Construct additional laneage on Forest Avenue to permit two approach lanes. The left turn lanes should align opposite each other.
Since a minimal number (4%) of vehicles turn left from southbound Ford Blvd. and since this left turn can be made at another intersection, it is recommended that this left turn be prohibited. Use an overhead case sign with the legend "NO LEFT TURN" to accomplish this. Also, use two post-mounted "NO LEFT TURN" symbol signs, one on the n~ar right hand corner and one on the far left hand corner.
Erect Overhead Lane Use Control signs on southbound Ford Blvd. Also, erect a "RIGHT LANE MUST TURN RIGHT" (R3-7) sign on southbound Ford Blvd. to indicate a turn movement for this lane.
The new signal timing would include a 70 second cycle with a 64-36 percent split favoring Ford Blvd. and six percent (4.2 seconds) yellow clearance interval for each phase. The north and southbound traffic would operate for 50 percent (35.0 seconds), then the southbound traffic would get a red indication, while the delayed left turn and cotitinued thru movement for northbound traffic would operate for the remaining 14 percent (9.8 seconds). Traffic on Forest Avenue would be allowed 36 percent (24.2 seconds) to operat·e.
Apply pavement markings including pavement arrows to stress the function of each lane.
Skidometer tests have been ordered for all approaches to this intersection because of the substantial amount of wet pavement accidents.
Total
Estimated Cost
$44,550.00
$411.76
$ 2,095.70
$ 35.00
$583.40
No Cost
$47,675.86
1·.·.1
I ,::_J
(Proposed R3-7)
1 --+,~ I .
1 ¢ B (Proposed R3-.2 Facing North)
"' ,._
l
38
(Proposed R3-2 Facing North)
South
NOTE• Existing pavement Is shown shaded.
Figure 20
STATE OF MICHIGAN ~~;;-.::-----,--ll-;u=-.::_;__:_:_-lp R 0 p 0 sED INTERSECTION DEPARTMENT OF STATE HIGHWAYS
--•- i-=,---------+=:f~"'--'-'-1 A P P R 0 A C H DIAGRAM TRAFFIC & SAFETY DIVISION
OF I"LAN
FORM 1191 ...... ,
39
WAGNER ROAD AT LIBERTY STREET
Operational Analysis:
Wagner Road intersects Liberty Street to form a right-angle intersection with Wagner Road operating under stop control, There are two 36 in. stop signs located on Wagner Road and a flashing beacon is used to supplement .the stop signs,
Accidents:
~ 1971 1972 1973 Total
Right-Angle 3 6 6 15
Rearc);:nd 3 1 1 5
Ran Off Roadway 3 2 0 5
Miscellaneous 3 2 0 5
Total 12 11 7 30
The miscellaneous types included three sideswipes and two head on-left turn accidents. The accident rate was 3.2 ACC/MV. The large number of right-angle accidents can be reduced by changing the type of controls at this intersection.
[j MDSHT orm B .
~ WAGNER 40
221
r ) "'\ ~ It
... .,.,._ ~
F 1547 (4/74)
I I
I l 201
~-/ L1 BE R T Y ------1:.( 22.' .
[l
I:~ F I I .. 1 I 1971 (12) ACC.j M.V. '' j RATE: 3.79
[;Aj WAGNER
.[1 ~ vtfr ;7"-
u ~ " .-~~ k LIBERTY
lJ ··~· ~ n -.,._
'
tJ 1972 (II) RATE: 3.48 ACC.jM.V. .·
[J rGNER !d -&=-I ! ·· ... ·.~ LIBERTY _j
[J .... 1
I i '197~ (7) RATE: 2..2.1 ACC/M.V. I i L)
STATE OF MICHIGAN LEGEND DEPARTMENT OF STATE HIGHWAYS
u AND TRANSPORTATION .
Stop & Go Signal -t", R Stop Sign . Location Ll BERTY AT WAGNER
s ... WASHTENAW co . ; -: ~ YioldSign y ... ( ·j L' Flashing Beacon Y Y j Figure 21
Fatal • Pedestrian --~--® Period: I g 7 I THRU 1973 3.2 ACC/M.V.
lJ Injury 0 Tree 0 Accidents- Total 30 . P.O. 2.2 Skidding CCC 7 I ( ) Out of Control '" ........ Injury ( ) Fatal Jackknife .....
