com 4
Risk Management
www.intertek.com4
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 4
A Tyre company designs a tyre which has following features, based on market research to capture the market (market share from 40% TO 75%) :
Long Lasting – 2 million milesAny Terrain - Desert & Rocky 100% Air Tight
Result in one yearcaptures the market (market share increased from 40% To 85% - more than targetted)
BUTBUT
New sales went down New sales went down as there was no need as there was no need for customers to invest for customers to invest in new tyresin new tyres
So both Risks (+ve & -ve ) be identified in Risk Assessment
Positive Risks (Opportunities)
www.intertek.com5Issue 2 © Intertek QATAR www.intertek.com 5
Risk Management
www.intertek.com5Issue 2 © Intertek QATAR www.intertek.com 5
RISK MANAGEMENT LIFE CYCLE
www.intertek.com6Issue 2 © Intertek QATAR www.intertek.com 6
Risk Management
www.intertek.com6Issue 2 © Intertek QATAR www.intertek.com 66
www.intertek.com7Issue 2 © Intertek QATAR www.intertek.com 7
Risk Management
www.intertek.com7Issue 2 © Intertek QATAR www.intertek.com 7
Risk Governance
www.intertek.com8Issue 2 © Intertek QATAR www.intertek.com 8
Risk Management
www.intertek.com8Issue 2 © Intertek QATAR www.intertek.com 8
>
RISK BASED THINING (RISK MANAGEMENT) & CORRECTIVE ACTIONS REQUIRE
BIGGER VISION
Importance of Vision
www.intertek.com9Issue 2 © Intertek QATAR www.intertek.com 9
Risk Management
www.intertek.com9Issue 2 © Intertek QATAR www.intertek.com 9
ENTERPRISE RISK MANAGEMENT
www.intertek.com10Issue 2 © Intertek QATAR www.intertek.com 10
Risk Management
www.intertek.com10Issue 1 © Intertek QATAR www.intertek.com
Information Security OverviewInformation Security Overview
Scenario 1
Occurrence CHANGES Occurrence CHANGES
but
Impact is SAMEImpact is SAME
Scenario 2
Impact CHANGES Impact CHANGES
but
Occurrence isOccurrence is SAMESAME
THERE ARE TWO SCENARIOS OF RISK
Scenarios of Risk
www.intertek.com11Issue 2 © Intertek QATAR www.intertek.com 11
Risk Management
www.intertek.com11Issue 1 © Intertek QATAR www.intertek.com
Information Security OverviewInformation Security Overview
11
Probability of falling is LOWProbability of falling is HIGH
Risk of Failure = Probability of Occurrence X Severity of the ImpactRisk of Failure = Probability of Occurrence X Severity of the Impact
Scenario 1 = Probability of Occurrence CHANGES but Impact is SAME
www.intertek.com12Issue 2 © Intertek QATAR www.intertek.com 12
Risk Management
www.intertek.com12Issue 1 © Intertek QATAR www.intertek.com
Information Security OverviewInformation Security Overview
Impact is LESS if speed is LESS @ 10k/ hr Impact is HIGH if speed is HIGH @ 150 km / hr
Scenario 2 = Impact CHANGES but Probability of Occurrence is SAME
Risk of Failure = Probability of Occurrence X Severity of the ImpactRisk of Failure = Probability of Occurrence X Severity of the Impact
www.intertek.com13Issue 2 © Intertek QATAR www.intertek.com 13
Risk Management
13
0.3 Selecting controls Controls can be selected from this standard or from other control sets, or new controls can be designed to meet specific needs as appropriate. The selection of controls is dependent upon organizational decisions based on the criteria for risk acceptance, risk treatment options and the general risk management approach applied to the organization, and should also be subject to all relevant national and international legislation and regulations. Control selection also depends on the manner in which controls interact to provide defence in depth. Some of the controls in this standard can be considered as guiding principles for information security management and applicable for most organizations. The controls are explained in more detail below along with implementation guidance. More information about selecting controls and other risk treatment options can be found in ISO/IEC 27005.[11]
RISK MITIGATION IN INFORMATION SECURITY
www.intertek.com14Issue 2 © Intertek QATAR www.intertek.com 14
Risk Management
www.intertek.com14Issue 2 © Intertek QATAR www.intertek.com 14
Logical Flow of Risk Assessment in ISMS
1. Identification of Vulnerability for Information Risk of C, I & A
2. Identification of Existing Controls (if any already there) for Information Risk of C, I & A
3. Performing the Risk Evaluation to understand the level of existing risk ( Example > High / Medium / Low) - of C, I & A
