Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
2 RNC2600 step upgrade
Purpose
This procedure explains how to perform upgrade from RNC2600 step 1 to RNC2600
step 2 or RNC2600 step 3, and upgrade from RNC2600 step 2 to RNC2600 step 3.
RNC2600 capacity configuration is shown in Figure 1 RNC2600 steps.
Figure 1 RNC2600 steps
The RNBC cabinet is added only with step 2. When upgrading RNC2600 from step 2,
with RNBC already in use, to step 3, start from procedure step 4 Create the hardware
configuration.
g You can make expansions without impact to the traffic. However, it is strongly recom-mended that you carry out the expansions during low traffic time.
10 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
Before you start
Check and make sure that all the system release upgrades are done. Make a fallback copy of the software build.
For instructions, see Fallback copying software build in Performing Safecopying
and Restoring Operations.
g After the expansion is completed, this fallback copy does not work with the new configuration. If you wish to take this fallback copy into use, fall back to the con-
figuration before the expansion.
Check and make sure that there are no active alarms. Correct all the existing faults. It is also recommended that you monitor the
alarms while making the expansion.
Run diagnostics on all the units and make sure that the network element is working properly.
Verify the consistency of the equipment database.D Dump the equipment database to the disk.
ZDBC:EQDATA,0;
E Save the equipment database log to the disk.ZDBO:EQDATA,0;
F Empty the equipment database disk updating log.ZDBX:EQDATA,0;
G Prevent the equipment database updates to the disk.ZDBP:EQDATA,0:DISK;
H Check the equipment database integrity.ZDBV:EQDATA,0:DISK;
I Resume the equipment database updates to the disk.ZDBR:EQDATA,0:DISK;
Check and make sure that the TBU-0, SFU-0, MXU-0 and OMU-0 units are in WO-EX state and their spare units are in SP-EX state.
Check and make sure that you have all the required documents.All the documents are available in NOLS. Site documents are also delivered in
paper binders with the first delivery of the network element.
Operating documentation:
License Management in WCDMA RAN Hardware Configuration Management in IPA-RNC Diagnostics and Testing for IPA-RNC Performing Safecopying and Restoring Operations in IPA-RNC Integrating IPA-RNC Synchronization and Timing in IPA-RNC Managing IPA-RNC Software Configuration Creating RNC2600 Hardware Configuration Activating A-GPS Using External Reference NetworkSite documentation:
WCDMA IPA-RNC Engineering Description Installation Site Requirements for IPA-RNC Unpacking IPA2800 Cabinets Installing the IPA-RNC
DN70674866 11
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
Equipment Lists for RNC2600 Cable Lists for RNC2600 Use of ATM Links and LAN Connections in RNC2600 Cabinet Interfaces and External Cables of MGW and IPA-RNC MGW and IPA-RNC, Jumper Settings of the Plug-in Units and Hard Disk
Drives
Hardware Revision List for WCDMA IPA-RNC Commissioning IPA-RNC and Commissioning Checklist for IPA-RNC Alarms, available as part of the Product Documentation (NED)
Check and make sure that you have all the required equipment and tools.There are different grounding sets for attaching the cabinets. See Equipment
Lists for RNC2600 for more information on the grounding sets.
Check against Hardware Revision List for WCDMA IPA-RNC and make sure that all the materials have correct versions and interchangeability
levels.
Check against MGW and IPA-RNC, Jumper Settings of the Plug-in Units and Hard Disk Drives and make sure that the jumpers of the plug-in units
are correctly set.
Register the barcodes of the extended units. Check that the cables are correctly installed.
All the intra-subrack and intra-cabinet cables are installed at the factory. For
more information, see Cable Lists for RNC2600.
The inter-cabinet cables for TBU, which are needed when connecting the RNBC
cabinet to RNAC cabinet, are connected to the cabinet RNBC, and the other
ends of the cables are looped and attached to cable supporting shelf at the
factory. To connect the inter-cabinet cables to RNAC cabinet, see Installing the
MGW and IPA-RNC and Cable Lists for RNC2600.
w NOTICE: Electrostatic discharge and incorrect installation and uninstallation can damage circuits or shorten their lifetime.
To ensure proper functioning of the plug-in units during their lifetime, take the following
precautions before handling them:
Before touching integrated circuits, ensure that you are working in an electrostatic-free environment.
Wear an ESD wrist strap or use other method to discharge static electricity in your body.
