+ All Categories
Home > Documents > RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN...

RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN...

Date post: 06-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
14
2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PLANS AND RESULTS OF PUBLIC PUBLIC CONSULTATION IN CONSULTATION IN LITHUANIA LITHUANIA Bernardas Pauk Bernardas Pauk š š tys tys , , GWP GWP - - Lithuania Lithuania
Transcript
Page 1: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

RIVER BASIN MANAGEMENT RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PLANS AND RESULTS OF

PUBLICPUBLIC CONSULTATION IN CONSULTATION IN LITHUANIALITHUANIA

Bernardas PaukBernardas Paukšštystys,,GWPGWP--LithuaniaLithuania

Page 2: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

4 RIVER BASIN DISTRICTS4 RIVER BASIN DISTRICTS

Polska

Page 3: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

20 G20 GROUNDWATER BODIESROUNDWATER BODIES

Polska

Page 4: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

HUMAN IMPACTHUMAN IMPACT

• Non-point pollution: agriculture and non-sewered population;

• Point sources: domestic, industrialwastewater and storm water discharges;

• Morphological alterations: riverstraightening, ponds and hydropower;

• Transboundary pollution;• Pollution with dangerous substances.

Page 5: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

WB AT RISK DUE HUMAN IMPACTWB AT RISK DUE HUMAN IMPACT• 590 river category water bodies (total length

10200 km), • 234 lake category water bodies (area > 50

ha) and • 42 ponds (reservoir) category water bodies

(total area 11559 ha) have been delineated in the Nemunas RBD.

• Of them 320 river water bodies and 64 lakes are categorized as water bodies at risk.

Page 6: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

WATER BODIES AT RISKWATER BODIES AT RISK

Polska

Page 7: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

WATER BODIES AT RISK AFTER WATER BODIES AT RISK AFTER THE UNCERTAINTY ANALYSISTHE UNCERTAINTY ANALYSIS

Group of water bodies

Number ofWB in theNemunasRBD

Certain pollution source and impactNumber of

WB%

Rivers 320 69 22%

Lakes 64 1 1,6%

Ponds and reservoirs

26 0 0%

Page 8: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

PROGRAMMEPROGRAMME OF MEASURESOF MEASURES

Urban Waste waterNitrateDrinking waterBirdsHabitatsBathingSludgePlant protection (biocides)Environmental impact assessmentIPPCLarge accidents (SEVESO)

Baseline measures Supplementary measusres

Reduction of point pollution(urban and industrial waste)

Reduction of point pollution(agriculture & non-seweredpopulation)

Improvement ofhydromorphological status

Reduction of transboundarypollution

Page 9: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

EXEMPTIONSEXEMPTIONSTime exemptions or less stringhent

environmental objectives - Time exemptionsWhere -1.WB with uncertain pollution source, uncertain

status and/or effect of measure2.WB where measures are not affordable (e.g.

renaturalisation of straightened rivers)3.Due to socio-economic reasons.

Page 10: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

WFD WFD ART. 14 ON PUBLIC ART. 14 ON PUBLIC INFORMATION AND CONSULTATIONINFORMATION AND CONSULTATION

For public consultations shall be presented:• (a) a timetable and work programme for the

development of the RB management plans of each RBD;

• (b) overview of the significant water management issues identified in the river basins;

• (c) draft copies of the river basin management plans.

Page 11: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

PUBLIC CONSULTATIONPUBLIC CONSULTATION PROCESSPROCESSIn 2005 river basin district Coordination Boards havebeen established and consultation process started:

•seminars for the main stakeholders groups –municipalities, NGOs, REPDs, other related stateinstitutions as well as Coordination boards.• EPA has signed agreements with 6 NGOs working inwater sector, who became information centres forimplementation of the WFD and RBM plans. •information campaigns on RBM have beenimplemented in four main Lithuanian cities: Kaunas Alytus, Kedainiai and Vilnius.

Page 12: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

PUBLIC CONSULTATIONPUBLIC CONSULTATION PROCESSPROCESS• Educational film on water issues has prepared and

demonstrated as well as leaflets about water weredistributed. Interviews for different national andregional newspapers and TV, radio have beengiven by water experts.

• Main environmental problems in the RBD havebeen described and uploaded onto EPA web site in2007 m.

• Preliminary RBD management plans andprogrammes of measures have also been uploadedonto web site of EPA in 2008-2009.

• Only few institutions commented plans andprogrammes.

Page 13: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

WHY SOCIETY IS NOT INTERESTED WHY SOCIETY IS NOT INTERESTED IN RB MANAGEMENT PLANS?IN RB MANAGEMENT PLANS?

• Despite of all work mentioned above society is not actively involved in the river basin management process. Main reasons of this are:

• Wrong information procedure;• People do not feel responsibility for their water

resources;• “This is not happening in my yard”;• Heavy technical language of management plans and

programme of measures makes these documentsdifficult to understand for public;

• Lack of public participation culture in general.

Page 14: RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC ... · 2009.11.28 GWP-Lithuania RIVER BASIN MANAGEMENT PLANS AND RESULTS OF PUBLIC CONSULTATION IN LITHUANIA Bernardas Paukštys,

2009.11.28 GWP-Lithuania

Diękuja bardzo


Recommended