    MARCH 2007 UNION COUNTY NEW JERSEY HEYER, GRUEL & ASSOCIATES

    Roselle ParkRomerovskiSite Redevelopment Plan

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    2/31

    Credits

    Borough of Roselle Park

    Heyer, Gruel & Associates Inc.Project Manager

    Charles Latini Jr. PP/AICP

    Urban Designer

    Dilip Roy Chittajallu, BARCH

    Graphic Designer

    Lydie Bemba

    Planning Board

    Chairman

    Joel Reed

    Vice Chairman

    Phil Vellucci

    Mayor

    Joseph Delorio

    Councilman

    Loren Harms

    Class II Member

    Carl Pluchino

    Member

    Leland Stanford

    Acting Secretary

    Giuseppe Barberio

    Alternate I

    John Stephen

    Alternate II

    John Velazquez

    Clerk

    Debbie Buli

    Attorney

    Michael Tripodi

    Governing Body

    Mayor

    Joseph DeIorio

    Councilman At Large

    Ricky Badillo

    First Ward Councilman

    Laurence Dinardo

    Second Ward Councilman

    Rick Matarante

    Third Ward Councilman

    Robert Rubilla

    Fourth Ward CouncilmanLoren Harms

    Fifth Ward Councilman

    Michael Yakubov

    The original of this report was signed and sealed in accordance with the Professional PlannersStatutes (NJSA 45:14A-12) of the State of New Jersey

    ___________________________________________________

    Charles Latini Jr., PP, AICPPP #5724

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    3/31

    Table of Contents

    2 Introduction

    3 Statutory Requirements

    3 Romerovski Site - Location, Area and Description

    5 Site History and Planning Background of the Romerovski Site9 Existing Conditions

    12 Public Outreach

    13 Vision

    13 Goals and Objectives of the Plan

    14 Relationship of Plan to the Master Plan and Land Development Regulations

    15 General Land Use Standards

    16 Specifc Land Use Standards

    21 Parking Standards

    21Architectural Design Standards

    24 Streetscape Standards

    25 Other Standards

    25 Redevelopment Powers of the Plan

    25 Redeveloper Agreements and Selection of Redevelopers

    26 Administrative and Procedural Requirements

    27 Relationship to Other Plans

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    4/31

    1

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    5/31

    Introduction

    The Borough Council of the Borough of Roselle Park in a resolution dated April

    20, 2006 authorized the Planning Board to conduct a preliminary investigation

    to determine if the Study Area (Romerovski Site) is a Redevelopment Area

    according to the criteria set forth in N.J.S.A. 40A:12A-5 and to conduct a

    hearing in accordance with N.J.S.A. 40A:12A-6. Subsequently, an analysis of

    the Study Areas existing Land Use, physical characteristics and accessibility

    was conducted and publ ished in a report/ study call ed the Romerovski Site

    Redevelopment Study. The Romerovski Site Redevelopment Study determined

    that the study area satisfied the criteria established by section 5 of the LRHL as

    a Redevelopment Area. The Planning Board then completed a hearing on the

    matter on September 18, 2006 and recommended it to the Borough Council.

    The Borough Council adopted Resolution 158-06 determining the study

    area as an Area in Need of Redevelopment . The Borough Council of the

    Borough of Roselle Park in a resolution dated April 20, 2006 authorized the

    preparation of a redevelopment plan for the Romerovski Site Redevelopment

    Area (heretofore referred to a s the Redevelopment Area) .

    2

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    6/31

    Statutory Requirements

    According to the Loca l Redevelopment and Housing Law

    (N.J.S.A. 40A:12A-1, et seq.), The Redevelopment Plan

    shall include an outline for the planning, development,

    redevelopment or rehabilitation of the project area sufficient

    to indicate:

    1. Its relationship to definitive local objectives as to

    appropriate land uses, density of population and

    improved traffic and public transportation, public

    utilities, recreational and community facilities and

    other public improvements;

    2. Proposed land uses and building requirements in the

    project area;

    3. Adequate provision for the temporary and permanent

    relocation as necessary of residents in the project

    area including an estimate of the extent to which

    decent, safe and sanitary dwelling units affordable to

    displaced residents will be available to them in the

    existing local housing market;

    4. An identification of any property within the

    Redevelopment Area which is proposed to be acquired

    in accordance with t he Redevelopment Plan;

    5. Any significant relationship of the Redevelopment Plan

    to:

    The Master Plans of contiguous municipalities;

    The Master Plan of the County in which the

    municipality is located; and

    The State Development and Redevelopment Plan

    adopted pursuant to the State Planning Act PL

    1985, C398 (C52:18A-196 et al.).

