43
Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019 Rob Armstrong, P.E., CFM & Allison Wood, P.E., CFM
Transcript
Page 1: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Risk Management & Resiliency for Design

RainfallNCTCOG Public Works Roundup May 21, 2019

Rob Armstrong, P.E., CFM & Allison Wood, P.E., CFM

Page 2: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Overview

Current Statistical Methods

Uncertainty

Why Resiliency

Methods for Resiliency

Moving Forward

Page 3: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Determination of 1% AEP Storm EventHouston Intercontinental Airport (IAH)

Page 4: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Maximum 24-hr Rainfall

Page 5: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 6: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 7: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

1% AEP Estimate: 16”

Page 8: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Houston

Page 9: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

UncertaintySample Size, Conditions, Location, Methods

Page 10: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Sample SizePeriod of Record

Page 11: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

1% AEP Design Storm Prior to 2018: 12.5”

Page 12: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

-2.81 – -2.00 0.01 – 1.00 3.01 – 4.00 6.01 – 7.00

-1.99 – -1.00 1.01 – 2.00 4.01 – 5.00 7.01 – 7.36

-0.99 – 0.00 2.01 – 3.00 5.01 – 6.00

Page 13: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

ConditionsClimate Change

Page 14: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

*Utah Geological Society (Modified from Gary Saltzman)

Page 15: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Winter, Spring, Summer, Fall Climate Predictions

Page 16: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Winter, Spring, Summer, Fall Climate Predictions

Page 17: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

LocationRisk of Getting Hit

Page 18: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Tropical Cyclone Tracks in Gulf Coast (1900-2015)

Page 19: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

MethodsStatistical Uncertainty

Page 20: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 21: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 22: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

1% AEP Upper 90% Confidence Limit: 21.7”

1% AEP 90% Lower Confidence Limit: 12.2”

“A large amount of uncertainty has a chance to cause a prediction to go very badly”

~ Nate Silver (The Signal and the Noise)

Page 23: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Why Resiliency?

Page 24: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 25: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Resilience Model

Page 26: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Methods for ResiliencyUpper Confidence Intervals, Higher Standards

Page 27: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Upper Confidence Intervals

Page 28: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 29: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

1% AEP Upper 90% Confidence Limit: 21.7”

1% AEP 90% Lower Confidence Limit: 12.2”

Page 30: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Extreme Event Analysis

Page 31: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 32: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

24 hr PMP Gulf Coast (HMR51) = 39”

1% AEP NOAA Estimate = 16.5”

1% AEP Previous NOAA Estimate = 12.5”

Page 33: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Storms in North Central Texas

Page 34: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 35: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

North Central Design Rainfall: 8”-10.5”

Page 36: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 37: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

North Central Design Rainfall: 8”-10.5”

29” - Remnants of TS Amelia

Page 38: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 39: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

1% Estimate: 19.89”

North Central Design Rainfall: 8”-10.5”

Page 40: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Moving Forward

Page 41: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,
Page 42: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Are Policy Changes Needed?

Current Approach

Risk Analysis Upper Confidence Interval

Up to 1% Tropical Cyclone/Extreme Rainfall Event Emergency Services

Major Thoroughfares

Major Flood Infrastructure

Critical Facilities

Communicate Risk to Public

Page 43: Risk Management & Resiliency for Design Rainfall...Risk Management & Resiliency for Design Rainfall NCTCOG Public Works Roundup May 21, 2019. Rob Armstrong, P.E., CFM & Allison Wood,

Questions

Rob Armstrong [email protected]

Allison Wood [email protected]