4. Deciding if this is acceptable or requires further treatment to reduce the risk of C, I & A5. Deciding treatment from Annexure A Controls / Newly designed Control to reduce the risk of C, I & A
6. Analysing the Controls effective and Approving Residual Risks of C, I & A
So we do Risk Evaluation twice - one after existing controls and one after new controls to understand the level of risk reduction of C, I & A
www.intertek.com15Issue 2 © Intertek QATAR www.intertek.com 15
Risk Management
www.intertek.com15
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 15
RISK MITIGATION IN BCMS
www.intertek.com16Issue 2 © Intertek QATAR www.intertek.com 16
Risk Management
www.intertek.com16
Risk Management
Issue 2 © Intertek QATAR www.intertek.com 16
Logical Flow of Risk Assessment in BCMS
1. Identification of Vulnerability for Information Risk of C, I & A
2. Identification of Existing Controls (if any already there) for BC Plans
3. Performing the Risk Evaluation to understand the level of existing risk ( Example > High / Medium / Low) - of BC
4. Deciding if this is acceptable or requires further treatment to reduce the risk of BC5. Deciding treatment from Annexure A Controls / Newly designed Control to reduce the risk of BC
6. Analysing the Controls effective and Approving Residual Risks of BC
So we do Risk Evaluation twice - one after existing controls and one after new controls to understand the level of risk reduction in BCMS
www.intertek.com17Issue 2 © Intertek QATAR www.intertek.com 17
Risk Management
www.intertek.com17Issue 2 © Intertek QATAR www.intertek.com 17
RIS
K L
EVEL
HIGH
/
71 - 100
Medium
/
41 - 70
Low
/
1 - 40
RISK MITIGATION ( Risk Reduction )
Risk Mitigation – Implemeting Controls for Risk
Reduction
No matter which ever controls implemented, following are the facts:1. Shall definitely bring down the risk of C, I & A – till the time control is effective;2. What ever control – risk cannot be brought to ZERO – can only reduce the risk; 3. In IT, controls can reduce the “PROBABILITY” only;4. Residual risks shall always be there – one must remember 24x7;
NO CONTROL CAN BRING ANY RISK TO ZERO LEVEL SHALL ALWAYS HAVE RESIDUAL RISK
www.intertek.com18Issue 2 © Intertek QATAR www.intertek.com 18
Risk Management
www.intertek.com18Issue 2 © Intertek QATAR www.intertek.com 18
Risk Evaluation Methodologies (samples only)
www.intertek.com19Issue 2 © Intertek QATAR www.intertek.com 19
Risk Management
www.intertek.com19Issue 2 © Intertek QATAR www.intertek.com 1919
STEP 1 = Identifying the Potential Causes + % of Impact on business + Current
Risk Level (considering existing controls)IDENTIFICATION OF THREATS AND
VULNERABILITIES FOR RISKS
CONSIDER THE EXISTING
CONTROS AS CURRENT
BASELINE
ISMS RISK ASSESSMENT
RISK EVALUATION 1 – IMPACTS ON
CONFIDENTIALITY , INTEGRITY AND AVAILABILITY
CURRENT RISK
LEVEL
www.intertek.com20Issue 2 © Intertek QATAR www.intertek.com 20
Risk Management
www.intertek.com20Issue 2 © Intertek QATAR www.intertek.com 2020
NEW CONTROLS – RISK MITIGATION PLANS
OVERALL RESIDUAL RISKS
Stage 2 = Plan the actions / controls to reduce the risks and
calculate RPN again to demonstrate
reduction of the identified risks and also record the residual risks.
ISMS RISK ASSESSMENT
MEW RISK
LEVEL
NEW BASELINE
RESIDUAL RISKS OF CONFIDENTIALITY, INTEGRITY & AVAILABILITY
www.intertek.com21Issue 2 © Intertek QATAR www.intertek.com 21
Risk Management
www.intertek.com21Issue 2 © Intertek QATAR www.intertek.com 21
STATEMENT OF APPLICABILITY[ SOA ]
SOA IS A STATEMENT CONTAINING
The list of controls used in the Risk Assessment – with JUSTIFICATIONS for INCLUSIONS The list of controls not used in the Risk Assessment – with JUSTIFICATIONS for NON-INCLUSIONS
BEST PRACTICE
1. The SOA and RA have to be considered as Synchronized Cis (CI = Configuration Item)
Synchronized CI = VERSION OF SOA AND RA BE SAME > EVERY CHANGE ONCE DONE IN RA , SOA BE REVIEWED AND VERSION OF SOA BE UPGRADED = SAME AS THAT OF RA
www.intertek.com22Issue 2 © Intertek QATAR www.intertek.com 22
Risk Management
www.intertek.com22Issue 2 © Intertek QATAR www.intertek.com 22
Applicable
Cross reference/
YES / NOIn Risk Assessment
A.6.2.1Mobile device policy YES
To ensure that confidentialinformation is not carriedoutside through laptopcomputers & cellphones
Risk Number 43
A.12.1.4
Separation of development, testing environments
NODocument Bank is involved onlyin operational activities such asscanning and storage etc.
