+ All Categories
Home > Documents > Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry...

Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry...

Date post: 05-Oct-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
29
Monday, September 9, 2019 Mille Lacs County Courthouse Rum River 1W1P Technical Advisory Committee Meeting #1 Facilitator: Jen Kader, Freshwater Writer: Julie Blackburn, Respec
Transcript
Page 1: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Monday, September 9, 2019

Mille Lacs County CourthouseRum River 1W1P Technical Advisory Committee Meeting #1

Facilitator: Jen Kader, Freshwater

Writer: Julie Blackburn, Respec

Page 2: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Welcome and introductions

1W1P overview

Nomenclature and Future Content

Principles for how we will work together

Aggregated Data

What is coming out of the participant conversations

Initial identification of criteria for prioritization

Wrap up and next steps

Agenda

Page 3: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

1W1P Overview

Page 4: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

› A plan that:⁄ Is shaped and supported by water management entities and stakeholders⁄ Is understandable and usable⁄ Is fundable

⁄ Leads to resource improvements

› In other words, our charge is to help you through the hard work of planning together.

Our goals

WHERE WE'RE GOING

4

Page 5: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

How we'll get there

5

› An iterative process

› Merging the science with stakeholder priorities and ground-truthed by local staff

› Following BWSR guidance, while making something that is uniquely yours in a way that works for you.

Page 6: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

6

Work plan

› Determine agreed upon priority resources, issues, and locations

› Set clear goals for what can be accomplished in ten years

› Build an implementation table to do just that

› Define an organizational arrangement that supports implementation of the plan

Page 7: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Definitions

Process

Draft Table of Contents

Nomenclature and Future content

Page 8: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

8

Page 9: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

1W1P Content Development Process: at a glance

Issues List Prioritized Issues List

Issue Statements

Measurable Goals

Strategies & Outputs

Implementation Table

Page 10: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

10

Developing plan content In Reality: it’s a messy process!

Surface Water

Lakes

Unimpaired Lakes

Nearly/ Barely

Improving Trend

4 Named Lakes

Tier 1

Tier 2

Tier 3

Tier 4

Tier 5

Issue Statements

Issues

Measurable Goals

Strategies & Outputs

Implementation Plan

Priority Issues

Evaluation/ModelingAchievability

Cost AssessmentAchievability

Nesting and Tiers

Categorizing

Categorizing & Prioritizing

Page 11: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

11

Developing plan content In Reality

Surface Water

Lakes

Unimpaired Lakes

Nearly/ Barely

Improving Trend

4 Named Lakes

› It is a messy process!› Recommend that:

⁄ Issue Statements be developed at the 2nd

or 3rd Tier resource concern level.⁄ Desired Future Conditions be established

for the same level.⁄ Measurable Goals (Plan goals) be

established for Tier 3 level.

Tier 1

Tier 2

Tier 3

Tier 4

Tier 5

Page 12: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

12

Developing Issue statements and goals In Reality

Surface Water

Streams

Impaired

TSS

Nearly/ Barely

4 AUIDs

› Example 1: ⁄ Issue Statement Tier 3:

» Excess sediment in streams is harming aquatic life.

⁄ Desired Future Condition Tier 3:» All impaired streams are restored to

unimpaired status. ⁄ Measurable 10-year Plan Goal:

» TSS loading in impaired streams will decrease by 15%.

Tier 1

Tier 2

Tier 3

Tier 4

Tier 5

Page 13: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

13

Table of COntents

› Writing the content for the beginning and end of the plan will occur throughout the process

⁄ Surveys, data gathering, one on one calls, etc. to develop content

› Content for the issues and priorities will be developed through the committees and defined approval process

INTRODUCTION⁄ GENERAL DESCRIPTION OF THE AREA COVERED BY THE PLAN⁄ ONE WATERSHED ONE PLAN PRIMER⁄ VISION STATEMENT⁄ PLANNING PARTNERSHIP, ROLES, AND REPSONSIBILITIES⁄ PURPOSE AND EXTENT OF THE PLAN⁄ PLAN APPROVAL AND ADOPTION

