FEMA
Risk Management Series
Design Guidefor Improving Hospital Safety in Earthquakes, Floods, and High Winds
FEMA 577 / June 2007
Olive View Hospital After the 1971 Magnitude 6.7 San Fernando EarthquakePhoto Credit: e.V. LeyendeCker, U.S. GeoLoGiCaL SUrVey
About the CoverOlive View Hospital Replacement Fares Well In 1994 Quake
The new Olive View hospital building shown on the cover performed well during the 1994 Northridge earthquake. This quake, of the same magnitude as the 1971 San Fernando Earthquake that nearly collapsed the original building, caused no serious damage. Built in 1970, the Medical Treatment and Care Building of the Olive View Hospital complex was designed to meet the earthquake provisions of building codes in place at that time. The hospital incurred heavy damage (at left) during the 1971 earthquake and was subsequently rebuilt to stricter design and construction standards.
Risk ManageMent seRies
Design Guide for Improving Hospital Safety in Earthquakes, Floods, and High Winds
Providing Protection to PeoPle and Buildings
FEMA 577 / June 2007
Any opinions, findings, conclusions, or recommendations expressed in this publication do not necessarily reflect the views of FEMA. Additionally, neither FEMA nor any of its employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, product, or process included in this publication. Users of information from this publication assume all liability arising from such use.
�FOREWORD AND ACKNOWLEDGMENTS
FOREWORD AND ACKNOWLEDGMENTS
BACKGROUND
T he United States is currently in the middle of the biggest hospital construction boom in more than 50 years. According to data from the U.S. Census Bureau, spending for construction of new hospi-
tals and other medical facilities increased 65 percent between 2000 and 2006. New scientific and technological innovations, as well as advance-ments in medical practice and the organization of health care, demand a physical environment different from the hospitals of the past. This de-mand is being met by the increasing use of evidence-based design, which relies on a combination of scientifically proven research and the evalua-tion of completed projects to make design and construction decisions that improve the safety and functionality of hospital buildings.
Architects and engineers now look at credible research related not just to structural and mechanical engineering, but also to clinical outcomes, behavioral science, the environment, and technology. New building de-signs are now seen as important components that can improve medical outcomes, patient safety, employee satisfaction, and even financial perfor-mance. The effective use of evidence-based design requires continuous and timely updates of the information that affects hospital design. As part of this effort, the Federal Emergency Management Agency (FEMA) has developed this Design Guide to provide the designers of new hospitals and retrofits to existing ones with the latest information and research re-sults on the best practices to reduce the risks from natural hazards.
This publication is the latest addition to FEMA’s Risk Management Series, which provides guidelines for mitigating the risks associated with mul-tiple hazards. The series emphasizes mitigation best practices for specific
FOREWORD AND ACKNOWLEDGMENTS��
building uses and occupancies, such as schools, critical facilities, commer-cial buildings, and multi-family dwellings.
OBJECTIVE AND SCOPE
The objective of the “Design Guide for Improving Hospital Safety in Earthquakes, Floods, and High Winds” is to inform and assist design profes-sionals, hospital administrators, and facility managers in implementing sound mitigation measures that will decrease the vulnerability of hospi-tals to disruptions caused by natural hazard events. The intent of the Design Guide is to provide its audience with state-of-the-art knowledge on the variety of vulnerabilities faced by hospitals exposed to earthquakes, flooding, and high-winds risks, as well as the best ways to mitigate the risk of damage and disruption of hospital operations caused by these events.
The information presented in this publication provides an exhaustive re-view of mitigation measures and design solutions that can improve the safety of hospitals in natural hazard events. However, this publication is not intended to be a comprehensive mitigation design manual that the reader can use to develop actual plans and specifications. It is intended as an introduction to the fundamental principles of natural hazard risk reduction, with an emphasis on mitigation planning and the design of hospital buildings. The information presented here is intended to help design professionals, hospital administrators, and facility managers un-derstand the broad aspects of risk reduction methods and strategies, and integrate them into hospital designs.
ORGANIZATION AND CONTENT
The Design Guide is organized around three specific natural hazards: earthquakes, floods, and high winds. It comprises four main chapters.
