+ All Categories
Home > Documents > Rogroup Capability Statement 2013

Rogroup Capability Statement 2013

Date post: 15-Mar-2016
Category:
Upload: tha-lia
View: 222 times
Download: 1 times
Share this document with a friend
Description:
Construction Services
Popular Tags:
29
CONSTRUCTION SERVICES © ROGROUP | 2013
Transcript
Page 1: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

1

CONSTRUCTION SERVICES

© ROGROUP | 2013

Page 2: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

2

01 OUR COMPANY PROFILESectorsManagement SystemTechnologyRelationshipsTraining & Professional DevelopmentOur History

02HEALTH, SAFETY & ENVIRONMENT Health, Safety & Environment (HSE) ManagementEnvironment

03OUR DELIVERY METHODOLOGYIntegrated SolutionsEarly Contractor Involement (ECI)Systemised Contract Management & Reporting

04OUR CAPABILITY

05OUR PROJECTS

06OUR CONTACT DETAILS

Page 3: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

3

01 OUR COMPANY PROFILE

Construction Services Capability Statement © ROGROUP | 2013

3

Page 4: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

4

Rogroup strives to be recognized as a leading privately owned company strategically providing construction contracting services to the Mining, Resources, Industrial and Commercial sectors throughout Western Australia.

We are providing clients with successful outcomes by offering positive solutions in our key areas of expertise.

• Mine Site Construction;

• Remote Area Logistics and Construction; and

• Commercial Buildings.

Rogroup is striving for excellence in quality, OHSE, asset, cost and time management. We are committed to developing and maintaining an integrated management system which is currently being prepared in accordance with the relevant Australian and ISO Standards which will be designed to provide an efficient working environment for all staff, clients and sub-contractors alike.

Sectors

Management Systems

Construction ServicesCapability Statement© ROGROUP | 2013

4

Page 5: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

5

We are continually searching for ways to improve our efficiency through the use of technology both throughout our building capability and management systems.

Our integrated management system consists of using a complete cloud based IT solution through our IT services provider, Base 3 as well as a streamlined construction management software package, CHEOPS.

Developing long-term beneficial relationships with our clients, business partners have been key to Rogroup’s success to date.

We are actively involved in a number of major projects, bringing to these projects significant multi-disciplinary service capabilities. We deliver projects through a variety of methods to provide the best possible outcomes for our clients and are constantly looking for ways of making our services more efficient to suit client requirements.

Technology

Relationships

TNT Warehouse, Welshpool WA

Construction ServicesCapability Statement © ROGROUP | 2013

5

Page 6: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

6

We believe our people are our most valuable offering to our Clients. We have an ongoing training and professional development programme which we utilize regularly to continually reinvest in the job knowledge of our staff and ultimately provide our Clients with a professional service.

From the business’s inception in 2006 where our first project opportunity was created from the idea of designing, procuring and constructing a small shed extension at a rural property for a private client to the business that we are today which is responsible for employing numerous skilled people and delivering multi-million dollar construction projects across a range of different sectors and locations.

Training & Professional Development

Our History

2006

2010

2008

2012

Coney IvanhoeConstruction

No. Staff 3

Structural Steel ErectionPrecast & Tilt-up Panel Erection

RogroupNo. Staff 30

Structural Steel ErectionPrecast & Tilt-up Panel ErectionCladding & Roof Plumbing

Coney IvanhoeConstruction

No. Staff 20

Structural Steel ErectionPrecast & Tilt-up Panel Erection

Cladding & Roof Plumbing

Rogroup

No. Staff 50+

Structural Steel ErectionPrecast & Tilt-up Panel ErectionPlumbing & Hydraulic Services

Page 7: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

7

02 HEALTH, SAFETY &

ENVIRONMENT

Construction ServicesCapability Statement © ROGROUP | 2013

7

Page 8: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

8

Rogroup recongises its duty for ensuring the safety and health of all staff, sub-contractors and visitors to our construction sites in accordance with the Occupational Safety and Health Act 1984. We are committed to becoming one of the industry’s future leaders. Our Safety Management System is currently being prepared in accordance with AS/NZS4801:2001 which will be designed to provide a safe working environment for all staff, sub-contractors and visitors alike.

From design to delivery, we endeavor to use best practice sustainable solutions where possible and as directed by our Clients. Our team of skilled and experienced personnel ensures sound management practices and controls are in place to guide our approach for sustainable outcomes.