    Romerovski Site Location, Area and

    Description

    The Borough of Roselle Park is 1.2 s quare miles in size located

    along the Garden State Parkway and State Route 28 in Union

    County. It shares its borders with Roselle Borough to the

    south, Cranford Township to the west, Union Township to the

    north and east, Kenilworth Borough to the north and west,

    and the City of Elizabeth to the east. Figure 1- Aerial Photo.

    3

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    7/31

    Figure 1 Aerial Photo

    4

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    8/31

    5

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    9/31

    The Romerovski Site (Study Area) is located on the south

    side of Westfield Ave (State Route 28) roughly mile from

    the border of Cranford. It is bound by the Raritan Valley Rail

    Line to the west and Roselle Borough to the south. Running

    adjacent to the site along the border with Roselle Borough

    is the abandoned rail spur of the Central Jersey Rail Line.

    Gordon Street, a public street, r uns between the two parcels.

    The study area also contains an easement located underneath

    the Gordon Street roadbed, to accommodate a tunnel

    connecting the buildings on either sides of Gordon Street.

    The Study Area contains two parcels: Block 213 Lot 1, which

    is 2.181 acres in size and is located on the west side of Gordon

    Street, adjacent to Raritan Valley Rail ROW; and Block 314,

    Lot 1, which is 2.502 acres in size and is located on the east

    side of Gordon Street, although both lots are connected via an

    underground passageway under Gordon Street. The western

    parcel (Block 213 Lot 1) is the building, which housed the

    historically significant Marconi Wireless CommunicationCompany. Figure 2- Roselle Park Tax Map

    The western portion of the Study Area is located on the site

    of the present day Romerovski Brothers factory and was

    constructed between 1912 and 1913. Guglielmo Marconi,

    the sites owner from 1912 1919, manufactured wireless

    equipment that was valuable to war communications during

    the First World War. On that site later, WDY became the

    first licensed broadcast radio station in 1921. The infamous

    Eddie Cantor made his radio debut in Roselle Park over

    WDY.

    Site History and Planning Background of the

    Romerovski Site

    The Romerovski Site (Study Area) has a long and involved

    history in Roselle Park, beginning with the sites original

    owners, of the last dated records, belonging to Dr. David

    Hibbard who made his home on the site in and around 1862.

    The site remained in the Hibbard Estate in 1910 when the

    Central Railroad condemned a large portion of the site for rail

    expansion. At the time of the propertys sale to the American

    Marconi Company in 1912, the property contained a house,

    outbuildings, and extensive gardens.

    In 1912, Guglielmo Marconi began construction of a portion

    of the sites (Block 213 Lot 1) current 75,000 square feet in

    an L shape design. Subsequent construction of additional

    buildings and development of Block 314 Lot 1 in the 1940s

    and 1960s followed. The sites history with regard to zoning

    and approvals is briefly summarized as follows. Most of the

    Photos clockwise (left to right): A view east along the freight line toward

    the confluence with the Raritan Valley Ruie Line and Romerovski; Plaque

    commemorating Marconi Wireless; A gateway sign along Westfield Avenue.

    6

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    10/31

    Borough of Roselle Park

    Figure 2 Tax Map

    7

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    11/31

    information below is based Roselle Parks Construction Office

    records and Roselle Parks Historic Society:

    1862 Earliest known record of site ownership where

    Dr. David Hibbard was proprietor.

    1910 Central Jersey Rail expansion took a large

    portion of the Hibbard Estate for additional rail right-

    of-way (R.O.W.)

    1912 American Marconi Company constructed the

    first 20,000 square feet of the western portion of the

    sites (Block 213 Lot 1) current 75,000 square feet. At

    the time, employing 200 persons. The building was a

    L shaped structure.