NP8S1-B and NP2GE-B plug-in units include CLASS 1 LASER PRODUCT.
g It is highly recommended to wait for 2 minutes between consecutive DMCUs and/or ICSUs functional unit creations (ZWFU commands). Otherwise PROFIC supervision
failure occurs and ICSU/RSMU restarts with alarm1023.
Steps
Install the new cabinet.For instructions, see Installing the IPA-RNC.
12 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
Ground the cabinets.For instructions, see Installing the grounding cables or strips between the cabinets in
Installing the IPA-RNC.
Table 3 Grounding set for RNC shows the grounding set. See Equipment Lists for
RNC2600 for more information on the grounding sets.
Install the power supply to the cabinet.For instructions, see Installing the site power supply cables and grounding the network
element in Installing the IPA-RNC.
g Do not power on any subrack. At this phase, only the cabinets have power and the switches of CPD120-A units are in OFF position. PD30 and TBUF units are not installed
in the new subracks.
Create the hardware configuration.For detailed instructions, see Creating plug-in unit description and Creating and attach-
ing functional unit description in Hardware Configuration Management in IPA-RNC.
D Create the cabinet description.E Create the subrack description.F Create the plug-in unit description for PD30 and TBUF plug-in units.
Install the PD30 and TBUF plug-in units.Install the power distribution plug-in units (PD30) and the timing and synchronization
units (TBUF) of all subracks into the correct positions. For installation instructions, see
Installing plug-in units in Installing the IPA-RNC.
Check which TBU unit is the active unit (USI).ZUSI:TBU;
In the following steps, it is supposed that TBU 0 is the active unit.
Check the timing bus cable connection for RNAC.This step is only valid in RU30 release and afterwards.
Check if the timing bus cable connection of RNAC is in accordance with table RNAC
HMS and timing bus cables in Cable Lists for RNC2600. If yes, it is star configuration
and you do not need to do any change. If no, it is daisy chain configuration and you
need to change the timing bus cables of RNBC cabinet from star configuration to daisy
chain configuration. For details, see Table 4 Removed RNBC timing bus cables and
Table 5 Added RNBC timing bus cables.
ID Use Note
C109878 Grounding RNAC to RNBC EC216 to EC216
Table 3 Grounding set for RNC
DN70674866 13
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
Connect HMS bus 1 and timing bus 1 intercabinet cables between RNAC and RNBC.
The two HMS buses cannot be cut off at the same time. Also, you can only install the
HMS and timing cables when the corresponding TBU unit is in SE-NH working state.
In order to function correctly, the HMS bus and timing and synchronization distribution
bus need terminations at the ends of the buses by means of termination cables. The
location of termination points for the timing and synchronization distribution bus
depends on the bus topology. In "star" configuration, the bus termination points are in
all the subracks for both RNAC and RNBC cabinets. In "daisy chain" configuration, the
bus termination points are in subrack 4 for both RNAC and RNBC cabinets.
When advancing RNC2600 from step 1 to step 2, or from step 1 to step 3, RNBC cabinet
is taken into use. If the timing bus cables of RNAC cabinet and RNBC cabinet are in
star configuration, the intercabinet cables need to be connected according to Figure
2 HMS bus cabling principles, Figure 3 Timing bus cabling principles: star configura-
tion, Table 6 HMS bus 1 and timing bus 1 intercabinet cables: star configuration, and
Table 8 HMS bus 0 and timing bus 0 intercabinet cables: star configuration. If the
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CB_030 CHZ001 TIMING bus 0
term.
B TBU 0 1.0B 19.2L B TBU 0 1.0B 19.2E
CB_031 CHZ001 TIMING bus 0
term.
B TBU 0 2.0B 19.2L B TBU 0 2.0B 19.2E
CB_032 CHZ001 TIMING bus 0
term.
B TBU 0 3.0B 19.2L B TBU 0 3.0B 19.2E
CB_034 CHZ001 TIMING bus 1
term.
B TBU 1 1.0B 38.5L B TBU 1 1.0B 38.5E
CB_035 CHZ001 TIMING bus 1
term.
B TBU 1 2.0B 38.5L B TBU 1 2.0B 38.5E
CB_036 CHZ001 TIMING bus 1.
term.