[i Overturned ~,._ Driver Intent '(!) c.s. Miles Drown DFK Backing
Deer LOCATION 6 5--17-74 -- Violator X I Plan No. Date
--------'----·····················
41
NORTHBOUND WAGNER ROAD
SOUTHBOUND WAGNER ROAD
Figure 22
.___ __ -~---- ----
I I ;
(~ .. I
L l
\ ~ :
42
EASTBOUND LIBERTY STREET
l !
WESTBOUND LIBERTY STREET
Figure 23
43
1.
2.
3.
RECOMMENDATIONS
In an attempt to reduce the right-angle accidents, it is recommended that this location be converted to a 4-Way Stop. A 4-Way Stop will require two 36 in. Stop signs, two 36 in. Stop signs, two 36 in. Stop . Ahead signs and four "4-Way" Panels. The flashing beacon will also have to be converted to four red lenses.
Install an overhead street light~ ing system at this location.
Remove the Special Sign Background on the Stop Ahead signs at this intersection.
Total
,. j-:.
Estimated Cost
$290.72
$252.00
$48.00
$590.72
I i J
N 44
Remove Bi-directional Special Sign Background from W3-l
' "' "' 3:
"' "' '0
" .. "
.., 0
" " c.
Proposed R 1-3 J.. 'tiM v .. .. 0 0 0 ~
c. c. 0. 0 0 ~ ~
a. 0.
Existing Rl-1
LIBERTY RD.
Double Yellow Stop Bar
Proposed Overhead Lighting System
Existing Rl-1 -o "0
~ ~ 0 -o
~
0
0
" 0 " 0 4WAY Proposed Rl-3
"' 0 0 .. c.
0 .. c.
0 .. c.
:0
'
Replace "SLIPPERY WHEN WET"~ with we-5 W
"CAUTION ~ 0 (Existing) TRUCKS = 0::::
TURNINGu -
0:::: w :z (!) <{
3=: AUTH. NO.
Remove Bi-directional Special Sign
Background from W3-l
Figure 24 DRAWN
~~~---------+~~D~F~K~4 STATE OF MICHIGAN .--CONT. SEC. DATE PR 0 PO s E D DEPARTMENT OF STATE HIGHWAYS 3-19-75 INTERSECTION
---·-- REF. SCALE APPROACH DIAGRAM TRAFFIC 8c SAFETY DIVISION
SHEET OF PLAN
FORM 1191 (REV. ID-88) EOCO• 191iiM 5~71 "582.0
45
HOLMES ROAD AT FORD BOULEVARD
Operational Analysis:
Holmes Road intersects Ford Boulevard to form a "T" intersection operating under traffic signal control. The right-ofway assignment is based on a 70 second cycle with a 64-36 ~plit favoring Holmes Road and clearance intervals of seven percent (4.2 seconds). A leading green arrow for left turns off westbound Holmes Road of 11 percent (7.7 seconds) is included in the phasing of this signal. A shopping center drive, located directly across from Ford Boulevard, has no traffic controls.
Accidents:
~ 1971 1972 1973 Total
Rear End 6 4 3 13
Turning 2 2 2 6
Sideswipe 2 2 1 5
Miscellaneous 0 1 3 4
Total 10 9 9 28
The miscellaneous types include two right-angles, one head onleft turn and one ran off roadway accident. The accident rate was 2.1 ACC/MV.
The utilization of a left turn green arrow that terminates without a yellow clearance interval is not in accordance with the Michigan Manual and creates an accident potential at this intersection.
r
[
F'i l i
r 1
t ~ J
·[]
(_ ' u
I.J
[I
! SERVICE 46 DRIVE
24' .k:
.. .. ~ '-~ • .. 1l .. • ~l
o• • \1
~ 48'. HOLMES 48'
~ .. .. ~ .. •0
1971 {IO) 46' ;f RATE: 2.20 ACC.jM.V. FORD ~ERVICE DRIVE
.. • ll .. .. \1
HOLMES ·~ .
~
rt 1L ... •
1972 (9) FOR~t RATE: 1.98 ACCjM.V.
~ERVICE . DRIVE
.. ... y 7"rt.
~ HOLMES ~~-
~~ -----...__ -, ~
1973 (9) FORD RATE: 1.98 ACC.jM.V.
LEGEND MICHIGAN DEPARTMENT OF STATE HIGHWAYS
TRAFFIC AND SAFETY DIVISION
Stop & Go Signal + R Stop Sign Location FORD AT HOLMES
s ~
WASHTENAW CO. Flashing Beacon v-0-v Yield Sign
y ~
Figure 25
• Pedestrian .... ·® Period: 1971 THRU 1973 2.1 ACC./M.V. Fatal r-Injury 0 Tree 0 Accidents- Total 28 P.O. 20 Skidding Q; Q Q I
( ) Out of Control •" ... Injury 8 ( ) Fatal 0 Jackknife ----z-Overturned ~,....... Driver Intent ~ c.s. Miles Drawn DFK
Deer V Backing __ Violator v Plan No. LOCATION 7 Date 3,-21-75
EOCO• 196M 8-72 52350 Form 15478 (Rev, 11/70)
47
EASTBOUND HOLMES ROAD
WESTBOUND HOLMES ROAD
Figure 26
I
II I '
I I i
J
I : l !
_)
I I
t l II L !
l i
r L
48
NORTHBOUND FORD BOULEVARD
SOUTHBOUND FORD BOULEVARD
Figure 27
49
1.
2.
3.
RECOMMENDATIONS
Change the present signal operation to a three phase system. Install a vertical signal arrangement (4 lenses) for westbound Holmes Road and green arrows for the right turn lane on eastbound Holmes Road and northbound Ford Boulevard. The new signal timing would include a 70 second cycle with six percent (4.2 seconds) yellow clearance intervals. The three phases would include one phase for east and westbound Holmes Road traffic (40 percent- 28 seconds), one phase for westbound Holmes Road traffic including the left turn movement on Holmes Road and the right turn from Ford Boulevard (20 percent -14 seconds), and one phase for northbound Ford Boulevard including the right turn from eastbound Holmes Road (40 percent- 28 seconds).
Apply pavement marking including ~avement arrows to stress the function of each lane.
Extend the flares and tapers on Holmes Road to provide enough laneage for vehicles to maneuver around waiting vehicles.
4. Close off the Shopping Cente~ service drive. There are other drive openings available to the east that provide access to the shopping center.
5. Erect two R3-7 "RIGHT LANE MUST TURN RIGHT" signs for the eastbound Holmes Road right turn lane.
Total
Estimated Cost
$204.00
$466.50
$31,500.00
$6,600.00
$71. 80
$38,842.30 I
I
Former Service
Drive
Proposed Barricade
iRAFFIC & SAFETY DIVISION SHEET OF PLAN.
FORM 1595 (REV. 10-68) ~97
"' "'
"' "'
"' "' "' _j_
50
FACING EAST
FORD
I 2'
I 2'
White Ski 2 4-'
Arrows
Rt6HT LAN£
MUST Proposed R3-7 ,. ..
Proposed R 3-7
''''"
m NEW CONSTRUCTION
Figure 28
EDCO• 196M 9-71 47520
51
PACKARD STREET AT HEWITT ROAD
Operational Analysis:
Packard Street intersects Hewitt Road to form a right-angle intersection operating under signal control. The right-ofway assignment is based on a 70 second cycle with a 57-43 percent split favoring Packard Street and yellow clearance intervals of seven percent (4.9 seconds). There is also a ten percent (7.0 second) left turn green arrow for east and westbound Packard Street.
Accident:
~ 1971 1972 1973 Total
Head On-Left Turn 1 5 2 8
Rear End 1 3 4 8
Right-Angle 0 2 1 3
Turning 1 0 2 3
Miscellaneous 0 3 1 4
Total 3 13 10 26
The miscellaneous types include two sideswipes and two improper backing accidents. The accident rate was 1.4 ACC/MV. The operation of this location was changed in 1972 from stop control to signal control.
The use of a leading left turn arrow which terminates without warning is non-standard according to the Michigan Manual of Uniform Traffic Control Devices.
1--:i
I ·. N HEWITT 52 i
1 511
,---
~ • !
621 _f'" PACKARD 621
~ .. 1>0
•
1971 (3) 51 1 RATE: 0.49 ACC.jM.V.
.. HEWITT
1~ f) ~ ~r PACKARD
~l .. '
#~ t '
1972 (13) RATE: 2.13 ACC./M.V.
HEWITT
• lily
~ IL~ ·~Jr PACKARD ~l ~
• 1--> :1 1973 (10) RATE:. 1.63 ACC.jM.V. /
["]. STATE OF MICHIGAN LEGEND DEPARTMENT OF STATE HIGHWAYS
AND TRANSPORTATION
Lacatl"" H E W I T T AT PACKARD Stop & Go Signal +
1
R Stop Sltn 5 ... WASHTENAW co. -®- Yield Slvn y ... !]
