ROUTE Corridor Study / \ \ / / mass DOT !751:!-f/IO Retail Corridor Segment September 7, 2016
Transcript

ROUTE ~Salem

107~ Corridor Study

/ \

\ /

/

mass DOT !751:!-f/IO

Retail Corridor Segment

September 7, 2016

September 7, 2016

Retail Corridor Segment Considered Cross-Section Concepts

September 7, 2016

Retail Corridor SegmentAgreed Upon Concept

September 7, 2016

Retail Corridor Segment

t Summary of Changes

Added buffered bicycle lanes through most of segmenImproved pedestrian accommodations by adding sidewalk to the west side of Route 107 Enriched transit accommodations by providing ADA compliant bus stops Improved safety by reducing lane width Improved vehicle operations thru signal installation, signal timing/coordination improvements Provided aesthetically pleasing median

September 7, 2016

Route 107 at Walmart DriveExisting Conditions

September 7, 2016

Route 107 at Walmart Drive Proposed Improvements

September 7, 2016

Route 107 at Olde Village Dr Existing Conditions

September 7, 2016

Route 107 at Olde Village Dr Proposed Improvements

September 7, 2016

Route 107 at Barnes Rd Existing Conditions

September 7, 2016

Route 107 at Barnes Rd Proposed Improvements

September 7, 2016

Zigzag Segment

INSERT Segment Map

September 7, 2016

Zigzag Alternatives

Proposed short-term improvement for improved traffic flow Evaluated alternatives, with Working Group guidance, that redirected zigzag mov ement off Route 107 to Traders Way and First Street At the request of the Working Group, developed four alternatives to the zigzag that keeps zigzag movement on Route 107 through widened ROW Developed long-term recommendations for zigzag traffic movements

Zigzag Alternatives

September 7, 2016

Full Access Signalization of First Street at Swampscott Road Improve signal coordination Reallocate green time to better accommodate the zigzag movement Consider for short term improvement

Legend

Existing Traffic Signal

Potential Traffic Signal

September 7, 2016

Zigzag Alternatives No Connection Between Marlborough Rd & Swampscott Rd via Route 107

Shortens left-turn queues onto Marlborough Road and Swampscott Road Further study of Highland Avenue/First Street impacts recommended

X X X

Legend

Prohibited Movement

Rerouted Movement

September 7, 2016

Zigzag Alternatives

Improved overall operations Reduced vehicle queuing on Route 107 Overall intersection LOS is E or better with few movements that operate at LOS F.

ROUTE ~Salem

107~ Corridor Study

mass DOT !751:!-f/IO

Lane Barriers

September 7, 2016


Recommended