B TBU 1 3.0B 38.5L B TBU 1 3.0B 38.5E
Table 4 Removed RNBC timing bus cables
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CBU_030 CHZ011 TIMING bus 0 B TBU 0 1.0B 19.2L B TBU 0 2.0B 19.2K
CBU_031 CHZ011 TIMING bus 0 B TBU 0 2.0B 19.2L B TBU 0 3.0B 19.2K
CBU_032 CHZ011 TIMING bus 0 B TBU 0 3.0B 19.2L B TBU 0 4.0B 19.2K
CBU_034 CHZ009 TIMING bus 1 B TBU 1 1.0B 38.5L B TBU 1 2.0B 38.5K
CBU_035 CHZ009 TIMING bus 1 B TBU 1 2.0B 38.5L B TBU 1 3.0B 38.5K
CBU_036 CHZ009 TIMING bus 1 B TBU 1 3.0B 38.5L B TBU 1 4.0B 38.5K
Table 5 Added RNBC timing bus cables
14 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
timing bus cables of RNAC cabinet and RNBC cabinet are in daisy chain configuration,
the intercabinet cables need to be connected according to Figure 2 HMS bus cabling
principles, Figure 4 Timing bus cabling principles: daisy chain configuration, Table
7 HMS bus 1 and timing bus 1 intercabinet cables: daisy chain configuration, and
Table 9 HMS bus 0 and timing bus 0 intercabinet cables: daisy chain configuration.
Figure 2 HMS bus cabling principles
DN70674866 15
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
Figure 3 Timing bus cabling principles: star configuration
16 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
Figure 4 Timing bus cabling principles: daisy chain configuration
For HMS and Timing cables information see Cable Lists for RNC2600.
D Set TBU 1 to SE-NH working state (USC)ZUSC:TBU,1:TE;
ZUSC:TBU,1:SE;
ZUSC:TBU,1:SE;
E Connect the intercabinet cables of HMS bus 1 and timing bus 1. If the timing bus 1 cables of RNAC cabinet and RNBC cabinet are in star configuration, see Table
6 HMS bus 1 and timing bus 1 intercabinet cables: star configuration. If the timing
bus 1 cables of RNAC cabinet and RNBC cabinet are in daisy chain configuration,
DN70674866 17
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
see Table 7 HMS bus 1 and timing bus 1 intercabinet cables: daisy chain configu-
ration.
g Do not cut off the two HMS buses at the same time.
g In RNC2600, the timing termination is always default and not to be moved.
Power up all the new subracks.All the new subracks must be powered up in a row, starting from the first new subrack.
Attach the TBU 1 functional unit description to the TBUF plug-in units in the new subrack(s).
Add the TBUF plug-in units in the new cabinet into the hardware configuration of the
TBU 1functional unit.
D Set TBU 1 to SE-NH working state if not already in this state (USC)ZUSC:TBU,1:TE;
ZUSC:TBU,1:SE;
ZUSC:TBU,1:SE;
E Attach the TBU 1 functional unit description to the TBUF plug-in unit (WFU)Add all the TBUF plug-in units on slot 38 of the new subracks to the TBU 1 functional
unit.
ZWFU:TBU,1::,,38;
F Set TBU 1 to TE-EX state (USC)ZUSC:TBU,1:SE;
ZUSC:TBU,1:TE;
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CB0_041 CHZ020 HMS bus 1 A TBU 1 1.0B 38.5C B TBU 1 1.0B 38.5A
CB0_051 CHZ020 TIMING bus 1 B TBU 1 1.0B 38.5K A TBU 1 2.0B 38.5N
CB0_053 CHZ016 TIMING bus 1 B TBU 1 2.0B 38.5K A TBU 1 2.0B 38.5O
CB0_055 CHZ020 TIMING bus 1 B TBU 1 3.0B 38.5K A TBU 1 2.0B 38.5P
CB0_057 CHZ024 TIMING bus 1 B TBU 1 4.0B 38.5K A TBU 1 2.0B 38.5Q
Table 6 HMS bus 1 and timing bus 1 intercabinet cables: star configuration
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CB0_041 CHZ020 HMS bus 1 A TBU 1 1.0B 38.5C B TBU 1 1.0B 38.5A
CB0_051 CHZ020 TIMING bus 1 B TBU 1 1.0B 38.5K A TBU 1 2.0B 38.5N
Table 7 HMS bus 1 and timing bus 1 intercabinet cables: daisy chain configuration
18 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
G Run total diagnostics for TBU 1 (UDU)ZUDU:TBU,1;
With the UDQ command you can get a list that shows all the tests running in the
exchange, their starting times, and the tests waiting in the queue. With the UDH
command you can interrogate the results of the diagnosis. You can also check the
results from the alarm printer.
