+ All Categories
Home > Documents > Rocky Hill Farm Digester Project - Buzun

Rocky Hill Farm Digester Project - Buzun

Date post: 03-Nov-2014
Category:
Upload: massrecycle-
View: 885 times
Download: 0 times
Share this document with a friend
Description:
 
Popular Tags:
29
Rocky Hill Farm Digester Project By Marianne, Fran, and Joe Buzun
Transcript
Page 1: Rocky Hill Farm Digester Project - Buzun

Rocky Hill Farm Digester Project

By Marianne, Fran, and Joe Buzun

Page 2: Rocky Hill Farm Digester Project - Buzun

Constructing the Tube

• Two sections– 36 foot section– 17 foot section

• Two sections welded together for total length of 53 feet.

• Diameter is 10 feet

• Total volume approximately 150 yd³.

• Runs at 60-70% capacity.

Page 3: Rocky Hill Farm Digester Project - Buzun

Delivery of 36 foot section

Page 4: Rocky Hill Farm Digester Project - Buzun

Welding the two sections

Page 5: Rocky Hill Farm Digester Project - Buzun

Completed 53 foot tube

Page 6: Rocky Hill Farm Digester Project - Buzun

Building the Stanchions

• Poured two square concrete pads.

• Made two stanchions out of I-beams and mounted rollers to top to allow tube to rotate on.

• Stanchions made to different heights to create ideal pitch of tube.

Page 7: Rocky Hill Farm Digester Project - Buzun

Pouring the Concrete Pads

Page 8: Rocky Hill Farm Digester Project - Buzun

Placement of stands on concrete pads

Page 9: Rocky Hill Farm Digester Project - Buzun

Tube is placed onto stanchions

Page 10: Rocky Hill Farm Digester Project - Buzun

Gearing

• Driven by three horsepower electric motor into a gear reducing transmission.

• Transmission is chain driven which drives main chain around tube.

• Turns one revolution every 15 minutes.

Page 11: Rocky Hill Farm Digester Project - Buzun

Main Sprocket

Page 12: Rocky Hill Farm Digester Project - Buzun

Gear Reducer

Page 13: Rocky Hill Farm Digester Project - Buzun

Gear Reducing Transmission

Page 14: Rocky Hill Farm Digester Project - Buzun
Page 15: Rocky Hill Farm Digester Project - Buzun

Finished Machine

• Coated with four inches of insulation.

• Temperature reaches between 140-160°F.

• Handles 30 yd³ daily.

• Material takes three days for completion.

Page 16: Rocky Hill Farm Digester Project - Buzun

Finished before insulation

Page 17: Rocky Hill Farm Digester Project - Buzun

Finished after insulation

Page 18: Rocky Hill Farm Digester Project - Buzun
Page 19: Rocky Hill Farm Digester Project - Buzun

Material to be composted

Page 20: Rocky Hill Farm Digester Project - Buzun

Product before screening

Page 21: Rocky Hill Farm Digester Project - Buzun
Page 22: Rocky Hill Farm Digester Project - Buzun

Material being loaded

Page 23: Rocky Hill Farm Digester Project - Buzun

Disney Composting Site

Page 24: Rocky Hill Farm Digester Project - Buzun
Page 25: Rocky Hill Farm Digester Project - Buzun
Page 26: Rocky Hill Farm Digester Project - Buzun
Page 27: Rocky Hill Farm Digester Project - Buzun
Page 28: Rocky Hill Farm Digester Project - Buzun
Page 29: Rocky Hill Farm Digester Project - Buzun

Recommended