15
GOALS OF STUDY Feasibility Study – Strategies and Guidance for Future Design Three Options – Renovation, Addition, New Improved Functioning and Use Costs Analysis and Design Soils Architecture Structural Mechanical Electrical Aquatics Landscape Civil • Estimating PRESENTATION Aquatics – Spray Park and Overview of Existing Pool Three Options – Renovation, Addition, New Cost Overview of Three Options Strategies and Discussion ROY H. MURPHY COMMUNITY CENTER AND POOL OVERVIEW May 2016
Transcript
  • CITY OF FIRCREST

    FIRCREST COMMUNITY CENTERADDITION CONCEPTMARCH 17 2016

    PARKING LOT34 REGULAR STALLS

    2 ADA STALLS

    COMMUNITY CENTER

    POOL

    EVENTS LAWN

    PLAZA

    PLAZA

    PLAZA

    PARK

    NEW CENTER

    NEW POOL

    ELECTRON WAY

    ELECTRON WAY

    GOALS OF STUDY• Feasibility Study – Strategies and Guidance for Future Design• Three Options – Renovation, Addition, New• Improved Functioning and Use • Costs• Analysis and Design

    • Soils• Architecture• Structural• Mechanical• Electrical• Aquatics• Landscape• Civil• Estimating

    PRESENTATION• Aquatics – Spray Park and Overview of Existing Pool• Three Options – Renovation, Addition, New• Cost Overview of Three Options• Strategies and Discussion

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    OVERVIEWMay 2016

  • GYM

    STORAGEMEETING

    STOR

    MENWOMEN

    OFFICE

    KITCHEN MEETING/SENIORS

    YOUTH

    LOBBY

    TERRACE

    EXISTINGELECTRICAL

    JAN

    NEW ENTRY CANOPY

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    TO PARKING

    CHEMICAL DELIVERIESTO

    STR

    EET

    SECURITY FENCE

    SECURITYFENCE

    EVENTSKITCHEN

    0 10 20 40

    MAIN ENTRY

    EXISTING DECORATIVE CMU WALL

    OFFICE2 1

    /2'

    TERRACE

    .EX

    ISTI

    NG

    SHADESTRUCTURE

    SHADESTRUCTURE

    WADING

    LAP POOL

    UNDERWATERBENCH

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    EXISTING POOL & SPLASH PAD

    EXISTING POOL

    • Sloped deck– remove and replace

    • Uneven skimmers – sawcut and replace at water level

    • Losing water

    • Old pool mechanical– may be able to re-use boiler

    • Hydrostatic conditions will still exist – new deck and skimmers could be out of alignment again

    • Cost for updates approximately 75% of new; could be more depending on structural capability of tank

    SPLASH PAD

    May 2016

  • PARKING LOT24 REGULAR STALLS

    2 ADA STALLS

    POOL

    EVENTS LAWN

    PLAZA

    PLAZA

    PLAZA

    CITY OF FIRCREST

    FIRCREST COMMUNITY CENTERRENOVATION CONCEPTMAY 10, 2016

    SPLASHPAD

    PERGOLA

    COMMUNITY CENTER

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    RENOVATION - LANDSCAPEMay 2016

    1STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    RENOVATION: ARCHITECTURAL

    GYM

    STORAGE

    YOUTH

    CORR

    IDOR

    FITNESSLOBBY

    ADMIN

    OFFICE/JAN

    MTG.SENIORS

    STORAGE

    ELEC

    MEETINGKITCHEN

    LOUNGE W DISPLAY AREA

    NEW ENTRY CANOPY

    ELEC

    NEW ELEC

    HALLWAY/SEATING

    TERRACE

    TERRACE

    MEN

    WOMEN

    OFFICE

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    POOL

    TO PARKING

    CHEMICAL DELIVERIES

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    PARKFIELD

    BLDG M/E

    0 10 20 40

    1/16" = 1' - 0"

    GYM

    STOR

    AGE

    YOUT

    H

    CORRIDOR

    FITN

    ESS

    LOBB

    Y

    ADMI

    N

    OFFI

    CE/JA

    N

    MTG.

    SENI

    ORS

    STOR

    AGE

    ELEC

    MEET

    ING

    KITC

    HEN

    LOUN

    GE W

    DIS

    PLAY

    ARE

    A

    NEW

    ENT

    RY C

    ANOP

    Y

    ELEC

    NEW

    ELE

    C

    HALL

    WAY

    /SEA

    TING

    TERR

    ACE

    TERR

    ACE

    MEN

    WOM

    EN

    OFFI

    CE

    LOCK

    ER R

    MLO

    CKER

    RM

    SHOWER

    SHOWER

    POOL

    MECH

    ANIC

    AL

    STOR

    AGE

    FAMI

    LY C

    HANG

    ING

    REST

    ROOM

    SFO

    R PA

    RK

    STAF

    F

    LOCK

    ERS

    LOCK

    ERS

    POOL

    TO P

    ARKI

    NG

    CHEM

    ICAL

    DEL

    IVER

    IES

    TO STREET

    SECU

    RITY

    FEN

    CE

    SECU

    RITY

    FENC

    E

    PARK

    FIEL

    D

    BLDG

    M/E

    010

    2040

    1/16"

    = 1'

    - 0"

    GYM

    STORAGEMEETING

    STOR

    MENWOMEN

    OFFICE

    KITCHEN MEETING/SENIORS

    YOUTH

    LOBBY

    TERRACE

    EXISTINGELECTRICAL

    JAN

    NEW ENTRY CANOPY

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    TO PARKING

    CHEMICAL DELIVERIES

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    EVENTSKITCHEN

    0 10 20 40

    MAIN ENTRY

    EXISTING DECORATIVE CMU WALL

    OFFICE

    2 1/2'

    TERRACE

    .EX

    ISTI

    NG

    SHADESTRUCTURE

    SHADESTRUCTURE

    WADING

    LAP POOL

    UNDERWATERBENCH

    Renovation...............9,700 sqftPool Building...........3,400 sqft

    1STRATEGY May 2016

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    RENOVATION: STRUCTURAL

    in estimate

    1STRATEGY May 2016

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    RENOVATION: CIVILMay 2016

    1STRATEGY

  • CITY OF FIRCREST

    FIRCREST COMMUNITY CENTERADDITION CONCEPTMAY 10, 2016

    PARKING LOT34 REGULAR STALLS

    2 ADA STALLS

    POOL

    EVENTS LAWN

    PLAZA

    PLAZA

    SPLASHPAD

    PLAZA

    COMMUNITY CENTER

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    ADDITION - LANDSCAPEMay 2016

    2STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    ADDITION: ARCHITECTURAL

    GYM

    STORAGE

    YOUTH

    CORR

    IDOR

    FITNESSLOBBYOFFICES

    OFFICE/JAN

    MEETING

    STORAGE

    ELECMEETING/SENIORSKITCHEN

    LOUNGE W DISPLAY AREA

    NEW ENTRY CANOPY

    HALLWAY/SEATING

    TERRACE

    TERRACE

    MEN

    WOMEN

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    TO PARKING

    CHEMICAL DELIVERIES

    PARKFIELD

    EVENTSKITCHEN

    0 10 20 40

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    UNDERWATERBENCH

    SHADESTRUCTURE

    EXIS

    TING

    ENTRY

    SHADESTRUCTURE

    COLUMNS @ 8'-0" O.C.WADING

    LAP POOL

    Addition.....................11,800 sqftPool Building...........3,400 sqft

    May 2016

    GYM

    STORAGE

    YOUTH

    CORR

    IDOR

    FITNESSLOBBY

    ADMIN

    OFFICE/JAN

    MTG.SENIORS

    STORAGE

    ELEC

    MEETINGKITCHEN

    LOUNGE W DISPLAY AREA

    NEW ENTRY CANOPY

    ELEC

    NEW ELEC

    HALLWAY/SEATING

    TERRACE

    TERRACE

    MEN

    WOMEN

    OFFICE

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    POOL

    TO PARKING

    CHEMICAL DELIVERIES

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    PARKFIELD

    BLDG M/E

    0 10 20 40

    1/16" = 1' - 0"

    GYM

    STOR

    AGE

    YOUT

    H

    CORRIDOR

    FITN

    ESS

    LOBB

    Y

    ADMI

    N

    OFFI

    CE/JA

    N

    MTG.

    SENI

    ORS

    STOR

    AGE

    ELEC

    MEET

    ING

    KITC

    HEN

    LOUN

    GE W

    DIS

    PLAY

    ARE

    A

    NEW

    ENT

    RY C

    ANOP

    Y

    ELEC

    NEW

    ELE

    C

    HALL

    WAY

    /SEA

    TING

    TERR

    ACE

    TERR

    ACE

    MEN

    WOM

    EN

    OFFI

    CE

    LOCK

    ER R

    MLO

    CKER

    RM

    SHOWER

    SHOWER

    POOL

    MECH

    ANIC

    AL

    STOR

    AGE

    FAMI

    LY C

    HANG

    ING

    REST

    ROOM

    SFO

    R PA

    RK

    STAF

    F

    LOCK

    ERS

    LOCK

    ERS

    POOL

    TO P

    ARKI

    NG

    CHEM

    ICAL

    DEL

    IVER

    IES

    TO STREET

    SECU

    RITY

    FEN

    CE

    SECU

    RITY

    FENC

    E

    PARK

    FIEL

    D

    BLDG

    M/E

    010

    2040

    1/16"

    = 1'

    - 0"

    2STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    ADDITION: STRUCTURAL

    in estimate

    May 2016

    2STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    ADDITION: CIVILMay 2016

    2STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    NEW A: SITE

    PARK

    NEW CENTER

    NEW POOL

    ELECTRON WAY

    PAVILION

    NEW POOLBUILDING

    May 2016

    3STRATEGY

    SPRAY PARK

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    NEW A: PLAN

    GYM

    YOUTH

    FITNESS

    M

    W

    STOR BOH

    AADMINMTG

    OFFICEE

    LOBBY

    MEETING

    MEETING

    KITCHEN

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE

    STOR

    AGE HALL

    CLER

    ESTO

    RY A

    BOVE

    TERR

    ACE

    TERR

    ACE

    TERR

    ACE

    TERR

    ACE

    TERR

    ACE

    TERR

    ACE

    TERR

    ACE

    New Construction...13,000 sqftPool Building................3,400 sqft

    May 2016

    GYM

    STOR

    AGE

    YOUT

    H

    CORRIDOR

    FITN

    ESS

    LOBB

    Y

    ADMI

    N

    OFFI

    CE/JA

    N

    MTG.

    SENI

    ORS

    STOR

    AGE

    ELEC

    MEET

    ING

    KITC

    HEN

    LOUN

    GE W

    DIS

    PLAY

    ARE

    A

    NEW

    ENT

    RY C

    ANOP

    Y

    ELEC

    NEW

    ELE

    C

    HALL

    WAY

    /SEA

    TING

    TERR

    ACE

    TERR

    ACE

    MEN

    WOM

    EN

    OFFI

    CE

    LOCK

    ER R

    MLO

    CKER

    RM

    SHOWER

    SHOWER

    POOL

    MECH

    ANIC

    AL

    STOR

    AGE

    FAMI

    LY C

    HANG

    ING

    REST

    ROOM

    SFO

    R PA

    RK

    STAF

    F

    LOCK

    ERS

    LOCK

    ERS

    POOL

    TO P

    ARKI

    NG

    CHEM

    ICAL

    DEL

    IVER

    IES

    TO STREET

    SECU

    RITY

    FEN

    CE

    SECU

    RITY

    FENC

    E

    PARK

    FIEL

    D

    BLDG

    M/E

    010

    2040

    1/16"

    = 1'

    - 0"

    GYM

    STORAGE

    YOUTH

    CORR

    IDOR

    FITNESSLOBBY

    ADMIN

    OFFICE/JAN

    MTG.SENIORS

    STORAGE

    ELEC

    MEETINGKITCHEN

    LOUNGE W DISPLAY AREA

    NEW ENTRY CANOPY

    ELEC

    NEW ELEC

    HALLWAY/SEATING

    TERRACE

    TERRACE

    MEN

    WOMEN

    OFFICE

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    POOL

    TO PARKING

    CHEMICAL DELIVERIES

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    PARKFIELD

    BLDG M/E

    0 10 20 40

    1/16" = 1' - 0"

    3STRATEGY

  • ROY H. MURPHY COMMUNITY CENTER AND POOL

    NEW B: SITE

    PARK

    NEW CENTERNEW

    POOL

    ELECTRON WAY

    PAVILION

    NEW POOLBUILDING

    May 2016

    4STRATEGY

    SPRAY PARK

  • GYM

    LOBBY

    M W STOR

    BOH

    ADMIN

    OFF.YOUTH

    MEETINGMEETING

    KITC

    HEN

    STORAGE STORAGEHALL CLERESTORY ABOVE

    TERRACE

    TERRACE

    CONTRA COSTA AVE

    TERRACE

    MTGFITNESS

    ELEC

    TRON

    WAY

    ENTRY

    POOL

    PARKING

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    NEW B: PLANMay 2016

    4STRATEGY

    GYM

    STOR

    AGE

    YOUT

    H

    CORRIDOR

    FITN

    ESS

    LOBB

    Y

    ADMI

    N

    OFFI

    CE/JA

    N

    MTG.

    SENI

    ORS

    STOR

    AGE

    ELEC

    MEET

    ING

    KITC

    HEN

    LOUN

    GE W

    DIS

    PLAY

    ARE

    A

    NEW

    ENT

    RY C

    ANOP

    Y

    ELEC

    NEW

    ELE

    C

    HALL

    WAY

    /SEA

    TING

    TERR

    ACE

    TERR

    ACE

    MEN

    WOM

    EN

    OFFI

    CE

    LOCK

    ER R

    MLO

    CKER

    RM

    SHOWER

    SHOWER

    POOL

    MECH

    ANIC

    AL

    STOR

    AGE

    FAMI

    LY C

    HANG

    ING

    REST

    ROOM

    SFO

    R PA

    RK

    STAF

    F

    LOCK

    ERS

    LOCK

    ERS

    POOL

    TO P

    ARKI

    NG

    CHEM

    ICAL

    DEL

    IVER

    IES

    TO STREET

    SECU

    RITY

    FEN

    CE

    SECU

    RITY

    FENC

    E

    PARK

    FIEL

    D

    BLDG

    M/E

    010

    2040

    1/16"

    = 1'

    - 0"

    GYM

    STORAGE

    YOUTH

    CORR

    IDOR

    FITNESSLOBBY

    ADMIN

    OFFICE/JAN

    MTG.SENIORS

    STORAGE

    ELEC

    MEETINGKITCHEN

    LOUNGE W DISPLAY AREA

    NEW ENTRY CANOPY

    ELEC

    NEW ELEC

    HALLWAY/SEATING

    TERRACE

    TERRACE

    MEN

    WOMEN

    OFFICE

    LOCKER RMLOCKER RM

    SHOW

    ER

    SHOW

    ERPOOLMECHANICAL

    STORAGE

    FAMILY CHANGING

    RESTROOMSFOR PARK

    STAFF

    LOCKERS LOCKERS

    POOL

    TO PARKING

    CHEMICAL DELIVERIES

    TO S

    TREE

    T

    SECURITY FENCE

    SECURITYFENCE

    PARKFIELD

    BLDG M/E

    0 10 20 40

    1/16" = 1' - 0"

    New Construction...13,000 sqftPool Building................3,400 sqft

  • New Pool and Renovated Center

    • Estimated project budget - $9,500,000

    • Could be phased to spread out costs• Signi� cant investment in a 50-year building

    New Pool and Addition to Center

    • Estimated project budget - $12,000,000

    • Could be phased to spread out costs• Very signi� cant investment in a 50-year building

    New Pool and New Center

    • Estimated project budget - $13,000,000

    • Can be phased to avoid shutdown of either pool or center

    • New facilities with a new 50-year life

    New Pool and Delayed New 13,000 sfCenter at Current Location

    • Estimated project budget Pool & Splash Pad - $3,500,000

    • Estimated project budget Site & Center $9,000,00

    • Get a new pool soon• No signi� cant investment in the existing center• New facilities with a new 50-year life

    ROY H. MURPHY COMMUNITY CENTER AND POOL

    STRATEGIES

    STRATEGY STRATEGY

    STRATEGY STRATEGY

    May 2016

    3 4

    1 2


Recommended