+ All Categories
Home > Documents > RTI Update

RTI Update

Date post: 03-Feb-2016
Category:
Upload: sukey
View: 46 times
Download: 0 times
Share this document with a friend
Description:
RTI Update. PI Meeting February 17-18, 2010. Agenda. Activities since last PI meeting User Statistics Updates to infrastructure – New Home Page Phase II Planning. Activities. Participated in Belmont Workshop - PowerPoint PPT Presentation
23
RTI International is a trade name of Research Triangle Institute www.rti.org RTI Update PI Meeting February 17-18, 2010
Transcript
Page 1: RTI Update

RTI International is a trade name of Research Triangle Institutewww.rti.org

RTI Update

PI MeetingFebruary 17-18, 2010

Page 2: RTI Update

www.rti.org

2

Agenda

• Activities since last PI meeting• User Statistics• Updates to infrastructure – New Home Page• Phase II Planning

Page 3: RTI Update

www.rti.org

3

Activities

• Participated in Belmont Workshop• Poster at RTI Fellows Symposium – Integrating Basic

and Applied Research: High Performance Cyberinfrastructures

• Phase II Discussions• Procedure Change

– USC Confidentiality Agreement to be included with the PCC Dataset Request MOA

• Portal Updates– Implementing security changes– Upgrading portal framework– New home page

Page 4: RTI Update

www.rti.org

Page 5: RTI Update

www.rti.org

5

Compliance Activities

• Certification & Accreditation– IV&V findings implemented, final report drafted– Updated SSP, IR Plan, other documentation– 2010 Annual Assessment - Key Controls identified and

undergoing verification

• Security– Implement DHS SSL certificate– IV&V High Risk vulnerabilities remedied– Implement DotNetNuke version 5.0 for enhanced security

• Planning– Submitted Request for Change for Version 4.0

Page 6: RTI Update

www.rti.org

User Statistics Request Type

StatusJanuary

2010

Cumulative (Since

Launch)

Account Requests Received 1 97

Data Provider 0 8

Data Host 0 8

Researcher 1 71

Requests Approved 0 52

Data Provider 0 3

Data Host 0 4

Researcher 0 45

Requests Pending - Awaiting S/A Letter 0 27

Data Provider 0 2

Data Host 0 1

Researcher 0 24

Requests Rejected 0 18

Data Provider 0 3

Data Host 0 3

Researcher 0 12

Dataset Requests Received 1 29

Request Pending - Awaiting MOA 1 10

Requests Approved 0 19

Requests Rejected 0 0

Page 7: RTI Update

www.rti.org

7

Organizations

Eligible• Academia 43• Government 9• Private Sector 37

Ineligible• International 8

Page 8: RTI Update

www.rti.org

8

Dataset Utilization

1 LBNL Does not currently participate in PREDICT.

Page 9: RTI Update

www.rti.org

Updates to infrastructure – New Home Page

Version 4.0

http://predictbeta.rti.org

alternate

9

Page 10: RTI Update

www.rti.org

PREDICT Phase II Issues & Discussion

10

Page 11: RTI Update

www.rti.org

11

Phase II Issues

• Impact on Researchers• Impact on Data Hosts/Data Providers• Impact on ARB and PRB• Impact on Advisory Board• Impact on Process• Impact on Documentation• Unresolved Issues

Page 12: RTI Update

www.rti.org

12

Impact on Process

• Data Provider changes• Contact with Researchers • Foreign researchers from

approved institutions• Matchmaking between

providers and researchers (special MOA)

• Public Metadata plus more• Application review and the

ARB• Required anonymization

• PRB review• Advisory board interaction

with privacy community • USC confidentiality

agreement• More institution MOAs

versus individual researcher MOAs

• Restrict SCA data if to government entities

• New datasets

Page 13: RTI Update

www.rti.org

13

Contact with Researchers

• More information from Researchers– Collect more contact information on the Sponsorship Letter– Require more details for dataset requests– Attachment B: USC confidentiality agreement– System automation for MOA, expiration & data destruction

processes

• More frequent/different interaction with Researchers– Proactive emails– Matchmaking

Page 14: RTI Update

www.rti.org

14

Foreign Researchers

Page 15: RTI Update

www.rti.org

15

Matchmaking

Page 16: RTI Update

www.rti.org

16

Public Access to Metadata

More info in metadata?

Metadata from hosts

Page 17: RTI Update

www.rti.org

17

Application Review

• Expand ARB?• Urge member participation• Adjust size of ARB for each review• How long to serve?• Response time• Privacy issues

Page 18: RTI Update

www.rti.org

18

Publication Review

• Review Process for PRB– Data Provider– PCC– Anyone else?

• Requirements for Researchers

Page 19: RTI Update

www.rti.org

19

Remaining Issues

• Advisory Board roles and responsibilities • More institution MOAs versus individual researcher

MOAs• Restrict Stored Communications Act (SCA) data if

government entities

Page 20: RTI Update

www.rti.org

20

Impact on Data Hosts / Data Providers

• Give data to PREDICT– Eliminates need to manage expiration of access

• New Datasets– Non-anonymized data

• Expand metadata• Provider Testing• Public Provider Data

Page 21: RTI Update

www.rti.org

21

Documents Affected

• PIA• Sponsorship Letter

– Revised: Researcher, Data Host, Data Provider– New: PCC and Foreign Country

• MOAs– Revised: Researcher, Data Host, Data Provider– New: PCC and Foreign Country

• Internal PCC docs• ARB, PRB, Advisory Board docs

Page 22: RTI Update

www.rti.org

22

Unresolved Issues

• Providers distributing data outside of PREDICT• Periodic verification of access to data• ARB approval process – no response

Page 23: RTI Update

www.rti.org

23

Discussion


Recommended