Standard Operation Procedure Of OptiX RTN 910 Installed in Cabinet & Commisionned
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 2/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 3/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 4/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 5/272
Page 5
The IDU is installed on the Huawei open rack which is in a shelter besides the tower
The DDF/DCDB/Rack/Pole are installed on site
The height of towers is !!"#!! $eters
Using in%house !&'"&#$ antenna
Protection is ( H)B
The # sites of the hop share the sa$e configuration
The distance of the # sites between this hop is about ' k$
Typical Scenario:OptiX RTN 910 Installed and Commissioned in CaBS3900 S300
天线 抱杆
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 6/272
Page 6
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 7/272
Page 7
inet
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 8/272
Page 8
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 9/272
Page 9
Standard Installation Tools for Installation of Optix RT
Diagonal plier Paper knife *)D%pre+e
File ,ire cutter )olid wrench -d.ustable wrench
-llen wrench adder 0ulti$eter Co$pass ifting
Flathead screwdri+er10'%023
Crosshead screwdri+er10'%023
Cable cla1for #!%oh
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 10/272
Page 10
Cleaner Tor4ue wrench )ocket wrench Teles
)aft5 hel$et Ca$era Cri$per For
Percussion drill1for instalaltion on wall7
dia$eter8 !3
Claw ha$$er 1for installation on wall3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 11/272
Page 11
N910
nti+e glo+e 0ark pen
Cri$ping pliers
hook ifting rope
ping knife $ * cable3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 12/272
Page 12
cope )afet5 belt
fe6 e+el bar
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 13/272
111 1!1 1"1
Prepare for installation Assemble the pole
!8!! !8! !8! !8#9 !8#9 !89!
:perator #C :perator #C :perator #C
11! 1!! 1"! 1$
Assemble the antenna
!8!! !8! !8! !8'! !8'! !8;! !8;! !89!
:perator %' :perator %' :perator :perator
;! !
1""
!8'! !8;9
:perator %'
1(1 191
8;! 899 899 #8'!
:perator #C' :perator #
19!
Stand
Prepare for theoperations on the tower
Perform unpackinginspection
Install the hbri!coupler
Install :DU
Assemble the out!oorconnectors for I" cables
#ift an! install the I"cable
Connect the IF connectorsof the :DU< take
waterproof $easures forthe IF connectors< and bind
the IF cables
StartStart
$
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 14/272
Power o
899 #8;9 #8;9
:perator C' :perat
1(! 19"
Affi' the labels
8;9 #8! #8! #8;9
:perator % :perator %
1(" 19$ 110
(lean up the site
8;9 #8! #8! #8#! #8#! #8'!
:perator :perator :perator
)roun! the I" cables an!take waterproof measures
for the I" cables
Install an! wrap the *1cable
+oute the in!oor I"cable
Install the power cableof the e&uipment
■A/B/C/D/E 5 people will fnish the implementation o the new site within 8 hours
■T)e distance bet*een t)e ! sites is i+nored
■A/B are experienced on Microwave installation
,
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 15/272
1,1 1-1
!89! 89 89 8;!
:perator .%'/#C :perator .%'/#C
1,! 1-!
Install the D(DB Install th
!89! 89 89 8'9 8'9
:perator %' :perator %' :perator
11$
28#! =89!
:perator #
111 11! 11" 11$
rd Installation Procedure for OptiX RTN 910
#ift an! install thepole
#ift an! install the antennagroun! /D.
Install the 19inch rack
Co$$issioning the antennaSite %2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 16/272
n the e&uipment
#899 #899 '8! '8! 28#!
r % :perator % :perator %#C' :perator #
11$
28#! =89!
:perator %C'
9
Perform per4*commissioning
Install 0icrowa+ee4uip$ent)ite B2
-fter finish installation of stie B< B/Dreturn to site - for co$$issioning the
antenna
Co$$issioning the antennaSite #2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 17/272
1
ID. an! DD"
8;9
%'
11,1
,
$
,
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 18/272
=89! >8!!
:perator
11,!
* loopback test
=89! >8!!
:perator %
Perform selfcheck on theinstallation an! take photograph
#(C')
EndEnd
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 19/272
Page 19
aterials of OptiX PTN910 site
IDU subrack RT?@! IDU subrack RT?@9! IDU subrack RT?@>! :DU H5brid
-ntenna (ore en! terminal (able ties 7aterproof mastic cement /r!er wire
I" cable Power cable Protection groun!ing *1 cable 4con
)rou! clip -dhesi+e insulation tape 1mm groun! cable (apti8e nut *1 c
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 20/272
Page 20
coupler Panel screw
telephone (rosso8er cable
ector #ightning protection terminal
able Panel screw
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 21/272
Page 21
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Proces
111 Prepare for t)e installa
Check the design docu$ents 7
;
parabolic antenna installation $anual
:ptiA RT? @!! radio trans$isssion s
' 0ake the labels according to the
;
9 Tools 1see tools card in this guide3 &
2
=
#
'
#
; 9
Check installation condition1placebar<hole<indoor en+iron$ent 7
<=
<=
>?@
<=
>?@
<=
<=
>?@
<=
>?@
#abels
Design !ocuments
#%-
#%B
#%B
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 22/272
Page 22
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 23/272
P
Operator Operation Time
ion #C 10 min
Steps
1In packed bo63 7
5ste$%IDU:DU 4uick installation guide 7
re4uire$ent of Huawei1optional3
4ey Tec)ni5ues
Tools6eters
'
2
of antennacableIDU< power<cable rack<earth
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 24/272
Page 2
aterials
#
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 25/272
Page
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
11!%
#
'
;
9
2
4
# Forbid touching the surface of $etal with
' !npa"#ed e$%ip&ent and 'rapper s
Paper knife #
; 9
Inst
Perform t)e unpac3in+inspection
Check the IT*0 nu$ber on the packagetributar5 board< * cable and DDF&
During the process of transporting< handparts or co$ponents do not collide with o
+R
DDF
I" boar!Tributar5
board
IDU
Caterial for In!oor Installation
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 26/272
Page 26
#
' ;
9 2
Powercable
)roun!cable
IDU accessor5packet
*cable
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 27/272
Pag
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
1D1D;B
1
;
3
%
-
1
; Forbid touching the surface of $etal w
3 !npa"#ed e$%ip&ent and 'rappe
%
1 Paper knife ;
% *)D%pre+enti+e glo+e - C
Ins
Perform t)e unpac3in+inspection
Check whether the goods< including thconsistent with the 0R/packing list7
Check whether the dia$eter and f re4uconsistent with the design docu$ent&
During the process of transporting< hanparts or co$ponents do not collide with
:DU accessor5 case
I" cable
:DU
Antenna
(heck the fre&uenc ban! ofthe /D.
