+ All Categories
Home > Documents > ROSEMOUNT OPUS ROSEMOUNT, MN... · 2020. 8. 25. · OPUS Group - Philip Cattanach...

ROSEMOUNT OPUS ROSEMOUNT, MN... · 2020. 8. 25. · OPUS Group - Philip Cattanach...

Date post: 25-Dec-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
2
INFORMATION SHEET ROSEMOUNT OPUS ROSEMOUNT, MN CORPORATE ECONOMIC DEVELOPMENT CERTIFIED SITE GENERAL SITE INFORMATION Location Owner Size Zoning Preferred Industry Asking Price Highway Access Air Access Rail Access County Road 42/145th Street OPUS Group - Philip Cattanach [email protected] 160 acres, relatively flat, undeveloped Agriculture. Allowable uses for the phase one industrial area will include office, light industrial, distribution, warehouse, clean manufacturing, research and development, laboratory facilities, and service oriented retail. Commercial / Industrial TBD 9.9 miles to I-35, 18.6 miles to I-94, 2.5 miles to 4-lane US Highway 52, 4-lane Highway 42 adjacent to site 19 miles to Minneapolis St. Paul International Airport No rail access UTILITY INFORMATION Electric Power Natural Gas Xcel Energy. Multiple high voltage transmission lines available, starting at 115kV. 34.5kV Overhead 3- phase with 25 MW of capacity at the site now. Another 10 MW capacity in a line within .5 miles. Minnesota Energy Resources Group. 6” and 4” lines along Highway 42, 40-55 p.s.i. New lines not yet in place but are planned for this development. City would extend existing water lines east from Rosemount 1 mile along Hightway 42 or construct a new well to service this site for a significant user. New lines not yet in place but are planned for this development. City would extend existing sewer lines east from Rosemount 1 mile along Highway 42 for new users. New lines not yet in place but are planned for this development. City would extend existing sewer lines east from Rosemount 1 mile along Highway 42 for new users. Frontier Communications, Century Line. Fiber would be extended east from Rosemount 1 mile along Highway 42. Current capactiy of 10 Mbps to <25 Mbps (download) 6 Mbps to <10 Mbps (upload). Water Sewer Storm Water Telecom/Fiber Babcock Ave 152nd St E Blaine Ave E 145th St E 5 £ ¤ 2 7 5 6 1 4 5 6 2 OPUS Site (approx. 160 acres) Approx. 0.5 miles M i s s i s s ippi R iv e r É ® 0 5 35 § ¨ ¦ E 35 § ¨ ¦ W 4 § ¨ ¦ 94 3 § ¨ ¦ 5 16 £ ¤ 9 6 £ ¤ 1 95 £ ¤ 2A 5 £ ¤ 2 1 £ ¤ 0 É ® 7 9 É ® 5 É ® 3 É ® 3 1 10 É ® 0 É ® 5 5 É ® 2 6 Washington County Ramsey County Dakota County Scott County MSP Int'l Airport Minneapolis St. Paul Rosemount Bloomington Rosemount OPUS Site
Transcript
Page 1: ROSEMOUNT OPUS ROSEMOUNT, MN... · 2020. 8. 25. · OPUS Group - Philip Cattanach Philip.Cattanach@opus-group.com 160 acres, relatively flat, ... Century Line. Fiber would be extended

INFORMATION SHEETROSEMOUNT OPUSROSEMOUNT, MN

CORPORATE ECONOMIC DEVELOPMENT

C E R T I F I E D S I T E

GENERAL SITE INFORMATIONLocation

Owner

Size

Zoning

Preferred Industry

Asking Price Highway Access

Air Access

Rail Access

County Road 42/145th Street

OPUS Group - Philip Cattanach [email protected]

160 acres, relatively flat, undeveloped

Agriculture. Allowable uses for the phase one industrial area will include office, light industrial,

distribution, warehouse, clean manufacturing, research and development, laboratory facilities, and service oriented retail.

Commercial / Industrial

TBD

9.9 miles to I-35, 18.6 miles to I-94, 2.5 miles to 4-lane US Highway 52, 4-lane Highway 42

adjacent to site 19 miles to Minneapolis St. Paul International Airport

No rail access

UTILITY INFORMATIONElectric Power

Natural Gas

Xcel Energy. Multiple high voltage transmission lines available, starting at 115kV. 34.5kV Overhead 3-

phase with 25 MW of capacity at the site now. Another 10 MW capacity in a line within .5 miles.