    1914 Marconi became the headquarter s of New York

    Wire less because of it idea l hygi enic and operational

    standards.

    1917 World War I Site expanded to 40,000 square

    feet and 600 employees to manufacture communications

    equipment for the War.

    1919 American Marconi was forced to absorb into

    the RCA Corporation to protect patent rights from the

    Italian immigrant for fear of losing rights to Italy.

    1921 September David Sarnoff, a Marconi protge,

    was licensed to operate WDY radio from the Marconi

    facility.

    1921 December 15, 1921 The first American radio

    broadcast was conducted from the site. This gave way

    to the airing of many radio historic radio personalities

    including; Eddie Cantor, Frankie Frisch, and Benny

    Vanuta.

    1923 General Electric moved the wireless operation

    to New York State

    1923 May 19, 1923 A&M Kargheusian bought the

    Highlighted in red is the original

    Marconi building circa 1917.

    Under GE ownership in1920.

    8

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    12/31

    facility and opened its carpet manufacturing operation

    making its famous carpets for the next 39 years.

    1940s 85,000 square feet was constructed in two (2)

    different pieces east of Gordon Street. An underground

    tunnel connecting both sides of Gordon Street was

    only constructed.

    1962 Romerovski Brothers Export Company

    purchased the property for textile recycling and world-

    wide sale s.

    1962 The site begins an aggressive expansion

    including;

    1962 - July Loading Docks were constructed for

    tenant located in portions of Block 314 Lot.

    1962 - October - Construction of the billboard that

    is currently located on the northeastern corner of the

    warehouse at B lock 314, Lot 1.

    1963 January Construction of additional loading

    docks at Block 314 Lot 1

    1963 February Block 314 Lot 1 has partitionsconstructed for office and lavatories.

    1963 May Block 314 Lot1 is subdivided to house

    Midas Muffler Corporation. Alterations include a

    new loading dock and exterior doors.

    1964 October Installation of additional loading

    docks and 2 bay doors.

    1979 March Last known upgrade of the Heating and

    Ventilation system. Alterations unknown

    Existing Conditions

    As ment ioned earl ier, the Romerovski site consist s of two

    parcels: Block 213 Lot 1, which is 2.181 acres in size and is

    located on the west side of Gordon Street, adjacent to Raritan

    Valley Rail ROW; and Block 314, Lot 1, which is 2.502 acres in

    size and is located on the east side of Gordon Street. The two

    lots are connected via a tunnel under the Gordon Street right-

    of-way. The following is a brief site and building description

    of properties on these two parcels:

    Block 213 Lot 1: This parcel has approximately 450+ feet

    of frontage on Westfield Avenue. It is bordered to the south

    by Roselle, to the north and west by the Raritan Valley rail

    ROW and commercial land uses beyond that, and to the

    east by Gordon Street and the easement to the other portion

    of the Romerovski operations. The site is relatively level,

    topographically. The parcel contains a surface parking lot

    and loading-dock facility on Westfield Avenue. The site also is

    geometrically constrained by the rail ROW where the trestle

    Photos clockwise (top left to right): The awkward entrance into

    the site from the West; Immediately asjacent to the council

    R.O.W. the site once relied on rail; A doc as it exists today.

    9

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    13/31

    bifurcates the parking lot from one of the access points to it.

    Primary Buildings: The property contains a large three--story

    industrial building of approximately 75,000 square feet i n size. There

    are administrative offices, production space and warehouse space

    within the structure where portions were cons truc ted near ly 100

    years ago (c.1912) by Guglielmo Marconi. The entire building is fully

    sprinklered although plumbing has been characterized as in need of

    upgrade.

    Parking Areas: There is one p arking area on this parcel. The parking

    10

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    14/31

    area can accommodate approximately 22 vehicles. Access

    to the parking can be obtained through the loading area

    or under the railroad trestle.

    Loading Areas There are one (1) large loading areas

    with six (6) dock s. The area is approximately 5,000

    square feet in size.

    Circulation There are three (3) access points to Block

    213 Lot 1, all from Westfield Avenue, each respectively

    serving the parking lot and loading area.