)oo!s for /ut!oor Installation
、 、 &、 、 &、 、 &、 、 &、 、 &、 、 &
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 28/272
Page 28
1 ;
3 %
-
(heck the !iameter an!fre&uenc ban! of the
antenna
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 29/272
Operator Operation Time
%' , min
Steps
ec)ni5ues
painting with wet or dirt glo+e
ld )e &o*ed to indoor
ls6eters
*)D glo+es '
2
tion aterials
0R&Including the IDU< IDU accessor5 package< IF board<
and installing the e4uip$ent< $ake sure that the spare
r ob.ects< doors< walls< or shel+es&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 30/272
Page 30
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 31/272
Operator Operation Time
A * - min
Steps
ec)ni5ues
painting with wet or dirt glo+e
ld )e &o*ed to indoor
ls6eters
3
a$$er
tion aterials
nna< :DU< :DU accessor5 bo6< and IF cable< are
and of the antenna< the fre4uenc5 band of the :DU are
and installing the e4uip$ent< $ake sure that the sparer ob.ects< doors< walls< or shel+es&
head screwdri+er10'%023
0ark pen
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 32/272
Page 32
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 33/272
Page 33
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
1!1 %ssemble t)e pole
Fi6 the first U%bolt to one end of the pol
# Fi6 the second U%bolt to the other end o
'
;
9
2
4ey
The U%bolts should be fi6ed to the pole
#
'
To
Soli! wrench #
; 9
>?@
>?@
>?@
#%-
%- %B
%C
#%B #%C
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 34/272
Page 3
0icrowa+e pole #
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 35/272
Pag
Operator Operation Time
#C 1, min
Steps
f the pole
ec)ni5ues
ir$l5&
ls6eters
'
2
aterials
ocket wrench
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 36/272
Page 36
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 37/272
Page37
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3i
1!!% %ssemb
Deter$ine the position wh
# Install the connecting ears
'
; Fi6 the chassis to the cabi
9 Fi6 the other end of the P
2
The chassis is properl5 fi6
# The P?D cables are pro
'
Phillips screwdri+er
; Cable peeler
:ptiA PT? @! chassis
0ake the :T ter$inal of ththe back of the chassis&
>?@
>?@
>?@
>?@
%- %B
# '%-
'%B '%C
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 38/272
Pa
'
9
Bare pressure ter$inal%:$$#%0;
ca e% & $$ %5e
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 39/272
Page39
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3i
1!!# %ssemb
# .sing the screws of the au
'
;
9
2
=
#
Allen wrench
;
+eflector
Put the reflector on the shield
Install the two brackets of the
<=
>?@
<=
>?@
#%- #%B
'%- '%B '%C
'%D
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 40/272
Page0
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 41/272
Page
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3i
1!!C %ssemb
Fi6 the $ounting ki ts to the an
#
' -ppl5 the anti%seie grease to
;
9
2
=
#
)olid wrench
;
oosen the screw in the $iddlin the suitable position for the
<=
>?@
<=
>?@
>?@
>?@
%- %B %C
#%- #%B '%-
'%B '%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 42/272
Page
0ount
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 43/272
Pa
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or
1!! %ssem
+emo8e the % screws from
# Insert the fee!er into an
' :urn the fee!er to the su
; "i' the fee!er b the % s
9 "i' the ring accor!ing as
2
:he polariGation must mee
#
'
;
"ee!er
screwdri+er
<=
<=
>?@
78 )oriontal:8 :ertical
:op
#%- #%B
'%- '%B ;%-
;%B 9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 44/272
Page
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 45/272
Page5
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3i
1!!' %ssemb
Assemble the strut an! bol
#
'
;
9
'
;
Solid 'ren"(
;
Support collar
<=
<=
>?@
%- %B
%C %D
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 46/272
Page6
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 47/272
Pa
n+ Process Operator Operation Time
le t)e antenna %' , min
X
re the chassis is installed in the cabinet< and install the capti+e nuts&
of the *T)I cabinet&
et b5 using the Phillips screwdri+er&
?D cable to the grounding point of the cabinet&
4ey Tec)ni5ues
d&
erl5 connected&
Tools6eters
# Cord end cla$p ' Cable cutting plier
9 Heat gun 2
aterials
#
e P?D cable< and connect the P?D cable to the grounding point on the left of
;6capti+e nut%02;6panel screw%026#T0%co$$on use
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 48/272
Pa
;
2 Heat shrink tube< binding strap
%#&9 Connecting ears and installation screws for the *T)Icabinet
w
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 49/272
n+ Process Operator Operation Time
le t)e antenna %' , min
Steps
iliar material to firm the reflector to the shiel!
4ey Tec)ni5ues
Tools6eters
# '
9 2
aterials
# Shiel!
Eensure the EFE of the reflector and the shield are $atched7
le+el strut on the position which $arks EFE on the shield&
Crosshead screwdri+er10'%023
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 50/272
Page50
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 51/272
n+ Process Operator Operation Time
le t)e antenna %' 10 min
Steps
tenna with ; 0#A'! bolts7
the fine ad.ust$ent screws< U%bolts and so on&
4ey Tec)ni5ues
Tools6eters
# '
9 2
aterials
e of ele+ation ad.ust$ent screw< then fi6 the forepart of ele+ation screw to the $ounting kitsdesired antenna center offset&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 52/272
Page
#
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 53/272
n+ Process Operator Operation Time
le t)e antenna % , IN
Steps
e fee!er hole
nna from the reflect si!e
table polariGation accor!ing to the !esign file
rews remo8e! before
the installation mo!eH make sure the ring is alwas up !uring hoisting
4ey Tec)ni5ues
the re&uirement of the !esign file
Tools6eters
# '
9 2
aterials
#
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 54/272
Page5
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 55/272
n+ Process Operator Operation Time
le t)e antenna ' , IN
Steps
ts
4ey Tec)ni5ues
Tools6eters
# '
9 2
aterials
#
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 56/272
Page56
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 57/272
Page 5
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
1"1 Prepare and climb to*er
Position of antenna on tower as
#
'
;
9
4
#
Co$pass #
; )afet5 belt 9
Design !ocuments #
:ake safet beltHblockHtools bagcable earth clampHwaterproof tatower
"i' the pulle on tower abo8e ththrough the pulle to groun!
'
%-
#%B
>?@
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 58/272
Page 58
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 59/272
Operator Operation Time
#C !, IN
Steps
esign !ocumentantenna highHaGimuth an! tower legJ
ey Tec)ni5ues
ools6eters
ifting rope ' ,ifting (oo#
2
aterials
spannerH!iagonal pliersHcutterH/D. earth cableHI"eHPK( tapeHbin!erHetcJan! the en! of rope up to the
antenna which will be mounte!:hrea! hanging rope
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 60/272
Page 60
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 61/272
Page
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
1"!%Assemble the hbri! coupler
#
'
;
9
2
4ey
:he polariGation must meet the re&uirem
#
'
To
#
; 9
Re$o+e the protecti+e cap of the feed boo$+ertical polariation& The arrow of feeder po
Check the polariation with the design< if it ilink is designed with the horiontal polariat)?&'&#BL
>?@
<= >?@
>?@
>?@
#%-
>?@
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 62/272
Page ;
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 63/272
Page
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Process
1"!#
oosen the bolts that fi6 the feed boo$7
# :ake out the 8ertical polariGation part
' /ffloa! the 8ertical flangeHswich it to
; Insert the polariGation parts into the
9
2
4ey
Neep the polariGation con8erter properl
#
'
To
Allen wrench #
; 9
Assemble the hbri!
couplermo!if the
polariGation
Point the polariation indicator to the letter H$odification&
>?@
>?@
>?@
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 64/272
P
Obri! coupler
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 65/272
Stan!ar! /peration Proce!ure for /pti +:4 900 series
No 2or3in+ Proce
1"!CAssemble the hbri!
Re$o+e the two lifting rings of th
#
' +emo8e the protecti8e cap of
; Apll antiseiGe grease to th
9 Confir$ that the :DU is consiste
2 (lose the four latches corner
= Install the re$o+ed lifting rings o
:he polariGation an! the hbr
# Do not appl5 +aseline to the fron
'
;
Allen wrench
Re$o+e the protecti+e cap of thgasket of the feed boo$7
>?@
<= >?@
#%- #%B
9 2%- 2%B
#%C ' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 66/272
;
Obri! coupler
' Kaseline
9
=%- =%B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 67/272
Operator Operation Time
! IN
Steps
ec)ni5ues
nt of the !esign file
ls6eters
'
2
aterials
EThe default polariation $ode of the antenna is the
t at EGE7
+ertical polariation b5 default< turn to &'&#C7 If the radion< the polariation $ode needs to be $odified& )ee
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 68/272
Page 6
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 69/272
Operator Operation Time
, IN
Steps
M
horiGontal polariGationM
bri! coupler smoothlM
ec)ni5ues
ls6eters
'
2
< fir$ the screws b5 allen wrench and co$plete the
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 70/272
Page 50
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 71/272
Operator Operation Time
" IN
Steps
couplerM
screwsM
DU in the polariation $ode7
the % capti8e screws with allen wrenchM
a&
ec)ni5ues
must be consistent with the fee!erM
erior of the feed boo$&
ls6eters
'
< and then appl5 an appropriate a$ount of +aseline to the
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 72/272
2
aterials
Antenna
AntiseiGe grease
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 73/272
Standard Operation Procedure for OptiX RTN 910
No 2or3in+ Pr
1""%
Place the nut to the IF cable
# Place the cla$p to the end o
'
; Reser+e the shielding la5er o
9
2 Fit the IF cable in the bod5 o
=
#
'
;
Paper knife
Assemble the
connectors for
Fold back the shielding la5erinsulating la5er7
)trip the insulating la5er off< conductor to the arc shape7
S)eat) S)ieldin+layer
Insulatin+layer
Innerconductor Nut Clamp Slee;e #ody
mm
%- %B %C #
' ;%- ;%B ;%-
9%- 9%B 9%C 9%D
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 74/272
Page
; File 9
IF cable #
' ;
9 2
Standard Operation Procedure for OptiX RTN 910
No 2or3in+ Process
1""#
)et the $ulti$eter to the continuit5 test $
#
' If no bu is generated< the IF cable is no
; If the bu is generated< the IF cable is s
9
2
=
4
Assemble the out!oor
connectors for I" cable
Connect one needle of the $ulti$eter to other needle to the core of the IF cable c
>?@
>?@
安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 &
!