Flashing Beacon Y Y Figure 29
Fatal • Petleotdqn ---··® Perletl: · I 9 7 I THRU 1973 1.4 ACC./._M.V. Tree
, Injury 0 0 Accidents~ Total 26 P;D. 16 Skidding Qcc.
Out of c .... tr•l "' .. 10 ( ) Faflll 0 ( ) Jackknife - ... ,..., ·. -Overtumed " ..- f• -- Driver lnfllnt
-sf c.s. Milo a Dr~~wn DFK l Backing
Deer plcHo He. L 0 C A T I 0 N 8 5-17-74
J -- Violator Dote
53
EASTBOUND PACKARD STREET
WESTBOUND PACKARD STREET
I_
Figure 30
1 .• I
'-!
. I-_ I l
(· I !
I
I : . I
54
NORTHBOUND HEWITT ROAD
SOUTHBOUND HEWITT ROAD
Figure 31
55
1.
2.
3.
RECOMMENDATIONS
Type
A traffic investigation and a capacity analysis indicate that a left turn problem does not exist for traffic on Packard Street. It is recommended that the left turn arrows be removed.
Apply pavement markings including pavement arrows to aid in determining the function of each lane.
Erect overhead Lane-Use Control signs for all four approaches.
Total
Estimated Cost
$70.00
$894.80
$8,278.80
$9,243.60
1 I R3-5 R3-5a 56
N
bJJ b!J I ...
"" 7-
-IC
' A 8
< 0 0::: R3-6
1- [tJ 1--3: 4lr mliC I
-"' w L ::c c
·o c B A !£?
• - --~A~~~
j ,, .. J ' PACKARD RD.
~ite s k; e::. -~ au~ -- s ........ ~ -,:- - -I F'.-.2! Double Yellow- h I f
All ~I low
0
~J ~.-~ r~ ~r~ White-....~ l>
~e Skie:::.. ~ ........ OJI ~ ........ s -<
--=-fn -t -- -- -
I I AI I
~ t ,r- REMOVE
t- I oopJ
~ ! .;, ff ·o
!£? 0 a. -
~ ::. PN~ PND U)
l ¢A " I ..
.Q " - -~ .c 0 .c
!l 3: 0 3:
T "" 7 " -.c
j (lis -.,
~ t---'- r I I Figure 32
AUTH· NO. DRAWNDFK STATE OF MICHIGAN
DEPARTMENT OF STATE HIGHWAYS CONT. SEC. DATE PROPOSED INTER SECTION
9-20-74 --·-- REF,
TRAFFIC & SAFETY DIVISION
SCALE APPROACH DIAGRAM SHEET OF I PLAN
FORM 1195 (REV. to.A) EOCO• 19iM 5-71 4512:0
57
WHITTAKER ROAD AT STONY CREEK ROAD
Operational Analysis:
Whittaker Road intersects Stony Creek Road to form a "T" intersection with Stony Creek Road operating under stop control. There is a 36 in. Stop sign and supplemental flashing beacon on Stony Creek Road.
Accidents:
~ 1971 1972 1973 Total
Ran Off Roadway 1 9 3 13
Sideswipe 1 2 2 5
Miscellaneous 1 1 1 3
Total 3 12 6 21
The miscellaneous types included one rear end, one involving debris falling off a vehicle and one right-angle accident. The accident rate was 3.9 ACC/MV.
Thirteen of the accidents occurred at night. ran off roadway accidents occurred at night.
Ten of the thirteen
1971 (3)
1972 (12)
WHITTAKER ~
197 3 (6)
Stop & Go Signal
Flashing Beacon
Fatal e Injury -o Skidding o 0 0 , Jackknife ---.....,_ Overturned ----7,.._ Backing _...._ ~
LEGEND
R Stop Sign ).__ Yield Sign
y~y
s .... y ....
Pedestrian • • ·- ·@ Tree 0 Out of Control a a ._
Driver Intent (!) Deer Violator y I
RATE: 1.69 ACC/ M.V.
RATE: 6.76 ACC.jM.V.
RATE: 3.38 ACC./MV.
STATE OF MICHIGAN DEPARTMENT OF STATE HIGHWAYS
AND TRANSPORTATION
Location WHITTAKER AT STONY CREEK WASHTENAW CO.
Fi ure 33
Period: 1971 TH RU 1973 3.9 ACC/M.V. J
Accidents- Total _ ____,2'-'I ___ P.D. 12
Injury _ _____,8'-----'--~)'-- Fata I ---'------'-___!.