    Block 314, Lot 1: This parcel has approximately 546 feet of

    frontage on Westfield Avenue. It is bordered to the south by

    Roselle, to the north and east by commercial land uses, andto the west by Gordon Street and the easement to the other

    portion the Romerovski operations. The site is relatively

    level topographically. The parcel contains a surface parking

    lot and loading-dock facility on Westfield Avenue.

    Primary Buildings: The property contains a large single-

    story industrial warehouse of approximately 85,000 square

    feet in size. The warehouse has extraordinarily high vaulted

    ceilings of approximately 20 feet in height with concrete

    flooring. The warehouse is fully sprinkleredParking Areas: There is one parking area on this parcel. The

    parking area can accommodate approximately 20 vehicles.

    Loading Areas: There are two (2) loading areas with a total

    of seven (7) docks. Each area is approximately 4,000 square

    feet for a total of 8,000 square feet.

    Circulation: There are three (3) access points to Block 314Lot 1, all from Westfield Avenue, each respectively serving

    the parking lot and two (2) loading areas. There is also a

    bus stop adjacent to the site.

    Block 314 Lot 1 as it exists today.An existing parking area insufficient to meet current standard land use..

    11

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    15/31

    Public Outreach

    An extensive public outreach process occur red throughout the

    preparation of this Plan. A number of public meetings were

    held in the Town. The purpose of the meetings was to receive

    input from residents of t he community and other interested

    stakeholders regarding their vision of the neighborhood

    and to identify the issues, opportunities and goals of the

    neighborhood. Follow-up public meetings were held in order

    to present preliminary recommendations. Based upon public

    comments, revisions were made to the recommendations

    and a subsequent public meeting was held where revised

    recommendations were presented. The following ideas/input

    for the redevelopment of Romerovski Site were acquired from

    the public and stakeholders:

    The site acts as a Gateway into the Borough

    Utilize part of Marconi building faade or retrofit or

    re-use

    Possible location of the Historical Society on site

    Park space should be incorporated into the sites

    design

    Explore opportunities for improvements to the tax

    base

    Parking must be considered

    Mixed Use Gateway type development is sorely

    needed

    Senior citizen housing is acceptable due to schools

    being maxed out

    Adaptive Reuse and Loft Housing: Include senior

    housing (55+), associate retail, rental opportunities

    and owner occupied condominiums

    Any housing on-site should be required to have a

    homeowners association

    Commercial Development: Mixed use; Red Bank'sGalleria as an example of the mixed use; Local Retail-

    New Investment & Improvement; Professional Offices;

    Strip Mall; Shopping Center

    12

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    16/31

    Vision

    The Romerovski Site Redevelopment Plan envisions that by

    the year 2021, this two lot area located in the southeast corner

    of the intersection of Westfield Avenue and the Raritan

    Valley Rail Line shall be transformed from a stagnant and

    underutilized area to a gateway site into the Borough of

    Roselle Park, and one of the most significant landmarks of

    the Borough. It provides a stable housing development and

    neighborhood retail. The development takes full advantage

    of its strategic location along a major thoroughfare, Westfield

    Avenue, and its convenient acces s to Garden Sta te Parkway.

    The buildings suit the needs of a new age while p reserving

    the original character of the existing historic buildings.

    The revitalization of the Romerovski Site shall be a unique

    example for future redevelopment activities not only in the

    Borough, but also throughout the State. It shall become a

    point of pride to every resident of Roselle Park.

    Goals and Objectives of the Plan

    The goals and objectives of the Plan are as follows:

    To preserve the unique character of the original

    Marconi Wireless and Telegraph buildings and to

    capitalize on the historic significance of the site.

    To provide for modern living spaces in a site specific

    and context sensitive manner that provides housing for a

    variety of income levels.

    To create an active mixed-use neighborhood retail node

    that serves the site and surrounding neighborhoods

    needs.

    To capitalize on the strengths of the Borough and its

    strategic location along Westfield Avenue, its proximity

    to the Garden State Parkway, and the Roselle Park Rail

    Station.

    To create gateway into the Borough and a distinct

    landmark on Westfield Avenue.

    To set an example in style and quality of buildings for the

    future redevelopment activities i n the Borough.