Health, Safety & Environment (HSE) Management

Environment

We aim to incorporate environmental and sustainable principles into each project at the design phase:

• Statutory and legislative obligations are met

• Best environmental engineering practices are used to recycle, conserve resources and prevent pollution

• Any harmful impact on surrounding communities is minimized.

Rogroup is engaged in the global challenge of reducing global green house gas emissions. We are apart of the climate change solution and are committed to proving a carbon conscious service that benefits the environment, our clients and the future generations.

Coca Cola Amatil Warehouse, Hazelmere WA

Page 9: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

9

Rogroup is engaged in the global challenge of reducing global green house gas emissions. We are apart of the climate change solution and are committed to proving a carbon conscious service that benefits the environment, our clients and the future generations.

Rogroup is engaged in the global challenge of reducing global green house gas emissions. We are apart of the climate change solution and are committed to proving a carbon conscious service that benefits the environment, our clients and the future generations.

03 OUR DELIVERY

METHODOLOGY

Construction Services Capability Statement © ROGROUP | 2013

9

Page 10: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

10

Rogroup welcomes opportunities to offer a whole of business approach to projects. The capabilities of our business are often used on individual projects.

We encourage Clients to engage our services at the design and planning stages of projects.

Our early engagement business model allows us to assist with the construction methodology resolving potential issues which may be associated with sequence planning and programming before they occur and ensues that the people and resources are available to progress as quickly as possible.

While we encourage a whole of business approach, we understand that for some projects this will not be suitable and we work with clients to tailor our services to fit their needs.

Integrated Solutions

Early Contractor Involvement (ECI)

The advantages of this approach are that.

• It promotes the smooth transfer of knowledge and innovation throughout the project

• It reduces the number of projects interfaces, and

• It assists in reducing overall project costs to our Clients

Construction Services Capability Statement© ROGROUP | 2013

10

Page 11: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

11

When you choose Rogroup to undertake your next project, you choose a company which provides a systematized contract management and reporting system.

We choose to use CHEOPS, an integrated construction management and accounting software package, to pro-actively setup and manage all of our project assignments from contract award to completion.

Systemised Contract Management & Reporting

Construction ServicesCapability Statement © ROGROUP | 2013

11

Page 12: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

12

04 OUR CAPABILITY

Rogroup’s capabilities are as diverse as the people and projects that have the business future focused.

Through our mine site construction, logistics and transport, infrastructure and maintenance expertise we are able to effectively manage the project from delivery through to operations, training and handover to operations.

Page 13: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

13

05 OUR PROJECTS

Construction ServicesCapability Statement © ROGROUP | 2013

13

Page 14: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

14

Rogroup was contracted for the install of roof cladding to Five Prisoner Accommodation buildings for the Department of Corrective Services located at the Hakea, Casuarina & Albany Regional Prison sites in Western Australia. Each building consisted of 2000 m² of proprietary insulated roof panels & associated flashings specifically designed to meet technical architectural specifications. We provided all services, materials and logistics required for completion of cladding & roof plumbing works.

Client: Broad Construction ServicesProject Value: $50 million est.

Completed March 2011.

Fast Track Prisoner Accommodation Project Western Australia

Rogroup managed a range of construction services which were provided to the Main Contractor & Client including structural steel and tilt panel erection, roof plumbing and crane & labor hire. The project consisted of a 4,000m² of warehouse including a locomotive maintenance unit located in a remote location in Western Australia.

Client: HighlineProject Value: $30 million est.

Completed March 2008.

Rolling Stock Yard Project - Port HedlandWestern Australia

Our cranes and heavy lift logistics division Rogroup installed a temporary accommodation camp situated at Christmas Creek mine site 215km south east of Marble Bar. Panel Lift was contracted to provide equipment, personal and lifting solutions to install prefabricated modular building units to accommodate up to 800 personnel on this particular mine site. The modular units are 14.0m in length x 4.2m wide and weigh 20t each and were typically stacked across 2 stories.

Client: Complete SteelProject Value: $48 million est.

Completed March 2011.

800 Man Mining Camp Accommodation - Christmas CreekWestern Australia

Page 15: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

15

Rogroup’s Erection Services division was contracted to erect 200 tonne of structural steel for the new Roy Hill mine site accommodation village in Roy Hill WA. The team consisted of full erection crew, Contract Manager, Safety Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 4 single level facilities buildings consisting of Dry Mess, Wet Mess Auditorium & Administration Building

Client: Cays Engineering / Brookfield MultiplexProject Value: $150 million est.

