1. NISHANT SADHWANI - 47
2. ARNAV KHAMKAR - 24
3. VENKATESH CHOUTAPELLI - 12
4. VISHAL WAVHAL - 66
In 1893, the Enfield Manufacturing Company Ltd was registered to manufacture bicycles, adopting the branding Royal Enfield.
The legacy of weapons manufacture is reflected in the logo, a cannon, and their motto "Made Like A Gun". Their first motorcycle was built in 1901.
In 1955, Enfield Cycle Company partnered with Madras Motors in India in forming Enfield of India, based in Chennai, and started assembling the 350 cc Royal Enfield Bullet motorcycle in Madras.
The original Redditch, Worcestershire based company dissolved in 1971, but Enfield of India continued, and bought the rights to use the Royal Enfield name.
Master Production Schedule (MPS)
MPS is a means of communication, a Link or Contract between Marketing and Manufacturing.
It is a plan of what is to be produced and when
It is an agreed upon plan between marketing and manufacturing.
The MPS is a priority Plan for Manufacturing.
It is not meant to be rigid. It is the basis to make changes that are consistent with the demands of the marketplace and the capacity of manufacturing.
Manufacturing Planning & Control System (MPC) : Framework
Manufacturing Resource Planning
MarketDemand
Productionplan
Problems?
Rough-cutcapacity planning
Yes No YesNo
Finance
Marketing
Manufacturing
Adjustproduction plan
Masterproduction schedule
MRP
Capacityplanning
Problems?Requirements
schedules
Adju
st m
aste
r sc
hedu
le
JIT/Lean Production
CustomerAssembly
Assembly
Production
Production
Production
Production Planning & Control(PPC)
PRODUCTION SYSTEM
System is a whose function is to convert a set of inputs into a set of desired outputs.
Planning+ Control = Productivity
PRODUCTION PLANNING
Given a specific process planning, process technologies and production conditionspredetermine varieties, quantities, quality, and scheduled of products to be produced according to market demand of products.
TIME DIMENSIONS• Long Range Planning;
is done annually and focus on a planning horizon greater than one year.
• Medium Range Planning; usually covers a period from 6 months to 18 months, with monthly or sometimes quarterly time increments.
• Short Range Planning; covers a period from one day or less to six months, with weekly time increment usually.
PRODUCTION PLANNING
• PLANNING• ROUTING• SCHEDULING• LOADING
PRODUCTION CONTROL
• DISPATCHING• FOLLOWING UP• INSPECTION• CORRECTIVE
CONCLUSION…
Royal Enfield is now the oldest motorcycle brand in the world still in production with the Bullet model enjoying the longest motorcycle production run of all time. Royal Enfield of India now sells motorcycles in over twenty countries.