Chapter 1 presents an overview of the principal considerations deter-mining hospital design, from standard industry requirements to new developments that are transforming both hospital operations and organi-zation of the physical environment. It highlights the known vulnerabilities of hospitals and the repercussions of damage caused by natural hazard events that frequently interfere with the operation of these facilities. The chapter concludes with a look at the multi-hazard approach to hospital design, and provides basic guidelines on the interaction between the re-sponses of building components to various natural hazard risks.
Chapter 2 examines potential earthquake damage to hospitals, and how these facilities can most efficiently improve their performance. The
FOREWORD AND ACKNOWLEDGMENTS ���
chapter opens with an introductory discussion on the nature and prob-ability of earthquakes, and procedures for determining seismic risk to specific locations. Typical seismic damages, and the possible resulting ef-fects on building functions or risk to occupants, are described and related to the standard damage states currently used in performance-based earth-quake engineering design. The chapter ends with a review of the best practices in seismic design and seismic retrofit of hospital facilities.
Chapter 3 discusses the nature of flood forces and their effects on build-ings. It outlines the procedures for risk assessment and describes the current mitigation measures for reducing flood damage. It emphasizes the benefits of avoiding construction of new hospitals in high-risk areas, describes regulatory design requirements that help reduce the exposure of hospitals that must be located in flood hazard areas, and encourages the application of appropriate mitigation measures to existing hospitals at risk of flooding.
Chapter 4 discusses the effects of wind forces on hospitals’ structural and nonstructural building components. By reviewing numerous examples of wind-induced damage to these facilities, this chapter highlights the best mitigation practices for new hospital design and construction, and for the rehabilitation of existing facilities. It concentrates on the building compo-nents that are the most critical for maintaining uninterrupted operation of hospitals, and provides detailed guidelines for improving their design and construction.
At the end are Appendix A, which contains a list of acronyms, and Ap-pendix B, which contains a glossary of terms that appear in the Design Guide.
ACKNOWLEDGMENTS
Principal Authors:
Christopher Arnold, Building Systems Development, Inc.
William B. Holmes, Rutherford and Chekene
Rebecca C. Quinn, RCQuinn Consulting, Inc.
Thomas L. Smith, TLSmith Consulting
Bogdan Srdanovic, URS Corporation
Wilbur Tussler, Consultant
FOREWORD AND ACKNOWLEDGMENTS�v
Contributors:
Milagros Nanita Kennett, FEMA, Project Officer, Risk Management Series Publications
Eric Letvin, URS Corporation, Project Manager
Susan Patton, URS Corporation
Rob Fernandez, URS Corporation
Ivy Porpotage, URS Corporation
Wanda Rizer, design4impact
Project Advisory Panel:
Amar Chaker (AEI), American Society of Civil Engineers (ASCE)
Ken Dickerman, AIA Academy of Architecture and Health
Skip Gregory, Florida Agency for Health Care Administration
Mike Kuechenmeister, American Society of Healthcare Engineering
Jim Rossberg (SEI), American Society of Civil Engineers (ASCE)
John Sullivan, Portland Cement Association
This manual will be revised periodically, and FEMA welcomes com-ments and suggestions for improvements in future editions. Please send your comments and suggestions via e-mail to: [email protected]
TABLE OF CONTENTS
�TABLE OF CONTENTS
FOREWORD AND ACkNOWLEDgmENTS....................................................................... i
Background................................................................................................................................. i
Objective.and.Scope................................................................................................................ ii
Organization.and.Contents.................................................................................................... ii
Acknowledgements................................................................................................................iii
1 HOSPITAL DESIgN CONSIDERATIONS............................................................. 1-1
1.1 Introduction......................................................................................................................... 1-1
1.2 HealthCareIndustry............................................................................................................. 1-3
1.2.1. Ambulatory.Care..................................................................................................... 1-3
1.2.2. Patient.Volume........................................................................................................ 1-4
1.2.3. Aging.Facilities........................................................................................................ 1-5
1.2.4. Healing.Environments........................................................................................... 1-5
1.2.5. Technological.Advances......................................................................................... 1-6
1.3 HazardMitigation................................................................................................................. 1-8