ANALYSIS AND PRIORITIZATION OF ISSUES⁄ AGGREGATION OF BACKGROUND INFORMATION⁄ PUBLIC MEETINGS AND COMMENTS⁄ PRIORITY VALUES, CONCERNS, AND GOALS⁄ EMERGING ISSUES

MEASURABLE GOALS⁄ PRIORITY CONCERNS⁄ MEASURABLE GOALS⁄ GEOGRAPHICAL MANAGEMENT AREAS

TARGETED IMPLEMENTATION PLAN

IMPLEMENTATION PLAN PROGRAMS⁄ INCENTIVE PROGRAMS⁄ BEST MANAGEMENT PRACTICE SELECTION⁄ CAPITAL IMPROVEMENT PROJECTS⁄ PREVIOUS CAPITAL IMPROVEMENT PROJECTS⁄ OPERATION AND MAINTENANCE (O&M) PLANS⁄ REGULATORY CONTROLS AND ENFORCEMENT⁄ POTENTIAL RESEARCH, STUDIES, DATA ACQUISITION, AND DATA

MANAGEMENT

PLAN ADMINISTRATION AND COORDINATION⁄ FORMAL AGREEMENTS⁄ DECISION MAKING AND STAFFING⁄ COORDINATION OF SHARED SERVICES⁄ COLLABORATION WITH OTHER UNITS OF GOVERNMENT⁄ COLLABORATION WITH NONGOVERNMENTAL PARTNERS⁄ WORK PLANNING⁄ ASSESSMENT AND EVALUATION⁄ PLAN AMENDMENTS

Page 14: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Principles for working together

Page 15: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Ground rules

› Everybody participates

› One idea per post-it note

› Use complete thoughts

› Stay focused on the question

Page 16: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Aggregated data

Page 17: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Categorizing each Individual data point

I D I s s u e S o u rc e D a te E n te rE n te re d Bs s u e P g #R e s o u rc e I s s u eP rio rity I s s u e ?

S p e c ific R e s o u rc e I d e n tifie d

R e s o u rc e C a te g o ry -1 S u b c a te g o ry -1

R e s o u rc e C a te g o ry -2 S u b c a te g o ry -2 N O T E S

1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT 2 Watershed Citizen Empowerment – The key to effective watershed management is recognizing the people who live and work within the watershed are independent actors who make daily choices that will have cascading influences with unexpected water quality outcomes. Most, if not all, of those who live, work, and play within the watershed would like to see the natural environment protected or enhanced, particularly the water resources. With the understanding that governmental funding will never be able to address all of the problems within the watershed, it is critical to ensure that these individuals have the knowledge and access to resources to empower them to make wise choices that lead to desired water quality goals. As the policy committee is composed of elected and appointed officials, we encourage the policy committee members to create a sound watershed ethical framework in which government agencies recognize and empower the watershed residents to make decisions that allow for the individual and community management of locally important water resources and other features of the environment.

Yes n/a Leadership Public Outreach Leadership Stakeholder Involvement

2 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT 2 Protection of Healthy Ecosystems – The upper portion of the Rum River Watershed is composed of large tracks of forest and substantial wetland complexes. These healthy ecosystems provide an important mix of ecosystem services that protect water quality, provide wildlife habitat, contribute to economic development (forest products), and allow for many dispersed recreational opportunities. The planning efforts surrounding these large tracts of healthy woodlands and wetlands should seek to protect these resources and manage land uses in such a way as to minimize any unintentional degradation of the upper watershed. Future development and management of these healthy ecosystems should come from a point of first, doing no harm.

Yes n/a Natural Resources Manage, Enhance, and Restore Habitat

Leadership Policy and Regulation [or Land Use Management]

3 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT 2 Twin Cities Metropolitan Area Drinking Water Protection – According to the US Forest Service, the Rum River is the second most threatened tributary for the Twin Cities metropolitan area drinking water supply, which comes from the Mississippi River. Therefore, it is critically important for the planning partnership to consider ways to at least mitigate any additional impairment, if not seek to reduce impairments, that may hinder the Twin Cities ability to affordably treat and manage their drinking water supply.