    To provide ample indoor and outdoor space that caters to

    the active and passive recreation activities of the residents

    and users of the site, as well as for the community.

    To provide adequate parking for all the users of the

    site according to the most appropriate and currentstandards.

    To create a pedestrian friendly environment that focuses on

    enhancing the streetscape, improves pedestrian activity,

    promotes public safety and reduces auto dependence.

    13

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    17/31

    Relationship of Plan to the Master Plan and

    Land Development Regulations

    A land use plan was c reated to take advantage of ex ist ing and

    potential physical and socioeconomic opportunities in the

    Area and to achieve the goals o f the Plan.

    The proposed land uses for the site takes advantage of the

    many different opportunities that are present in the Area.

    The permitted uses and design standards within the variousdistricts and the design standards that apply to the entire

    Area are deta iled in the Land Use and Design Standards

    sections. The Area shall be redeveloped in accordance with

    the standards detailed in this Redevelopment Plan. The Plan

    supercedes the use, bulk, and design standard provisions of

    the Borough Land Development Regulations. Any deviation

    from permitted use standards, height of a principal structure

    standards, or expansion of a nonconforming use or any other

    deviation that results in a d variance shall be addressed as

    an amendment to the Plan.

    Neither the Planning board nor the Board of Adjustment

    shall have authority to allow deviations from the permitted

    use, or height standards or expansion of a nonconforming use

    or other d variance deviations. The Planning Board shallhave power to grant relief from other bulk and dimensional

    requirements of the Plan to the same extent as the Board

    may grant relief from bulk and dimensional requirements

    pursuant to the Municipal Land Use Law. All development

    must be approved by the Planning Board and shall be

    submitted through the normal site plan and subdivision

    procedures as identified by N.J.S.A. 40:55, et seq.

    14

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    18/31

    The re-use of the existing building could leadto an interesting looking project.

    General Land Use Standards

    The following section contains t he Land Use Standards that

    apply within the Redevelopment Area. These Standards

    contain information pertaining to the permitted and

    accessory uses within the district and the general standards

    that apply to each of the districts.

    Permitted Principal Uses:

    Condominium for purchase and Luxury Residential

    Buildings

    Facilities associated with residential buildings

    such as private gyms, resident meeting rooms, or

    management offices

    Secondary Permitted Uses:

    Secondary uses are permitted on the first floor of all

    buildings and must be accompanied by the principal

    uses. Retail and general services:

    Restaurants and cafes:

    Studios: art, dance, music, exercise

    Day care and child care facilities

    Community clubs and other public facilities

    Permitted Accessory Uses:

    Off-street parking: For principal as well as public

    uses

    - At grade or above grade parking shall be located

    behind active uses or an architecturally treated

    faade.

    Storage associated with the principle use

    Parks, playgrounds, gardens or other types of open

    space both public and private.

    15

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    19/31

    The site adjacent to the Raritan Valley RailLine could become park space for new

    residential enjoyment.

    Facilities associated with building operations such

    as mechanical, laundry, trash or other service related

    features.

    Loading:

    Off-street loading areas are prohibited unless

    confined within a parking facility.

    Trash and recycling areas shall be enclosed and

    located a minimum of 10 feet from any street or

    property line.

    Other:

    Creative use of the underground connection beneath

    Gordon Street is encouraged.

    - Pedestrian walkways that link underground

    parking from Block 314 to 213.

    - Pedestrian access to common amenities.

    Specific Land Use Standards

    A mix of residential unit sizes is permitted and

    encouraged but the gross average unit size shall be

    at least 900 square feet.

    - Up to 15% of all units may be 3-bedroom

    - Up to 35% of all units may be 2-bedroom

    - Up to 60% of all units may be 1-bedroom

    - Up to 50% of all units may be studios

    All build ings shall contain laundr y facili tie s either on

    each floor or one sufficient in size to accommodate

    all residents.

    All buildings shall have on-s ite workout fac ilit ies.

    All buildi ngs shall contain a sto rage room(s) avai labl e

    for residents of the building

    All buildings shall conta in an indoor bicycle s torage

    area.

    Senior citizen units are permitted and encouraged

    but shall be incorporated within all the units in each

    building. Age segregated units are discouraged.