If the diagnostic report indicates a failure, locate and correct the failure according to
the instructions in Diagnostics and Testing. Do not continue until the faults have
been corrected.
When you have corrected the faults, change the unit working state back to TE and
repeat the diagnosis.
H Set TBU 1 to SP-EX state (USC)ZUSC:TBU,1:SP;
Connect HMS bus 0 and timing bus 0 intercabinet cables between RNAC and RNBC.
You can only install the HMS and timing cables when the corresponding TBU unit is in
SE-NH state.
In the following steps, HMS and timing cables are connected for TBU 0.
D Set TBU 1 to WO-EX state (USC)ZUSC:TBU,1:WO;
E Set TBU 0 to SE-NH working state (USC)ZUSC:TBU,0:TE;
ZUSC:TBU,0:SE;
ZUSC:TBU,0:SE;
F Connect the intercabinet cables of HMS bus 0 and timing bus 0. If the timing bus 0 cables of RNAC cabinet and RNBC cabinet are in star configuration, see Table
8 HMS bus 0 and timing bus 0 intercabinet cables: star configuration. If the timing
bus 0 cables of RNAC cabinet and RNBC cabinet are in daisy chain configuration,
see Table 9 HMS bus 0 and timing bus 0 intercabinet cables: daisy chain configu-
ration.
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CB0_040 CHZ020 HMS bus 0 A TBU 0 1.0B 19.2C B TBU 0 1.0B 19.2A
CB0_050 CHZ016 TIMING bus 0 B TBU 0 1.0B 19.2K A TBU 0 1.0B 19.2N
CB0_052 CHZ020 TIMING bus 0 B TBU 0 2.0B 19.2K A TBU 0 1.0B 19.2O
CB0_054 CHZ024 TIMING bus 0 B TBU 0 3.0B 19.2K A TBU 0 1.0B 19.2P
CB0_056 CHZ028 TIMING bus 0 B TBU 0 4.0B 19.2K A TBU 0 1.0B 19.2Q
Table 8 HMS bus 0 and timing bus 0 intercabinet cables: star configuration
DN70674866 19
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
g In RNC2600, the timing termination is always default and not to be moved.
Attach the TBU 0 functional unit description to the TBUF plug-in units in the new subrack(s).
Add the TBUF plug-in units in the new cabinet into the hardware configuration of the
TBU 0 functional unit.
D Set TBU 0 to SE-NH working state if not already in this state (USC)ZUSC:TBU,0:TE;
ZUSC:TBU,0:SE;
ZUSC:TBU,0:SE;
E Attach the TBU 0 functional unit description to the TBUF plug-in unit (WFU)Add all the TBUF plug-in units on slot 19 of the new subracks to the TBU 0 functional
unit.
ZWFU:TBU,0::,,19;
F Set TBU 0 to TE-EX state (USC)ZUSC:TBU,0:SE;
ZUSC:TBU,0:TE;
G Run total diagnostics for TBU 0 (UDU)ZUDU:TBU,0;
With the UDQ command you can get a list that shows all the tests running in the
exchange, their starting times, and the tests waiting in the queue. With the UDH
command you can interrogate the results of the diagnosis. You can also check the
results from the alarm printer.
If the diagnostic report indicates a failure, locate and correct the failure according to
the instructions in Diagnostics and Testing. Do not continue until the faults have
been corrected.
When you have corrected the faults, change the unit working state back to TE and
repeat the diagnosis.
H Set TBU 0 to SP-EX state (USC)ZUSC:TBU,0:SP;
I Set TBU 0 to WO-EX state (USC)ZUSC:TBU,0:WO;
Check HMS data.Check the software version of the HMS node and the HMS address of the subrack
according to the instructions in Checking the software version of the HMS node in
Hardware Configuration Management.
Do not close the service terminal connection.
Equip.
No
Type Use Cable from Cable to
Cab. FU Position Cab. FU Position
CB0_040 CHZ020 HMS bus 0 A TBU 0 1.0B 19.2C B TBU 0 1.0B 19.2A
CB0_050 CHZ020 TIMING bus 0 B TBU 0 1.0B 19.2K A TBU 0 1.0B 19.2N
Table 9 HMS bus 0 and timing bus 0 intercabinet cables: daisy chain configuration
20 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
Connect the SFU cables.When connecting the SFU cables, the corresponding SFU unit must be in SE-NH state
and disconnected from the subrack.
D Check which SFU unit is the active unit (USI)ZUSI:SFU;
In the following steps, it is assumed that SFU 0 is the active unit.