1.3.1. Assessing.Risk.......................................................................................................... 1-9
1.3.2. Evacuation.Considerations................................................................................... 1-10
1.3.3. Potential.Vulnerabilities....................................................................................... 1-11
TABLE OF CONTENTS�i
1.3.3.1.. Structural.Vulnerability..................................................................... 1-12
1.3.3.2.. Nonstructural.Vulnerability.............................................................. 1-12
1.3.3.3. Spatial.and.Other.Organizational.Vulnerabilities........................... 1-15
1.4 HospitalDesignandConstruction.......................................................................................... 1-17
1.4.1.. Building.Codes...................................................................................................... 1-18
1.5 Multi-HazardDesignConsiderations...................................................................................... 1-20
1.5.1.. The.Need.for.a.Multi-Hazard.Approach............................................................. 1-21
1.5.2. Multi-Hazard.Design.Matrix................................................................................ 1-22
1.6 References......................................................................................................................... 1-32
2 mAkINg HOSPITALS SAFE FROm EARTHQUAkES.................................. 2-1
2.1 Introduction......................................................................................................................... 2-1
2.1.1. The.Nature.and.Probability.of.Earthquakes......................................................... 2-1
2.1.2. Earthquake.Effects.................................................................................................. 2-2
2.1.3. Measuring.Earthquake.Effects............................................................................... 2-3
2.1.3.1. Measuring.Seismic.Ground.Motion................................................... 2-5
2.1.3.2. Measuring.Potential.for.Liquefaction................................................ 2-7
2.1.3.3. Measuring.Potential.for.Landslide..................................................... 2-7
2.1.3.4. Measuring.Potential.for.Tsunami.and.Seiche................................... 2-8
2.1.4. Earthquakes:. A.National.Problem........................................................................ 2-8
2.2 SeismicBuildingDesign....................................................................................................... 2-11
2.2.1. The.Equivalent.Lateral.Force.(ELF).Analysis.Methodology............................. 2-12
2.2.1.1. Acceleration....................................................................................... 2-13
2.2.1.2. Amplification.and.Soil.Type............................................................. 2-14
2.2.1.3. Building.Period.................................................................................. 2-15
2.2.2. Critical.Building.Characteristics.......................................................................... 2-16
2.2.2.1. Period.and.Resonance...................................................................... 2-16
2.2.2.2. Damping............................................................................................. 2-16
2.2.2.3. Nonlinear.Behavior........................................................................... 2-17
TABLE OF CONTENTS �ii
2.2.2.4. Ductility.............................................................................................. 2-17
2.2.2.5. Strength.and.Stiffness....................................................................... 2-18
2.2.2.6. Drift.................................................................................................... 2-19
2.2.2.7. Configuration:. Size.and.Shape........................................................ 2-20
2.2.2.8. Stress.Concentrations........................................................................ 2-20
2.2.2.9. Torsional.Forces................................................................................. 2-21
2.2.3. Specifications.for.Performance-Based.Seismic.Design...................................... 2-24
2.2.3.1. Performance.Levels........................................................................... 2-24
2.2.3.2.. New.Developments.in.Performance-Based.Design......................... 2-27
2.3 EarthquakeDamagetoHospitals........................................................................................... 2-29
2.3.1. Types.of.Structural.Damage................................................................................. 2-31
2.3.1.1. The.Case.of.the.Olive.View.Medical.Center.................................... 2-32
2.3.2.. Nonstructural.Damage......................................................................................... 2-35
2.3.2.1. The.Case.of.New.Olive.View.Medical.Center.................................. 2-39
2.3.2.2. The.Case.of.Kona.Community.Hospital,.Hawaii............................ 2-42
2.3.3. Consequences.of.Building.Damage.................................................................... 2-48
2.3.4. Seismic.Vulnerability.of.Hospitals....................................................................... 2-49
2.3.4.1. Seismic.Vulnerability.of.Hospitals.Based.on... Historical.Performance.in.California.............................................. 2-50
2.3.4.2. Vulnerability.Assessment.of.Hospital.Buildings.............................. 2-52
