Agenda
Introduction
Facts About the Rotation
Rotation Participation Details
Projects
Continues Improvement Initiatives
Lessons Learned
2
Introduction
University Attended &Majors/Minors
Indiana University – Purdue University Indianapolis (IUPUI)Mechanical Engineering TechnologyTechnical Communications CertificateLean Six Sigma Green Belt
Organization Involvement
Society of Women EngineersEngineers Without Borders American Society of Mechanical Engineers Society of Manufacturing EngineersEngineering Technology Student CouncilInternational Society of AutomationEngineering Technology Leadership Development Program
Study Abroad Experience
No International Experience - Yet
Travel throughout the United States with organizations:- California, Michigan, Wisconsin, Florida, Ohio, Illinois, Louisiana, New York- Heard from many local engineers on their companies and what they are doing in varying industries
Fun Facts about Yourself
- I play the violin and the piano - I enjoy bourbon, beer, and wine tastings - I like to cook/bake, read, draw/paint - I love to travel & try to visit at least one new place per year - I can speak some Spanish & Italian and am working to become more fluent in both
3
Facts About the Rotation
Rotation # 2
Core Field Operations
Executive Mentor Eddie Millington, Continuous Improvement Director, FECT - NAO
Site Manager Alex Portas, Industrial Engineering Manager , FAS - SHO
Location / Division Faurecia Automotive Seating – Sterling Heights, MI
Objectives of the Rotation
1. Introduction to Process/Industrial Engineering in a JIT Facility2. Participate in a Launch Program3. Participate in Plant MOD Reduction Plan through Hoshin Events4. Attend Successful Manager Training Modules5. Experience Working w/ Plant JIT Diagnostic Tool
Next Rotation Faurecia Automotive Seating – Simpsonville, KY
4
5
Rotation Participation Details
Plant Projects and Activities Participation in Women@Faurecia Initiative University Visits
Central Michigan University Career Fair Purdue University Women in Business Conference Oakland University Diversity and Inclusion Conference
Ignition Workshop – Technology Implementation for Efficient Operations RDP Workshop Session Lead – Millennials & Mentors RDP Candidate Interviews Participation Training
Successful Manager Training Interviewing Talent for Faurecia FES NAO Coaching Modules – Employee Empowerment, 7 Delivery Basics, 7
Inventory Basics, New QRCI, HSE and 13 Mandatory Rules, 7 Quality Basics in Production, 7 Quality Basics in Program, and QRCI in Program
Projects
Cadillac Omega Line – Flow & WIP Racks for Offside Stations Scope
Act as liaison between Program Team & Supplier (Trilogiq) Gather data/information, communicate needs/limitations,
approve drawings, collect & approve quotes, facilitate rack build & delivery
Result Currently being built – 3 WIP Racks & 2 Flow Racks w/ Carts
Actions Determined overall rack dimensions
Space constraints & ergonomic standards Found optimal number of Kit Boxes & WIP Communicated updates & design changes as
Program Team needs changed Approved drawing & received quote approval Currently keeping communication between
Program Team & Trilogiq as racks are beingbuilt
6
7
Projects
Cadillac Omega Line – Kit Boxes Scope
Acted as liaison between Program Team & Suppliers Gather data/information, create needed layouts,
communicate needs/limitations, determine correct parts, approve drawings, collect & approve quotes, facilitate rack build & delivery
Result 2 Inner Kit Box Layouts Prototypes for customer viewing Enough Kit Boxes for run at rate & full production
Actions Found information on part delivery Scheduled supplier visits to discuss needs Created several inner layout designs & updates Analyze supplier capability vs. Program Team
needs & limitations Receive quotes & approve layouts
8
MOD Reduction Hoshins Plant (UF) MOD: 176 on 12/31/14 Plant (UF) MOD Target: 166 by 7/1/15
LH/RH 140 Reduction (MOD -2) – Complete
LH 130 Elimination (MOD -2) – Complete
Clip Installer Elimination (MOD -2) – Complete
LH/RH 95 Elimination (MOD -4) – Complete
RC 33 Elimination (MOD -2) – In Process
Projects
9 10 11 12 18160162164166168170172174176178 176
166
MOD Convergence 2015
WeekM
OD
9
Projects
MOD Reduction Hoshins Scope
Day long events to find areas of improvement on the line
Reduce MOD by improving layout, process, etc.