>?@
>?@
>?@
>?@
安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 &
"5mm
9%* 2%- 2%B 2%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 75/272
Page 5-
#
'
;
To
Cultimeter #
' ;
#
' ;
9 2
Standard Operation Procedure for OptiX RTN 910
No 2or3in+ Process
1""C
0ark the IF cable b5 color tape to identif5 wh
# Cark the I" cable with out!oor labelM
' Protect the IF ter$inal to a+oid the da$age
Assemble the out!oor
connectors for I" cables
#
#%- #%B
>?
@
>?
@
安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 &
>?
@
>?
@
>?
@
>?@
安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 & 安装绝缘垫片 &安装螺栓、弹垫、平垫在绝缘垫片上 &
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 76/272
;
9
2
#
'
;
Diagonal pliers
;
PGC tape
' :utdoor label
9
'%- '%B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 77/272
Operator Operation Time
%'
Steps
he sheath off the IF cable 7
off the redundant part 7
tighten the bod5 and nut with the wrenches1)2$$37
ec)ni5ues
ls6eters
Diagonal pliers ' )olid ,rench
1, IN TOT%<)
hen< place the slee+e between the shielding la5er and the
ner conductor of ;&9 $$& Then< file the head of inner
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 78/272
2
aterials
IF cable connector 1?%R>% Connector3
Operator Operation Time
%'
Steps
e&
al&
%circuited& The IF cable connector should be $ade again&
ec)ni5ues
1, IN TOT%<)
e6ternal conductor of the IF cable connector& Connect theector&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 79/272
ls6eters
'
2
aterials
Operator Operation Time
%'
Steps
ich connected to $ain :DU< if it is ( configuration7
during hanging &
1, IN
TOT%<)
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 80/272
Pa
ec)ni5ues
ls6eters
'
2
aterials
Cable tie 1black3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 81/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ P
1$%
#
' Close the four latches corne
-ppearance of the :DU )eparate 0ounting Bracket ; Install the stand b5 :DU in
9
# :he interface for I" cabl
-ppearance of the -ntenna -dapter '
;
Assemble
Re$o+e the protecti+e capsgasket of the feed boo$&
Confir$ that the :DU is con:DU on the $ain interface 1?otice the arrow indicator o
The $ain :DU $ust be $o$ounted no to the standb5 i
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 82/272
Page 6;
:DU #
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 83/272
Page 63
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
1$#
Re$o+e the nut of the grounding point7
# Connect the P?D cable of :DU to the gro
' )crew the nut< fi6 the P?D cable of :DU7
; 0ark the opposite site na$e/ID on the back
9
4ey Te
0ark the opposite site na$e/ID on the back
#
'
;
Too
Solid 'ren"( #
; 9
Asseble O=
>?@
<=
>?@
>?@
>?@
>?@
%- %B %C
#%- #%B #%C
'%- '%B '%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 84/272
Page 6%
P?D cable of :DU #
' ;
9 2
)tandard :peration Procedure for :ptiA RT? @!! )eries
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 85/272
Operator Operation Time
, IN
Steps
)ni5ues
pposite of lifting ring
ls6eters
'
2
Caterials
< and then appl5 an appropriate a$ount of +aseline to the
oupler in the polariation $ode& Then< install the $ainstall the standb5 :DU on the standb5 interface of coupler&
ain interface of coupler and the standb5 :DU $ust beler&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 86/272
Page 6
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 87/272
Operator Operation Time
, IN
Steps
nding point7
of the antenna&
)ni5ues
of the antenna&
ls6eters
+ar# pen '
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 88/272
Page
aterials
!&2$ antenna
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 89/272
Pag
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
1,1#iftinstall the pole
Bin! the lifting rope to the two en!s o
#
BCD* control the lifting rope< - controls the
B and C confir$ the direction of the pole in t
' "i' the ; :brackets to the towerM
; A!Qust the nether :bracket to make the
9
4ey Te
# Cake sure the pole 8erticalit
'
To
#ifting rope #
; 9
Cateria
(onfirm the right location of the pole!ocumentsM
<=
>?@
<=
>?@
>?@
>?@
#
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 90/272
P
Cicrowa8e pole #
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 91/272
Operator Operation Time
.%'/#C !, IN
Steps
the poleM
dragline7
he installation position according to the design7
pole 8erticalM
c)ni5ues
ls6eters
Safet belt ' Solid 'ren"(
2
Caterials
ccor!ing to the height an! aGimuth of the !esign
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 92/272
Page 9;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 93/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pro
Install the 19in
Cark the !atum marks accor
#
'
;
9
#
Percussion !rill
' +ar# pen
*'pansion bolt
1,!%
Drill the install holes b5 percuthe dust around the holes7
Put the e'pansion bolt 8ertube into the hole complet
:he !rill bit shoul! keep same
:he !ust in an! aroun! the
it shoul! be !rill again
<=
>?@
<=
>?@
#
'
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 94/272
Page 9%
'
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 95/272
Pa
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Proce
Install the 19inch
"i' the chassis to the gantr
# Co8e the cabinet to the holes
' "i' the screw !ri8ers to both
;
9
#
; 9
@%inch cabinet
1,!#
If it is o8erhea! cablingH !o un!erfloor cablingH !o not in
Crossheadscrewdri+er
>?@
>?@
%- %B
#%- #%B
'%- '%B
Insulating boar!
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 96/272
Page 9
'
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 97/272
Page
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
Install the 19inch c
# Connect the Core end ter$inal to th
' 7iring the groun! cable to the i
; 0ake the Core end ter$inal on the o
9
Keep the groud cable connecting to
#
'
;
#
; Paper knife 9
1,!C
0ake a Core end ter$inal on one en&;&#D&
Crossheadscrewdri+er
>?@
>?@
>?
>?
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 98/272
Page 96
Core end ter$inal
'
9
@
@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 99/272
Pa
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Proce
Install the 19inch
Cut off the power cables to a pro
#
' Press the endface to the conduc
;
9
#
'
;
Cri$ping pliers
;
1,!
Insert the e6posed conductor intendface of the core end ter$inal
,hen $aking the core end or rinthe ter$inal and press the endfa
>?@
>?@
> >
$ MM
%- %B %C
%D #%- #%B
'%- '%B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 100/272
Page 100
Core end ter$inal
'
9
@
@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 101/272
Operator Operation Time
( IN
Steps
the !esignM
ey Tec)ni5ues
Tools6eters
' Solid 'ren"(
#e8el bar 2
aterials
#
%'
ill with a 2J drill bit< at the sa$e ti$e< using a cleaner clean all
into the holeHuse a claw hummer to strike the e'pansionmo8e the e'pansion bolt
l !uring !rillingH the !epth of all the holes shoul! be the
shoul! be cleane! up If the hole is too flat or inclineH
-la' (a&&er
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 102/272
Page 10;
;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 103/272
Operator Operation Time
- IN
Steps
fi' the % screws of the bottomM
e screw the screwsM
e of the gantr accor!ing to the !esign
ey Tec)ni5ues
Tools6eters
'
2
aterials
# Insulating boar!
%'
install the screw !ri8ers in the bottomM if it is
l the uppermost screw !ri8ers
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 104/272
Page 10%
;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 105/272
Operator Operation Time
- IN
Steps
grounding point7
!oor groun! bar along the cable la!!erM
her end of the ground cable< then connect to the indoor grand bar&
ey Tec)ni5ues
e Core end ter$inal fir$l5&
Tools6eters
Diagonal plier ' Soli! wrench
Cri$per 2
%'
of the ground cableRT?UVWXY:TZ[E\]^_`
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 106/272
aterials
#
;
2
2$$# ground cable
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 107/272
Operator Operation Time
, IN
Steps
ength&
5 using the cri$ping pliers&
ey Tec)ni5ues
Tools6eters
Paper knife '
2
%'
core end ter$inal& *nsure that the conductor is le+el with the
r$inal< 5ou should le+el the e6posed conductor with the endface ofthe conductor with the cri$ping pliers&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 108/272
Page
aterials
# )roun! cable
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 109/272
Standard Operation Procedure for OptiX RTN 910No 2or3in
1,1%
#
' -fter lift the antenna to a
;
9 +emo8e the ; rubber p
2
The U%bolt of the $ount
#
#ifting rope
; Safet belt
#ift an!
an
Bin! the lifting ropemounting bracket
BC sta5 on the tower< -
Fi6 the anti%fall angle irobracket< install the hori
<=
>?@
<=
>?@
>?
