LOCATION
Friuli Venezia Giulia Region – NE Italy Basilicata Region – South Italy
GOALS TO REACH Erosion control and soil reinforcement Environmental restoration
TARGET WORKS River, creek and channel banks
SURFACE
LYTHOTYPE Gravel, sand, loam
1° SEEDING DATE 2001, 2006, 2007
REMARKS 4 different sites
River, creek and channel banks consolidation
River banks consolidation – Noncello river – NE Italy
Re-profiled riverbanks and site preparation
October 2001
March 2002
River banks consolidation – Noncello river – NE Italy
April 2002
River banks consolidation – Noncello river – NE Italy
Environmental restoration. Results after 5 years
April 2007
Overflow channel banks consolidation – NE Italy
Site view before FortGrass application
July 2008
Overflow channel banks consolidation – NE Italy
Soil reinforcement after FortGrass application
FortGrass sprouting
December 2006
Creek banks consolidation – NE Italy
FortGrass results
August 2009
Creek banks consolidation – NE Italy
FortGrass application
November 2006
Channel banks consolidation – NE Italy
Erosion control and soil reinforcement. FortGrass after a flooding
May 2007
Channel banks consolidation – NE Italy