Result Current UF MOD @ 166 – Target
Achieved Actions
Visit line - current cycle times & process recorded
Analysis of data & brainstorming Action Plan & PDCA Update Trial Prep & Data Collection Implementation Success/Failure
based on Data & Feedback
Projects
JIT Diagnostic Tool Purpose
Diagnose Direct Labor Potential Centralizes Program Information Improvement Opportunities Provides Program Target Helps generate & maintain PIP
Consists of Excel Sheet w/ Varying Tool Tabs
Labor Summary & Line Balance, Takt Time Calculation, Work Content Charts, Work Content by Weighted Volume (Bubble) Charts, Work Content Variant Charts, Labor Potential Calculations, Complexity Analyses, Diversity Tree
Binder All Tools from Excel Sheet, JIT Tool PDCA, Shift Volume Pulled by Customer, PDP Adherence,
Daily Variation of Mix, Customer Preliminary Module, Product Allocation, JIT Window, Current & Target MIFD/MIFA, Operating Times, Volumes of Finished Goods, Availability Analysis of Current Process, Supplier MPMs, Quality Level of Line, Inventory Segmentation, Target Layout, Target Line Balancing, Commitment on Quality, Labor, Delivery, etc., PIP, Training Logs & Meeting Sign-Ins, Questionnaire for Faurecia JIT Sequence Plants
10
JIT Diagnostic Tool Scope
Build/Update UF JIT Tool Documentation/Binder (LH/RH/Row 2) Begin building JIT Tool for Omega Line
Result Complete & up-to-date JIT Diagnostic Tool for UF Line Progress on Omega JIT Tool Organized JS JIT Tool Binder
Actions Collected Cycle Times from each
line and input into Tool Updated Tool to be consistent
(layout, text, colors, etc.) and link data
Worked w/ other departments to gather necessary documentation & data
Printed, organized, labelled, and assembled binders & documentation
11
Projects
Projects
Miscellaneous Projects PC&L Cycle Times
PC&L had outdated/missing cycle times necessary to create SWIs
Created Excel file w/ data for each area of PC&L (except HiLo’s)
Designed a Flow Rack to Hold Seatbelt Buckles HSE Warehouse Fire &
Emergency Routes Miscellaneous Cycle Time
Collection ECR (Engineering Change
Request) Data Improvement Initiative Data
PC&L Area Safety Hoshin
14
Omega Shadowing (Personal Improvement) Watched Omega Master Builders assemble seats
JIT Diagnostic Tool Changes JIT Diagnostic Tool Documentation Library Data linking in JIT Diagnostic Tool Excel files Updated layouts of documentation for Tool
consistency/ease of navigation Hoshins
Gather relevant information prior to Hoshin meeting Videos, Cycle Times, Pictures, etc.
Bring Improvement Idea Sheets to Hoshin Events Various changes to the line (as a team)
Rotational Development Program Objective Updates Training creation targeted for Millennials & Mentors
communication
Continuous Improvement Initiatives
15
Daily Improvement Ideas JIT Diagnostic Tool
Function, Design, Capabilities Faurecia/Customer Interaction during New Program
“Slow Builds” – customer visit to analyze seat build Faurecia/Customer Interaction during Existing Program
Customer can add work content to line React quickly to protect customer & line
Involvement of Floor Representative in every Hoshin Importance of cross-functional team during
Hoshins & general team collaboration Continuous Improvement as a Leader RDP is New – Trainees need to reach out & take
charge of their own development Gain experience in other areas (PC&L, Quality,
Finance, etc.) FES is not a bunch of standards to be followed –
it’s a company culture
Lessons Learned