C.S. ---- Miles ____ Drawn DF K
Plan No. LOCATION II Date 5-23-74
59
.\
NORTHBOUND WHITTAKER ROAD
', i
l.·l I , • _I
SOUTHBOUND WHITTAKER ROAD
Figure 34
r-,. \
' ' I , I I ' . .J
I ·I j
I I ~
\ i I
60
EASTBOUND STONY CREEK ROAD
WESTBOUND STONY CREEK ROAD
Figure 35
61
1.
2 •
3.
RECOMMENDATIONS
Change the Bi-Directional Target Arrows to Directional Target Arrows (96 x 48) on both north and southbound Wittaker Road,
Apply pavement markings - center line, edge line and stop bars -to aid motorists during periods of darkness.
Create a safe landing area by removing the trees, bushes, poles, etc., south ,of Stony Creek Road.
4. Relocate the guida sign which is in target position for southbound Whittaker Road to a position north of the intersection.
5. Erect Road Name signs (D3-2a) on the existing Side Road warning signs on Whittaker Road on both sides of the intersection.
6. Erect delineators at 50 foot intervals along the west side of Whittaker Road for a distance of 500 feet each direction from Stony Creek Road to provide visibility at night.
Total
Estimated Cost
$126.64
$120.00
$500.00
$16.00
$41. 84
$183.00
.-.-~
$987.48
; ,_·
Replace WI-I a Wl2-1(35mph) w; Wl-2 a
Proposed D3-2a (STONY CREEK
Existing Dl-2, Relocate from 20' southeast of Stony Creek Rd.
R e pI ace W I - 7 ~
W3-l "STOP AHEAD"
Existing W2-2
Delineators spacing every 50 feet
White Edge Lines---
Proposed D3-2a (STONY CREEK RD.) on Existing W2-2
STATE OF MICHIGAN DEPARTMENT OF STATE HIGHWAYS
SEC-
--. -- '-==--------+=~---'-~--'-..:'~ TRAFFIC. & SAFETY DIVISION
SHEET OF PLAN
FORM 1595 (REV. 10-68) ~97
a
PROPOSED INTERSECTION DIAGRAM
Figure 36
EOCO• 196M 9~71 47520
63
TEXTILE ROAD AT MCKEAN ROAD
Operational Analysis:
Textile Road intersects McKean Road to form a "T" intersection. Traffic is controlled at this intersection by two traffic signals which operate on flasher (yellow for Textile Road and red for McKean Road) except when there is a shift change at the adjacent Ford Motor Company plant. Included in the phasing of this signal is a 12 percent (7.2 seconds) leading green arrow for left turns ... !.,
off westbound Textile Road. There are two green arrows for right turns off eastbound Textile Road and northbound McKean Road.
Accidents:
~ 1971 1972 1973 Total
Rear End 1 5 1 7
Turning 2 3 0 5
Right-Angle 2 1 0 3
Head On Left Turn 1 1 1 3
Miscellaneous 1 1 0 2
Total 7 11 2 20
The miscellaneous types included one parked vehicle and one sideswipe accident. The accident rate was 1.1 ACC/MV. The use of a leading left turn arrow which terminates without warning is in violation of the Michigan Manual of Uniform Traffic Control Devices; however, this only occurs during the stop and go operation of the signal.
~ MDS HT F 547 B (4/74). orm 1
i] 64
i
Jt{ ·., 41 1 TEXTILE 34
1
c
1. \ I
I
MCKEL t '
~~ N
1 I 1971 (7) ~~~ ACC/M.V. i RATE: 1.14
l~ (:'·:.
J f! TEXTILE ~
;:.-_: "----;---o ~--··· r -~
r~ H '] 1972 (II)
MCKEAN"
J -~) RATE: 1.79 ACC/M V
('·_j -"-I I
'·~
f~ 1 j
] ·~ \:. i
r I TEXTILE 'l II
t 'I ['·'
\j
;~ 1973 (2) MCKEAN RATE: 0.32 ACC.jM.V.
'f STATE OF MICHIGAN LEGEND DEPARTMENT OF STATE HIGHWAYS
I AND TRANSPORT A liON
1
f Stop & Go Signol +/ R Stop Siun Location TEXTILE AT MCKEAN
s ~ WASHTENAW ( 0. ! i .4f- Yield Sign y ~
i 1, Flashing Beacon Y F Y Figure 37 L\
11, Fatal -· Pedestrian -----® Period: 19 7 I THRU 1973 1.1 ACC.[M.V.
\I Injury -o Tree 0 ,
Accidents- Total 20 P.O. 18 L; Skidding o o o , I Jackknife --......,_ Out of Control ..... - Injury 2 ( ) Fatal 0 ( )
\; · 1: Overturned """""'!-- Driver Intent (!)' c.s. Miles Drawn DFK ' I Deer
LOCATION l [' Backing ____. - Violator X Plan No. 13 Date 5-23-74 '
65
,;,.•I
EASTBOUND TEXTILE ROAD ' ' I ,
I
WESTBOUND TEXTILE ROAD
1:_·'
Figure 38
/ ': < <
i 'i
\
J
(.1' / r l j
) \
r.
t
l I
}
66
NORTHBOUND MCKEAN ROAD
SOUTHBOUND MCKEAN ROAD
Figure 39
67
1.
2.
3.
4.
RECOMMENDATIONS
Change the present signal operation to three phases. The new signal timing would include a 70 second cycle with six percent (4.2 seconds) yellow clearance intervals. The three phases include one for east and westbound Textile Road traffic (40 percent- 28.0 seconds), one for westbound Textile Road traffic including the right turn from McKean Road (33 percent- 29.7 seconds) and one for northbound McKean Road traffic including the right turn from McKean Road (33 percent- 29.7 seconds). A vertical signal arrangement (4 lenses) .should be installed for westbound Textile Road.
Apply pavement markings including pavement arrows to stress the function of each lane.
Reconstruct additional laneage to provide two approach lanes per approach.
Erect two R3-7 "RIGHT LANE MUST TURN RIGHT'' signs for the eastbound right turn lane on Textile Road.
Estimated Cost
$280.00
$467.50
$32,625.00
$71. 80
Total $33,444.30
r
0 :(]
>..J
l---z I-4-:J o
"'7 l "I . ~ ,.,..~....-o
-L l " IIJGREEN ARROW
68
~ _ ~~-~--------~----------------------~M~C~K~E~A~N~--~ 'IIIII' ~-~ '-.1, White-:::..._ 0 7~ r-1-"\. ""'O;;;;ble Yellow-=:-. ~---~~--~~~----------------------------------------~ • f/1' '&' JlEI ONLY ONLY
FA~NG t i.'!!J GREEN ARROW EAST ~ ~ RtGHTLAM[
o ' MUST Proposed R3-7 JUAN RIGHT
~~ ~ .~ -0 ll 1' "- 1~
w ....I IX w 1-
> ~ "---. \..:-( ~ [( T( T( .\
. I -'
"' "' "' 'j
""" LAIOE MUST ........ "
AUTH. NOo
¢A ¢s ¢c Proposed R3 -7
~NEW CONSTRUCTION
DRAWN
DFK DEPAR.;~~~~~~~~~~~~:HWAYSI-,co=N=T,-,s""Ec.,--~----11-o=A=TE=-~_!!-1 P RQPQ SED INT ERSECTIQ N
I 1-14-74 -·- REF, SCALE APPROACH DIAGRAM
SHEET OF I PLAN Figure 40 TRAFFIC 8c SAFETY DIVISION
FORM IHS (REV. 1048) EDCO• 19iM 5·71 <45820
,, .
TEXTILE ROAD AT BRIDGE ROAD
Operational Analysis:
Textile Road intersects Bridge Road to form a four-legged intersection. The south leg is a private drive leading into the Ford Motor Company plant. Traffic is controlled at this intersection by two signal heads which operate on flasher (yellow for Textile Road and red for Bridge Road and the private drive) except when there is a shift change at the adjacent Ford plant. Included in the phasing of this signal is a 12 percent (7.2 seconds) leading left turn arrows for left turns off east and westbound Textile Road.
Accidents:
Type 1971 1972 1973 Total
Turning 3 1 0 4
Right-Angle 1 1 1 3
Miscellaneous 1 1 1 3
Total 5 3 2 10
The miscellaneous types included two rear ends and one ran off roadway accident. The accident rate was 0.8 ACC/MV. The use of a leading left turn arrow which terminates without warning is in violation of the Michigan Manual of Uniform Control Devices; however, this only occurs during the stop and go operation of the signal.
N .. .... .. , ........
' BRIDGE MICHIG,,_;·: '!;' T. STAH HIGHWAY~ .',)
! /
l r! "--.. 321 TRANSPORT AT ION LANSING, MICH.
L --~L ------------------ - ····--- ··-··-··
I I • .._-I 'J , --c.