2.3.4.3. Comparability.of.Hospital.Buildings................................................ 2-53
2.4 RiskReductionMeasures..................................................................................................... 2-57
2.4.1. Site.Selection.Basics.............................................................................................. 2-57
2.4.2. Seismic.Design.Basics........................................................................................... 2-58
2.4.3. Structural.Systems................................................................................................. 2-59
2.4.3.1. Basic.Types.of.Lateral.Force.Resisting.Systems............................... 2-59
2.4.3.2. Innovative.Structural.Systems........................................................... 2-62
2.4.3.3. Structural.Systems.Selection............................................................. 2-63
2.4.4. Nonstructural.Components.and.Systems............................................................ 2-64
2.4.4.1. Code.Regulated.Nonstructural.Systems........................................... 2-65
2.4.4.2. Interstitial.Space.for.Utility.Installations......................................... 2-67
TABLE OF CONTENTS�iii
2.4.5. Mitigation.Measures.for.New.Buildings.............................................................. 2-68
2.4.5.1. The.Case.of.Loma.Linda.Veterans.Hospital.................................... 2-68
2.4.6. Mitigation.Measures.for.Existing.Buildings........................................................ 2-72
2.4.6.1. Procedures.and.Design.Strategies.for.Rehabilitation... of.Structural.Systems......................................................................... 2-72
2.4.6.2.. The.Case.of.Naval.Hospital.Bremerton........................................... 2-73
2.4.6.3. Procedures.and.Design.Strategies.for.Rehabilitation... of.Nonstructural.Systems.................................................................. 2-77
2.4.6.4. Summary.of.Risk.Reduction.Measures.for.Existing... Buildings............................................................................................ 2-77
2.5 ChecklistforSeismicVulnerabilityofHospitals........................................................................ 2-80
2.6 ReferencesandSourcesofAdditionalInformation.................................................................... 2-84
3 mAkINg HOSPITALS SAFE FROm FLO0DINg............................................ 3-1
3.1 GeneralDesignConsiderations................................................................................................ 3-1
3.1.1. The.Nature.of.Flooding......................................................................................... 3-1
3.1.2. Probability.of.Occurrence.or.Frequency.............................................................. 3-4
3.1.3. Flood.Characteristics.and.Loads............................................................................ 3-7
3.1.3.1. Hydrostatic.Loads................................................................................ 3-9
3.1.3.2. Hydrodynamic.Loads........................................................................ 3-10
3.1.3.3. Debris.Impact.Loads......................................................................... 3-12
3.1.3.4. Erosion.and.Local.Scour................................................................... 3-13
3.1.4. Design.Parameters................................................................................................ 3-14
3.1.4.1. Flood.Depth....................................................................................... 3-14
3.1.4.2. Design.Flood.Elevation..................................................................... 3-17
3.1.4.3. Flood.Velocity—Riverine.................................................................. 3-17
3.1.4.4. Flood.Velocity—Coastal.................................................................... 3-18
3.1.5. Flood.Hazard.Maps.and.Zones............................................................................ 3-19
3.1.5.1. NFIP.Flood.Maps............................................................................... 3-20
3.1.5.2. NFIP.Flood.Zones.............................................................................. 3-21
3.1.5.3. Coastal.A.Zones................................................................................. 3-24
TABLE OF CONTENTS ix
3.1.6. Floodplain.Management.Requirements.and.Building.Codes........................... 3-26
3.1.6.1. Overview.of.the.NFIP........................................................................ 3-26
3.1.6.2. Summary.of.the.NFIP.Minimum.Requirements............................. 3-28
3.1.6.3. Executive.Order.11988.and.Critical.Facilities................................. 3-29
3.1.6.4. Scope.of.Model.Building.Codes.and.Standards.............................. 3-30
3.2 HospitalsExposedtoFlooding............................................................................................. 3-33
3.2.1. Identifying.Flood.Hazards.at.Existing.Hospitals................................................ 3-33
3.2.2. Vulnerability:. What.Flooding.Can.Do.to.Existing.Hospitals............................ 3-33
3.2.2.1. Site.Damage....................................................................................... 3-34
3.2.2.2. Structural.Damage............................................................................. 3-36
3.2.2.3. Nonstructural.Damage...................................................................... 3-38