Not Applicable
Control Number
Control Objectives/ Controls
Justification
SAMPLE
www.intertek.com23Issue 2 © Intertek QATAR www.intertek.com 23
Risk Management
NEW CONTROLS – RISK MITIGATION PLANS FROM RISK ASSESSMENT
BUSINESS CONTINUITY PLANS
www.intertek.com24Issue 2 © Intertek QATAR www.intertek.com 24
Risk Management
www.intertek.com24Issue 2 © Intertek QATAR www.intertek.com 24
Incident Incident
www.intertek.com25Issue 2 © Intertek QATAR www.intertek.com 25
Risk Management
www.intertek.com25Issue 2 © Intertek QATAR www.intertek.com 25
Who was involved?Who has to be informed about the incident ?Who will inform?
Where Impacted?
Was it a Product Design Fault / Process Failure ?
When? When did the Incident occur?
Who?
STEP 1 > RECORD THE INCIDENT
INCIDENT MANAGEMENT – RISK VALIDATION & CORRECTIVE ACTIONS
STEP 2 > IDENTIFY THE CAUSES OF THE INCIDENT
www.intertek.com26Issue 2 © Intertek QATAR www.intertek.com 26
Risk Management
www.intertek.com26Issue 2 © Intertek QATAR www.intertek.com 2626
Incident > Product Withdrawal and Product Recall
Mattel recalls 1.5 million toys:
http://www.youtube.com/watch?v=NlsvfXAQ5v8&
feature=fvw
Lead contamination – Toxic levels of Lead pain
lawsuit:
http://www.youtube.com/watch?v=3DL4dleEz7I
www.intertek.com27Issue 2 © Intertek QATAR www.intertek.com 27
Risk Management
www.intertek.com27Issue 2 © Intertek QATAR www.intertek.com 27
The 2009 Toyota 9 Million Car Recall
Toyota Motor Corp. recalled approximately 9 million vehicles in the United States, which was the company’s
largest-ever U.S. recall. The purpose of the recall was to address quality assurance and quality control
problems with a removable floor mat that could cause accelerators to get stuck and potentially lead to a crash.
(Source: Toyota recalls 3.8 million vehicles, MSNBC.com)
Toyota, which up until that point prided itself on its quality practices, had made the decision in the 1990's to put a
greater emphasis on growth. They failed to adhere to the quality principle of employee involvement, as there was
less employee engagement and sharing of best practices. While the CEO was proactive about cancelling the
sales and productions of the recalled models, 52 people lost their lives as a result of motor vehicle crashes
Incident > Product Withdrawal and Product Recall
www.intertek.com28Issue 2 © Intertek QATAR www.intertek.com 28
Risk Management
www.intertek.com28Issue 2 © Intertek QATAR www.intertek.com 28
PROPOSED CONTROLS IN RISK ASSESSMENT AFTER INCIDENT
DOES THIS NEW DOES THIS NEW CONTROL(S) CONTROL(S)
GENERATES ANY GENERATES ANY CASCADING CASCADING
IMPACTSIMPACTS
YESYES
NONO
Update Risk Assessment and implement New
Controls to Mitigate the Risk
of Incident Repetition
The BIG Qs.
Is AWHAT ARE THE
STEPSTO UPDATE THE
RISK ASSESSMENT?
www.intertek.com29Issue 2 © Intertek QATAR www.intertek.com 29
Risk Management Answer> RISK VALIDATION
SYSTEMSYSTEM
• Governance;• Strategy;• Policies;
• Industry sector specific Statutory & Regulatory Requirement Strategy & Policies
Controls (mitigations) Incorporated In the Process Documents& Implemented
Incident
New controls
and /or
and /or
Existing controls
New Threats/New Vulnerabilities
and /or
Take away >>> R̀ISK ASSESSMENT, SOA AND INCIDENTS have to be Synchronized
PLAN
DO
CHECK
ACT
Risk Validation– Converting
VISION RA to FACTUAL RA
Residual risks
1st Step to Validate > RESIDUAL RISKS MIGHT HAVE CAUSED THE INCIDENT ?2nd Step to Validate (If 1st is Failure) > WEAK MITIGATIONS / WEAK IMPLEMENTAION MIGHT HAVE CAUSED THE INCIDENT ?3rd Step to Validate (If 1st & 2nd are Failure) > NEW THREAT / VULNERABILITY MIGHT HAVE CAUSED THE INCIDENT
KNOWLEDGE BASE
RCA
Root Cause Analysis
KEDB
Known Error Data Base
CMDB
Configuration
Management Data Base
www.intertek.com30Issue 2 © Intertek QATAR www.intertek.com 30
Risk Management
www.intertek.com30Issue 2 © Intertek QATAR www.intertek.com 30
COST IMPACT DUE TO
PERFECTION / NON-CONFORMANCE
www.intertek.com31Issue 2 © Intertek QATAR www.intertek.com 31
Risk Management
www.intertek.com31Issue 2 © Intertek QATAR www.intertek.com 31
COST IMPACT DUE TO
PERFECTION / NON-CONFORMANCE