Completed June 2013

Rogroup’s Erection Services division was contracted to erect 400 precast floor beams and 160 precast panels for the new multi-storey mixed use development in East Perth WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators, grouters, joint sealers and Boiler Makers and all associated equipment.

Building Type: Multi-storey Office & Residential Apartments.

Client: Probuild ConstructionProject Value: $30 million est.

Completed June 2013

Rogroup’s Erection Services division was contracted to erect 250 precast panels for the new multi-storey government facility in Leederville WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators, grouters, joint sealers and Boiler Makers and all associated equipment.

Building Type: Multi-storey Office

Client: PACT ConstructionProject Value: $30 million est.

Completed June 2013

Roy Hill Accommodation Facilities - PilbaraWestern Australia

United Voice - East PerthWestern Australia

Walga - LeedervilleWestern Australia

Page 16: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

16

Rogroup’s Erection Services division was contracted to erect 1200 tonne of structural steel, 200 precast panels and 100 delta-planks for the new Coca-Cola distribution centre in Hazelmere WA. The team consisted of full erection and on-site fabrication crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

The facility consists of 55,000sqm of ambient high bay storage, cool rooms and office space.

Client: Gavin ConstructionProject Value: $40 million

Completed July 2011.

Rogroup’s Erection Services division was contracted to erect 90 tonne of structural steel, 70 tilt-up panels for the new scrap metal recycling facility in Canningvale WA. The team consisted of full erection and on-site fabrication crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: OostveenProject Value: $15 million est.

Completed April 2012.

Coca-Cola Amatil Distribution Centre - HazelmereWestern Australia

Southern Metropoliton Regional Council - Canning ValeWestern Australia

Rogroup’s Erection Services division was contracted to erect 550 tonne of structural steel, 100 tilt-up panels for the new pressure testing facility in Kewdale WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment. Rogroup also undertook further works providing labour and equipment solutions to GFWA constructing sub ground structures.

Building Type: 15,000m2 Warehouse & 5,000m2 Multi-storey office

Client: Richmond / GFWA (Bachy Group)Project Value: $12 million est.

Completed December 2012

Cameron Australia - WelshpoolWestern Australia

Page 17: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

17

Rogroup was responsible for overseeing the structural and building envelope construction of a major office and warehouse facility in Welshpool WA. The team consisted of a full erection and onsite fabrication crew consisting of a Contract Manager, Site Supervisor, Riggers & Doggers, Trades Assistants, Roof Plumbers, Crane Operators and Boiler Makers and all associated equipment provided to the Client to erect the structural steel and complete the building envelope with cladding and concrete tilt panel erection.

Client: RichmondProject Value: $12 million est.

Completed May 2010.

Rogroup’s Erection Services division was contracted to erect 350 tonne of structural steel for the new document storage facility in Belmont WA. The team consisted of full erection, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: Vaughan ConstructionsProject Value: $12 million est.

Completed April 2012.

Rogroup’s Erection Services division was contracted to erect 400 tonne of structural steel, 120 tilt-up panels for the new soft drink manufacturing facility in Welshpool WA. The team consisted of full erection and on-site fabrication crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: RichmondProject Value: $12 million

Completed April 2012.

Dulux Group Office & Warehouse Facility - WelshpoolWestern Australia

Compustore - BelmontWestern Australia

Tru Blue Beverages - WelshpoolWestern Australia

Page 18: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

18

Rogroup’s Erection Services division was contracted to erect 340 tonne of structural steel, 80 tilt-up panels for the new tyre storage/distribution facility in Welshpool WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: RichmondProject Value: $10 million est.

Completed October 2011.

Rogroup’s Erection Services division was contracted to erect 130 tilt-up panels for the new Bunnings warehouse in Armadale WA. The team consisted of full erection, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and all associated equipment.

Client: Sarich & Sons / Southern Cross Construction. Project Value: $10 million est.

Completed May 2012.

Bunnings Warehouse, Harrisdale - reword as follows; Rogroup’s Erection Services division was contracted to erect 350 tonne of structural steel for the new Bunnings Warehouse in Harrisdale WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: H TroonProject Value: $10 million est.