3.2.2.4. Medical.Equipment........................................................................... 3-41
3.2.2.5. Utility.System.Damage....................................................................... 3-41
3.2.2.6. Contents.Damage.............................................................................. 3-44
3.3 RequirementsandBestPracticesinFloodHazardAreas............................................................ 3-47
3.3.1. Evaluating.Risk.and.Avoiding.Flood.Hazards..................................................... 3-47
3.3.2. Benefits.and.Costs:. Determining.Acceptable.Risk............................................ 3-48
3.3.3. Site.Modifications................................................................................................. 3-50
3.3.4. Elevation.Considerations..................................................................................... 3-53
3.3.4.1. The.Case.of.Boulder.Community.Foothills.Hospital,... Boulder,.Colorado............................................................................. 3-58
3.3.5. Dry.Floodproofing.Considerations..................................................................... 3-63
3.3.6. Flood-Resistant.Materials..................................................................................... 3-66
3.3.7. Access.Roads.......................................................................................................... 3-68
3.3.8. Utility.Installations................................................................................................ 3-69
3.3.9. Potable.Water.and.Wastewater.Systems............................................................... 3-71
3.3.10. Storage.Tank.Installations.................................................................................... 3-71
3.3.11. Accessory.Structures............................................................................................. 3-72
3.4 RiskReductionforExistingHospitals..................................................................................... 3-73
3.4.1. Introduction.......................................................................................................... 3-73
TABLE OF CONTENTSx
3.4.2. Site.Modifications................................................................................................. 3-73
3.4.3. Additions............................................................................................................... 3-75
3.4.4. Repairs,.Renovations,.and.Upgrades.................................................................. 3-77
3.4.5. Retrofit.Dry.Floodproofing.................................................................................. 3-78
3.4.5.1.The.Case.of.Pungo.District.Hospital,.Belhaven,.North... Carolina.............................................................................................. 3-79
3.4.6. Utility.Installations................................................................................................ 3-84
3.4.7. Potable.Water.and.Wastewater.Systems............................................................... 3-86
3.4.8. Other.Damage.Reduction.Measures................................................................... 3-87
3.4.9. Emergency.Measures............................................................................................ 3-88
3.5 ChecklistforBuildingVulnerabilityofFlood-ProneHospitals...................................................... 3-90
3.6 ReferencesandSourcesofAdditionalInformation.................................................................... 3-98
4 mAkINg HOSPITALS SAFE FROm HIgH WIND................................ 4-1
4.1 GeneralDesignConsiderations................................................................................................ 4-1
4.1.1. Nature.of.High.Winds............................................................................................ 4-3
4.1.2. Probability.of.Occurrence...................................................................................... 4-3
4.1.3. Wind/Building.Interactions.................................................................................. 4-5
4.1.4. Building.Codes........................................................................................................ 4-9
4.1.4.1. Scope.of.Building.Codes..................................................................... 4-9
4.1.4.2. Effectiveness.and.Limitations.of.Building.Codes............................ 4-10
4.2 HospitalsExposedtoHighWinds.......................................................................................... 4-13
4.2.1. Vulnerability:. What.High.Winds.Can.Do.to.Hospitals...................................... 4-13
4.2.1.1. Types.of.Building.Damage................................................................ 4-13
4.2.1.2. Ramifications.of.Damage.................................................................. 4-16
4.2.1.3. The.Case.of.West.Florida.Hospital,.Pensacola,.Florida.................. 4-17
4.2.2. Evaluating.Hospitals.for.Risk.From.High.Winds................................................ 4-24
4.2.2.1. New.Buildings.................................................................................... 4-24
4.2.2.2. Existing.Buildings.............................................................................. 4-25
TABLE OF CONTENTS xi
4.3 RequirementsandBestPracticesInHigh-WindRegions........................................................... 4-26