E Set SFU 1 to SE-NH working state (USC)ZUSC:SFU,1:TE;
ZUSC:SFU,1:SE;
ZUSC:SFU,1:SE;
F Connect the SFU 1 cables between the RNAC and RNBC cabinets. For cable posi-tions, see Table 10 SFU 1 LVDS cables.
G Set SFU 1 to TE-EX state (USC)ZUSC:SFU,1:SE;
ZUSC:SFU,1:TE;
Equip. No Cable from Cable to Type
Cab. FU Position Cab. FU Position
CB0_216 B MXU 8 / BISFB 1.0B 9.B02 A SFU 1 / BISFA 2.0B 2.B08 CSB022
CB0_217 B MXU 9 / BISFB 1.0B 11.B02 A SFU 1 / BISFA 2.0B 2.B09 CSB024
CB0_218 B MXU 10 / BISFB 2.0B 9.B02 A SFU 1 / BISFA 2.0B 2.B10 CSB018
CB0_219 B MXU 11 / BISFB 2.0B 11.B02 A SFU 1 / BISFA 2.0B 2.B11 CSB021
CB0_220 B MXU 12 / BISFB 3.0B 9.B02 A SFU 1 / BISFA 2.0B 2.B12 CSB022
CB0_221 B MXU 13 / BISFB 3.0B 11.B02 A SFU 1 / BISFA 2.0B 2.B13 CSB024
CB0_222 B MXU 14 / BISFB 4.0B 9.B02 A SFU 1 / BISFA 2.0B 2.B14 CSB028
CB0_223 B MXU 15 / BISFB 4.0B 11.B02 A SFU 1 / BISFA 2.0B 2.B15 CSB030
CB0_224 B NPGE/NPGEP 8 /
NPS1/NPS1P 6 / BISFC
1.0B 15.B02 A SFU 1 / BISFA 2.0B 2.B24 CSB025
CB0_225 B NPGE/NPGEP 9 /
NPS1/NPS1P 7 / BISFC
2.0B 15.B02 A SFU 1 / BISFA 2.0B 2.B25 CSB019
CB0_226 B NPGE/NPGEP 10 /
NPS1/NPS1P 8 / BISFC
1.0B 17.B02 A SFU 1 / BISFA 2.0B 2.B26 CSB025
CB0_227 B NPGE/NPGEP 11 /
NPS1/NPS1P 9 / BISFC
2.0B 17.B02 A SFU 1 / BISFA 2.0B 2.B27 CSB019
CB0_228 B NPGE/NPGEP 12 /
NPS1/NPS1P 10 / BISFC
3.0B 15.B02 A SFU 1 / BISFA 2.0B 2.B28 CSB025
CB0_229 B NPGE/NPGEP 13 /
NPS1/NPS1P 11 / BISFC
4.0B 15.B02 A SFU 1 / BISFA 2.0B 2.B29 CSB031
CB0_230 B NPGE/NPGEP 14 /
NPS1/NPS1P 12 / BISFC
3.0B 17.B02 A SFU 1 / BISFA 2.0B 2.B30 CSB025
CB0_231 B NPGE/NPGEP 15 /
NPS1/NPS1P 13 / BISFC
4.0B 17.B02 A SFU 1 / BISFA 2.0B 2.B31 CSB031
Table 10 SFU 1 LVDS cables
DN70674866 21
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
H Run total diagnostics for SFU 1 (UDU)ZUDU:SFU,1;
If the diagnostic report indicates a failure, locate and correct the failure according to
the instructions in Diagnostics and Testing. Do not continue until the faults have
been corrected.
When you have corrected the faults, change the unit working state back to TE and
repeat the diagnosis.
I Set SFU 1 to WO-EX state (USC)ZUSC:SFU,1:SP;
ZUSC:SFU,1:WO;
SFU 0 becomes the spare SFU.
J Set SFU 0 to SE-NH state (USC)ZUSC:SFU,0:TE;
ZUSC:SFU,0:SE;
ZUSC:SFU,0:SE;
K Connect the SFU 0 cables between the RNAC and RNBC cabinets. For cable posi-tions, see Table 11 SFU 0 LVDS cables.
Equip.