@
>?
@
>?
@
#%- #%B
' ;%- ;%B
9;%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 110/272
Page
Antenna
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 111/272
P
Standard Operation Procedure for OptiX RTN 910No 2or3in+
1,1%
lift the le8el strengt
# Install the le8el stre
'
;
9
2
:he angle between the
# :he angle between the
#ifting rope
; Safet belt
#ift an! i
ant
Fi6 the other end of le+elbe no $ore than #9 degre
>?@
>?@
>?@
#%- #%B
#%C '%- '%B
'%C '%D '%*
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 112/272
#e8el str
'
9
:he angle between the ro! an!horiGaontal shoul! be no morethan ;- !egrees
. /
e ang e etween t e roan! antenna shoul! be lessthan 90 !egrees
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 113/272
Page1
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Pro
1,1# O= +roun
# Fi6 the fi6ing clip of the groun
' Bind the ground cable to the t
;
9
The position of grounding poi
#
'
;
Soli! wrench
;
Deter$ine a proper groundingpoint&
>?@
>?@
>?@
>?@
%- %B #%-
#%B #%C '%-
'%B '%C '%D
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 114/272
round cable of the :
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 115/272
cess Operator Operation Time
.%'/#C
Steps
er place< -D could fi6 the lifting rope to the tower< then prepare ne6t step&
f the scuppers in the bottom of the antenna
4ey Tec)ni5ues
acket should fi6 to the pole fir$l5&
Tools6eters
# Pulling rope ' Soli! wrench
9 2
#ift an! install the
antenna
"0 INTOT%<2
e lifting ring of the antennaHbin! the pulling rope to the
the lifting rope on the ground< * controls the pulling rope7
e pole< fi6 the antenna to the pole with the # U%bolts of the $ountingine ad.ustable rod to the anti%fall angle iron&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 116/272
aterials
# Counting bracket
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 117/272
cess Operator Operation Time
.%'/#C
Steps
ro! to the install locationM
n ro! to the le8el le8er mechanical partM
4ey Tec)ni5ues
n! horiGaontal shoul! be no more than ;- !egrees
n! antenna shoul! be less than 90 !egrees
Tools6eters
# Pulling rope ' Soli! wrench
9 2
aterials
#ift an! install the
antenna
"0 INTOT%<2
gthen rod to the tower& The angle between the rod and horiaontal shouldThe angle between the rod and antenna should be less than @! degrees&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 118/272
#
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 119/272
cess Operator Operation Time
din+ #C
Steps
d cable to the grounding point&
ower and cut off the redundant bundling tape&
4ey Tec)ni5ues
t should be lower than the antenna&
Tools6eters
# Diagonal plier ' #e8el bar
9 2
"0 INTOT%<2
point on the tower& Then< re$o+e anti%rustic paint or rust at the grounding
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 120/272
aterials
# Bundling tape
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 121/272
Page 1
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Process
1-!%
"ollow the !esignH install the % cap
# Put the DCDB into the cabinet< fi6 it with
' Screw off the % screws of the panel
;
9
2
4ey
#
'
#
; 9
Install C#
Connect the %;>G blue power cable to thcable to the circuit breaker grounding po
The dia$eter of the power cable$ust be
Crossheadscrewdri+er
$=
- po'er"a)le
<= >?@
<=
<=
>?@
<=
>?@
>?@
%- %B
#%- #%B
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 122/272
Pa
DCDB
' (apti8e screw
9
- - 8po'er "a)le
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 123/272
Page 1;3
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Process
1-!#
# Connect the power cable fro$ DCDB to the
'
;
9
2
4ey Te
:he %6K blue power cable shoul! be con
#
'
To
# C
; Paper knife 9
Install C#
Place the power cable of DCDB1blue one aalong the cable rack7
Crossheadscrewdri+er
<= >?@
<=
>?@
>?@
>?@
- gro%nd"a)le
- -8 po'er
"a)le
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 124/272
Page 1
DCDB #
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 125/272
Pa
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Proces
1-!C
Connect the ground cable to DCDB
# Place the DCDB ground cable to t
'
;
9
2
# Check if the +oltage is in the accep
'
Crosshead screwdri+er #
; Paper knife 9
Install C#
Cut the power cable in a suitable leter$inal< connect to the ground ba
The dia$eter of the power cable $
<= <=
<=
>?@
<=
- gro%nd"a)le
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 126/272
Page 1
DCDB #
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 127/272
Operator Operation Time
%' ( IN
Steps
screws to the cabinetM
nel screws7
(DBH then remo8e the panelM
)ni5ues
ls6eters
ri$ping pliers ' Core end ter$inal
2
aterials
t chief circuit breaker< sie 2'-< connect the black groundpside&
$#&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 128/272
Pa
Power cable
Panel screw
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 129/272
Operator Operation Time
%' - IN
Steps
proper circuit breaker of the power distribution cabinet&
c)ni5ues
ecte! to the circuit breaker in siGe 3A
ls6eters
ri$ping pliers ' Core end ter$inal
2
d black one3 to the DC power distribution cabinet indoor<
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 130/272
Page 1
aterials
Power cable
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 131/272
Operator Operation Time
%' - IN
Steps
bar indoor along the cable rack7
)ni5ues
e< then connect %;>G power&
ls6eters
Cri$ping pliers ' Core end ter$inal
2
rding to the location of ground bar< $akr the core end
$$#&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 132/272
Page 1
aterials
)roun! cable
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 133/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pro
1% Install I
:btain the IDU and ground ca
# Re$o+e the two screws at the
' Use the re$o+ed screws to fi
;
9
2
# Tighten the four front panel s
' There $ust be a space of two
;
;
Fi6 the four capti+e nuts to thIDU7
Hold the IDU with both handsdiagonal se4uence& In this $a
-sse$ble :T ter$inals to onthe @Erack&
,hen installing the IDU @!! oholes on the installbar&
screwdri+er
!=
%- %B #
'%- '%B ;
9%- 9%- 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 134/272
Pa
IDU
' ; capti+e nuts
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 135/272
Pag
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Proces
1#Install the boar
Take out the tributar5 board fro$ th
#
' Push the board to ensure that the b
; Press the e.ector le+ers inward forc
9 Tighten the two screws on the front
2 Install the IF board in the sa$e $a
7hen installing the boar!sH wea
#
'
;
#
; 9
Press the e.ector le+ers with both hboard cannot $o+e forward7
screwdri+er
%- %B #
' ; 9
2%- 2%B 2%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 136/272
Page 136
Boar! #
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 137/272
Operator Operation Time
%' $ IN
Steps
int on the left of the IDU7
ble to the grounding point of the IDU7
c)ni5ues
nal se4uence&
nd below the IDU chasssis for heat disspation&
ls6eters
'
2
aterials
he rack colu$n< according to the deigned location of the
DU into the rack& Then< t ighten the four panel screws in as fi6ed to the rack7
?D cable<ink the :T ter$inal to the grounding screw on
en rack< 5ou should fi6 two capti+e nuts with a space of four
ead screwdri+er10'%023
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 138/272
round cable of IDU
; panel screws
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 139/272
Operator Operation Time
%' ! IN
Steps
e7
aught tightl57
c)ni5ues
static glo8es
tistatic glo8es '
2
aterials
n< insert the board s$oothl5 along the board track till the
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 140/272
Page 10
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 141/272
Stan!ar! /peration Proce!ure for /pti +:4 900 Series
No 2or3in+ P
1(1#ift an! insta
Put the hanging rope along
#
'
;
9 Cake the coile! cable a
2
# Cake sure I" cable is st
'
;
#ifting rope
;
Bind the IF cable and feedecable 7
Reser+e the IF cable and fcircle of $ore than !&2 $et
Place the I" cable alongthe fee!er win!owM
,hen binding the IF cable
connect $ight be da$aged
d"
d
d"
d
>?@
>?@
06+
#%- #%B
'%- '%B ;
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 142/272
Page 1%
I" cable
'
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 143/272
Operator Operation Time
#C' 1, IN
Steps
ladder down to the ground7
f cur8e in front of the fee!er win!ow
ey Tec)ni5ues
ring liftingH a8oi! crimp happens
Tools6eters
)olid wrench ' Diagonal plier
2
ting rope on the ground< then pull up the lifting rope with the IF
tra three to fi+e $eters at the :DU& Coil the e6tra cable into aeter< and fi6 the cable to the tower 7
e la!!erH lea! the I" cable into the e&uipment room through
g rope< 5ou canLt bind the connector with the rope& :therwise< theng process&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 144/272
Page 1
aterials
# (able ties
;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 145/272
Pag
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+
1(!%
# Route the * cable f ro$
'
;
9
#
'
;
; Paper knife
Install an! r
Connect the * cables tocables&
Cut the * cables to a proas T6/R63&
Connect the * connecto
screwdri+er
%- %B %C
%D # '
;%- ;%B ;%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 146/272
' Cable ties
9
#!*
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 147/272
Pa
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in
1(!#
# ead * cables through
' )trip off the skin< shield
;
9
#
'
;
Diagonal plie
; Paper knife
a3e '1 co
+e$o+e the KR:?* $
Pass the core wires of t
Place the core wires ofa cable punchdown too
# '%-
'%B '%C '%D
'%* ; 9%-
9%B 9%C 9%D
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 148/272
' Cable tie
9
#!*
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 149/272
Page 1%9
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pr
1(!C
%inCa&le '!