4.3.1.. General.Hospital.Design.Considerations............................................................ 4-26
4.3.1.1. Site...................................................................................................... 4-28
4.3.1.2. Building.Design................................................................................. 4-29
4.3.1.3. Construction.Contract.Administration............................................ 4-34
4.3.1.4. Post-Occupancy.Inspections,.Periodic... Maintenance,.Repair,.and.Replacement.......................................... 4-35
4.3.1.5.. Site.and.General.Design.Considerations.in... Hurricane-Prone.Regions................................................................. 4-36
4.3.2. Structural.Systems................................................................................................. 4-37
4.3.2.1. Structural.Systems.in.Hurricane-Prone.Regions............................. 4-41
4.3.3. Building.Envelope................................................................................................ 4-42
4.3.3.1. Exterior.Doors................................................................................... 4-42
4.3.3.2. Exterior.Doors.in.Hurricane-Prone.Regions................................... 4-46
4.3.3.3. Windows.and.Skylights...................................................................... 4-47
4.3.3.4. Windows.and.Skylights.in.Hurricane-Prone.Regions..................... 4-49
4.3.3.5. Non-Load-Bearing.Walls,.Wall.Coverings,.and.Soffits.................... 4-52
4.3.3.6. Non-Load-Bearing.Walls,.Wall.Coverings,.and.Soffits... in.Hurricane-Prone.Regions............................................................. 4-64
4.3.3.7. Roof.Systems...................................................................................... 4-65
4.3.3.8. Roof.Systems.in.Hurricane-Prone.Regions...................................... 4-74
4.3.3.9. The.Case.of.DeSoto.Memorial.Hospital,.Arcadia,.Florida............. 4-81
4.3.4. Nonstructural.Systems.And.Equipment.............................................................. 4-85
4.3.4.1. Exterior-Mounted.Mechanical.Equipment..................................... 4-86
4.3.4.2.. Nonstructural.Systems.and.Mechanical.Equipment.. .in.Hurricane-Prone.Regions............................................................ 4-94
4.3.4.3. Exterior-Mounted.Electrical.and.Communications... Equipment......................................................................................... 4-94
4.3.4.4. Lightning.Protection.Systems.(LPS).in.Hurricane-.. Prone.Regions.................................................................................... 4-97
4.3.4.5. The.Case.of.Martin.Memorial.Medical.Center,.Stuart,... Florida.............................................................................................. 4-102
TABLE OF CONTENTSxii
4.3.5. Municipal.Utilities.in.Hurricane-prone.Regions.............................................. 4-104
4.3.5.1. Electrical.Power............................................................................... 4-104
4.3.5.2. Water.Service................................................................................... 4-105
4.3.5.3. Sewer.Service................................................................................... 4-106
4.3.6. Post-design.Considerations.In.Hurricane-Prone.Regions............................... 4-106
4.3.6.1. Construction.Contract.Administration.......................................... 4-106
4.3.6.2. Periodic.Inspections,.Maintenance,.and.Repair........................... 4-106
4.4 RemedialWorkonExistingFacilities.................................................................................... 4-107
4.4.1. Structural.Systems............................................................................................... 4-109
4.4.2. Building.Envelope.............................................................................................. 4-111
4.4.2.1. Sectional.and.Rolling.Doors........................................................... 4-111
4.4.2.2. Windows.and.Skylights.................................................................... 4-112
4.4.2.3. Roof.Coverings................................................................................ 4-115
4.4.3. Exterior-Mounted.Equipment........................................................................... 4-117
4.4.3.1. Antenna.(Communications.Mast)................................................. 4-117
4.4.3.2. Lightning.Protection.Systems......................................................... 4-118
4.4.4.. The.Case.of.Baptist.Hospital,.Pensacola,.Florida............................................. 4-118
4.5 BestPracticesinTornado-ProneRegions............................................................................... 4-122
4.5.1.. The.case.of.Kiowa.County.Memorial.Hospital,... Greensburg,.Kansas............................................................................................ 4-126
4.5.2. The.case.of.Sumter.Regional.Hospital,.Americus,.Georgia............................ 4-135
4.6 ChecklistforBuildingVulnerabilityofHospitalsExposedtoHighWinds.................................... 4-141
4.7 ReferencesandSourcesofAdditionalInformation.................................................................. 4-147
APPENDICES
AppendixA Acronyms................................................................................................................A-1
AppendixB GlossaryofTerms....................................................................................................B-1