No
Cable from Cable to Type
Cab. FU Position Cab. FU Position
CB0_200 B MXU 8 / BISFB 1.0B 9.B00 A SFU 0 / BISFA 1.0B 2.B08 CSB018
CB0_201 B MXU 9 / BISFB 1.0B 11.B00 A SFU 0 / BISFA 1.0B 2.B09 CSB021
CB0_202 B MXU 10 / BISFB 2.0B 9.B00 A SFU 0 / BISFA 1.0B 2.B10 CSB022
CB0_203 B MXU 11 / BISFB 2.0B 11.B00 A SFU 0 / BISFA 1.0B 2.B11 CSB024
CB0_204 B MXU 12 / BISFB 3.0B 9.B00 A SFU 0 / BISFA 1.0B 2.B12 CSB028
CB0_205 B MXU 13 / BISFB 3.0B 11.B00 A SFU 0 / BISFA 1.0B 2.B13 CSB030
CB0_206 B MXU 14 / BISFB 4.0B 9.B00 A SFU 0 / BISFA 1.0B 2.B14 CSB032
CB0_207 B MXU 15 / BISFB 4.0B 11.B00 A SFU 0 / BISFA 1.0B 2.B15 CSB032
CB0_208 B NPGE/NPGEP 8/NPS1/NPS1P
6 / BISFC
1.0B 15.B00 A SFU 0 / BISFA 1.0B 2.B24 CSB019
CB0_209 B NPGE/NPGEP 9/NPS1/NPS1P
7 / BISFC
2.0B 15.B00 A SFU 0 / BISFA 1.0B 2.B25 CSB025
CB0_210 B NPGE/NPGEP
10/NPS1/NPS1P 8 / BISFC
1.0B 17.B00 A SFU 0 / BISFA 1.0B 2.B26 CSB019
CB0_211 B NPGE/NPGEP
11/NPS1/NPS1P 9 / BISFC
2.0B 17.B00 A SFU 0 / BISFA 1.0B 2.B27 CSB025
CB0_212 B NPGE/NPGEP
12/NPS1/NPS1P 10 / BISFC
3.0B 15.B00 A SFU 0 / BISFA 1.0B 2.B28 CSB031
CB0_213 B NPGE/NPGEP
13/NPS1/NPS1P 11 / BISFC
4.0B 15.B00 A SFU 0 / BISFA 1.0B 2.B29 CSB034
CB0_214 B NPGE/NPGEP 14
/NPS1/NPS1P 12 / BISFC
3.0B 17.B00 A SFU 0 / BISFA 1.0B 2.B30 CSB031
CB0_215 B NPGE/NPGEP
15/NPS1/NPS1P 13 / BISFC
4.0B 17.B00 A SFU 0 / BISFA 1.0B 2.B31 CSB034
Table 11 SFU 0 LVDS cables
22 DN70674866
Hardware Expansions for RNC2600
Id:0900d805808dd111
Confidential
RNC2600 step upgrade
L Set SFU 0 to TE-EX state (USC)ZUSC:SFU,0:SE;
ZUSC:SFU,0:TE;
M Run total diagnostics for SFU 0 (UDU)ZUDU:SFU,0;
If the diagnostic report indicates a failure, locate and correct the failure according to
the instructions in Diagnostics and Testing. Do not continue until the possible faults
have been corrected.
When you have corrected the faults, change the unit working state back to TE and
repeat the diagnosis.
N Set SFU 0 to SP-EX state (USC)ZUSC:SFU,0:SP;
O Set SFU 0 to WO-EX state (USC)ZUSC:SFU,0:WO;
SFU 1 becomes the spare SFU.
Install plug-in units.For details, see Creating RNC2600 Hardware Configuration. Create plug-in units, con-
nections, and functional units such as:
ICSU MXU DMCU NPGE(P) NPS1P
g MXU units (in pairs) must be installed before their tributary units. For instructions, see Taking new functional unit into use in Hardware Configuration Managment.
Check the system configuration.Check the system configuration to verify that the new plug-in units are in correct posi-
tions and that the subrack numbers are correct. For instructions, see Checking the
software version of the HMS node in Hardware Configuration Management.
Run RUOSTE ICSU load balancing.For instructions, see Appendix A - ICSU load balancing.
Modify DSP pool configuration.For detailed information, see step 1 to step 3 in Activating Basic HSDPA with QPSK and
5 codes and WP - Signal Processing Service Handling.
Make a fallback copy of the software build.For instructions, see Fallback copying software build in Performing Safecopying and
Restoring Operations.
g After the expansion has been completed, the new fallback copy does not work with the previous configuration.
DN70674866 23
Hardware Expansions for RNC2600 RNC2600 step upgrade
Id:0900d805808dd111
Confidential
Restart the system (optional).ZUSS;
For more information, see Restarting system.