(emar)s %inCa&le '#
(emar)sColor (elation Color (elation
15 l%ePair Tx1
38 l%ePair Rx1
#
30 4(ite 23 4(ite '
1 OrangePair Tx2
37 OrangePair Rx2
;
29 4(ite 22 4(ite 9
13 reenPair Tx3
36 reenPair Rx3
28 4(ite 21 4(ite
12 ro'nPair Tx
35 ro'nPair Rx
#
27 4(ite 20 4(ite '
11 re
Pair Tx5
3 re
Pair Rx5
;
26 4(ite 19 4(ite
10 l%ePair Tx6
33 l%ePair Rx6
25 Red 18 Red ;
9 Orange 32 Orange
Install se4uence of #
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 150/272
Page 1-0
2 Red 17 Red
8 reenPair Tx8
31 reenPair Rx8
'
7 Red 16 Red 9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 151/272
cess Operator Operation Time
% 1, IN
Steps
DU to the DDF< bind the cable to the rack b5 bunding tape7
4ey Tec)ni5ues
Tools6eters
# Cark pen ' Impact tool
9 Diagonal plier 2
'1 cable
* interface on the tributar5 board& Then< tighten the screws to fi6 the
length and $ark the cables for the trans$it and recei+e directions 1such
he DDF7 *?E\]^_`&>&#B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 152/272
aterials
# PGC insulation tape
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 153/272
cess Operator Operation Time
% 10 IN
Steps
fro$ the back of DDF to the front7
and protect la5er< protect the * cable b5 PGC tape7
4ey Tec)ni5ues
Tools6eters
# Cark pen ' Impact tool
9 2
aterials
tors .1!0
ro$ DDF7
cable through the hole of the KR:?* $odule7
le to the forepart of KR:?*< then punch the wires into KR:?* b5 usingse4uence< see &=&#C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 154/272
# PGC insulation tape
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 155/272
P
cess Operator Operation Time
Steps
4ey Tec)ni5ues
Tools6eters
# '
9 2
aterials
!* cable
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 156/272
Page 1-
#
;
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 157/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+
191%
#
'
;
9 ,rap the PGC tape on bo
# The redundant of cable tie
'
;
Paper knife
;
2aterproconnector
Connect the connector of
with a wrench7
,rap the connector with othe :DU 7
,rap the connector with tdirections of the three la5e
,rap the connector with tof the three la5ers are fro$
,hen wrapping the conne'/; of its original width& In
!#
*
!#
*
!
%- %B #
'%- '%B ;
9%- 9%B 9%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 158/272
7aterproof mastic ce
' (able tiesBlack
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 159/272
Page 1-9
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
191#Bin I" cable
Bind IF cable to the cable ladder e+er5 $ w
# Cut off e6tra part of cable ties&
'
;
9
2
4ey Te
The redundant of cable tie $ust be 9%!$$&
#
'
;
To
Diagonal plier #
>?@
>?@
#
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 160/272
Page 1
I" cable #
' ;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 161/272
Operator Operation Time
# 1, IN
Steps
cable tie& Then< cut off the redundant bundling tape&
)ni5ues
ls6eters
iagonal plier '
2
interface on the :DU& Then< tighten the connector gentl5
pe 'M9 c$ below the connector and toward the direction of
rproof tape 'M9 c$ below the connector& The wrappingo up< fro$ up to down< and fro$ down to up respecti+el57
tape 'M9 c$ below the connector& The wrapping directionsup to down< and fro$ down to up respecti+el5 7
proof tape and PGC tape< 5ou should stretch the tape tola5er should co+er about /# of the lower la5er&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 162/272
Page 1;
aterials
PGC tape
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 163/272
Operator Operation Time
# "0 IN
Steps
ith cable ties&
)ni5ues
ls6eters
'
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 164/272
Page
(able tiesblackJ
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 165/272
Page
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
19!%
(onfirm the location of the groun!ing
#
'
;
9
4ey T
#
'
;
#ocations of the groun!ing clips Positions of the groun!ing connections
To
#
# /ut!oor groun!ing bar un!er the fee!er win!ow ; 9
?roundin+ Points of t)e I>Cable
)roun!ing
steps 4oD
:he place about 1 m awa from the I"interface of the /D.
(onnect the groun!ing cable accor!ing to the groun!ingpoints on the towergroun!ing bar or towerJ
The place about $ awa5 fro$ the point wherethe cable is routed onto the wiring fra$e
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 166/272
'
'
9
:he mi!!le point of the cable when thecable on tower is longer than 0 metersJ
(onnect the groun!ing cable accor!ing to the groun!ingpoints on the towergroun!ing bar or towerJ
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 167/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Proces
19!#
# Fit the grounding clip where the sh
'
;
9
2
# )trip the sheath off the IF cable ac
' DonLt strip an5 shielding la5er of th
;
Paper knife #
; 9
Perform t)e ?roundin+I> Cable
Deter$ine where the grounding cl
according to the length of the grou
The angle between the ground ca9 degrees& Route the ground cab
>?@
>?@
*8mm
%- %B %C
%D #%- #%B
#%C
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 168/272
P
I" cable clip
'
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 169/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pro
19!C7ater proof of
#
'
; ,rap the PGC tape on both e
9 +emo8e the paint in a suit
2 Fi6 another end of grounding
#
'
;
"ile
,rap the connector with three
of the :DU7
,rap the connector with threedirections of the three la5ers a
,rap the connector with threeof the three la5ers are fro$ do
The angle between the ground9 degrees& Route the ground
!!
