-.......,. ..M. N..I.I ii iiiiii Hill H ill H IM Hill l52O02NW0024 2.16742 DUFFELL LAKE
REPORT
ON
GEOPHYSICAL SURVEYS
ON PROPERTY
IN
DUFFELL LAKE AREA
SIOUX LOOKOUT MINING DIVISION
ONTARIO
E. W. Bazinet, P. Eng.
Designated Consulting Engineer
010
fc.1674 2
Dated at
Toronto, Ontario
November l, 1995 RE
SFP
MINING LANDS BRANCH
TABLE OF CONTENTS - 010C
Introduction
Property and Location
Survey Method and Presentation of Results V.L.F. Electromagnetic Survey Horizontal Loop Electromagnetic Survey Magnetometer Survey
Grid Lines
Interpretation of Results of the Geophysical Program Anomaly A Anomaly B Anomaly CAnomalies E, F, G and H Anomaly Q
Conclusions and Recommendations
List of Illustrations
Name, Address and Qualifications of Person Who Supervised Surveys
Name and Address of the Holders of the Mining Claims
REPORT
ON
GEOPHYSICAL SURVEYS
ON PROPERTY
IN
DUFFELL LAKE AREA
SIOUX LOOKOUT MINING DIVISION
ONTARIO
INTRODUCTION
Ground geophysical work, consisting of a V.L.F. electromagnetic survey, a horizontal loop electromagnetic survey and a magnetometer survey was carried out on claims in the Duffell Lake Area, Ontario, between May 3 and May 30, 1991.
The survey outlined several horizontal loop electromagnetic conductors, coincident with strong magnetic anomalies.
PROPERTY. LOCATION AND ACCESS
The properties upon which the work was carried out include all or portions of the following:
claim block 1150754 claim 1092114 claim block 1150755 claim 1092115
claim 1092103 claim 1150422claim 1092106 claim 1150423claim 1092107 claim 1150424claim 1092108 claim 1150425claim 1092109 claim 1150426claim 1092110 claim 1150427claim 1092111 claim 1150428claim 1092112 claim 1150429claim 1092113
Access is by charter aircraft to Duffell Lake which is situated 35 miles west of the Town of Pickle Lake, Ontario. The claim group is accessed by foot from Duffell Lake.
SURVEY METHOD AND PRESENTATION OF RESULTS
V.L.F. Electromagnetic Survey
The Geonics E.M. 16 electromagnetic unit was employed to conduct the survey on the property. This instrument monitors the signal transmitted from very low frequency stations operating at various locations throughout the world for communications with military submarines. These V.L.F. radio stations have a vertical antenna. The antenna current is thus vertical, creating a concentric horizontal magnetic field which is transmitted through (he ground. When these magnetic fields encounter conductive geological bodies in the ground, secondary fields radiate from the bodies.
The E. M. 16 measures the vertical in-phase component (Tangent of the Tilt Angle) in pei cent and the vertical out-of-phase component (Quadrature) in percent, of the secondary field.
Transmitter stations are selected to result in a field approximately at right angles to the main strike of the conductive bodies or geological feature being investigated, but a field of up to 45 0 to the main strike will yield acceptable results. The transmitter station at Seattle, Washington (24.8 KHz) was used to perform the survey on the property, [leadings were recorded along grid lines at 25 metre intervals. The grid lines were spaced 100 metres apart.
The V.L.F. responses are plotted on the accompanying map at a scale of l :2500.
Horizontal Loop Electromagnetic Survey
' The horizontal loop electromagnetic survey employed the Apex Parametrics Maxmin H electromagnetic instrument operated in the horizontal coil configuration with a
Kowinogons L
I/5075-7
887241 1887231
DUFFELL LAKE PROJECT SIOUX LOOKOUT MINING DIVISION
ONTARIO
Claim Map Duffell Lake Area (G 2013)--
transmitter - receiver separation of 100 metres. Readings of the in-phase and out-of-phase components of the resultant field at 3555 Hz and 1777 Hz were recorded at station intervals of 25 metres. Grid lines were established at 100 metre spacings. The ideal profile of the electromagnetic readings over the conductive body forms a curve with positive shoulders as the conductor is approached and a negative trough over the conductor. Both the in-phase and out-of-phase response show the same general curve over a conductor except in areas of deep conductive overburden. In the latter setting phase rotation phenomena can alter the ideal type response over a bedrock conductive body. The ratio between the in-phase and out-of-phase response over a conductive zone provides a qualitative indication of the degree of conductivity as does the response at different transmitted frequencies. Conductivity thickness determinations (mhos) provide a quantitative method for comparing the degree of conductivity. In general, the ratio of the in-phase to out-of-phase response increases as the conductivity of the underlying body increases and a ratio of l .0 or greater is considered to be typical of the response generated by a massive sulfide body.
The electromagnetic responses as plotted on the accompanying map at a scale of l :2500, are not corrected for topographic variations.
The survey was conducted at frequencies of 3555 Hz and 1777 Hz to maximize the response from weakly mineralized zones and to differentiate between those V.L.F. conductors which are caused by sulfides and those which are caused by conductive overburden or shear zones in bedrock.
Magnetometer Survey
The magnetometer survey employed the Geometrics Model G.816 portable magnetometer, measuring the total intensity of the earth's magnetic field within an accuracy of plus or minus one gamma. The magnetic responses as plotted on the accompanying maps, are corrected for diurnal variation and instrument drift, and are contoured at appropriate intervals.
Magnetic base stations were established at regular intervals so that base station readings were made approximately every 40 minutes. The base stations were located on the base line.
The magnetic survey is plotted on the accompanying map at a scale of l :2500.
GRID LINES
An attempt was made to establish the grid lines to conform with an old grid which was established on the property many years ago. However, many of the old winter cut grid lines were either not traceable or were determined to have deviated unacceptably from their intended direction and as a result some of the new grid lines do not coincide with the old grid lines.
INTERPRETATION OF RESULTS OF THE GEOPHYSICAL PROGRAM
The V.L.F. survey outlines conductors A, B, C, E, F, G, H, I, J, K, L, M, N, O, P, Q, R and S. Conductors N, O, P, R, and S are weak and appear to have a probable condutive overburden source. Conductors I and J are coincident with small clusters of dipole magnetic anomalies. They are weak and are not detected by the horizontal loop electromagnetic survey. The bedrock source of conductors I and J are probably weakly mineralized sulfide zones.
Conductors A, B, C, E, F, G, H and Q are strong V.L.F. conductors and are also strongly detected by the horizontal loop electromagnetic survey. They are coincident with strong magnetic anomalies. These geophysical responses are consistent with responses from sulphidized zones in oxide facies iron formation and constitute favourable loci for the deposition of gold mineralization.
A more detailed description of these anomalous zones is as follows:
Anomaly A
Anomaly A is a moderate to strong horizontal loop electromagnetic conductor, coincident with a strong magnetic anomaly (up to 8,000 gammas). It has a length of 1,000 metres and an apparent width of 22 metres. Based on core angle observations and surface geophysical observations, the dip is approximately 75 south.
Prospecting has revealed that the source of the anomaly is a sulphidized silicate-oxide facies iron formation with associated gold values..
Anomaly B
Anomaly B is a medium to strong horizontal loop electromagnetic anomaly, coincident with a strong magnetic anomaly. It has a strike length of 700 metres and an apparent width of up to 10 metres. It appears to be on the same trend as Anomaly A. The bedrock source is concealed by overburden, but the geophysical responses are consistent with a sulphidized oxide facies iron formation source.
Anomaly C
Anomaly C is a medium to strong horizontal loop electromagnetic conductor. It is coincident with a series of medium strength dipole magnetic anomalies. The conductor appears to slightly transect a major east - west magnetic anomaly, possibly reflecting sulphidization along preferred shear directions.
The major east - west magnetic anomaly may represent a folded limb of the same oxide facies iron formation horizon as Anomaly A or a separate parallel horizon.
Anomaly C has a length of 700 metres and attains a maximum apparent width of 20 metres.
The source of the anomaly is concealed by overburden.
Anomalies E, F, G, and H
These conductors are relatively short, but as is the case of Anomaly C, they appear to slightly transect the same major magnetic anomaly as Anomaly C, possibly reflecting sulphidization along preferred shear directions.
The bedrock source of these conductors is concealed by overburden.
Anomaly Q
This zone is represented by a weak to moderate horizontal loop electromagnetic conductor which is associated with and, in part, coincident with a magnetic anomaly. It could represent a sulphidized oxide facies iron formation bedrock source.
The conductor is 1,200 metres long and attains a maximum apparent width of 60 metres. Because of the large dimensions of this anomalous zone, it may require that more than one drill hole be completed along the zone in the preliminary program.
The zone has been prospected. The conductor source is in low ground and is concealed by overburden.
CONCLUSIONS AND RECOMMENDATIONS
The geophysical surveys outline anomalous zones with geophysical responses typical of sulphidized zones within oxide facies iron formation.
These zones are designated on the accompanying maps as conductors A, B, C, E, F, G, H and Q. Sulphidized zones in oxide facies iron formation are favourable settings for gold mineralization in the Pickle Lake Area. It is recommended that these zones be explored by diamond drilling.
Respectfully submitted,
E. W. Bazinet, P. Eng. Designated Consulting Engineer
Toronto, Ontario November l, 1995
S E. W. BAZINET R! a,
LIST OF ILLUSTRATIONS
Location Map
Map of V.L.F. - E.M. Survey
Map of Horizontal Loop Electromagnetic Survey @ 3555 Hz
Map of Horizontal Loop Electromagnetic Survey @ 1777 Hz
Map of Magnetometer Survey
NAME, ADDRESS AND QUALIFICATIONS OF PERSON WHO SUPERVISED SURVEYS
E. W. BazinetProfessional Engineer and Designated Consulting Engineer, Ontario22, Concession 16 East,RR3,Penetang, OntarioL9M 1R3
NAME AND ADDRESS OF THE HOLDERS OF THE MINING CLAIMS
The claims are held in trust by:
E. W. Bazinet, 22, Concession 16 East, RR 3, Penetang, Ontario L9M 1R3.
for the benefit of
Milner Consolidated Silver Mines Ltd., 7 Station Street, Toronto, Ontario M5J 1C3.
Wimstere duDeveloppement du Nord et des Mines
Rapport sur les travaux executes apres I'enregistrement d'un claim
M" de transaction
. cooOntario Loi sur les mines e? 4 2*w^r — OB ^^ w -*- r^Les renseignements personnels contenus dans la presents formule son! recueillis en vertu de la Loi sur les mines et serviront a la correspondence Adresser loute Question sur la collecle de ces renseignements au chef provincial des terrains miniers. mimstere du Developpement du Nord et des Mines, 159. rue Cedar 46 etage. Sudbury (Ontario) P3E 6A5: telepnone : (705) 670-7264.
Directives : - Dactylographier ou ecrire en lettr- Se reporter a la Loi sur les min
devaluation ou consulter le regi- Remplir une formule pour chaqu- Joindre a la presente formule de- Joindre a la presente formule un
s travaux
52002NW0024 2 16742 DUFFELL LAKE
900
Titulaire(s) enregistre(s)
Gulfstrearn Trading Limited
N 0 de client
[Adresse ~ IN 0 de telephone
P.M.B. 7, Hibiscus Square, Ftnd Street,, Grard TUrk, TUrks S, Caicos Islards, ; British Nest Indies
Division des mines
Sioux Lockout.Canton/secteur
Duffell LakeN 0 de plan M ou G
G2013
Datesd executiondes travaux
duMay 12, 1995 Novgitoer 2, 1995
Travaux executes ( cocher un seul groupe de travaux)Groupe de travaux Genre
1
Leve geotechnique
\ Travaux physiques, ! y compris forage
Rehabilitation
Autres travaux autonses
Essais
I^gnetoreter, VLF ElectroiBgnetic, ^fex Min Horizontal loop Electraragnetic 3555 Hz ! and 1777 Hz !
C \kY \ f**\ ""- \/ L t 1 &-J C\ "*J M l fei f Kjl C\^ 7 lA , ^p" C /-* r: 3 \/ F Hn b U b l v t: USEP 4 1996
MINING LANDS BRANCH
i
1
1
Valeur transferee de la reserve
Total des travaux devaluation reclame sur le releve des frais ci-annexe 13,578.06 Q 3S78)
Nota : Le ministre peut rejeter une partie ou la totalite des travaux devaluation presentes pour obtenir des credits devaluation si le titulaire enregistre ne peut verifier les depenses reclamees sur le releve des frais dans les trente jours suivant une demande de verification.
Les personnes et la compagnie d'arpentage qui ont execute les travaux (donner le nom et I'adresse de I'auteur du rapport)Nom Adresse
E. W. Bazinet, P. Erg.F.
R. W. Mi liar
22, OaToessian 16 East, RR3, Paretang, Ontario L9M 1R3 90 Fox Street, Ffcnetang, QTtarlo LSM 1C8————————59 Withall Grove, Wyevale, Ottario LQL 210
D. J. Bazinet 22, Concession 16 East, RR3, Paretang, Chtario L9M LR3
Lavid E. Etecoskie 1297 3rd Aw., Val D 1 Or, Quebec J3P 1V4(Joindre une annexe au besoin)
Certification d'interet beneficiaire * Voir la note n 0 1 au versoTDate
Je certitie qu au moment ou les travaux onl ete executes, les claims dont il estquestion dans le present rapport etaienl enregistres au nom de leur titulaire actuel iou detenus a litre benedciaire par I'actuel titulaire enregistre ffcJvHTber 2, 1995
Titulaire enregistre Ou representant (Signature)
Certification du rapport sur les travaux executes•r
Je certifie que j'ai une connaissance directe des 'aits exposes dans le present rapport, pour avoir execute les travaux ou en
avant ou apres leur achevement. Je certifie aussi que le rapport ci-annexe est exact.
Nom e! adresse du certificates
E. W. Bazinet, P. Erg., 22, Concession 16 East,N 0 ae telepnone 'Date
705-533-3430 Noverber 2, 1995
Reserve au ministereValeur totale des credits :Date d'enregistrement
enregistres
RR 3, Paretang, Ontario L9M 1R3 T. ;-' Certifie par (signatu/s) ̂ . '
S/ r^ ^-^
/yCT/A/^yy , ' ' ~-
\F(egis\ta\eur Jbjty&ims ' Cachet recu ~-Jf
C J en
jy5*f (
~
^r~^j
onstate I'execution
"~~ .^
Date de ('approbation prevue
Date d envoi de l avis de modilication
Date d'approbation
0241 105/91;
c
\
0.0IB 3 o o-01 IB
la
. /A~~r*
Valeur totale travaux exec
So.O- IkIft l*
<DI•o*
c 5* atf-aa Q.i?2O —
OBCx
^®f\so
1500
bC*
""j
In jCO0CC
^.-
C* rf (' 0j; -Cr 3 M c 1 -t
iT
1 J)3 0
0'"N
J3 0lA"^
li
. _ .
0 'l -Ut
i\H 10
•gtA
—
SI
t
1
r
,o c J) -H ^ o f
,T
sfN* '0^N
O
v _ ̂
A ;H '
.^ ,o : j L
~ f'i/1 ( -
-l
fi
"fCD
00s
0 -Q 1
li
5100
*
"i
}
1
h
1
f
sM
f
CO
-J
650^a^ —— — ——
c J)roD -J
f
.Jr .j
CO0s
^
G-PN" .D
O"
j
CD
*^
f^
Jl04:I0CP
f
COJ
DO^^00
O -D
,-
"
f
CO (T J
CO^^^8?
D-0r0
D J)
—
1—"r0
j
co
C ^^ —
oN1
0 CP
t
^^~N1
Hi
(pr—
u
0-Jr
M
f
x:le5"
00L-tJ ———
l/10-J
N1
CO
pt0
^̂^~^
00^
D̂
ODL-frf ———
-f-
J*
oO
I
CX)0
25 N"^-^
.t/3
jin -CJJL
Q
0
N
-
J) O
CDyx-v
o•i^
11
f
1,
.D M
5
1
r
WT.5 i
^ CD" c a 2 w 3CO S -g.S" ~5 o-^ ^; CU Q. ]
S " * -p a? CD GJ
5 o o
roU)
1
0.1flj fi).
3 o
ifCn CD
Valeur de
travaux d'eval
executes s ce claim
-aO
— <
ls|lCD ~"
le1 ik-
Reserve lota
it
W~J
CO'j)OD
Lr
If^^-0o
\. ^*' '
II
S jos~^J)o
^
H
f 1s~^
0^ ^ '
fi
fi
Hi
H
Mt4
}ft
Les credits que vous reclamez dans le presenreductions, veuillez mdiquer I'ordre dans lequttions suivantes :
: 1. Les credits doivent etre reduits en co
3
*QIU ODo-^i ?^
1
fn —— 7Z4!a:ai
uJ "" 1/S D- —ns^ort pauvenCM3ijs defeftez auiU-" 2
ifirBni'JP^r le ̂
i
f
-
1
t
1
1
1 l
[
t t
-D Jr N9 o-•V— f—/""^^ft-4 ——C*--'
li
0/~ ̂•t^ ,-ORJ
1
-0ol/1
CO,^—^.0o3\.
f
f
i
CD- ^CD
^.
c -la,^ C X CO- O- D . W ^ CD W' CD
11 CD oT "3CD
re reduits. Afin de diminuer les consequences defavorables de telleses soient appliquees a vos claims Veuillez cocher ( s) I 'une des op-
rnier claim sur la liste.
; 2 . 3] Les credits doivent etre reduits egalement entre tous les claims figurant dans le present rapport. ^^
3. _ Les credits doivent etre reduits selon I'ordre donne en annexe. Si vous n'avez pas choisi d'option, la premiere sera appliquee.
t rapport.
. l 67 4Note 1 : Examples d'interets beneficiaires : cessions non enregistrees, ententes sur des options, protocoles d'entente, etc. relatifs
au x claims.
Note 2: Si des travaux ont ete executes sur un terrain faisant I'objet de lettres patentes ou d'un bail, veuillez remplir ce qui suit:
Je certifie que le titulaire enregistre possedait un interet beneficiaire sur le terrain faisant I'objet de lettres patentes ou d'un bail, au moment ou les travaux ont ete executes.
Signature Date
Ontario
Ministry ofNorthern Developmentand Mines
Mimsiere duDeveloppernent du Word et des mines
Statement of Costs for Assessment Credit
Etat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No /N 0 de transaction
E t p '*?'A O l D t 'at ^Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing stalus of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands. Ministry of Northern Development and Mines, 4lh Floor, 159 Cedar Street, Sudbury. Ontario P3E 6A5. telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur les mines et serviront A tenir a jour un regislre des concessions mimeres. Adresser (oule quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord et des Mines. 159, rue Cedar. 4 e elage, Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/Gouts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Orolts de ('entrepreneur et de I'expert- consell
Supplies Used Fournltures utillsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
TvPe l^&gnetatEter survey 26.635 kmsVLF survey 26.635 kmsNtomin survey i3555 Hz, 13.985 kmsTypfl I^Hxmin survey 11777 Hz, 13.985 kms
Batteries, Gas,Propane, Flagging Tape, Motebocks,Wire, Nails
TypeSkidoo, canoe and
Amount Montan!
2,530.32
2,929.85
2,377.45
2,377.45
500.00
—— 000.00
Total Direct Costs Total des couts directs
Totals Total global
lent*
asif At
too . o o
11,315.0:
2. Indirect Costs/Couts indirectsNote: When claiming Rehabilitation work Indirect costs are not
allowable as assessment workPour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tanl que travaux devaluation
Type
Transportation Transport
Food and Lodging Nourrlture et hebergement
Mobilization and Demobilization Mobilisation et demobilisation
Description
Type 4 Wreel Dri\e Truck 3,600 kms @3KT
Qiarter aircraf t
jxbtel 8. I^feals in transit
Wages k fees while travelling
Amount Montan!
1,116.00
784.00
1,200.00
1,600.00
Sub Total of Indirect Cpsts Total partlel des couts Indirects
Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 H des couts directs)
Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable devaluation Indirect costs) iTotol des couts directs
Totals Total global
(Hoo)
J. -? t vXAJ,* UJ
1,200
1,600.00
4,700.00
2,263.01
13,578.08et Indirect! admissible*
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is nol made, the Minister may re|ect for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demande a cet edet. Si la verification n'est pas effectuee, le ministre peul rejeter tout ou une partie des travaux devaluation presentes
Filing Discounts
OD Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.2 Work filed three, four or five years after completion is claimed at
50 0Xo of the above Total Value of Assessment Credit. See calculations below
Total Value of Assessment Credit Total Assessment Claimed
x 0.50 =
Remises pour depd
1 Les travaux depose; rembourses A 100 "/o
2 Les travaux depos^ i trnir'nii
RECEDEDdans le^g^3x ansLsuA-a^fjleur ac e la valeur totale susmentionrj^du c
evemeni sont edit devaluation
Is ir achievementsont rembourses a. 50 07o de la valeur totale discredit devaluation susmentionne. Voir les calculs ci-dessous O j
Valeur totale du credit devaluation --
x ,: fj,
EvaluSflon totale demandee
Certification Verifying Statement of Costs
l hereby certify:
Attestation de I'etat des couts
J'atteste par la presente :that the amounts shown are as accurate as possible and these costs que les montants indiques sont le plus exact possible et que ces were incurred while conducting assessment work on the lands shown depenses ont ete engagees pour effectuer les travaux devaluation on the accompanying Report of Work form. sur les terrains indiques dans la formule de rapport de travail ci-joint.
that as Agent(Recorded Holder, Agent. Position in Company)
to make this certification
am authorized Et qu'a litre de je suis autorise(titulaire enregislre, representant. poste occupe dans la compagnie)
a faire cette attestation. •j J j
Signature Date
Noverber 2, 1995
0212 (04/91) Nota : Dans cette formule. lorsqu'il designe des personnes, le masculin est utilise au sens neutre
9 (J 1
,\c; y
Ox
C My^^
Mimstere du Developpement du Nord et des Mines
Ontano
Rapport sur les travaux executes apres I'enregistrement d'un claim
Loi sur les mines
N" de transaction
- O OQ
2.1674 2iinW?t serviront a la correspondence. AdreLes renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Loi sur les miHWft serviront a la correspondence. Adresser
toute question sur la collecte de ces renseignements au chef provincial des terrains miniers, mimstere du Developpement du Nord et des M,"es 159. rue Cedar 46 stage. Sudbury (Ontario) P3E 6A5; telephone : (705) 670-7264
Directives : - Dactylographier ou ecrire en lettres moulees.- Se reporter a la Loi sur les mines e t aux reglements pour connaitre les directives de depot des travaux
d'evaluation ou consulter le registrateur de claims.- Remplir une formule pour chaque groupe de travaux.- Joindre a la presente formule deux exemplaires des rapports techniques et des caries.- Jomdre a la presente formule une esquisse indiquant les claims ayant fait I'objet des travaux.
Tiiulaire(s) enregistre(s)
Gulf strean Trading Limited
:N" de client
300105Adresse N 0 de telephoneP.M.B. 7, Hibiscus Square, Pond Street, Grand TUrk, TUrks S, Cairns Islands, British West Indies
'Division des mines
Sioux Lookout
Dates dexecution du : 0333^33: 2, 1994 des travaux
Canton/secteur N 0 de plan W ou G
Cuffell Lake G2013
au : I^vaiter 2, 1995
Travaux executes (cocher un seul groupe de travaux)Groupe de travaux 1 Genre
Leve geotechnique
Travaux physiques, y compris forage i line Cutting (.Rehabilitation
Autres travaux autorises
Essais
Valeur transferee de la reserve
Total des travaux d'evaluation reclame sur le releve des frais ci-annexe 14.184.28 (HM38)Nota : Le ministre peut rejeter une parlie ou la totalite des travaux d'evaluation presentes pour obtenir des credits
d'evaluation si le titulaire enregistre ne peut verifier les depenses reclamees sur le releve des frais dans les trente jours suivant une demande de verification.
Les personnes et la compagnie d'arpentage qui ont execute les travaux (donner le nom et I'adresse de I'auteur du rapport)Nom
E. W . Eazinet, P. Eng.
F. Larroureux
R. W. MillarFrank Ftecoskie David Iteccskie
Adresse
22, CaxEssion 16 E, RR3, Penetang, Ontario I9tt 1KB
90 Fox Street, Penetang, Ontario L9M 1KB
59 Withall Grove, Wyevale, Ontario LOK 2TO130nhird Ave., Apt. 7, Val D'Or, Quebec J9P 1V4 1297 3rd Ave., Val D 'Or, Quebec J9P 1V4 j
(Joindre une annexe au besoin)
Certification d'interet beneficiaire * Voir la note n 0 1 au verso
Je certifie qu'au moment ou les travaux ont ete executes, les claims dont il est question dans le present rappon etaient enregistres au nom de leur titulaire actuel ou detenus a litre beneficiaire par I'actuel titulaire enregistre
Date
tvfoverrber 2, 1995
Titulaire enregistre ou representani (Signature)/9 , t fff^r~ — .
W/^,^^:-^
Je certide que j'ai une connaissance directe des fails exposes dans le present rapport, pour avoir execute les iravaux ou en avant ou apres leur achievement Je certifie aussi que le rappon ci-annexe est exact.
Noiu et adresse du certificateur E. W. Eazinet, P. Eng., 22, Concession 16 E, RR3, Penetang, Ontario L9M 1R3
N 0 de telephone
705-533-3430
Date
Itoveirfcer 2, 1995
Reserve au ministere frValeur lotale des credits
enregistres
: * Kies
Dale d'enregistrement Reg
^(p Jut- /kDate de 1 approbation prevue Date
Certifie par (signature) ^ ^
^^-^^-^
)J- ^ ~,^ .strateur m gfajms
d'approbation^
Date d'envoi de 1 avis de modification
CacneT^egu v.
VCHf'-C
--
— — — ̂
. .
i —— — -*
nsiate 1 execution
-^ i
ao B. 3 o o- n i!
15
i
fr
dNMl/vj
ip ^
p ^
f-
L*1 ' C7 C 41 -J po rt/0 1
-•1
ii
)j
o l
0
-
P J
2
f
H (— rl/1 6
^^ i
i
j
r——
J tnH 0 ~ Lf fO-j
^-. ^™.
s
—
D
0J
—
LO 0 L
^
Lfl DC-
CP
. —
i
^ Qn !C 'J) J ^o L M H iro C^ 3 o f
i! j
1 : ;
J
J
0
inQ J
J1
N
C? O-Jn
-P
o j)
—
c hq
]l
en *c2. z
0.0 S |
-i 2. M a :||x-
300ow
UJiep ap ojeoin^
o. z
W CD
~ <~^ a B5- i!— a oJ ||
x^x w- A w w
S.
~^ "S
ju 5*— DI Q.
X) y!S*^3 ^ ** ^ ^ u
u cx
? fs1 ?- -J S-
^
3)re-
I
OsQ
j:
00
00
CO Ofl000
i \i i/' 00
00
^f-
} g •^1 Ql0
^-* r^
————— 1 —————
If00 fCOJ?*f-
HSr*dx
21CO
^N
t
H
II
M00 00'c*
cix v
II
r 6~6 p^
S 8?? fi.\r~.
1 1i
(T1
1
r f?CDoo
f
t
r CD
1
(T
rCP CO/—xr
'- : i
j ; . __
i i ! -J
i 6"
; ; -D
; |
r r ;er f "Jor if c~ i ^ce co oo t uJ CP leo CP i j
r^ C fc* 5^
CO
V1^
^ _ ̂00
S, ^
J) N*
tAIA
J
CO00^*4-
1
1O)
CD Ux c <
O (D- X 0)
r- C (/) ^ 0)
g
i 03ST*!?*- 0 0 CD3 ^ co. c
CD ~"
z, ^
rrcc'co
0
( ^0
8
o o
r0 Pp0
o a
C"
•^
r••^^ Bl*
(? 0
Jl
0 0
it0 0
J
0
.o i ^7 4 i
1
0
I
0
i
l0
l '.
i i
M i o ?i i ii i**.00i : ^^^^^o o o o ;Q
i i
! ;
N)
J) f
bCP
-0
PJ
j) 4:
COCP
x.•v^
^ ,-^
0 D
i ' j
f
0
_____________ _ . _ — _
Les credits que vous reclamez dans le present rapport peuvent etre reduits. Afin de diminuer les conseque 1JSp fl^avar reductions, veuillez mdiquer I'ordre dans lequel vous desirez au'elles soient appliquees a vos claims Veuill ladDdEcrv*- tions suivantes :
1. i _ Les credits doivent etre reduits en commencant par le dernier claim sur la liste. SEP
2. Hj Les credits doivent etre reduits egalement entre tous les claims figurant dans le present rapport
oQ.5^ of ® w 9L3S?2
CD- ~* CD
^.
OJ
^ C X CD- CD- ^ C/3 ^ CD W- CD
^ w o"^^ CD ST
3CD
i
lii*es de J ellis1 .-LferVlSsB-D
41996 î^H
3. ~J Les credits doivent etre reduits selon I'ordre donne en annexe. MINING LANDS BRANCHSi vous n avez pas choisi d'option, la premiere sera appliquee.
Note 1 : Examples d'interets beneficiaires : cessions non enregistrees, ententes sur des options, protocoles d'entente, etc. relatifs aux claims.
Note 2: Si des travaux ont ete executes sur un terrain faisant I'objet de lettres patentes ou d'un bail, veuillez remplir ce qui suit:
j Je certifie que le titulaire enregistre poesedait un interet beneficiaire sur lel terrain faisant I'objet de letlres patentes ou d'un bail, au moment ou lesl travaux ont ete executes
Signature Date
Onterrio
Ministry ofNorthern Developmentand Mines
Mimstere du Developpement du Nord el des mines
Statement of Costs for Assessment Credit
Etat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No /N 0 de transaction
. ooo (o 2,
,j 674 2Personal information collected on this form is obtained under the authority of the Mining Act This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines, 4th Floor. 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignements personnels contenus dans la presents formule sont recueillis en vertu de la L oi sur les mines e t serviront A ( emr a jour un registre des concessions minieres. Adresser (oule quesilon sur la collece de ces renseignements au chef provincial des terrains mimers, mmistere du Developpement du Nord et des Mines, 159, rue Cedar. 4 e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264
1. Direct Costs/Couts directs 2. Indirect Costs/Couts indirects
Type
Wages Salaires
Contractor's and Consultant's Fees Drolts de {'entrepreneur et de I'expert- consell
Supplies Used Fournltures utlllsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvre
Field Supervision Supervision sur le terrain
Type Lire Cutting 31.735 kms
Type Prepare, Gas Flapping Tape, rfeilsWire
Type 3cicbo, chain saw, carrp gear
Amount Montant
10,948.5-
75. Q
soo.a
Total Direct Costs Total des couts directs
Note: The recorded holder will be required to verify expenditu
Totals Total global
^ ,
10,948.5:
75. Of
800.00
11,823.5:
es claimed in
Note: When claiming Rehabilitation work Indirect costs are not allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation
IF
w
Type
Transportation Transport
Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation
Description
Type 4 hteel Drive 3600 krrs
Charter airrtaft"
MDtel, Nfeals while travelling
m-nrpripfi fnr R^h
Vfeges or while
Sub Total pan
Amount AUnu^ii (mil annli r
foTST Value of Assessment Cre Total of Direct and Allowable ndlrect costs) . ^996
Str *
Salary travelling
Amount Montan!
1,116. Q!
562.8
1,200. C 4m. r
1,600.C
Total of Indirect Costs Ile! des couts Indirectshan 20Mi of Direct Costs) )as 20 H des couts directs)t Valeur totale du credit
d'evaluation (Told des coGts directs et Indirects sdmlsjlbln
;nu de verifier les depenses dt
Totals Total global
)
7
(ife,-!^)
1,678.82
D i i.mn.nn
D 1,600.00
4,878.82
2,364.7]
14,188.28
;mandees dansthis statement of costs within 30 days of a request for verification. H verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
5senl etat des couts dans les 30 jours suivant une demande b c et effet. Si la verification n'est pas effectuee. le mmistre peut rejeter tout ou une partie des travaux d'evaluation presentes.
Filing Discounts
Work filed within two years of completion is claimed at 100 07o of the above Total Value of Assessment Credit.
2 Work filed three, four or five years after completion is claimed at SOo/o of the above Total Value of Assessment Credit. See calculations below:
l Total Value of Assessment Credit Total Assessment Claimed
x 0.50 =
Remises pour depdt
1. Les travaux deposes dans les deux ans suivanl leuf achevement sont rembourses a 100 Vo de la valeur lotale susmentionrfee du credit d'evaluation.
e i2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement
sont rembours6s a 50 "/o de Ijr^aleujt'totale djb credit d'evaluation susmentionne. Voir les calcuis-c'i-dessous. —
Valeur totale du credit d'evaluation ~O
x Q.50~~ E valuation totale demandee
Attestation de I'etat des coGtsCertification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs que les montants indiques sont le plus exact possible et que ces were incurred while conducting assessment work on the lands shown depenses ont et6 engagees pour effectuer les travaux d'evaluation on the accompanying Report of Work form.
that as
J'atteste par la presents :que les montants indiquesdepenses ont et6 engageesur les terrains indiques dans la formule de rapport de travail ci-joint.
