Manapouri 220kV Voltage ControlRowan Sinton
MERIDIAN ENERGY LIMITED 2
3) Working with
Transpower:vs.
Bus
Voltage
Generator
Voltagevs.2) Voltage control:
MVAr
Dispatch
Continuous
Voltage
Controlvs.1) AVR mode:
MERIDIAN ENERGY LIMITED 3
Can you do both?
MVAr
Dispatch
Continuous
Voltage
Controlvs.
MERIDIAN ENERGY LIMITED 4
AVR
Actual
Voltage
220 kV bus
GSU
Voltage
Setpoint
Non-infinite bus
MVArNo OLTC
MERIDIAN ENERGY LIMITED 5
AVR
Actual
Voltage
GSU
Voltage
Setpoint
10 MVAr
220 kV bus
MERIDIAN ENERGY LIMITED 6
AVR
“Superimposed”
MVAr control
MVAr
Setpoint
SCADA
220 kV Bus
GSU
Actual
VoltageVoltage
Setpoint
Actual
MVAr
MERIDIAN ENERGY LIMITED 7
AVR
“Superimposed”
MVAr control
MVAr
Setpoint
SCADA
220 kV Bus
GSU
Actual
VoltageVoltage
Setpoint
Actual
MVAr
MERIDIAN ENERGY LIMITED 8
Superimposed MVAr mode – done badly
MERIDIAN ENERGY LIMITED 9
How long to stay in “superimposed MVAr mode”?
MERIDIAN ENERGY LIMITED 10
Yes you can (and must) do both, but:
• Be careful with superimposed MVAr control
• Loosen your definition of “continuous voltage control”
MERIDIAN ENERGY LIMITED 11
• Is the dispatched voltage at the generator terminals or bus voltage (GIP)?
• Does the dispatch have to be continuously met?
• Should all asset owners already be able to do this?
Bus
Voltage
Generator
Voltagevs.
MERIDIAN ENERGY LIMITED 12
220kV Bus Voltage Control Mode
AVR
Bus
Control
Bus Voltage
Setpoint
220 kV Bus
GSU
Actual
Generator
Voltage
Generator
Voltage
Setpoint
SCADAActual
Bus Voltage
MERIDIAN ENERGY LIMITED 13
Bus voltage control – done well
\\PISERVER\ANALOG:MAN_SS.FB_VCTRL_MAN
225.93
Volts
\\PISERVER\ANALOG:MAN_SS.STN3_KV
225.93
kV
MAN SS Volt Ctrl MAN Setpoint FB MAN SS 220kV Station Voltage
8:30 8:00 7:00 6:30
4/12/2017 9:00:00 a.m.Plot-0
220
221
222
223
224
225
226
227
228
229
230
MERIDIAN ENERGY LIMITED 14
Bus
Voltage
Control
Generator
Voltage
Controlvs.2)
• Is the dispatched voltage at the generator terminals or bus voltage (GIP)?Presumably bus voltage
• Does the dispatch have to be continuously met?Presumably yes
• Should all asset owners already be able to do this?Requires the asset owner to implement a bespoke control system
MERIDIAN ENERGY LIMITED 15
Working with Transpower after theMAN bus voltage “out of control” event
• Transpower approached Meridian on an engineering level first
• There was no formal breech…
• … but threats were made
• Meridian provided all available information – no secrets
• Transpower provided prompt and useful guidance
• Transpower followed up to ensure all actions were closed
MERIDIAN ENERGY LIMITED 16