Roosevelt High School Moderniza on Concept DesignNovember 2013
Roosevelt High School Moderniza on Concept DesignNovember 2013
Perkins Eastman DC Team
PERKINS EASTMAN DC TEAM
Sean O’Donnell, AIA, LEED AP Principal-In–Charge
Matt Bell, FAIADesign Principal
Mary Rankin, AIA, LEED AP BD + CProject Manager
William Griffin, AIA, LEED APProject Designer
Abbie CroninProject Architect
Tatiana Bendeck, LEED APArchitect
Roosevelt High School Moderniza on Concept DesignNovember 2013
Smoot/Gilbane Team
SMOOT/GILBANE TEAM
Roosevelt High School Moderniza on Concept DesignNovember 2013
ScheduleDesign Submissions• Concept Design October 2013• Schematic Design December 2013• Early Release Packages December 2013• Design Development/GMP March 2014• Construction Documents June 2014
Construction Milestones• Demolition January 2014 - March 2014• GMP finalized May 2014• Substantial Completion July 2015• School starts August 2015
Upcoming Meetings• CFA Concept Level Review November 21, 2013• CFA Final Submission January/February 2014
SCHEDULE
Roosevelt High School Moderniza on Concept DesignNovember 2013
VICINITY MAP
10 min w
alk
Petworth MetroBus Stops
MacFarland (RHS swing space)
Sharpe Health Greater Campus
RooseveltPetworth LibraryP
R
M
S
M
P
RS
Roosevelt High School Moderniza on Concept DesignNovember 2013
CONSTRUCTION PHASES
Construc on Phases
1932
1976
1932 SITE PLAN
Roosevelt High School Moderniza on Concept DesignNovember 2013
Restoring the Historic Par
RESTORING THE HISTORIC PARTI
DEMO INFILL TO RESTORE COURTYARDADD CLEARSTORY WINDOWS
RESTORE FRONT DOOR1932 SITE PLAN
Roosevelt High School Moderniza on Concept DesignNovember 2013
CAMPUS PLAN
Georgia Ave
Iowa Ave
13th Street NW
Allis
on S
tree
t NW
Ups
hur S
tree
t
Campus Plan
“The Heart”
“The Media Center”“The Waterworks”“The Gallery”“The School Garden”
“The Outdoor Classroom”“The Pavilion”
“The Terrace”+ “The Por co”
T
H
H
M
W
WG
G SS
M
T
P
P
C
C
Roosevelt High School Moderniza on Concept DesignNovember 2013
195.17
195.17 195.17
195.17
195.16
195.16
BUILDING ORGANIZATION
ARTS AUDITORIUM ACADEMICS
RHS ENTRY
STAY/COMMUNITY ENTRY
COMMUNITY + ATHLETICS
T
HW
G S
M P
C
“The Heart”
“The Media Center”“The Waterworks”“The Gallery”“The School Garden”
“The Outdoor Classroom”“The Pavilion”
“The Terrace”+ “The Por co”
H
M
W
G
S
T
P
C
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE TERRACE”
ENHANCED ENTRY STAIR
• Visibility• Iden ty• Access
“The Terrace”
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE PORTICO”
“The Por co “
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE PAVILION”
“The Pavilion”
• Community entrance• STAY entrance• Iden ty
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE OUTDOOR CLASSROOM” AND “THE PAVILION”
“The Outdoor Classroom” and “The Pavilion”
Roosevelt High School Moderniza on Concept DesignNovember 2013
195.17
195.16
“The Pavilion”
“THE PAVILION”
STAY/COMMUNITY ENTRY
STAY
GYM
POOL
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE HEART”
“The Heart”
Cafeteria
CulinaryArts
Career Center
13th Street
“The Terrace”
“The Steps”
MediaCenter
“O u td o o r Classroom”
“The Heart”
C o s m e -tology
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE HEART”
“The Heart”
gathering
learningcommunity building
sharing
179.37
179.37
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE HEART”
“The Heart”
Roosevelt High School Moderniza on Concept DesignNovember 2013
MEDIA CENTER
“The Media Center”
179.37
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE OUTDOOR CLASSROOM”
“The Outdoor Classroom”
EXISTING AREAWAY
Roosevelt High School Moderniza on Concept DesignNovember 2013
“The Waterworks”
“THE WATERWORKS”
Roosevelt High School Moderniza on Concept DesignNovember 2013
“THE GALLERY”
“The Gallery”
195.17
3D/2D Studio
Instrumental
Choral
Mul -purpose Studio
Roosevelt High School Moderniza on Concept DesignNovember 2013
“The School Garden”
“THE SCHOOL GARDEN”
Roosevelt High School Moderniza on Concept DesignNovember 2013
NORTHCOURTYARD
EAST ENTRANCEINTERPRETIVE
GREEN COURTYARD
PARKING LOT BIORETENTION -SEE SWM EXHIBIT FOR
ADDITIONAL SUSTAINABLE MEASURES
RENOVATEDRECREATION AREA,
(SOFTBALL FIELD,2 TENNIS COURTS AND
BASKETBALL COURT)
WEST ENTRANCELANDSCAPING
SOUTHSCIENCECOURTYARD
LANDSCAPE TO STABILIZESTEEP EMBANKMENT
PROTECT EXISTINGSPECIMEN TREE
ROOSEVELTHIGH SCHOOL
MACFA
RLAND
MID
DLE S
CHOOL
PROPOSED LANDSCAPE PLAN
Landscape
Roosevelt High School Moderniza on Concept DesignNovember 2013
CUPOLA RESTORATION
EXISTING CUPOLA
Historic Elements
Roosevelt High School Moderniza on Concept DesignNovember 2013