Minnesota Energy Resources Group. 6” and 4” lines along Highway 42, 40-55 p.s.i.

New lines not yet in place but are planned for this development. City would extend existing water lines

east from Rosemount 1 mile along Hightway 42 or construct a new well to service this site for a

significant user.

New lines not yet in place but are planned for this development. City would extend existing sewer lines

east from Rosemount 1 mile along Highway 42 for new users.

New lines not yet in place but are planned for this development. City would extend existing sewer lines

east from Rosemount 1 mile along Highway 42 for new users.

Frontier Communications, Century Line. Fiber would be extended east from Rosemount 1 mile along

Highway 42. Current capactiy of 10 Mbps to <25 Mbps (download) 6 Mbps to <10 Mbps (upload).

Water

Sewer

Storm Water

Telecom/Fiber

Oswego St

Doc

umen

t Pat

h:R

:\Pro

ject

War

ehou

se\E

cono

mic

Dev

elop

men

t\Rid

gega

te\M

XD

\Cer

tifie

dSite

Rid

gega

teB

roch

ureZ

oom

.mxd

85

E-470

rora

Path

:R:\P

roje

ctW

areh

ouse

\Eco

nom

icD

evel

opm

ent\R

idge

gate

\MX

D\C

ertif

iedS

iteR

idge

gate

Are

aV.m

xd

Babc

ock

Ave

152nd St E

Blai

ne A

ve E

145th St E

5£¤2

7561

4562

OPUS Site

(approx. 160 acres)

Approx. 0.5 miles

Miss issippi

River

ɮ05

35§̈¦E

35§̈¦W

4§̈¦94

3§̈¦5

16£¤9

6£¤1

95£¤2A

5£¤2

1£¤0

ɮ7

9ɮ5

ɮ3

ɮ31

10ɮ0

ɮ55

ɮ26

WashingtonCounty

RamseyCounty

DakotaCounty

ScottCounty

MSP Int'lAirport

MinneapolisSt. Paul

Rosemount

Bloomington

RosemountOPUSSite

Page 2: ROSEMOUNT OPUS ROSEMOUNT, MN... · 2020. 8. 25. · OPUS Group - Philip Cattanach Philip.Cattanach@opus-group.com 160 acres, relatively flat, ... Century Line. Fiber would be extended

xcelenergy.com | © 2019 Xcel Energy Inc. | Xcel Energy is a registered trademark of Xcel Energy Inc. | 19-10-308

INFORMATION SHEET

ROSEMOUNT OPUS

SITE DUE DILIGENCE DOCUMENTATION AVAILABLE (REPORTS AND DETAIL AVAILABLE)Title Commitment S Archeological and Historic Use

Assessments

Aerial Site Views and Maps S Park Covenants and Restrictions

Park Master Plan S Transportation Access Maps S

Utility Service Maps S Geotechnical Study / Soil Survey S

Site Dimensions and Configuration S FEMA Flood Plain Designation with map S

Wetlands Delineation and Map S Air Attainment Status S

Phase 1 Environmental Assessment S Endangered Species Assessment

GENERAL COMMUNITY INFORMATIONCommunity Profile and Demographics

S Letters of Support S

State and Local Incentives Overview S Business and Industrial Support Services and Amenities Profile

S

Xcel Energy Contact:

Name: Ryan BruersManager, Corporate Economic Development

Address: Xcel Energy 414 Nicollet Mall Minneapolis, MN 55401

Email: [email protected] P: 612.321.3186

XCEL ENERGY MAKES NO WARRANTY OR REPRESENTATION AS TO THE ACCURACY, QUALITY, AVAILABILITY, COMPLETENESS, OR SUITABILITY OF ANY INFORMATION CONTAINED HEREIN. ALL INFORMATION MUST BE INDEPENDENTLY VERIFIED. THE USER SHALL NOT RELY ON ANY OF THE INFORMATION CONTAINED HEREIN AND SHALL ASSUME ALL RISK AND RESPONSIBILITY ARISING FROM ITS USE.

Economic Development Contact:

Name: Kim LindquistDirectorCommunity Development

Address: City of Rosemount2875 145th Street Rosemount, MN 55068

Email: [email protected] P: 651.322.2020

S

S

S


Recommended