#*
!#
*
>?@
>?@
# '
; 9 2%-
2%B 2%C
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 170/272
;
PGC tape
'
9
(able tiesblack2
o'n
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 171/272
Operator Operation Time
#C ,0 IN.In total/
Steps
oints
)ni5ues
ls6eters
'
2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 172/272
Page 172
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 173/272
Operator Operation Time
#C ,0 IN.In total/
Steps
ipped off on the IF cable< and then tighten the screws&
)ni5ues
the length of the grounding clip&
&
ls6eters
ross screwdri+er '
2
ed on the IF cable& )trip the sheath off the IF cable
ted to the grounding clip and the IF cable can)?t e6ceede route of the IF cable&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 174/272
Page 17
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 175/272
Operator Operation Time
#C ,0 IN.In total/
Steps
cable tie& Then< cut off the redundant bundling tape7
g place of the towerM
ding bar and bind the grounding cable to the tower&
c)ni5ues
ls6eters
'
tape 'M9 c$ below the connector and toward the direction
rproof tape 'M9 c$ below the connector& The wrappingo up< fro$ up to down< and fro$ down to up respecti+el57
tape 'M9 c$ below the connector& The wrapping directionsup to down< and fro$ down to up respecti+el5 7
ted to the grounding clip and the IF cable can)?t e6ceede route of the IF cable&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 176/272
Page 1
2
aterials
7aterproof mastic cement
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 177/272
Page
Standard Operation Procedure for OptiX RTN 900 SeriesNo
11(lean the
Collect the tools and e6
# Clear up the e4uip$ent
'
;
9
?o packing bo6es or bo
# ?o cable ties or other su
;
d"
d-
d"
d-
d"
d-
d"
d-
d"
d-
d"
d-
d"
d-
d"
d-
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 178/272
Page178
'
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 179/272
or3in+ Process Operator Operation Time
(lean the site
1, IN
Steps
essi+e cables on site
roo$ and the outdoors&
4ey Tec)ni5ues
rds are placed at rando$ on the installation field&
ndries are left on the floor or in the cabinets&
Tools6eters
# '
9 2
aterials
#
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 180/272
Page180
;
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 181/272
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Pr
11$%
Follow the $icrowa+e antenn
#
'
;
9
#
'
;
;
%li+n t)e %ntennaPreparations
Deter$ine the +oltage +aluesCur+e and the $icrowa+e de
-100 -90 -80 -70 -60 -50 -40 -30 -20
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
RSL(dBm)
R S S I V o l t a g e ( V )
(hoose area
#%- #%B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 182/272
-100 -90 -80 -70 -60 -50 -40 -30 -200
0.5
1
1.5
2
2.5
RSL(dBm)
R S S I V o l t a g
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 183/272
P
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Proces
11$#
# Re$o+e the waterproof cap of the
'
;
9
#
'
;
0ulti$eter #
; 9
%li+n t)e %ntennas8C$ulti$eter
)et the $a6i$u$ +oltage that theeas5 obser+ation& Then< obser+e t
Connect the $ulti$eter to the wiretape&
#+,
#%-
#%B '%-
'%B '%C
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 184/272
Page 18
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 185/272
Standard Operation Procedure for OptiX RTN 910No 2or3in+ Proc
11$C
Fasten the antenna at the re$o
# :n the local antenna< loosen th
'
; I$$ediatel5 lock all in+ol+ed lo
9
?otice the +iew fro$ $ulti$eter
# Tighten the four nuts on the cla
'
;
0ulti$eter
;
%li+n t)e %ntennas8 -d.ust$ent
-d.ust the antenna in a wide ranthe rough ad.ust$ent< about threach peak signal and co$pare
0 7
"asten the antenna atremote site
OoriGontalA!Qustment
Site Site
N%ts t(at xt(e "la&ps
Bolts that connect theantenna an! the stan!
#e8ela!Qustmentscrew
2 3:
3:
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 186/272
Page 186
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 187/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pro
11"
oosen the bolts on the stand
#
'
;
9
,hen aligning the antennas< 5
#
'
;
0ulti$eter
;
%li+n t)e %ntennas8 -d.ust$ent
Perfor$ the fine tune around efine tune7
,hen the $a6i$u$ recei+e lele+el ad.ust$ent screw to fi6 th
Tighten all the bolts on the antand ensure the $a6i$u$ rece
Bolts that connect theantenna an! the stan!
#e8el a!Qustmentscrew
2 0 7
N%ts t(at xt(e "la&ps
1 2:
2: 3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 188/272
Page 188
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 189/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Proc
11"'
Fasten the antenna at the re$o
# oosen the bolts that connect t
'
; ,hen the $a6i$u$ recei+e le+
9
,hen aligning the antennas< 5o
#
'
;
0ulti$eter
;
%li+n t)e %ntennas8 -d.ust$ent
Rotate the ele+ation ad.ust$enpeak in e+er5 +ertical direction<
Tighten all the bolts on the anteand ensure the $a6i$u$ recei
"asten the antenna atremote site
KerticalA!Qustment
Site Site
Kerticala!Qustmentscrew
2 0 7
2 3:
3:
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 190/272
Page 190
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 191/272
P
Standard Operation Procedure for OptiX RTN 900 Series
No 2or3in+ Proces
11$>
# -d.ust the local and ro$te antenn
'
;
9
,hen aligning the antennas< 5ou
#
'
;
0ulti$eter #
; 9
%li+n t)e %ntennas8resite and align$ent repe
Follow the step &-< &B< &+alue of +oltage b5 $ulti$eter7
,hen the recei+e le+els of the loco+er&
Tighten all the bolts on the antennand ensure the $a6i$u$ recei+e
Site Site
Alignment+epeate!
Site Site
#
'%- '%B
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 192/272
Page 192
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 193/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
ciple7
)ni5ues
ls6eters
'
2
aterials
ecei+e le+el of the :DU< according to the :DU R)I%Gbnc1The :DU R)I%Gbnc Cur+e is deli+ered with the :DU3&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 194/272
Page 19
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 195/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
I port< connect the B?C connector to the :DU R))I port7
c)ni5ues
ls6eters
PGC tape '
2
r can detect to DC #! G< fi6 the $ulti$eter to the tower for+alue of the recei+e le+el when 5ou align the antennas7
nect the B?C connector Ethen protect the wire b5 PGC
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 196/272
Page 196
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 197/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
the antenna at local site 7
the cla$ps on the stand 7
tightl5 after ad.ust$ent co$pleted&
)ni5ues
he antenna< looking for the $a6i$u$ +iew&
onal se4uence&
ls6eters
)olid wrench '
2
aterials
ll5& In this $anner< the antenna is aligned roughl5&Duringals can be scanned& Then< perfor$ the fine tune around
recei+e le+el at each ti$e of fine tune7
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 198/272
Page 198
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 199/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
and the two ad.ust$ent nuts on the le+el ad.ust$ent screw7
)ni5ues
ne antenna and ad.ust the other antenna&
ls6eters
)olid wrench '
2
aterials
al and co$pare the $a6i$u$ recei+e le+el at each ti$e of
d<tighten the bolts on the stand base and the nuts on the
ghtening the bolts< 5ou should obser+e the recei+e le+el
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 200/272
Page 200
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 201/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
all5 align the antenna at local site 7
d the stand7
d< tighten the ele+ation ad.ust$ent bolt to fi6 the antenna &
)ni5ues
ne antenna and ad.ust the other antenna&
ls6eters
)olid wrench '
2
aterials
rench& Then< perfor$ the fine tune around the recei+e le+elthe $a6i$u$ recei+e le+el at each ti$e of fine tune7
ghtening the bolts< 5ou should obser+e the recei+e le+el
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 202/272
Page 202
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 203/272
Operator Operation Time
.%C/#' 1!0 IN.In total/
Steps
l57
)ni5ues
ne antenna and ad.ust the other antenna&
ls6eters
)olid wrench '
2
* to align the antenna at the site B to find the $a6i$u$
d re$ote :DU reach the design +alues< the align$ent is
ghtening the bolts< 5ou should obser+e the recei+e le+el
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 204/272
Page 20
aterials
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 205/272
Page2
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process Op
11,1
Steps
-ccording to the Checklist to check the hardware installa
#
' Re+iew the site 4ualit5 report&
;
9
4ey Tec)ni5ues
#
'
;
Tools6eters
(amera #
; 9
aterials
C)ec3 t)e )ard*areinstallation
#
Take photos on ke5 installation points of the base station re4uire$ents in the engineering docu$ents&
Be sure to collect all the re4uired data on site& This facilitae4uip$ent installation co$pletion report&
安装绝缘垫片 &、 、 & 安装绝缘垫片 &、 、 & 安装绝缘垫片 &、 、 & 安装绝缘垫片 &、 、 & 安装绝缘垫片 &、 、 &
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 206/272
Page206
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 207/272
tor Operation Time
10 IN
&
'
2
'2
rding to related
5ou to co$pose the
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 208/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 209/272
C
inks with APIC ena
Coattr$iAP
Create ?*s&
1
0ethod 8 Create an?* b5 searching the?* on the U#!!! ,ebCT&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 210/272
3
0ethod #8 Create ?*s$anuall5 on the U#!!!