    All proj ects must incorporate provisions that

    address the Boroughs Growth Share obligation in

    accordance with the Council on Affordable Housing

    (COAH) through inclusion or payment in-lieu of.

    16

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    20/31

    Block 314

    Permitted Use:Condominium or cooperatively owned

    residential.

    Retail: Shall be at least 35% of the total building

    footprint to be located fronting Westfield Avenue.

    Affordable Housing:1

    - 1 unit for every 8 market rate units

    - 1 unit for every 25 jobs created through commercial

    component

    - 50%may be designated for age restricted.

    Bulk:

    Maximum Building Coverage: 40%

    Maximum Impervious Coverage: 55%

    Maximum Height: 3-1/2 stories up to 40 feet

    Setbacks:

    Front: 10 feet (minimum of 15 foot sidewalks

    along all public R.O.W.)

    Rear: 40 feet

    Gordon Street: 15 feet

    Side: 20 feet

    1According to Council on Affordable Housing Rules and

    Regulations.

    If Marconi site is rehabilitated, retrofitted, or historically

    restored, Block 314 may be granted up to 60% building

    coverage and 70% impervious coverage. Additionally, up to

    4-1/2 stories up to a height of 50 feet may also be granted.

    Block 213 (New construction)

    Permitted Use:

    Residential: Condominium or cooperatively owned

    residential.

    Retail: No requirement.

    Affordable Housing:2

    - 1 unit for every 8 market rate units

    - 1 unit for every 25 jobs created through

    commercial component.

    - 50% may be designated for age restricted.

    Public Provisions: 0.75 acres of public parkland shall

    be created

    2According to Council on Affordable Housing Rules

    and Regulations.

    17

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    21/31

    18

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    22/31

    Bulk:

    Maximum Building Coverage: 30%

    Maximum Impervious Coverage: 55%

    Maximum Height: 3-1/2 up to 40 feet

    Setbacks:

    Front: 10 feet (minimum of 15 foot sidewalk

    along public R.O.W.)

    Rear: 40 feet

    Gordon Street: 15 feet

    Side (Along Raritan Valley Rail R.O.W.): 75 feet

    Block 213 (Rehabilitation, Retrofit or Historical Restoration

    of the former Marconi Wireless Site)

    Use:

    Residential: No age-restricted component. Artist loft

    space and studio space is permitted.

    Retail: No retail component is mandatory.

    NoAffo rdable Housing obligati on:

    Public Provisions: Location of the Borough of Roselle

    Park Historic Society Offices are encouraged.

    19

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    23/31

    Bulk:

    Should portions of the site be rendered not essential

    components or contributions to the historical integrity

    of the Marconi Wirelesss operations, all standards and

    setbacks of Block 213 (new construction) section shall

    apply. (*NOTE: According to Historic photos of the sit e,

    the original Marconi Wireless Operation occurred in an

    interior space located to the rear of the existing facility

    and depicted by the photo contained herein.)

    Site Review:

    Roselle Parks Historic Society is available in an advisory

    capacity should the Planning Board deem appropriate.

    20

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    24/31

    Parking Standards

    Ratios

    Recognizing the relationship between elements of this plan

    and proximity to mass transit, this plan utilizes reduced

    parking ratios. Furthermore, parking shall be encouraged

    to function in a shared situation where residential and non-

    residential uses share spaces based on the specific uses in

    peak demand.

    Residential Parking Ratios

    The minimum parking ratios for residential uses shall be 1.0

    space per unit. Senior Citizen units shall use a minimum

    standard of 0.75 spaces per unit.

    Non-Residential Parking Ratios

    The minimum parking ratio shall be 1.0 spaces for every

    2,000 square feet of retail space.

    Location and Screening Access

    All pa rking shal l be prov ided in structu red parking underneath

    building or landscaped courtyards; open surface parking

    facilities are prohibited. Any at-grade or above-grade parking

    facilities shall be located behind active uses. Under no

    circumstances is parking to be visible from Westfield Avenue.

    Acces s in common facil ities that are shared by tenants, vis itors

    and general public shall be equipped with tenant only access

    points.