Completed August 2011.

Bridgestone Tyre Warehouse - WelshpoolWestern Australia

Bunnings Warehouse - ArmadaleWestern Australia

Bunnings Warehouse - HarrisdaleWestern Australia

Page 19: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

19

Rogroup’s Erection Services division was contracted to erect 300 tonne of structural steel, 60 tilt-up panels for the new document storage facility in Welshpool WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: RichmondProject Value: $8 million est.

Completed December 2011.

Rogroup was contracted to erect 100 tonne of structural steel, 4,000m2 of roof & wall sheeting and installation of hydraulic & fire services for the new Tiger Group depot in Port Hedland WA. The team consisted of full erection crew, roof plumbers, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: Ridley Property TrustProject Value: $1 million

Completed December 2011.

Rogroup was contracted to erect 70 tonne of structural steel, 80 tilt-up panels for Grace Brothers expanding storage facility in Forrestfield WA. The team consisted of full erection and on-site fabrication crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: RichmondProject Value: $4 million est.

Completed April 2012.

Iron Mountain - WelshpoolWestern Australia

Tiger Group Office & Warehouse - Port HedlandWestern Australia

Grace Brothers Warehouse - BelmontWestern Australia

Page 20: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

20

Rogroup was responsible for overseeing the facade construction of this major transport and logistics warehouse in Kewdale WA. This building consisted of 10,000 m² of roof sheeting, walls, main office, amenities, truck wash & gat-house. The Client was provided with all services, materials and logistics required for the completion of cladding & roof plumbing works.

Client: Vaughan ConstructionsProject Value: $8 million est.

Completed November 2009

Rogroup was contracted to erect 700 tonne of structural steel and installation of 15,000m2 of roof and wall sheeting for a Heavy Vehicle Workshop in Christmas Creek mine site WA. The team consisted of full erection and on-site fabrication crew, roof plumbers, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Client: National Buildplan GroupProject Value: $7 million est.

Completed May 2011.

Rogroup undertook the structural & mechanical construction of this major lime distribution plant located in Henderson Western Australia. We provided a full erection and on-site fabrication crew consisting of a Contract Manager, Site Supervisor, Riggers, Trades Assistants, Crane Operators, Boiler Makers & Mechanical Fitters and all associated equipment provided to the Client for assembling, modifying and installing components.

Client: AH Civil EngineeringProject Value: $5 million est.

Completed March 2010.

K&S Freighters Transport Facility - KewdaleWestern Australia

Heavy Vehicle Workshop - Christmas CreekWestern Australia

Chememan Cement Bulk Storage Facility - HendersonWestern Australia

Page 21: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

21

Rogroup provided a range of services to the Builder, Coney Ivanhoe Construction from project initiation through to construction completion, fit-out and handover. The project consisted of 3 no. commercial office and warehouse units located in East Victoria Park, WA.

Rogroup’s scope included the project and construction management of the major building elements including structural steel and tilt panel erection, cladding and roof plumbing, interior fit-out and plumbing and drainage.

Client: ACWProject Value: $2 million

Completed December 2010.

Rogroup provided a Construction Management teamresponsible for the demolition, civil works and reconstruction of a scrap metal recycling plant in Naval Base, Western Australia. We provided a full shutdown crew consisting of a Construction Manager, Site Supervisor, Riggers, Crane Operators, Trades Assistants, Boiler Makers and Mechanical Fitters and all associated equipment provided to the Client to deliver the project up to and including the Testing & Commissioning Phase.

Client: OneSteel RecyclingProject Value: $2 million est.

Completed March 2009.

Rogroup transported 500 tonne of heavy structural steel from Fremantle wharf to Christmas Creek Mine Site Western Australia. The scope consisted of liaising with local utilities, client and other stakeholders to have all freight removed from the wharf in the allotted time allocated, transport to lay down area to repack for the 1400km journey to the Pilbara.

Client: National Buildplan GroupProject Value: $7 million est.

Completed April 2011.

Commercial Warehouse & Office Department - East Victoria ParkWestern Australia

Kwinana Shredder Mechanical Installation Project - Naval BaseWestern Australia

Transport and Logistics - Christmas CreekWestern Australia

Page 22: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

22

Rogroup’s Erection Services division was contracted to erect 250 tonne of structural steel for the Hanssen’s new precast facility in Hazelmere WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 10,000m2 Warehouse & 1,000m2 Office.