,eb CT&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 211/272
1
3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 212/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 213/272
)et % Status aplanning file&The default % S
)et ?uarantee '1 Capacity accthe network planning file& )et thipara$eter to the sa$e +alue at b
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 214/272
&
:
1
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 215/272
Confi+urin+ t)e P
:
1
3
=
The general attributet5pe< and $a6i$u$ f
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 216/272
For ports that are being us
If 5ou set Port ode to <aType can be set to (0!1@
'ncapsulation Type8
For P#P *%ine ser
For G-?%based *
For an *thernet port that is1enerall5< 2or3in+ ode%utoANe+otiation&
,hen .u$bo fra$es are trreco$$ended that aB >r
For P#P *%ine ser+ices
For G-?%based *%ineonl5 the tagged fra$es<
allows the access of theplanning file&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 217/272
Under %d;anced %ttri
This operation is $andbroadcast packet supp
)et <oopbac3 C)ec3<
T)res)old according t)uggestions to configu
'nablin+ #roadcast Pbroadcast packets to th'nabled& For *%-? s
This para$eter is appli
Confi+urin+ t)e P:
1
3
It
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 218/272
=
The a5er # attributesOinO t5pe do$ain&
For P#P *%ine ser+ices
For G-?%based *%ine sonl5 the tagged fra$es< sallows the access of the tplanning file&
Under %d;anced %ttrib If 5ou set Speed %ir Int
are co$pressed for highI)U#/I)A#< it is reco$$
If 5ou set Speed %ir Intfor higher trans$ission
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 219/272
reco$$en e a 5ou This operation is $anda
enable the broadcast pa )et <oopbac3 C)ec3<
Suppression T)res)ol
)uggestions to configuri
'nablin+ #roadcast Paof the broadcast packetpara$eter to 'nabled&
This para$eter is applic ,hen the IFN*TH port t
ser+ice< 5ou can set 'rr
Confi+urin+ <
:
1
3
Confi+urin+ 'A
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 220/272
:
1
3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 221/272
Cloc3 confi+ura
3
2
1
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 222/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 223/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 224/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 225/272
-lowchart or Conf.urin. Microw
Creatin. 0es
Configure the RFconfiguration $ode&
For (! or ?(! configuration< skip th
reate an APICorkgroup&
bled
figure the h5brid/-0ibutes of H5bridrowa+e links withIC enabled&
Create an ?(protection group&
Crpr
inks configured with ?(protection
inks configured wi( protection
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 226/272
Chan.in. 0E 2Ds/0ames
=
3
=
>
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 227/272
Creatin. a !4! %rotection r
=
?
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 228/272
onf.urin. the 2-/6D7 2normation o
)elect 7 2or3in+
Thesepara$eters
take theirdefault+alues&
)electboardprotecprotecpaired
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 229/272
cording to the network
tatus is isabled&
odulation ode of t)eCapacity and odulatio% Capacity are a+ailabStatus to 'nabled&
ou can specif5 anual odulation onl5 if 5ou set % Status to isabled&
ording to
oth ends'nable '1 Priority is a+ailable onl5 if 5ou
set % Status to 'nabled&
The I)U#/I)A# supports threeIF $odes&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 230/272
Conf.urin. DM 9ervice
3
=
)et the le+el of the new
that is bound with GC%data ser+ice that is bouser+ices in a GC%; pass
)et the slot< port of theser+ice source is locateSource :C$ are una+aplanning file&
)et the slot< port of the
ser+ice sink is located&:C$ are una+ailable& )
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 231/272
Conf.urin. ;<&rid Ethernet 9
rameters of 't)ernet Ports
Ports on *thernet boards
of *thernet ports define the ph5sical%la5er infor$ation< sa$e length&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 232/272
d< set 'nable Port to 'nabled& For ports that are not used< set 'n
er !< 'ncapsulation Type can be set to Null< (0!1@< or @in@& Ifonl5& In this case< the port can be used to carr5 tunnel ser+ices&
+ices and I*** >!#&d bridge%based *%-? ser+ices< set 'ncapsu
ine ser+ices and I*** >!#&4 bridge%based *%-? ser+ices< set
connected to the e6ternal e4uip$ent< set 2or3in+ ode to a +aluof the e6ternal e4uip$ent is set to %utoANe+otiation&3 For *therne
ns$itted< set aB >rame <en+t).byte/ according to the actual lenme <en+t).byte/ takes its default +alue&
and I*** >!#&d bridge%based *%ine ser+ices< 5ou need not set t
ser+ices and I*** >!#&4 bridge%based *%-? ser+ices< set Ta+ tet Ta+ to %ccess if the port allows the access of onl5 the untagged
agged fra$es and untagged fra$es& )et efault :<%N I and :<
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 233/272
utes< set %C <oopbac3 and P7 <oopbac3 and 4uer5 the port
tor5 when 5ou need to enable the port self%loop test and auto$aticession function&
<oopbac3 Port S)utdo*n< 'nablin+ #roadcast Pac3et Suppre
the re4uire$ents&ing the 'nablin+ #roadcast Pac3et Suppression para$eter8
ac3et Suppression specifies whether to restrict the traffic of broade total packets& If a broadcast stor$ $a5 occur on the e4uip$ent ar+ices< it is reco$$ended that 5ou set this para$eter to 'nabled&
cable to *%-? ser+ices in the ingress direction&
rameters of I>D'T7 Ports
>
f 5ou set Port ode to <ayer !< 'ncapsulation Type can be set to<ayer "< 'ncapsulation Type can be set to (0!1@ onl5& In this c
er+ices&
'ncapsulation Type8
For P#P *%ine ser+ices and I*** >!#&d bridge%based *%
For G-?%based *%ine ser+ices and I*** >!#&4 bridge%b(0!15&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 234/272
f the IFN*TH port specif5 the infor$ation about the link l
nd I*** >!#&d bridge%based *%ine ser+ices< 5ou need not set th
er+ices and I*** >!#&4 bridge%based *%-? ser+ices< set Ta+ tot Ta+ to %ccess if the port allows the access of onl5 the untaggedgged fra$es and untagged fra$es& )et efault :<%N I and :<%
utes< set %C <oopbac3 and P7 <oopbac3 and 4uer5 the
rface Transmission at <! to 'nabled< the a5er # *therneter trans$ission efficienc5& ,hen the # packet header co$prended that 5ou set Speed %ir Interface Transmission at <! t rface Transmission at <" to 'nabled< the IP packets recei+fficienc5& ,hen the ' packet header co$pression function is
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 235/272
e pee r n er ace ransm ss on a o na e or
tor5 when 5ou need to enable the port self%loop test and autocket suppression function&
oopbac3 Port S)utdo*n< 'nablin+ #roadcast Pac3et Sup according to the re4uire$ents&
g the 'nablin+ #roadcast Pac3et Suppression para$eter8
c3et Suppression specifies whether to restrict the traffic of brto the total packets& If a broadcast stor$ $a5 occur on the eor *%-? ser+ices< it is reco$$ended that 5ou set this para$
ble to *%-? ser+ices in the ingress direction&
ans$its an *thernet ser+ice that tolerates so$e bit errors< sur >rame iscard 'nabled to isabled&
?s
=
@
Configure ain #oard< ain Port<
network planning fi le& It is reco$$econsistentl5 for the e4uip$ent at bo
*nsure that the IF ports in a - ha
ine Ser;ices
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 236/272
>
If 5ou creID of theSource ISin3 :<Interface
:nl5 swaI is supG-? IDconfigurespecif5inthe sourc
3
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 237/272
:
ion
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 238/272
6
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 239/272
9
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 240/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 241/272
ve in)s
Configure the IF/:DUinfor$ation of $icrowa+elinks&
is step&
ate a (tection group&
th
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 242/272
:
:1
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 243/272
oup
:
@
Change ?* IDs toensure that the ID of
an ?* is uni4ue onthe network&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 244/272
icrowave in)s
#< S< or > fro$ theode drop%down list&
the working and protection IF& ?ote that the working andion IF boards in a ( FD/)Dion group $ust be housed in twoslots&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 245/272
?uaranteed %ode of t)e >ull
