15
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS & ASSOCIATES, Inc.
Transcript
Page 1: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

ROUTE 7 TRAFFIC FLOW IMPROVEMENTS

POTOMAC VIEW ROAD TO AUGUSTA DRIVE

LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND

WASTE MANAGEMENT

A. MORTON THOMAS & ASSOCIATES, Inc.

Page 2: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

PROJECT PURPOSE

OPERATIONAL IMPROVEMENTS

SAFETY IMPROVEMENTS

ADDITIONAL BENEFITS:

– DRAINAGE UPGRADES

– STORMWATER TREATMENT

Page 3: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

PROJECT HIGHLIGHTS

POTOMAC VIEW ROAD

– Add 3rd left turn lane, southbound Potomac View Rd.

onto eastbound Rte 7

– Add 2nd left turn lane, west-

bound Rte 7 onto south-

bound Potomac View Rd.

– Safety ImprovementsPotomac View Road Looking South

Page 4: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

POTOMAC VIEW ROAD

Potomac View Rd

Rou

te 7

New 2nd Left Turn Lane

New 3rd Left Turn Lane

Page 5: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

PROJECT HIGHLIGHTS

STERLING BOULEVARD– Add 3rd left turn lane, northbound Sterling Blvd. onto

westbound Rte 7

– Add right turn lane on eastbound Rte 7 onto southbound Sterling Blvd.

– Closure of connections to Amherst Street/Place

– Safety Improvements Sterling Boulevard Looking North

Page 6: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

STERLING BLVD

Rou

te 7

Sterling Blvd

New Lane Arrangement as Shown on Sign

Lanes shifted toward median to allow new right turn lane

New Right Turn Lane

New Acceleration Lane

W. A

mh

erst

Pl.

E. Amherst St.

Access to/from Sterling Blvdto Close

Page 7: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

PROJECT HIGHLIGHTS

Augusta Drive Looking South

AUGUSTA DRIVE– Add 3rd left turn lane, southbound August Dr. onto

eastbound Rte 7

– Extend left turn lane,

westbound Rte 7 onto

northbound Augusta Dr.

– Safety Improvements

Page 8: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

AUGUSTA DRIVER

oute

7

Augusta Dr

2 Thru Lanes will Shift to the right

New 3rd Left Turn Lane

Extended and Shifted Left Turn lane

Page 9: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

SAFETY IMPROVEMENTS

Widened shoulders where feasible

Increased acceleration zone where feasible

Flattened slopes in median where feasible

Traffic barrier (Guard Rail) along steep slopes

Page 10: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

ENVIRONMENTAL IMPROVEMENTS

Improving Roadway Drainage

– Increasing Storm Sewer Pipe Sizes to handle

more flow

– Re-grading Median Ditch Lines

Page 11: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

ENVIRONMENTAL IMPROVEMENTS

Utilizing Landscaped

Biofiltration Basins

– Provides a “Low Impact”

Solution

– Aesthetically pleasing

landscaping

Page 12: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

TRAFFIC CONTROL HIGHLIGHTS

Off-Peak Hour* Lane Closures

Temporary lane narrowing

Night Work to be minimized

Construction Period Approximately 12 months

Peak Hours currently defined as 5:00 a.m. to 9:00 a.m.and 3:30 p.m. to 7:00 p.m.

*

Page 13: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

PROJECT ACTIVITIES & CURRENT SCHEDULE

ACQUIRE EASEMENTS & RELOCATE UTILITIES

BEGIN CONSTRUCTION

– SUMMER 2012

SUBSTANTIAL COMPLETION

– SPRING/SUMMER 2013

Page 14: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

POINTS OF CONTACT

James Rauch, Division Manager

(703) 771-5564

Dawn Klassen, Land Acquisition Manager

(571) 258-3251

Laura Mehiel, Consultant Project Manager

(703) 817-1373

Page 15: ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &

QUESTIONS?

ROUTE 7 TRAFFIC FLOW IMPROVEMENTS

POTOMAC VIEW ROAD TO AUGUSTA DRIVE


Recommended