    Architectural Design Standards

    All buildings shall be trea ted on all sides and cons istent with

    important historic elements of Roselle Park and/or Marconi

    Wirel ess .

    Massing

    In order to minimize the i mpacts of larger building, building

    facades adjacent to the street frontage shall be designed to

    Photos: Architectural elements of Roselle park shall be incorporated

    into all proposals.

    21

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    25/31

    disguise the buildings mass as follows:

    Horizontal: The ground level of all buildings shall be

    designed to relate to the pedestrians. Base plantings are

    encouraged to be placed within recesses in the vertical

    plane of the building. Buildings shall also be designed

    to be grounded through materials and dimensions

    related to creating a base effect of the structure.

    Vertical: The faade shall be broken up into 40-60 foot

    wide vert ica l segments . Elements such as columns,

    expansion joints, pilasters, architectural changes in

    the faade plane, balconies, and/or variation of surface

    materials and patterns.

    Balconies: Balconies and terraces are encouraged.

    Simulated balconies or Juliette, and balustrades are

    22

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    26/31

    23

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    27/31

    permitted.

    Entries

    All bui ldings shall have entr ances from Westfi eld Avenue.

    Although residential unit s may have priv ate entr ies from

    parking garages, non-residential may not. Exterior entries

    must be distinguishable from the rest of the faade. Public

    entries are encouraged to be signature.

    Windows

    Non-residential uses shall have facades with 70% of it

    occupied by windows. Residential units shall have at least40% dedicated to windows.

    Materials

    All buildings shall be t reated on al l s ides and cons istent with

    important historic elements of Roselle Park and/or Marconi

    Wirel ess . Acceptable materia ls are as foll ows:

    Stone, masonry, brick, wood and glass are the preferred

    materials for facades.

    Faux or imitation faade treatments are strongly

    discouraged.

    Signage

    The following standards apply to signage for all non-

    residential uses:

    No internally lit signs.

    Illumination shall be shielded from residential

    windows.

    No freestanding signs.

    A signage plan will requi re approval but no sign shal l

    exceed 100 square feet for any single use.

    Colors and front should not be uniform but designedto compliment the overall architectural theme of the

    entire site.

    Streetscape Standards

    All above-ground uti liti es shal l be loca ted underground.

    Furthermore, a uniform streetscape plan is being developed

    for the Borough. The sites development shall implement

    its portion of the plan. Should the Boroughs streetscape

    plan for Westfield Avenue not be completed at the time of

    a redveelopment proposal, street trees shall be planted 30

    feet on center and street lighting consistent with Chestnut

    Street shall be installed or an equivalent payment in lieu of

    24

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    28/31

    installation may also be considered.

    Other Standards

    Residential Amenities: All residential buildings shall be

    for-sale with homeowner or management association. The

    buildings shall have amenities such as a gym, pool, open

    space and storage areas.

    Green Building:

    - Buildings are encouraged to be designed as LEED-

    qualified.

    Rooftop Gardens with green access for residents are

    encouraged as part of the amenities requirement.

    Efforts to minimize impervious surface are strongly

    encouraged.

    Redevelopment Powers of the Plan

    Properties to be Acquired

    The Plan does not anticipate the use of eminent domain,

    given the cooperative relationship with the property owner.

    Furthermore, the Borough will work in concert with the

    owner and its choice to select redevelopers. The Borough

    may revisit the matter should improvements fail to avail

    themselves, however a plan amendment shall be necessary.

    Redeveloper Agreements and Selection of

    Redevelopers

    Redeveloper agreements shall be required.

    The Borough shall have the right to s elect any potential

    redeveloper and may utilize an RFP process.

    The redeveloper will be obligated to carry out the specified

    improvements in accordance with the Redevelopment

    Plan.

    The redeveloper, its successors or assigns shall devote

    land within the Redevelopment Area to the uses specified

    in this Redevelopment Plan.

    The redeveloper shall begin and complete the development

    of said land for the use(s) required in this Redevelopment

    Plan within a period of time, which the Governing Body

    fixes as reasonable.

    Until the completion of the improvements, the redeveloper

    will not be permitted to sell , le ase, or o ther wise tran sfer

    or dispose of property within the Redevelopment Area

    without prior written consent of Governing Body.