Client: HanssenProject Value: $5 million est.

Completed October 2012

Rogroup’s Erection Services division was contracted to erect 300 tonne of structural steel, 80 tilt-up panels for Toll’s new inter-modal facility in Kewdale WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 16,000m2 Warehouse & 4,000m2 Multi-storey office

Client: Bluescope ConstructionProject Value: $12 million est.

Completed November 2012

Rogroup’s Erection Services division was contracted to erect 750 tonne of structural steel, 200 tilt-up panels for the new cold storage/distribution facility in Hazelmere WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 18,000m2 Warehouse & 3,500m2 Multi-storey office

Client: RichmondProject Value: $20 million est

Completed December 2012

Hanssen Precast Facility - HazelmereWestern Australia

Toll - KewdaleWestern Australia

Rand Coldstores - HazelmereWestern Australia

Page 23: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

23

The project consisted of 10,000m² of warehouse and office space. Our roofing division, Rogroup was involved in the delivery of the cladding and roof plumbing components during construction phase. We provided all necessary labour, materials, equipment and logistics required to successfully deliver the cladding and roof plumbing works.

Client: Savills / IncollProject Value: $20 million est.

Completed January 2011.

Southern Steel Office & Manufacturing Warehouse - Hope ValleyWestern Australia

Rogroup managed a range of construction services which were provided to the main Contractor and Client including structural steel and precast panel erection, roof plumbing and crane & labour hire. The project consisted of erection of over 500t of structural steel, erection of more than 400 precast panels, installation 30,000m2 of sheeting to 2 warehouse buildings and separate multi-story office & car park. The team consisted of a full erection and on-site fabrication crew consisting of a Contract Manager, Site Supervisor, Riggers & Doggers, Trades Assistants, Roof Plumbers, Crane Operators and Boiler Makers and allassociated equipment.

Client: Vaughan ConstructionsProject Value: $40 million est.

Completed March 2012.

Linfox Transport & Logistics Facility - HazelmereWestern Australia

Rogroup was responsible for overseeing the structural and building envelope construction of a major transport and logistics warehouse in Welshpool WA. The team consisted of a full erection and on-site fabrication crew consisting of a Contract Manager, Site Supervisor, Riggers & Doggers, Trades Assistants, Roof Plumbers, Crane Operators and Boiler Makers and all associated equipment provided to the Client to erect the structural steel and complete the building envelope with cladding and concrete tilt panel erection.

Client: RichmondProject Value: $15 million est.

Completed November 2009.

TNT Transport & Logistics Facility - WelshpoolWestern Australia

Page 24: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

24

Rogroup’s Erection Services division was contracted to erect 280 precast panels for the new multi-storey mixed use development in Northbridge WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators, grouters, joint sealers and Boiler Makers and all associated equipment.

Building Type: Multi-storey Office & Residential Apartments

Client: NW ConstructionProject Value: $16 million est.

Completed July 2013

Rogroup’s Erection Services division was contracted to erect 110 tilt-up panels for Stirlings new warehouse facility in Bibralake WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers and Crane Operators and all associated equipment.

Building Type: 10,000m2 Warehouse & 4,000m2 Multi-storey office

Client: Tuss Concrete / PACT ConstructionProject Value: $6 million est

Completed May 2013

Zen Apartments - NorthbridgeWestern Australia

Stirlings - Bibra LakeWestern Australia

Rogroup’s Plumbing and Hydraulic Services division was contracted to investigate the state of backflow in a number of commercial properties, shopping centres and hospitals throughout WA. A number of new high risk and medium risk backflow prevention devices where installed on properties domestic & fire service boundary and internal connections. All works were tested, serviced and commissioned and made compliant to the relevant codes and standards.

Building Type: Various Retail and Health Care Facilities

Client: Various Retail and Health Care FacilitiesProject Value: $65,000

Completed February 2012

High Risk Backflow Prevention - Perth MetroWestern Australia

Page 25: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

25

Rogroup’s Erection Services division was contracted to erect 70 tonne of structural steel and mechanical rigging of Schindler travelator units for the new Shopping Centre in Mt Lawley WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 4,000m2 Retail Building

Client: Spyda Construction Project Value: $6 million est.

Completed November 2012

Rogroup’s Erection Services division was contracted to erect 60 tilt-up panels for the new sports facility in Tom Price WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers and Crane Operators and all associated equipment.