(Recorded Holder, Agent. Position in Company)
to make this certification
l am authorized Et qu'a litre de. je suis autoris6(tilulaire enregistrA, reprfesentant. poste occup* dans la compagnie)
a faire cette attestation. ~~f
0?l? (04/91) Nota : Dans cette formule, lorsqu'il desigrre des personnes, le masculin est utilise au sens neutre
Ministere duDeveloppement du Nord et des Mines
Rapport sur les travaux executes apres I'enregistrement d'un claim
N 0 de transaction
. oooOntario Loi sur les mines
rvirontl la's, 1:
Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Loi sur les mines toute question sur la collecte de ces renseignements au chef provincial des terrains miniers, ministere du Develo~ - " 46 etage. Sudbury (Ontario) P3E 6A5; telephone : (705) 670-7264.
Directives : - Dactylographier ou ecrire en lettres moulees.- Se reporter a la Loi sur les mines e t aux reglements pour connaTtre les directives de depot des travaux
d'evaluation ou consulter le registrateur de claims.- Remplir une formule pour chaque groupe de travaux.- Joindre a la presente formule deux exemplaires des rapports techniques et des cartes.- Joindre a la presente formule une esquisse indiquant les claims ayant fait I'objet des travaux.
SserGar
Titulaire(s) enregistre(s)
Gulf stream Trading LimitedAdresseP.M.B. 7, Hibiscus Square, Pond Street, Grand Turk, Turks 8* CaicES Islands, British West Indies
Division des mines Sioux Lookout
Canton/secleur
Duffell Lake
N 0 de client
300106N 0 de telephone
N 0 de plan M ou G
G2013
Dates
deTfrav'aux d U ' D303*^ 2, 1994 a u : Noverfcer 2, 19951
Travaux executes (cocher un seul groupe de travaux)Groupe de travaux
Leve geotechnique
Travaux physiques, y compris forage
Rehabilitation
Autres travaux autorises
Essais
Valeur transferee de la reserve
Genre
Line Cutting (^ W 'O ~ OTKE^/ —— —--^~^~^^~^
R b c* t-" S V' F nL. O u. i v s- s— - j 1
* SFP 4 '—b : f " jMINING LANDS BRANCH
Total riss travaux d'evaluation reclame sur le releve des frais ci-annexe 14,184.28 V I^J lo"/ S
Nota : Le ministre peut rejeter une partie ou la totalite des travaux d'evaluation presentes pour obtenir des credits d'evaluation si le titulaire enregistre ne peut verifier les depenses reclamees sur le releve des frais dans les trente jours suivant une demande de verification.
Les personnes et la compagnie d'arpentage qui ont execute les travaux (donner le nom et I'adresse de I'auteur du rapport)Nom
E. W. Bazinet, P. Eng.
F. Larrcureux
R. W. Millar Frank Recoskie Eavid Keooskie
Adresse
22, Gbnoessicn 16 E, RR3, Penetang, Ontario L9M LR3
90 Fox Street, Penetang, Ontario L9M 1R3
59 Withall Grove, Wyevale, Ontario LOK 2TO1301 Third Ave., Apt. 7, Val D'Qr, Quebec J9P 1V4 1297 3rd Ave., Val D'Or, Quebac J9P 1V4^—^—
(Joindre une annexe au besoin)
Certification d'interet beneficiaire * Voir la note n 0 1 au verso
Je certifie qu'au moment ou les travaux ont ete executes, les claims dont il est question dans le present rapport etaient enregistres au nom de leur titulaire actuel ou detenus a litre beneficiaire par I'actuel titulaire enregistre.
Date
Njvarfcer 2, 1995
Titulaire enregistre ou representant (Signature)
Certification du rapport sur les travaux executesJe certifie que j'ai une connaissance directe des fails exposes dans le present rapport, pour avoir execute les travaux ou en avant ou apres leur achievement. Je certifie aussi que le rapport ci-annexe est exact.
ivoir't;"3
fNorr et adresse du certilicateur
i E. W. Egzinet, P. Eng., 22, Concession 16 E, RR3, Penetang, Ontario L9M 1R3
nstate I'execution
N 0 de lelephone
705-533-3430
Date
Noventer 2, 1995
Certifie par (signature)
Reserve au ministereCacheT^fecu v..Valeur totale des credits
enregistres
4188
Date d'enregistrement
JouDate de ['approbation prevue
Registrateur
Date d'approbation
Date d : envoi de I'avis de modification
z 0.0 it 30 O"
Di CD
latu
*8
: (S)•V- ^-^ n
i p ^
J1
f-
t/1 c(7 C f. 4r~* ^ i/3 l
i;
) J
-\
0 (J) -
0
P 0
l
-f
— — ^-
H c
l/1 6
1
J
-4
5 5H 0
^. . —
2N
—
S0-J
—
0 L
J)
,-
0 JI
OD
—
0J)
—
Q J)H
3
—
0 JD
D 00
—
L C
e t
1
J J
*)
QJ
J1
N
C/1 OJ(fin
J
6 j)
—
"c
hc
)1
1
-1
t/5
S-^c Q
i I'll3 c ^
CD-03
Q- -7CD ^
a30) (D-3'o
t" f
W CD
c l^\l (/\.lL. v^t"
5-
\^
^ <(U 0)
i!x m os.-O CDSo.ro~ (DCft W
<O)
J3 2
1~
GO 00^^
5^0
c ^"a(D- O)
CD- 2O) <
QJCX
i Hm-
JDm-atQ
(B
o.utt
r - "t — j- - 4 ^. . — — — -- — — — - — JJ ^ -y ' — *" 1W CD
J-
oo
00
ooOD
00
1*1 OP
OD
-O
^
i r 1 r
i0rj
MCO *CO
Ĵ*
F 1DO 00
r-4
* 1c* *00
JJx.r̂ -s
H\
II
nCOoo^-x
C3* -
li
r fr f
E ?-i ^
j
5
'r*n
1
r rCP 00
-̂j*- -*
t(T
CD CD
Ij
f
(T
CPco
x̂^-J ^
f
(TrccCPc^,^J
i
r rCO 00
J
\
00 CO
V̂ _ rf'
t 00J)-Jfj-?̂
f
i
f—
J^x
Mf L.
CO
ŜTiO
•*1 — *"
JIin
J)r-)
JDX
COCO'jTz.^"*
iCv*usL/S.
l
1
QJ
en cu x c "CO Ct). x fi)
ST CO- CO- -i5' w SCL3 m 5i CD
c ^ c/i ^ 55.o'
D
3 (B CD- cCD ~"
^ Xc-
r rCP'OD
0
Hg
P 0
NP 0
0 0
L Zl'(P
co
^.
^:-0 0
ii0 o
If
0 D
s0
\
0
I
0
t
0
t0
10
1
0
D
0
d1 oo
8^Svv^x
Q
NJ)r0(P
^^
Q
j .PCOCP
—s~~'
0
i
0
IS ®" c
Sc ^ 1^^ c xI!. CD w'
5 S" o"10 CD B
3CD
CD- W CD
CD
Les credits que vous reclamez dans le present rapport peuvent etre reduits. Afin de diminuer les consequences defavorables de tellesreductions, veuillez indiquer I'ordre dans lequel vous desirez au'elles soient appliquees a vos claims. Veuillez cocher ^) I'une des op-.ons^uivantes : RECEIVED1. -J Les credits doivent etre reduits en commengant par le dernier claim sur la liste. , .
2. d Les credits doivent etre reduits eqalement entre tous les claims figurant dans le present rap sort. ,--~r\ A moC ' ~il —i - StP 4 i^yo 'm
3. _ l Les credits doivent etre reduits selon I'ordre donne en annexe. -;. ^fi|Si vous n'avez pas choisi d'option, la premiere sera appliquee. m^ ̂ ^ RRAMnH
Note 1 : Examples d'interets beneficiairgjy: cessions npp ê eqisjreegr^ntentes sur des options, protocoles d'entente, etc. relatifs aux claims.
cessions nan agreqislr
* l ut 4Note 2: Si des travaux ont ete executes sur un terrain faisant I'objet de lettres patentes ou d'un bail, veuillez remplir ce qui suit:
Je certifie que le titulaire enregistr6 possedait un interet beneficiaire sur le terrain faisant I'objet de lettres patentes ou d'un bail, au moment ou les travaux ont ete executes.
Signature Date
Ontario
Ministry ofNorthern Developmentand Mines
Ministere du Developpement du Nord et des mines
Statement of Costs for Assessment Credit
Etat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No./N 0 de transaction
. ooo (b2,
Personal information collected on this form is obtained under the authority of the Mining Act This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
J.I 6742Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la L oi sur les-mines e t serviront a tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord el des Mines, 159, rue Cedar, 4 e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/Couts directs
Type
Wages Salaires
Contractor's and Consultant's Fees Drolts de {'entrepreneur et de I'expert- consell
Supplies Used Fournlturesutlllsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvre
Field Supervision Supervision sur le terrain
Type Lire Cutting 31.735 kms
Type Propane, Gas Flacmrn Tape, toilsWire
Type Skicbo, chain saw, carp gear
Amount Montan!