le onl5 if 5ou set %
ode
)et TB >re5uency.7/ and TBPo*er.d#m/&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 246/272
ser+ice& If the ser+ice is an * ser+ice or a data ser+ice
channels< set this para$eter to :C1!& If the ser+ice is ad with GC%' channels< set this para$eter to :C"& If all thethrough the ?*< set this para$eter to :C$&
slot< GC%; o+er the port< and ti$eslot in the GC%; where thed& If 5ou set Source to a tributar5 board< Source Port andilable& )et these para$eters according to the network
slot< GC%; o+er the port< and ti$eslot in the GC%; where the
If 5ou set Sin3 to a tributar5 board< Sin3 Port and Sin3t these para$eters according to the network planning file&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 247/272
rvices
ch as the port $ode< encapsulation
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 248/272
able Port to isabled&
5ou set Port ode to <ayer "< 'ncapsulation
ation Type to Null&
ncapsulation Type to (0!15&
the sa$e as that of the e6ternal e4uip$entt ports within a network< set 2or3in+ ode to
gth of the .u$bo fra$es& :therwise< it is
e a5er # attributes&
Ta+ %*are if the port allows the access offra$es< and set Ta+ to 7ybrid if the port
N Priority according to the network
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 249/272
rate&
loopback shutdown functions or to enable the
sion< and #roadcast Pac3et Suppression
ast packets according to the ratio of thethe opposite end< set this para$eter to
Null< (0!1@< or @in@& If 5ou set Port odease< the port can be used to carr5 tunnel
? ser+ices< set this para$eter to Null&
sed *%-? ser+ices< set this para$eter to
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 250/272
5er< including the tag attribute and
a5er # attributes&
a+ %*are if the port allows the access ofra$es< and set Ta+ to 7ybrid if the portN Priority according to the network
port rate&
ackets recei+ed b5 the IFN*TH portssion function is a+ailable for theo 'nabled for both ends of the link&d b5 the IFN*TH port are co$presseda+ailable for the I)U#/I)A#< it is
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 251/272
o en s o e n &
atic loopback shutdown functions or to
pression< and #roadcast Pac3et
adcast packets according to the ratiouip$ent at the opposite end< set thiseter to 'nabled&
h as a +oice ser+ice or a +ideo
>
<%? Type needs to be set to the sa$e +alueat both ends& enerall5< <%? Type is set toStatic&If a - is configured onl5 to i$ple$ent
protection< it is reco$$ended that 5ou set<oad S)arin+ to NonAS)arin+ for thee4uip$ent at both ends& If a - is configuredto increase bandwidth< it is reco$$ended that5ou set <oad S)arin+ to S)arin+ for the
e4uip$ent at both ends&It is reco$$ended that System Priority takes
its default +alue& This para$eter is +alid onl5 toa static -&
nd Selected Standby Ports according to the
ded that 5ou set the $ain and standb5 portsh ends&+e the sa$e h5brid/-0 attributes&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 252/272
=
)et Source Interface and Sin3 Interface&To specif5 the source or sink port< select aboard and then select a port on the board&If Source :<%N I and Sin3 :<%N I are
blank< it indicates that 5ou create a point%to%point transparentl5 trans$itted *%ineser+ice& If 5ou need to create a G-?%based *%ine ser+ice< enter the G-? IDsas planned&
)et Ser;ice I and Ser;ice Nameaccording to the network planning file&)et irection to =NIA=NI& For OinO%
based *%ine ser+ices< set irectionto =NIANNI&
ate a G-? forwarding table ite$< the G-??I%U?I *%ine ser+ice trans$itted fro$terface is changed fro$ Source :<%N I toN I< when the ser+ice is lea+ing Sin3&
pping fro$ Source :<%N I to Sin3 :<%Norted& If swapping fro$ the preceding sinkto the preceding source G-? ID is re4uired<another G-? forwarding table ite$<the sink G-? ID as Source :<%N I and
e G-? ID as Sin3 :<%N I&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 253/272
1
5
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 254/272
5
7
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 255/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 256/272
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 257/272
Pag
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Process
11,!% '1 Soft*are <oopbac3
In the Function Tree< click the tributar
#
'
;
9
4
* inloop indicates that the * signal
# * inloop indicates that the * signal
'
;
#
; 9
Choose Confi+uration Q P7 Interfdispla5ed&
)elect the * signal to be looped bacOutloop&
Click %pply&
"ront
8iew
"ront
8iew
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 258/272
Page 258
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 259/272
Standard Operation Procedure for OptiX RTN 900 SeriesNo 2or3in+ Pro
11,!# Test t)e '1 Ser;ice
Perfor$ the hardware loopba
#
'
;
9
# All the loopbacks shoul! b
'
;
;
Click the tributar5 board to beThen< the PRB) Test page is
)elect the * signal to be looduration to 9 $inutes&
Click Start to Test to start the
The test directions of the PRBlocal DDF to the e4uip$ent cadirection is selected at the loctested&
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 260/272
Page 260
#
' ;
9 2
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 261/272
Operator Operation Time
% 1, IN
Steps
where the loopback is to be perfor$ed&
)ni5ues
ed back toward the backplane&
ed back against the backplane&
ls6eters
'
2
aterials
he Function Tree& Then< the P7 Interface page is
< double%click Tributary <oopbac3 and select Inloop or
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 262/272
Page 262
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 263/272
Operator Operation Time
% 1, IN
Steps
nal on the DDF&
c)ni5ues
ter test
ls6eters
'
2
aterials
oose Configuration Q PRB) Test in the Function Tree&
le%click irection and select Tributary& Then< set the test
as follows& In the tributar5 direction< the bit errors fro$ thehen the re$ote * signal is looped back and the crossrrors fro$ the radio link to the local tributar5 board can be
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 264/272
Page 26
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 265/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +265,"-272,
:he tower an! pole groun!ing map of a micr
/D. groun!ing
:he thickness of the groun!ing cable shoul! not be
1 (onnect to the tower b groun! clipH the groun!; :he masts connect to the groun! bar in the bottshoul! be groun!e! well :he groun! point shoul! b
1m :he groun!ing cable of /D. shoul! be no more th
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 266/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +266,"-272,
SPD
I" cable
I" cable shoul! share the same fee!er win!ow with
ID. Information ID. installe! in the same cabinet with BB. is reco
The outer la5er of IDU shielded wire should be grounded
ID.
:he thickness of the groun!ing cable shoul! not be
I" there is a SPDH the SPD shoul! be installe! neagroun! bar of /D. or connecte! to the tower b gro
:here are ; groun! points of I" cable from /D. toan! the out!oor groun! bar
ID. shoul! be connecte! to the sub bar of the tranbar of the machine room
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 267/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +267,"-272,
less than 1'1
point shoul! be burnishe! if there is paint or rustinessom of the masts or to the cable la!!er :he groun! la!!ere burnishe! if there is paint or rustiness
an 1m
>?@
>?@
>?@
>?@
>?@
>?@
>?@
>?@
>?@
>?@
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 268/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +268,"-272,
the fee!er of rai!o sstem
mmen!e!
at DDF
less than '
r /D. :he SPD groun! cable shoul! be connecte! to theun! clip when there is no groun! bar of /D.
the out!oor groun! bar which locate the root of the tower
smission cabinetH if there is no sub barH connecte! to the
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 269/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +269,"-272,
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 270/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +270,"-272,
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 271/272
299235827xlsx j:
12;26;2015 华为!"#$%&'()* +271,"-272,
7/23/2019 RTN900 Series Product (V1R3) MW Implementation SOP
http://slidepdf.com/reader/full/rtn900-series-product-v1r3-mw-implementation-sop 272/272
299235827xlsx j: