Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience
Transcript
Page 1: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Roman BartákVisopt B.V. (NL) / Charles University (CZ)

IP&S in complex and dynamic areasVisopt Experience

Page 2: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Talk outlineTalk outline

Preliminariesplanning vs. schedulingconstraint technology in a nutshell

Complex Worldstransition schemesitem flows

Dynamic Worldshandling problem changes

Conclusionscomplex demo

Page 3: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

PreliminariesPlanning, scheduling, and constraints

Page 4: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

TerminologyTerminology

“The planning task is to find out a sequence of actions that will transfer the initial state of the world into a state where the desired goal is satisfied“

“The scheduling task is to allocate known activities to available resources and time respecting capacity, precedence (and other) constraints“

Page 5: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

IP&SIP&SIntelligent planning & scheduling

Integrated planning & scheduling

PlanningPlanning SchedulingScheduling

actions

failure

PlanningPlanning SchedulingScheduling

Page 6: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

IntegrationIntegration

When do we need to integrate more?

If there are too frequent backtracks from scheduling to planning.

Improving the planner may help.

If existence of the activity depends on allocation of other activities.

We call it a process-dependent activity.

Foregoing planning of activities cannot be done there!

Page 7: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Process-dep. activityProcess-dep. activityre-heating

re-cycling

AA BBsetup

by-product

transitionfinal product

heatheat

processprocess

heatheat

processprocessprocessprocess

long duration

re-heatre-heat

Page 8: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Constraint technologyConstraint technology

based on declarative problem description via: variables with domains (sets of possible values)

e.g. start of activity with time windows constraints restricting combinations of variables

e.g. endA < startB

constraint optimisation via objective functione.g. minimise makespan

Why to use constraint technology? understandable open and extendible proof of concept

Page 9: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Constraints: unary resource constraint

Search strategies: ordering of activities

Decide first the activities with a minimal slack Choose ordering leading to a bigger slack

4 16

7 15

6 16

SchedulingScheduling

A (2)

B (4)

C (5)

A (2)4 7

A

B

slack for slack for A<<B A<<B

Page 10: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Complex Worldshandling complex resources

Visopt experience

Page 11: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

MotivationMotivation

Planning & scheduling in complex areasresources with complex behaviour

setup and cleaning activitiescomplex relations between resources

alternative recipes re-cycling

Some examples: mould change in plastic industries acid cleaning in food industries re-cycling in petrochemical industries ...

Page 12: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Complex resourcesComplex resourcesResource behaviour is described via

a state transition diagram activity counters per state

global activity counterse.g. force a given state (cleaning)after a given number of activities

loadload

heatheat unloadunload

cleanclean

coolcool

clean load heat unload load heat unload cool clean

produce A (3-4)produce A (3-4)

produce B (1-2)produce B (1-2)

produce C (2-4)produce C (2-4)

A A A B C C C C A A A C C B A A A

1 2

2

Page 13: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Handling transitionsHandling transitions

A slot model of resourcesslot is a space for activity in the resource

variables describe activity parameters in the slot

state counters times constraints

time shift

slots can slide in time slots cannot swap their

position

endend startstart

K-1K-1 KK K+1K+1statestate

startstart endend

durationduration

+counters+counters

Page 14: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Item flowsItem flows

Relations between resources are described viasupplier-consumer dependencies

Alternative recipes

Recycling

supplier

consumer

N-to-N relations

Page 15: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Looking for suppliers

Handling dependenciesHandling dependencies

Basic ideas: when the activity is known (located to a slot) introduce

related activities (suppliers/consumers) the solver is selecting among introduced activities

(planning within scheduling)

Page 16: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Dynamic Worldshandling problem changes

academic research

Page 17: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

MotivationMotivation

Planning, scheduling & timetabling problemschanges in the problem formulationminimal changes to the solutionother features:

over-constrained problems hard-to-solve problems

Some examples: gate allocation in airports production scheduling timetabling problems ...

Page 18: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Soft solutionsSoft solutionsReturn some solution even if no solution exists

Soft constraintsUser assigns preferences/weights to the constraints.

Motivation:Some constraints express preferences rather than

requirements.

Return some solution even if one does not know in advance that no solution exists.

Soft (incomplete) solutionsAssign as many variables as possible (i.e., without any

conflict).

Motivation:In school timetabling assign as many courses as possible.

Note:Can be applied to hard-to-solve problems.

Page 19: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

PerturbationsPerturbationsinitial problem + initial solution

new problem ´

Perturbation:change in the new solution for ´ w.r.t.

The task:Find a solution of the changed problem

that minimises the number of perturbations.

Minimal Perturbation Problem

Mapping between objects/variables

Page 20: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

MPP exampleMPP example

Random placement problem Place a random set of rectangles (no

overlaps) to a rectangular placement area

ABCDEF

12

3

45

67

8

9

10

ABCDEF

3

45

67

8 10

Initial problem Solution of the changed problem with 3 perturbations

Change:object 1 must be in row B

9

12

Page 21: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Solving MPPSolving MPPPrinciple:

solve the changed problemuse the initial solution as a guide

Basic solver: branch-and-bound limited assignment number search

limit the number of attempts to assign a value to the variable

linear search space (lan_limit * number_of_variables)

Guide: first, assign values to variables with perturbation prefer values which minimise additional

perturbations

Page 22: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

ConclusionsDemo

Page 23: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Demo problemDemo problem

worker

machine 1

machine 2

parallel (3..3)parallel (3..3)

recycle (1..1)recycle (1..1)

clean (1..1)clean (1..1)

serial (1..sup)serial (1..sup)

beginner (4..4)beginner (4..4) experienced (1..sup)experienced (1..sup)

ser. par. par. par. ser. ser. ser. ser. clean1 2 3 4 5 6 7 8 0

par. par. par. rec. ser. ser.

ser. ser. par. par. par.

ser. ser. cle. par. par. par.

rec.

count

count

reset after 8

parallel (3..3)parallel (3..3) clean (1..1)clean (1..1)

serial (1..sup)serial (1..sup)

beg. exp. exp.1 2 3 4

beg. beg. beg.

Parallel (with worker) and serial production

Re-cycling of by-products after 3 parallel activities

Synchronised cleaning after 8 production activities

Learning curve and working time for the worker

Page 24: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Expected solutionsExpected solutionsSynchronised cleaning

cleaningcleaning

parallel with recyclingparallel with recycling

Free cleaning

cleaningcleaning

Page 25: Roman Barták Visopt B.V. (NL) / Charles University (CZ) IP&S in complex and dynamic areas Visopt Experience.

Roman BartákVisopt B.V. (NL) /Charles University (CZ)

IP&S in complex and dynamic areasVisopt Experience