Building Type: Sports Facility

Client: Tuss Concrete / Cooper & Oxley BuildersProject Value: $4 million est.

Completed June 2013

Rogroup’s Erection Services division was contracted to erect 150 tonne of structural steel, 120 tilt-up panels for the new workshop facility in Jandakot WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators and Boiler Makers and all associated equipment.

Building Type: 5,000m2 Warehouse & 2,000m2 Office Building

Client: Bluescope ConstructionProject Value: $5 million est.

Completed March 2013

IGA - MT LawleyWestern Australia

Sports Facility - Tom Price Western Australia

Site 14, Jandakot AirportWestern Australia

Page 26: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

26

Rogroup’s Erection Services division was contracted to erect 250 precast panels for Next DC’s new data storage facility in Malaga WA. The team consisted of full erection crew, Contract Manager, Site Supervisor, Riggers & Doggers, Crane Operators, grouters, joint sealers and Boiler Makers and all associated equipment.

Building Type: Multi-story Office / Data Building

Client: MetrowestProject Value: $20 million est.

Due to Complete December 2013

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic service to multi-story modular units on the new accommodation village in Newman WA. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: Whaleback & Kalgan Rest Tourist ParksProject Value: $100,000

Completed January 2012

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic and drainage services to the new industrial estate in Port Hedland WA. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Building Type: Industrial office & Warehouse

Client: Ridley Property TrustProject Value: $50,000

Completed October 2012

Next DC - MalagaWestern Australia

Newman 228 units staff and Executive Accommodation Western Australia

Ridley Property Trust - Port HedlandWestern Australia

Page 27: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

27

Rogroup recently carried out works in Bangkok Thailand certifying and testing plumbing installations on modular buildings being built for mine site accommodationinstallations and upgrades in Western Australia’s North West. Rogroup work included labour training and supervision, material procurement, mentoring of local workers and final certification.

Client: Modern Modular, ThailandProject Value: $100,000

Completed March 2012

Rogroup’s Plumbing and Hydraulic Services division was contracted to install services including; 50mm copper gas main, 100mm HDPE industrial waste, 100mm PVC sewer, 20mm High Risk backflow prevention, 2000ltr grease arrestor and a 1000ltr sewer pump station fitted with dual pumps and alarms. All of the above services where connected to Authentic Punjab’s new restaurant in Perth WA. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: Ibex InteriorsProject Value: $85,000

Completed June 2013

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic and drainage services to the new disabled ablution block in Kalamunda WA. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: BE ProjectsProject Value: $25,000

Completed April 2013

Modern Modular Building Design & Construction - BangkokThailand

Authentic Punjab - PerthWestern Australia

Disabled Ablution Block Installation - KalamundaWestern Australia

Page 28: Rogroup Capability Statement 2013

Construction Services Capability Statement© ROGROUP | 2013

28

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic, drainage and fire services to the new kennel facility in Nambeelup WA. All services where installed to the local utility regulations and requirements. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: Bluescope ConstructionProject Value: $45,000

Completed December 2012

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic & fire services and backflow prevention to new disabled ablution block in Nedlands WA. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: Sir Charles Gardiner Hospital Project Value: $25,000

Completed June 2013

K9 Dog Rescue Group - Nambeelup Western Australia

Sir Charles Gardiner Hospital - PerthWestern Australia

Rogroup’s Plumbing and Hydraulic Services division was contracted to install hydraulic and drainage services to Whiteman Park’s new visitors centre extension. The team consisted of Qualified Tradesmen, Contract Manager, Site Supervisor, Apprentices and all associated material & equipment.

Client: BE ProjectsProject Value: $30,000

Completed May 2013

Tourist Park Extension - Whiteman ParkWestern Australia

Page 29: Rogroup Capability Statement 2013

Construction ServicesCapability Statement © ROGROUP | 2013

29

Anthony Ivanhoe (Director)M | +61 406 429 249

E | [email protected]

John Kirkpatrick (Director)M | +61 488 155 554

E | [email protected]

Structural Erection Services

Plumbing & Hydraulic Services

Suite 5 Churchill Court335 Hay Street Subiaco

WA 6008 AustraliaPO Box 807

P | +61 8 6143 9668F | +61 8 9382 8240

E | [email protected] | www.rogroup.com.au


Recommended