Yes Rum River Surface Water Surface Water Quality Not Applicable n/a

4 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT 2 Local Controls – One of the best ways for ensuring high quality water and the protection of local natural resources is to ensure these resources do not become impaired in the first place. While financial incentives and activities are useful for restoring a system after it has been degraded, local controls provide an important check on unwise land uses and development. With development and land use conversion being a significant potential risk to water resources in the central and lower portions of the watershed, effective local land use controls are an important tool in water quality protection. The Rum River planning partnership should seek to ensure that current and future land use controls are effectively implemented in such a way as to balance growth needs with water quality and natural resource protection.

Yes n/a Leadership Policy and Regulation [or Land Use Management]

Surface Water Surface Water Quality

5 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT 2 Intergovernmental Partnerships – There are a diverse set of landowners within the watershed. While the majority of landowners are private citizens, land is also owned by the state, by the Mille Lacs Band of the Ojibwe, by the counties, and by municipalities within each county. During the plan development process, it will be important to be as inclusive as possible to ensure that all landowners understand the value of the Rum River One Watershed One Plan and participate as a valued entity in the planning and implementation phases of the process. In order to be fully inclusive, the planning partnership and/or consultant should consider a suite of outreach and communication strategies to maximize the ability of partners to provide input, clarify their ability to participate in watershed management, and incorporate the comprehensive watershed management plan’s implementation activity into their own local governing processes. The Mille Lacs Band of the Ojibwe has used PTMApp for some of their lands and the planning partnership should work with the band to ensure the results are included in the planning process, with Band approval.

Yes n/a Leadership Public Outreach Leadership Stakeholder Involvement

R u m R iv e r W a te rs h e d P rio rity I s s u e s

Page 18: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Resource categories and subcategories

Emerging Issues Groundwater Leadership Natural Resources Quality of Life Surface Water

Chlorides Drinking Water Supply Administrative PrioritiesManage, Enhance, and Restore Habitat

Aquatic Consumption

Altered Hydrology

Climate Change and Resilience

Groundwater Quality Collaboration Fish Habitat Aquatic RecreationDrainage System Management

Contaminants of Emerging Concern

Groundwater Quantity Financing Wetland Habitat Public Safety Erosion & Sediment Control

Land Development & Changes

Infiltration & Recharge Maintenance Upland Habitat Other Flooding & Floodplain

Reduce Pesticide & Fertilizer Impacts

Protect Groundwater Resources

Policy and Regulation [or Land Use Management]

Invasive SpeciesProtect Surface Water Resources

Other Other Public Outreach Preserve Prime Farmland Stormwater Management

Stakeholder InvolvementPreserve Sites of High Ecological Value

Surface Water Quality

Other Protect Soil Health Water Rate & QuantityOther Other

Page 19: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Resource categories and subcategories

Emerging Issues COUNTChlorides 3Climate Change and Resilience 7Contaminants of Emerging Concern 4Land Development & Changes 14Reduce Pesticide & Fertilizer Impacts 7Other 1

Groundwater COUNTDrinking Water Supply 15Groundwater Quality 5Groundwater Quantity 4Infiltration & Recharge 3Protect Groundwater Resources 20Other 1

Leadership COUNTAdministrative Priorities 12Collaboration 13Financing 2Maintenance 10Policy & Regulation [Land Use Mgmt] 29Public Outreach 15Stakeholder Involvement 4Other 1

Natural Resources COUNTManage, Enhance, and Restore Habitat 15Fish Habitat 6Wetland Habitat 7Upland Habitat 21Invasive Species 8Preserve Prime Farmland 0Preserve Sites of High Ecological Value 14Protect Soil Health 1Other 1

Quality of Life COUNTAquatic Consumption 0Aquatic Recreation 15Public Safety 2Other 1

Surface Water COUNTAltered Hydrology 16Drainage System Management 8Erosion & Sediment Control 16Flooding & Floodplain 11Protect Surface Water Resources 22Stormwater Management 27Surface Water Quality 87Water Rate & Quantity 7Other 1

Page 20: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Identifying criteria for prioritization

Page 21: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Prioritization criteria

› Targeted Resource screening

⁄ Applied at the resource issue level screening

› Comparative evaluation of quantifiable metrics

⁄ Data Trends⁄ Resource Condition ⁄ Biological Significance

› Relies on stakeholder determined threshold for ranking

› Macro-Level Criteria⁄ Applied when selecting

plan priorities

› Can include:⁄ Level of effort⁄ Level of impact achieved⁄ Stakeholder preference⁄ Multiple benefits⁄ Priority locations⁄ ‘shifters’ – things that if

accomplished, make high priority actions easier to achieve

› Micro-level criteria⁄ Applied during the

implementation phase

› Can include: ⁄ Project readiness⁄ Meets multiple benefits⁄ Addresses a priority

issue identified in the planning process

⁄ Supports high priority outputs

⁄ Riskiness/likelihood of success

Page 22: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Targeted Resource Screening

Ranking priority Priority Value Metric

1 Directly contributing to impaired Stream Reach (AUID)

2 Contribution/pollutant loading to a downstream Impaired reach

3 Altered Hydrology

4 Number of impairments per segment between endpoints

5 Achievability

6 On-Channel Impaired lakes

7 Drinking Water Impact

8 Disturbed Area

22

Priority Value Metric Scoring/Breakpoints

Lake Size to Drainage Area Ratio Ratio <10 = 1.0Ratio 11-25 = 0.66Ratio 26-50 = .033Ratio > 50 = 0.0

Lakeshed Land-Use Disturbance % <25 % = 1.025-40% = 0.5>40% = 0.0

Nearly/BarelyWithin 10% of WQ standard = 1.0More than 10% lower than WQ standards = 0.66More than 10% exceeding WQ standards = .33

P-Sensitivity Highest = 1.0Higher = 0.66High = 0.33

Water Clarity Trend(evaluated using both improving and declining trend)

Improving = 1.0No Trend = 0.66Declining = 0.33Declining = 1.0No Trend = 0.66Improving = 0.33

Lakes of Biological Significance Outstanding =1High = 0.66Moderate = 0.33

Lake Benefit:Cost Assessment Priority Score

Highest =1Higher = 0.66High = 0.33

› Define the metrics to evaluate the resources within each resource category or issue statement category

› Establish breakpoints for what will be prioritized

Page 23: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Targeted Resource Screening

› Results of screening metrics

› Four first tier prioritized lakes

› Eight second tier prioritized lakes

› The remaining are not prioritized in the plan

23

Page 24: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

What’s coming out of participant conversations?

Page 25: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

› 3 identical workshops, held on different days in different parts of the watershed

⁄ Anoka⁄ Onamia

⁄ Princeton

› Survey

What we did

Kickoff event workshops

25

Page 26: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

What we did

Kickoff event workshops

26

All workshopsValues Concerns Strategies All

Emerging issues 13 37 9 59Groundwater 15 13 0 28Leadership 51 44 119 214

Natural resources 69 45 21 135

Quality of life 31 18 3 52Surface water 98 74 28 200Not applicable 1 3 1 5

Page 27: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Next Steps

Page 28: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Rum River 1W1P

Rum River 1W1P Technical Committee Next Steps

› October 14 – Columbus day⁄ Are there conflicts with this date

› Synthesis of issues⁄ Presentation and review of categorized main themes⁄ Refinement

› Draft Issue statements⁄ Review consultant recommendations⁄ Refinement

› Geographical management areas⁄ Review potential alignment of management areas

Page 29: Rum River 1W1P - Mille Lacs SWCD...Sep 09, 2019  · R esource C a te g o ry - 2 S u b c a te g o ry - 2 NO TES 1 BWSR Response to Rum River 1W1P notification FINAL.pdf 8/19/2019 KAT

Monday, September 9, 2019

Mille Lacs County CourthouseRum River 1W1P Technical Advisory Committee Meeting #1

Facilitator: Jen Kader, Freshwater

Writer: Julie Blackburn, Respec


Recommended