1
PBN status in
Romania
Presented by
Valentin STOIAN – Aeronautical Inspector
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
2
Content
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
• Current status
• Main issues
• Conclusions
3
Current status (I)
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
National PBN Working Group
• established in 2010 (MoT)
• ANSP (Romatsa)
• Operators (TAROM, CarpatAir, others)
• Regulator (Romanian CAA)
Objectives
• develop national implementation plan
• identify required actions/measures
• coordinate implementation
4
Current status (II) – P RNAV
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
Source: ecacnav.com (Eurocontrol)
• TMA BUCHAREST
SID/STAR LROP, LRBS
• TMA ARAD
SID/STAR LRAR, LRTR
• TMA CLUJ (2013)
SID/STAR LRCL, LRSB,
LRTM
5
Current status (III) – RNP APCH
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
Source: Eurocontrol
• criteria to develop PBN
national plan (APV):
1. safety
2. operational benefits
3. environment
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
6 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
Main issues (I)-GEN
• Context
“It is a State’s responsibility to authorize GNSS operations in its airspace…” (ICAO Doc 9849, 5.7.2.1)
“By approving GNSS operations, a State accepts responsibility to ensure that such operations can be completed safely. This is the case irrespective of whether the operations are based on a non-augmented satellite navigation system, aircraft-based augmentation system or an augmentation system provided by a service provider in another State.” (ICAO Doc 9849, 1.5.3)
Main issues (II)-GEN
National regulation
• requirements applicable to procedure design
• other regulation
On-board capabilities
• P-RNAV capable (good)
• APV (not encouraging)
Training
• completed with the help of DGAC & ENAC France
• maintain the competence of oversight staff (PANS-
OPS)
7 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
Main issues (III)-REG
8 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
• SES regulatory framework (549/2004, art.3)
REGULATIONS (EC)
• 549/2004 (framework)
• 550/2004 (service provision)
• 551/2004 (airspace)
• 552/2004 (interoperability)
• regulation (EC) 216/2008 (EASA)
IMPLEMENTING RULES
• 1035/2011 (common req.)
• 1034/2011 (safety oversight)
• 73/2010 (ADQ)
• other
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
Main issues (IV)-REG
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
• Regulation 550/2004:
“…the provision of air navigation services…without
certification in cases where the provider of such services
offers them primarily to aircraft movements other than general
air traffic.” - art.7 (1)
“The provision of all air navigation services within the Community
shall be subject to certification by Member States.” - art.7 (1)
• Regulations 549/-, 552/2004 (Annex I)
Non-European GNSS systems (GPS) subject to SES
regulation ?
GNSS systems considered as navigation system
9 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
Main issues (V)-CNS
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
10 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
EGNOS Open Service Availability EGNOS APV-I Availability
Source: (ESSP monthly report, December 2012 )
Conclusions
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
11 8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013
• establish a regulatory approach a State shall follow to authorize
GNSS (GPS) under SES regulatory framework
“Note that SES service provision regulation cannot be applied
to GPS and that the impossibility to certify or exercise direct
safety oversight over GPS …” (SSC/10/36/9)
• EGNOS coverage extension (APV-I) towards the Eastern
European States
• improve/facilitate access to pan-European programmes in
support of PBN implementation
?
12
Questions?
ROMANIAN CIVIL AERONAUTICAL AUTHORITY
www.caa.ro
8th PBN Task Force, ICAO Regional Office, Paris, 23-24 January 2013