.. .\. TEXTILE: 32 !
l ·---~-- --~ --~ ---~-~- ·--~----""'-
I' 1971 (5) 20' zc- 1 1.13 Accjl.;rv ,)
l /3RIDGE '
lj ~L ·-·--·----·----- .......... ,, ' -.;--------~~------ ·----.. ~ .. ·--- ·-<· ·- •
li ~
TEXTILE ,'-i
l 1------ .. --------------- ~--------~-------
.......... _ I I I .. : 72(3) -,Clv .. MV -.. "-AU/
' ___ ,
lj I BRIDGE I .i
! i
~---- ~ -~·-»·-------··· ...
q ""' • 4 v
J TEXTILE
1 (------·--------·--·---- ------- ------- -- --. --~------ - . -------- -
1 i AC0V!V (2)
I
I , : 73 • 0.45 I I
.. ! MICHIGAN DEPARTMENT OF STATE HIGHWAYS r LEGEND TRAFFIC AND SAFETY DIVISION
I +R LOcation TEXTILE AT BRIDGE ! Stop & Go Signal
I, Stop Sign s 1-
Yield Sign y 1- WASHT:CNAW co Flashing Beacon v--0-v
::! Figure 41
I' Fatal • Pedestrian .... ·0 Period: 1971 Tt:!Bli 1273 0.8AC CLMV Injury 0 Tree 0 10 E Accidents- Total P.O. ' Skidding 0 Q 0
4 ( ) ( )
J Jackknife ---..._ Out of Control .. , ..... Injury Fatal
Overturned ~,.._ Driver Intent
~ c.s. Miles Drawn JLM Backing __ Deer
Violator v Plan No. LOCATION 20 Date 5-.:"-74
EDCO• 196M 8-72 52350 Form 15478 (Rev. 11/70)
71
EASTBOUND TEXTILE ROAD
' ' l \
'. '·
WESTBOUND TEXTILE ROAD
Figure 42
i . I
I
I
./ I l
II \ -;
72
NORTHBOUND BRIDGE ROAD
SOUTHBOUND BRIDGE ROAD
Figure 43
73
l.
2.
RECOMMENDATIONS
Eliminate the left turn arrows at this intersection due to a small number of left turns. The signal timing should be 60 second cycle with a so-so percent split and yellow clearnace interval of seven percent (4.2 seconds).
Apply pavement markings including pavement arrow~ to define the functions of each lane.
Estimated Cost
$70.00
$468.18
Total $S38.18
!
BRIDGE ri00'~15D'-!
r .
'1,_\.' ~· Do bl Y II __ , Ye~ Skipp============;;;"~·~=·~O~W==:}~1f~ -= 0 <~~2 .a q....,..,R_,
White:Y ""'f '"'f
\ 1 l_.J 1 ¢s
)
T i I.
AUTH, NO. DRAWN
fl,, -~ I ~ - !-
.
- AlNC 0 10 ~~~ "' l ,.tC
~s~
~sli>
T 0 10
"'
+
10 ,_ "'
L
74
w _J
-1--X w 1--
~ DRIVEWAYS TO
FORD PLANT
STATE OF MICHIGAN D F K DEPARTMENT OF STATE HIGHWAYS CONT. SEC. DATE PROPOsED INTER SECT I ON
--· -- tw.-------h~=-2.::_-~6.::_-!_7~5
I I
~EF. SCALE APPROACH DIAGRAM TRAFFIC Be SAFETY DIVISION I PLAN SHEET OF Figure 44
PORM 1595 (REV. 10-68) ~97 EDCO• 198M 9 .. 71 47520
75
SUMMARY OF RECOMMENDATIONS
The Department of State Police submitted 20 high accident locations for Washtenaw County to the Michigan Department of State Highways and Transportation. After an in-depth study of these locations, we formulated recommendations for 10 of them. The recommendations are as follows:
Location Number
1
2
3
5
Location Description and Cost Estimate
Carpenter Road and Packard Street
$10,028.20
Jackson Road and Wagner Road
$ 9,470.10
Ford Boulevard at Russell Street
$131,560.80
Ford Boulevard at Forest Avenue
$47,675.86
Recommendations
Change the signal timing. Install a signal face for left turns off Packard Street. Apply pavement markings. Erect overhead Lane-Use Control signs.
Remove the left turn phase. Apply pavement markings. Erect overhead LaneUse Control signs.
Construct additional laneage to pr~vide two approach lanes. Eliminate left turn green arrows. Erect a four way case sign (R3-10) for each left turn lane. Apply pavement markings. Resurface the intersection.