10,948.5'
t
75. a
800.0
Total Direct Costs Total des couts directs
Totals Total global
')o*H^)
10,948.5"
i
75.0T
i
800.00
11,823.5";
(11824)Note: The recorded holder will be required to verify expenditures claimed in
this statement of costs within 30 days ol request for verification, verification is not made, the Minister may all or part of the assessment work subm
2. Indirect Costs/Couts indirects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportation Transport
Food and Lodging Nourriture et hebergementMobilization and Demobilization Mobilisation et demobilisation
Description
Type 4 W-eel Drive 3600 kms
Charter aircraft'
MDtel, Maals while travelling
nmr-pripR fnr Rnsh
Wages or Salary while travelling
Amount Montan!
1,116.0
562.8
1,200. C 4nn.r
1,600. C
Sub Total of Indirect Costs Total partiel des couts Indlrects
Amount Allowable (not greater than 20Vo of Direct Costs) Montan! admissible (n'excedant pas 2 0 Vt d es couts directs)
Total Value of Assessment Credit Valeur totale du credit [Total of Direct and Allowable d'evaluation Indirect costs) (Total des couts directs
Totals Total global
3
l
Ot-n)l-,678.82
D T i. mn.no
3 1,600.00
4,878.82
2,364.7:
14,188.28
D
et Indirect! admlsslbles
Note : Le titulaire enregistr^ sera tenu de verifier les depenses demandees dans _ le present etat des couts dans les 30 jours suivant une demande ci cet
effet. Si la verification n'est pas effectuee, le mmistre peut rejeler tout ou une partie des travaux devaluation presentes.
Filing Discounts SEP 4 1996
OWork filed within two years of complet,the above Total Value of Assessment Credit:Remises pour depdt
cr;Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 07o de la valeur totale susmentionriee du credit d'evaluation.
2. Work filed three, four or five years after completion is claimed at 50 07o of the above Total Value of Assessment Credit. Seecalculations below:
(Total Value of Assessment Credit Total Assessment Claimed
x 0.50 =
2 . Les travaux deposes trois, quatre ou.cinq ans apres leur achievement sont rembourses a 50 "Vb de Ig^aletii/totale djt credit devaluation susmentionne. Voir les calculs--ci-des3ous. —
Valeur totale du credit d'evaluation r-
x 0,50
r; Evaluation totals demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded Holder. Agent, Position in Company)
to make this certification
Attestation de I'etat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a titre de je suis autorise(titulaire enregistre. reprSsentant, poste occupd dans la compagnie)
a faire cette attestation.
021? (04/91) Nota : Dans cette formule, lorsqu'il desigrre des personnes, le masculm esf utilise au sens neutre.
^
Ministers duDeveloppement du Nord et des Mines
Rapport sur les travaux executes apres I'enregistrement d'un claim
Ontario Loi sur les mines
Les renseignements personnels contenus dans la presente formule sont recueillis en verlu de la Loi sur les mines e t serviront a la correspondance. Adresser toute question sur la collecte de ces renseignements au chef provincial des terrains miniers, mmistere du Developpement du Nord et des Mines. 159, rue Cedar, 4 e etage, Sudbury (Ontario) P3E 6A5; telephone : (705) 670-7264.
Directives : - Dactylographier ou ecrire en lettres moulees.- Se reporter a la Loi sur les mines e t aux reglements pour connaitre les directives de depot des travaux
d'evaluation ou consulter le registrateur de claims.- Remplir une formule pour chaque groupe de travaux.- Jomdre a la presente formule deux exemplaires des rapports techniques et des cartes.- Joindre a la presente formule une esquisse indiquant les claims ayant fait I'objet des travaux.
Titulaire(s) enregistre(s)
Gulfstream Trading limitedAdresse
P.M.B. 7, Hibiscus Square, Ftnd Street,, Grard Turk, TUrte S, Calces Islards, British West Irdies
Division des mines Canton/secteur
Sioux Lockout Euffell Lake
N 0 de client
YYTinfiN c de telephone
N" de plan M ou G
G2013Dates d'execution du : au : d es travaux Jvfey 12, 1995 NOVattfiT 2, 1995
Travaux executes ( cocher un seul groupe de travaux)Groupe de travaux Genre
Leve geotechnique Nkgnetoreter, VLF Electromagnetic, ^fex Min Horiacntal Lccp Electroragnetic 3555 Hz and 1777 HzTravaux physiques, y compris forage - VLF 7 M ft* Kl.4/M AS,/H L )
Rehabilitation
Autres travaux autonses
Essais
Valeur transferee de la reserve
l SEP 4 1996MINING LANDS BRANCH
Total des travaux d'evaluation reclame sur le releve des frais ci-annexe 13,578.06 0 3578^
Nota : Le ministre peut rejeter une partie ou la totalite des travaux d'evaluation presentes pour obtenir des credits d'evaluation si le titulaire enregistre ne peut verifier les depenses reclamees sur le releve des frais dans les trente jours suivant une demande de verification.
Les personnes et la compagnie d'arpentage qui ont execute les travaux (donner le nom et I'adresse de I'auteur du rapport) H_ ^ _ Nom
E. W. Bazinet, P. Eng.l F.
Adresse
R. W. Millar
D. J. Bazinet
! David E. Reooskie
22, CcncEssicn 16 East, RR3, F&ietang, Cntario L9M 1R3 90 FCK Street, Raretang, QTtario L9M 1C8 - —————— -59 Withall Grove, Wyevale, Cntario LOL 2TO ______ ^
22, CcncEssicn 16 East, RR3, Ftoetang, Crttario
1297 3rd Ave., Val D'Qr, Quebec J9P 1V4
1R3
(joindre une annexe au besoin)
Certification d'interet beneficiaire * Voir la note n 0 1 au verso
Je certitie qu au moment ou les travaux ont ete executes, les claims donl il est question dans le present rapport etaient enregistres au nom de leur titulaire actuel ou detenus a litre beneficiaire par I'actuel titulaire enregistre.
Date
Moverrter 2, 1995
Titulaire enregistre ou representant (Signature)
Certification du rapport sur les travaux executesC . i
CD
Je certifie que j'ai une connaissance directe des fails exposes dans le present rapport, pour avoir execute les travaux ou avant ou apres leur achevement. Je certifie aussi que le rapport ci-annexe est exact. .
onstate ('execution
Nom et adresse du certificateur
E. W. Bazinet, P. Eng., 22, OcncEssicn 16 East, RR 3, F^etarg, Cntario L9M 1R3 N 0 de telephone 705-533-3430
Date
IsbvoTfcer 2, 1995
Reserve au ministere
Date de I'approbation prevue
Valeur totale des credits [Date d'enregistrement enregistres
Num
ero de rapport sur les travaux executes
; pour I'affectation
de la reserve
Num
ero de claim
i (\C
i ~)
i i r^
\ v— *
i î- l '
'~
\C,c\
Z. l L
1
l iSolS
M-
l |SO
~I^
^
l 1
^0
1^3
.
l Cs"! 2. loa
ID0! "LlcCi0!
lo0! Z
lVb
l \S0
42
.a
(1^0
42
^
10=1 2 lO
l
1 O0! 2
1 1 2.l t S
OM
'7.~I —
loi 2 i i 4
1 U
TS
P M
ILdi
l O^l
Z l 1
"3s—
.
l LJ^
-2- tCJTp*
10
^ 1,1
0^
( 1 1 C
i M i
J2;—
H ^
OM
2 3,
l \ "S ci M 2
,4
— no O
H ZO
-^r QS)
Nom
bre d'unites
r^1^ZZll1l111-uI.i.\ii
— f
(^fo)
Valeur des
travaux devaluationexecutes sur
ce claim
Valeur
affecteea ceclaim
. M- o
" T"J 1 L-
f 0 1 ( _
h \ i,r ^* * i.^
K \
, . ,
l V
J 1 IT
s
K \ . . ^
1 vj i i—-
35.518.oa
.15
4- 1
M
Uss)
d'O
St 1. 18
en. is(en
sn.
8 ii- is (en
Valeur
transfereede ceclaim
Reserve :
travaux a reclamer
a une dateulterieure
'Hj ^c^"
Z 8
•rO
i^ji d
—ft—
i 1
l f
\ "si * l^
tot c
"T^J 1 1-^
-wnr
KM ir
lO li _ '
TilL
.
^^W^T
^
^Qt t—"
("vjl ^ —
—
Nom
bre total de claim
s0241 (05/91)
d2O no"S
Valeu
r totale des travaux execu
tesV
aleur totale des travaux
qui a ete affecteeTotal
transfere
Reserve totale
en'5u-oo"̂o.ES!N0
1'raJDCJ33O**raQ.enO)50)•oO)5"-n|rac'rak-̂(U*"*c3k-3enen•*^0•COx0)•(U•CDCox3ra>i.tS(/j
Q)
Q ̂-
0)^fflcO)C/)CD^
*
2 oCO
^|o ^^5 Ec o
•CD g
~
D'CD
CO-cB —
-E ™c c13
13s"^"O
D
(P O
CO tn
O
CD
•CD CD
W
g.
2* CD
c .b0
0)CD
eoS
"D —
" 5" x
CD O
CD
O" CO ^-
i r
* ^^ x
CN 0-- 3
10
^5
0 1 "2
5z
[ ___
( 1 3 <
t Q
Ontario
Ministry olNorthern Developmentand Mines
Mmistere du Developpement du Nord ei des mines
Statement of Costs for Assessment Credit
Etat des couts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction N o.IN 0 d e transaction
. ooofei
.16742Personal information collected on this form is obtained under the authority of the Mining Act This information will be used to maintain a record and ongoing status ol the mining claim(s). Questions about this collection should be directed lo the Provincial Manager, Minings Lands. Ministry of Northern Development and Mines, 4lh Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Loi sur les mines e l serviront a tenir a jour un regislre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministers du Developpement du Nord et des Mines, 159, rue Cedar, 4 e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/Gouts directs
Type
Wages Salalres
i
Contractor's and Consultant's Fees Droits de I'entrepreneur et de I'expert- consell
Supplies Used Fournltures utllisees
r—— -- - - ' Equipment Rental Location de materiel
Description
Labour Main-d'oeuvre
Field Supervision Supervision sur le terrain
T yPe NfegnetOTEter survey 26.635 kmsVLF survey 26.635 kmsr^faxmin survey ®3555 Hz, 13.985 tonsTvP e Ntamin survey @1777 Hz, 13.985 kms
Batteries, Gas,Propane, Flagging Tape, Notebocks,Wire, Nails
Type
Skidoo, canoe andrrptor, canp gear — —
Amount Montan!
2,530.32
2,929.85
2,377.45
2,377.45
500.00
—— 600.00
Total Direct Costs Total des couts directs
Totals Total global
•rent*
aSTf.4^
too.oo
11, 315-Ov
2. Indirect Costs/Gouts indirectsNote: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportation Transport
Food and Lodging Nourrlture et hebergement
Mobilization and Demobilization Mobilisation et demobilisation
Description
Type 4 t^ee! Qrive
Truck 3,600 kms @31t '
Charter aircraft
Ntotel k Nfeals in transit
Wages Se fees while travelling
Amount Montant
1,116.00
784.00
1,200.00
1,600.00
Sub Total of Indirect Cpsts Total partiel des coOts Indirects
Amount Allowable (not greater than 20 (Mj of Direct Costs) Montant admissible (n'excedant pas 20 'H des couts directs)
Total Value of Assessment Credit Valeur totale du credit Total of Direct and Allowable d'evaluation ndlrect costs) (Total des coOts directs
Totals Total global
(l^oo)
i y g LXAJ. * wj
1,200
1,600.00
4,700.00
2,263.01
13,578.08et Indirects admlsslbles
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minisall or part of the assessment wort VE D
Note : Le titulaire enregistre ser; le present etat des couts effet. Si la verification n'( ou une partie des travai
tloi dEvetfFi^r Fes depensep"derjT#K fees dans Jans lestJO Jours suivant une demar de a cet st pas effectuee, le ministre peut re ;ter tout x d'evatotlipi presenteei-.-ih
Filing Discounts SEP 41996
OO Work filed within two years of co the above Total Value of Asses2 Work filed three, four or five years after completion is claimed at
500/0 of the above Total Value of Assessment Credit. Seecalculations below:
[Total Value ol Assessment Credit Total Assessment Claimed
0.50 =
Remises pour depot MINING
1. Les travaux deposes dans les deux ans suivant leur achevement sont rembourses a 100 07o de la valeur totale susmentionp^ du credit d'evaluation.
c2 . Les travaux deposes trois, quatre ou cinq ans 4pf6s leur achevement
sont rembourses a 50 Vo d e la valeur totale ^credit d'evaluation susmentionne. Voir les calculs Ci-dessous. O j
Valeur totale du credit d'evaluation ~-
x 0,50EvaluSflon lotale demandee
Certification Verifying Statement of Costs
l hereby certifythat the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded Holder, Agent. Position in Company)
to make this certification
Attestation de l'etat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces d6penses ont 6te engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a titre de. je suis autorise(titulaire enregistre, representant, poste occup^ dans la compagnie)
a faire cette attestation. +J-,
Dale
Novarfcer 2, 1995
O? l 2 ( 01/911 Nota : Dans cette formule, lorsqu'il de"signe des personnes, le masculin est utilise au sens neutre
, h
go0
- ^ - -- --p .98724 J l A 8 -f o ' 96:59.^ dilS-"'
Ministry ofNorthern Developmentand Mines
November 26, 1996
Sharon Kemash Mining Recorder Queen and Fourth P.O. Box 3000 Sioux Lookout, ON P8T 1C6
Ministere du Developpement du Nord et des Mines Ontario
Geoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5
Telephone: Fax:
(705) (705)
670-5853 670-5863
Dear Sir or Madam: Submission Number: 2.16742
Subject: Transaction Number(s): W9630.00061, W9630.00062
After reviewing the Work Report(s) we have prepared this letter and the attached summary, which lists the results of our review. Requirements of the Assessment Work Regulation may not have been fully met. Please examine the summary to determine the next course of action concerning the identified Work Report(s).
NOTE: The 90 day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, is no longer in effect for this submission.
PLEASE NOTE ANY REQUESTED REVISIONS MUST BE SUBMITTED IN DUPLICATE.
If the anniversary dates for the mining claims affected by this correspondence have not passed, a number of options are available. Please contact the Mining Recorder to discuss these options.
If you have any questions regarding this correspondence, please contact Bruce Gates at (705)670-5856.
Yours sincerely,
ORIGINAL SIGNED BYRon C. GashinskiSenior Manager, Mining Lands SectionMines and Minerals Division
Correspondence ID: 10366
Copy for: Assessment Library
Work Report Assessment Results
Submission Number: 2 .16742
Date Correspondence Sent: November 26, 1996 Assessor: B ruce Gates
Transaction First ClaimNumber Number Township(s) l A rea(s) Status Approval Date
W9630.00061 1092111 DUFFELL LAKE Approval After Notice November 18, 1996
Section:
14 Geophysical EM 14 Geophysical MAG
The revisions outlined in the Notice dated October 4, 1996, have been corrected.
Assessment work credit has been approved as outlined on the attached Distribution of Assessment Work Credit sheet.W9630.00062 1092111 DUFFELL LAKE Approval After Notice November 18, 1996
Section:
The revisions outlined in the Notice dated October 4, 1996, have been corrected.
Assessment work credit has been approved as outlined on the attached Distribution of Assessment Work Credit sheet.
Correspondence to: Recorded Holder(s) and/or Agent(s):
Mining Recorder E. W. Bazinet Sioux Lookout, ON PENETANG, ONTARIO
Resident Geologist GULFSTREAM TRADING LIMITED Sioux Lookout, ON TURKS ^ CAICOS ISLANDS, BR. WEST
Assessment Files Library Sudbury, ON
Page: l
Correspondence ID: 10366
Distribution of Assessment Work Credit
The following credit distribution reflects the value of assessment work performed on the mining land(s). Please contact the Mining Recorder to determine if this affects the status of your claims.
Date: November 26, 1996
Submission Number: 2 .16742
Transaction Number: W 9630.00061
Claim Number Value Of Work Performed
1092111 810.001150754 7,287.001150755 1,620.001092103 810.001150423 809.001150424 809.00
Total: S 1 2,145.00
Page: l
Correspondence ID: 10366
c-C-
R
JTVMV4,
)
D
9IPOO' J0?45'
5I 007'30"-
\ \Mout*trap^. -
))' ',—5I 0I5'
N
VJ
Q:
THE INFORMATION THA APPEARS ON THIS MAI HAS BEEN COMPILEt FROM VARIOUS SOURCES AND ACCURACY IS NO! GUARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP
8 MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON
U— 5 I 007'30"
9I59' 58' 57' 56' 55' 54' S3' 52' 51' 50' 49 48 47' 46
45
f\ t
512904
LEGEND
HIGHWAY AND ROUTE No.
OTHER ROADS
TRAILS
SURVEYED LINES:TOWNSHIPS. BASE LINES. ETC.LOTS. MINING CLAIMS, PARCELS, ETC
UNSURVEYED LINES: - ,,LOT LINESPARCEL BOUNDARYMINING CLAIMS ETC.
R Al LWA Y ANDRIGHTOF WAY
UTILITY LINES '
NON-PERENNIAL STREAM
FLOODING OR FLOODING RIGHTS
SUBDIVISION OR COMPOSITE PLAN i
RESERVATIONS
ORIGINAL SHORELINE
MARSH OR MUSKEG
MINES
TRAVERSE MONUMENT
DISPOSITION OF CROWN LANDS.
TYPE OF DOCUMENT SYM10I
PATENT,SURFACE A MINING RIGHTS........ .... . .... 9
" .SURFACE RIGHTS ONLY........................ 9
" . MINING RIGHTS ONLY ..._................... CI
LEASE. SURFACE * MINING RIGHTS....-. .......,-.' NJ
" .SURFACE RIGHTS ONLY._............^......^. 3
" .MINING RIGHTS ONLY............................ ii
LICENCE OF OCCUPATION .._...................... . T
ORDER-IN-COUNCIL ...................................M. OC
RESERVATION __.................................... (J)
CANCELLED ___........._.......................... 9
SAND ft GRAVEL __.....__........................... (J)
NOT!: MINING RIGHTS IN PARCH LS PATtNTfD PRIOR TO MAY t . 1*13. VISTEO IN ORIGINAL PATINTIE *Y THC PUBLIC LANDS ACT, R.S.O. 1*70, CHAP. MO, SIC. S3. SUMtC 1
REFERENCESAREAS WITHDRAWN FROM DISPOSITION
M.R.O. - MINING RIGHTS ONLY
8.R.O. -SURFACE RIGHTS ONLY
M.+ S. - MINING AND SURFACE RIGHTS
a. DM*
^ i V t
SCALE: 1 INCH ~ 40 CHAINS
FEETO 1000 20OO 4000 6OOO
O 200METRES
1000(1 KM)
2000(2 KM)
AREA
DUFFELL LAKEM.M.R. ADMINISTRATIVE DISTRICT
SIOUX LOOKOUTMINING DIVISION
PATRICIALAND TITLES/ REGISTRY DIVISION '
KENORA/ ( WTRICIA PORTION)
Ministry of Land
52O02NW0024 2 16742 DUFFELL LAKE 200
Q i
01g10
COen
~y ~7
S 5fc OH-B2oo
n po
O m z jo
l Hllll Hill IINIII in IP". .-.... - -.... 52O02NW0024 2.16742 DUFFELL LAKE 210
oJ3
O CD
o o(T
O LP
c? w o t0
Eoi
o o E
JD JO .CP
JO S" -o tflJ)x.
IZON
N
AST
118 M
i n N
1092.107
J) oC
N
115 N
l I3N
II5015H
(P 00C
00-JCDc~ ODun
OD CO
aOD go
lCOo
II2N
III N
l 1-0 N
MOUX LOOKOUT MINING DIVISION
ONTARIO
HORIZONTAL LOOP
ELECTROMAGNETIC.
LEGEND
STATJON
CoMfONeNT}~-'J; OttT-OF-Pn***e CoHfONBNT Coiu SepARATIflN \OO
l CH " Its*/*)
ac.
C.ONDUCTDH
INSTRUMENT MAX IHN 11
3555 H"Z.
l : 1500
Orri IDD ra
Base Line.108N -
101 N
lOloN
j g:i'674SIOSN
: E.\JJ. P. EMS.
S2002NW0024 2.16742 DUFFELLLAKE
oOD
C
OJ O1/1 2
to if V
5o o o
2f JD (P
S
X"-Jc
.D S~
C
JD O*
^
J? .O M C
12.0
119 N
X i
•-M
-Si. ! O
109 Z l 01
7-IS
-7
T'
•vi.
- l
-H
\ .7-5
7
•41
•HI
411
4l
\
i*i
"*** ""** — ̂ S
4*4
f '41
410
*ll '
\
;
4M
-2*'
;^"^^/i/'i
O i
7o
Ai\ iV& *i i
4-b1
\
*A\\
V
i)
t)
i' Z
-H
^ 1 1
-^-siL L.'^ -N4S
\
\
l
X4lo
41'. -\
i lvM
•no
-l
——— — — . - -IM
\\'r 7
- — 4- — —— —l* \
\o\
\ "f :X f•*2.
-^T5 —— ' —————— 7̂ -
S-ft^-
-3 —— ^
0\\\V4M.
11
•* 4 li
1•U 2x ~--.-3 ^*
-v
-J*
4-1 '
-Z y
-fi
**.*s
•H 3
.-4
"H
'-8
-Si-
412 '
•H-4
*7
f*
-t-
-S
-L
O ;-0
-s
-101
4|
-l
-l
-3
-S
-H -f -l
-IT.
' -IM
V.•V
.\
i -II ,
-^
1 -10
r -3
. -4
-X
-z
'-3
410
i
w|O .
•-to ;
-II
-Z
K
-n
-ZM *
•+T.
\
-^
•J
i n N
lib
USN
us N
l UN
UON
DUFFELL L MCE
Sioux LOOKOUT MINING DIVISION
Ssx
^
111(
1
i ^1\* *3\
\\
X ' *8111l t8));\\\•+H1
^^1,0/'/'X i
X \"V
\ \ \
410.1
1
-J.S /K̂ \A\\-\\
-A\-*2y
7/'S Boat Line
.in L̂. ___ ^ — ————— inftM\ Q - l kj O l M
r\-n '-,l" ———————— 101 N
-li
- Q
\•r -a -^ -,
\-k
.N^
. - M
.^^ ———— .... ————————— ——— (Ob N
-2.
MM
\0^'t
-u - ———— - I OM N ^-^-
VLF Efl
Lrll b
L
\
VEKTICM. IN-PHA5e COMPONENT
(TKMftCNT OF TILT A.NCL*.)
OUT- of- PH *SE COMPONENT
CONDUCTOR
sc*sv,e i CM - 10 MA.P SCALE t - Z5QO
STATION KHz.
*16742*R
l
-4o *
A';
'-S
- e. J* *i
-H
-w
NEC F; v e DSEP j IM-
MINING LANDS B
\0i M
.D
^
J) O
00 -D
COooc
00
l00 (T ^
CD l/1 ?
^
03yj^
OD ^
CD
i00Ol
J?
t
"U:--
52O02NW0024 2.16742 DUFFELL LAKE 230
-O-C
JD MC
-pE
0
lU
o
Looe
\J
5M,So
u)z1 IUJ
z orsiZ
Or
O)
N^/hU
1 I
S 5
1/1 v
1- a
s *r
zy
—S
!3S
u w
S s:
cc
M\//
\~•uJIt2iu oj ju SO.A-x^t.- sUJ3C8o10-Ĵo o*" x
•S.t-a:Q.010u o
\f\K*l\o-I f ui0.11uUIIli
1=4tf.Sxht.U)I5to
Z
vfl
.1••\\i1
52**
L-L
/&2
o
o
•M*O fcl*
^v^1—iv*s N.~ "" ' t-~ — ^
\
\
\
tOT3
fikZ
T*8
W
1^2.
8-rs
•M3
-J. J.^irr .r— rL -.j^srrJ
— —— — boo— —^
52O02NW0024 2 16742 DUFFELL LAKE 240
o J) oOPto-l o r o 2 o O Oo -D JD J) CP
E
-D-J r
EJ? X
j?N* .D -L
AVT
—————— UftN
U1N
UUPPELL LA*;e AREA
5iouv LOOKOUT MINING DIVISION
O NT AW O
PROTON MAGNETOMETER
1--2.SOO
loorrx
LEGEND
v^
3SO EMtTH'5 MAGNETIC
Fieuo, MINUS S0!,i
CONTOUR INTERVAL lOoo
M^&NeTlC CONTOUR 5OO GAMMAS
CONDUCTOR Axis
INSTRUMENT - (
i.1674: E- W.
R EC E l -,' ED
OD J3l
DO
lCD -J (P (T
00 00 COol
-J-D
MINING LANDS BHAN