    Upon completion of the required improvements,

    the conditions determined to exist at the time the

    Redevelopment Area was determined to be in need of

    redevelopment shall be deemed to no longer exist.

    25

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    29/31

    No covenant, agreement, lease, conveyance or other

    instrument shall be effected or executed by the

    redevelopers, Governing Body, or the successors,

    lessees, or assigns of either of them, by which land in

    the Redevelopment Area is restricted as to sale, lease, or

    occupancy upon the basis of race, color, creed, religion,

    ancestry, national origin, sex, sexual orientation or

    marital status.

    Neither the redeveloper nor Governing Body, nor the

    successors, lessees, or assigns or either of them shall

    discriminate upon the basis of race, creed, religion,ancestry, national origin, sex or marital status in the

    sale, lease or rental or in the use and occupancy of land

    or improvements erected or to be erected thereon, or

    any part thereof, in the Redevelopment Area.

    Administrative and Procedural Requirements

    Amending the Redevelopment Plan

    Upon compliance with the requirements of applicable law,

    the Governing Body may amend, revise or modify the Plan,

    as circumstances may make such changes appropriate.

    Duration of Plan

    The Plan, as amended, shall be in full force and effect for a

    period of thirty (30) years from the date of approval of this

    Plan by the Governing Body.

    Borough Expenses

    Redeveloper agreements shall incorporate a reimbursement to

    the Borough for expenses related to this Redevelopment Plan

    and process. Furthermore, this plan may require revision. A

    fee of $2,500 shall be paid by the party requesting such an

    amendment unless issued by the Governing Body. Any and

    all amendments shall be conducted by a licensed planner in

    the State of New Jersey.

    26

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    30/31

    One of the statewide goals of the State Plan is to revitalize the

    States Cities and Towns. This goal includes investing public

    resources and leveraging private investment in housing and

    jobs . The State Deve lopment and Redevelopment Plan (SDRP)

    also places the Redevelopment Area in the Metropolitan

    PlanningArea (PA1).

    This Redevelopment Plan is consistent with the planning

    goals and objectives of the SDRP as a whole (to revitalize the

    States urban centers and areas), moreover, it promotes thefollowing:

    Promote development and redevelopment in Cores and

    neighborhoods of Centers.

    Provide a full range of housing choices through

    redevelopment, new construction, rehabilitation, adaptive

    reuse of non-residential buildings, introduction of new

    housing in non-residential settings and preservation ofexisting housing stock.

    Promote economic development by encouraging strategic

    land assembly, infill development, public/private

    partnerships and infrastructure improvements that

    support an identified role for the community within the

    regional marketplace.

    Relationship to Other Plans

    Contiguous Municipalities

    The Redevelopment Area is adjacent to Roselle, however

    the site is constrained by the railroad R.O.W. Nevertheless,

    conversion from industrial to mixed-use will not adversely

    affect adjacent areas in Roselle. This Plan is consistent with

    the Master Plan of Roselle.

    County of Union

    This Redevelopment Plan is consistent with the planning

    goals of Union County as a whole. As identified in the

    County Cross Acceptance Report, Roselle Park is identified

    as a built out community whose growth will come from infill

    and redevelopment. This Plan does not deviate from the

    general policy set forth for Union County and is consistent

    with the Countys planning effo rts .

    State Development and Redevelopment Plan

    Although not designated, the Borough of Rose lle Park is acenter. According to the 2001 State Plan, urban centers offer

    the most diverse mix of industry, commerce, residences and

    cultural facilities of any central place Historically, public

    agencies at all levels have invested heavily in these Centers,

    building an intense service fabric that, with repair must

    occur anyway, offers a solid foundation for new growth in

    the future.

    27

  • 8/12/2019 Roselle Park Romerovski Site Redevelopment Plan (March 2007)

    31/31

    Provide maximum active and passive recreational

    opportunities.

    Concentrate on maintenance and rehabilitation

    of existing parks and open space while expanding

    and linking the system through redevelopment and

    reclamation projects.

    Promote design that enhances public safety, encourages

    pedestrian activity and reduces dependency on the

    automobile.

    Encourage the preservation and adaptive reuse of

    historic or significant buildings.

    31


Recommended