Construct additional laneage on Forest Avenue. Eliminate the left turn from southbound Ford Boulevard. Erect overhead Lane-Use Control signs on Ford Boulevard. Erect a R3-7 sign on southbound Ford Boulevard. Change the signal timing to include a delayed left turn. Apply pavement markings.
·::.
,'-.i
I l
Location Number
6
7
8
11
13
20
Location Description and Cost Estimate
Wagner Road at Liberty Road
$590.72
Holmes Road at Ford Boulevard
$38,842.30
Packard Street at Hewitt Road
$9,243.60
Whittaker Road at Stony Creek Road
$987.48
Textile Road at McKean Road
$33,444.30
Textile Road at Bridge Road
$538.18
76
Recommendation§_
Convert the operation of this intersection to a 4-Way Stop. Erect Rl-1 and W3-l signs on east and westbound Liberty Street. Install a overhead lighting system. Remove the special sign background.
Change the signal timing. Apply pavement markings. Close off shopping center service drive. Construct additional laneage on Holmes Road. Erect two R3-7 signs for eastbound Holmes Road.
Remove the left turn phase. Apply pavement markings. Erect overhead Lane-Use Control signs.
Replace Wl-7 Arrows with Wl-6 Arrows on north and southbound Whittaker Road. Apply pavement markings. Create a safe landing area. Relocate the guide sign. Erect D3-2a for north and southbound Whittaker Road. Erect delineators at 50 foot intervals on the west side of Whittaker Road.
Change the signal timing. Apply pavement markings. Construct additional laneage. Erect two R3-7 signs for eastbound Textile Road. Install a four level signal face for westbound Textile Road.
Eliminate the left turn phase for Textile Road. Apply pavement markings.
77
Furthermore, a few general recommendations were formulated that should be implemented by Washtenaw County.
1. Signalized intersections should have two approach lanes to provide adequate capacity at these intersections.
2. Green arrows shouldn't be terminated without going through a yellow and red indication as per the Manual.
3. A program should be initiated by the county for removing vision obstructions that are located in clear vision areas at intersections through the county.
4. Approximately 18 percent of the required regulatory signs on the Washtenaw County Primary Road System are in need of maintenance or new installation.
5. Approximately 20 percent of the required warning signs are in need of maintenance or new installation.
ESTIMATED COSTS
High Accident Location Recommendations $282,381.54
Control Devices Inventory 88,260.00
TOTAL $370,641.54
. ' ;, i
I ) . I ! ··\ ! __ .,
I ,
78
APPENDIX!
j···· ...____ _ ___;_ ______ ~ _ _J
79
HIGHWAY SAFETY ACT OF 1973
Section
203 Rail-Highway Grade Crossings
205 Pavement Marking DemOnstration Program
209 Projects for High Hazard Locations
210 Program For Elimination of Roadside Obstacles
230 Federal-aid Safer
Highway System
Federal-aid (Except Interstate)
All Highways (Except Interstate)
Federal- aid (Except Interstate)
Federal-aid (Except Interstate)
Roads Demonstration Non Federal-Program aid
Types of Projects Finance
Federal-State
Protective Devices; Signs & Markings; Crossing Illumination & Surface Improvements
Centerline & Edgeline Markings; Establishing & Painting "NO PASSING" zones
Intersection widening, Channelization, & signalization; Skid-prone location correction
Guard rail end treatments Breakaway signs; Crash cushions; Tree Removal; Culvert headwall corrections
90-10
100
90-10
90-10
Pavement Marking~ signing, eliminate roadside obstacles, eliminate hazards @ railway
-------------------·----------'c'-'r'-"'o.::sc:s:..:~=-· n::.ogc::s:_ __________ 9::..:::0_-_;l:_O:o:_-,i j
f· !
r-'
I
I l
80
The projects eligible for consideration for Funding under Section 209 are:
Loc. Ill Carpenter Road at Packard Road
Loc. l/2 Jackson Road at Wagner Road
·Loc. l/3 Ford Blvd. at Russell Road
Loc. l/5 Ford Blvd. at Forest Avenue
Loc. 1/6 Wagner Road at Liberty Road
Loc. 1/7 Holmes Road at Ford Blvd.
Loc. 1/8 Packard Road at Hewitt Road
Loc. II 13 Textile Road at McKean Road
Loc. 1120 Textile Road at Bridge Road
The project elibile for consideration for funding under Section 210 is:
Loc. illl Whittaker Road at StonY Creek Road.