RDIG – Russian Data Intensive Grid Consortium (EGEE-II partners): RRC KI, JINR, SINP MSU, IHEP, ITEP, PNPI, KIAM RAS, IMPB RAS
RDIG – regional federation in EGEE-II (SA1, NA2, NA3, NA4)full functional segment in global
grid infrastructure EGEE-II
RDIG now: more than 100 members ,(~>) 15 resource centres, 6 (++) sciences to serve,~ 2000 KSI2K CPU and ~ 50 (300++) Tbyte of data
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
• RDIG Resource Centres:– ITEP– JINR-LCG2– Kharkov-KIPT-LCG2– RRC-KI– RU-Moscow-KIAM-LCG2– RU-Phys-SPbSU– RU-Protvino-IHEP– RU-SPbSU– Ru-Troitsk-INR-LCG2– ru-IMPB-LCG2– ru-Moscow-FIAN-LCG2– ru-Moscow-GCRAS-LCG2– ru-Moscow-MEPHI-LCG2– ru-PNPI-LCG2– ru-Moscow-SINP-LCG2
Status page:http://grid.sinp.msu.ru/grid/roc/rc
++
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
RDIG ROC
ROC – regional operation center
– Grid services SINP MSU– Certificate Authority and security RRC KI – Monitoriing and Accounting JINR, SINP
MSU– VO management and support SINP MSU– User support ITEP, KIAM
RAS– Operational support of resource centers PNPI, IHEP
EGEE-II - grid operator on duty6 teams working in weekly rotation CERN, France, Italy, UK, Russia,Taipei
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
25 June2006, ~ 18:00
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
25June 2006, ~ 18:00
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
25 June 2006, ~ 18:00
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
CIC-on-duty
http://egee.sinp.msu.ru
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
RDIG Resource Broker monitoring
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
RDIG testing new MW
Testing/adaptation new gLite components (SA1, -> SA3 through CERN-INTAS project): PNPI, JINR, IHEP, SINP MSU
Testing new MW components (NA4 ARDA): - Metadata catalog, Fireman catalog, gridFTP, ... (JINR, SINP MSU) - testing gLite for ATLAS and CMS (PNPI, SINP MSU)
Evaluation of new MW: 2004: evaluation of GT3 (SINP MSU, JINR) 2005: evaluation OMII (JINR, KIAM RAS) 2005: evaluation GT4 (SINP MSU, JINR, KIAM RAS + CERN+GT4)
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
VOs
• RDIG supports 16 VOs
• In 2006 ~ 500 000 jobs• (about 50% non-HEP)
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
• Infrastructure VO's (all RC's):– dteam– ops• Most RC support the WLCG/EGEE VO's– Alice– Atlas– CMS– LHCb• Supported by some RC's:– gear– Biomed– Fusion• Regional VO's– Ams, eearth, photon, rdteam, rgstest, fusion_grid
VOs
++ crystal apps, engineering apps, medical apps ...
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
ATLAS: statistics for production jobs
Production mode of the grid usage:millions jobs by few users
on hundreds sites
Jobs per user Jobs per site
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
CMS: statistics for analysis jobs
Still not chaotic usage of the grid …
Jobs per user Jobs per user
Physicists are sleeping … … 2008 …
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
RDIG - training, induction courses
PNPI, RRC KI, JINR, IHEP, ITEP, SINP MSU: • Induction courses ~ 600 • Courses for application developers ~ 60 • Site administrator training ~ 100
2007 – series of physicists training how to use EGEE/RDIG in their daily activity (LHC coming ...)
today more than 100 physicists from different LHC centers in Russia got this training
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
RDIG web
• RDIG portal http://egee-rdig.ru• RDIG ROC http://grid.sinp.msu.ru RDIG CA http://ca.grid.kiae.ru/RDIG RDIG monitoring http://rocmon.jinr.ru:8080 User Support http://ussup.itep.ru • RDIG forum http://www.gridclub.ru
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
cluster of institutional computing centers;
major centers are of Tier2 level (RRC KI, JINR, IHEP, ITEP, PNPI, SINP MSU), other are (will be) Tier3s. each of the T2-sites operates for all four experiments - ALICE, ATLAS, CMS and LHCb.
this model assumes partition/sharing of the facilities (DISK/Tape and CPU) between experiments. basic functions: analysis of real data; MC generation; users data support plus analysis of some portion of RAW/ESD data for tuning/developing reconstruction algorithms and corresponding programming.
Thus, approximately equal partitioning of the storage: Real AOD ~ Real RAW/ESD ~ SimData
: Russia in World-wide LHC Computing Grid
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
T1s for Russia:
ALICE - FZK (Karlsruhe) to serve as a canonical T1 center for Russia T2 sites
ATLAS - SARA (Amsterdam) to serve as a canonical T1 center for Russia T2 sites
LHCb - CERN facilities to serve as a canonical T1 center for Russia T2 sites
CMS - CERN as a CMS T1 centre for the purposes of receiving Monte Carlo data from Russian T2 centres. Also as a special-purpose T1 centre for CMS, taking a share of the general distribution of AOD and RECO data as required.
Russia in World-wide LHC Computing Grid
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
Russian Federation, RDIGPledged Planned to be pledged
Comment2007 2008 2009 2010
CPU (kSI2K) 3000 5000 7000 10000
Disk (Tbytes) 600 1500 3000 5000
Nominal WAN (Mbits/sec) 2500 5000 10000 10000
Tape (Tbytes) 0 0 500 2000
The Russian Capacities are available at the end of the year.
RDIG resource planning for LHC:
Russia in World-wide LHC Computing Grid
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
Moscow 1 Gbps (ITEP, RRC KI, SINP MSU, …LPI, MEPhI) plans to 10 Gbps in 2007 for some centers
IHEP (Protvino) 100 Mbps fiber-optic (some plans on 1 Gbps)
JINR (Dubna) 1 Gbps f/o development to 10 Gbps in 2007 (autumn)
BINP (Novosibirsk) 45-100 Mbps (GLORIAD++)
INR RAS (Troitsk) f/o under realization (100 Mbps …)
PNPI (Gatchina) f/o link under testing (100 Mbps - 1Gbps)
SPbSU (S-Peterburg) 1 Gbps (potentially is available)
Russia in World-wide LHC Computing Grid
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
International connectivity for RDIG/LCG:
for connection with LCG centers in Europe:GEANT2 PoP has been upgraded in December 2006 to 2.5
Gbps (plans for 10 Gbps)
dedicated connectivity to “host” T1’s (kind of LHC OPN extension) by use of GLORIAD:
Jan'07 1 Gbps connection Moscow-Amsterdam. Feb'07 Moscow-CERN – 1 Gbps (just today 310 Mbps) testing by JINR – 30 Mbyte/s disk-to-disk.
Russia in World-wide LHC Computing Grid
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
GEANT2 in action!
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
CERN-T1 as FTS server for Russian sites (since February) !By use of Moscow-CERN lightpath by RBNet/GLORIAD
March, 19Transfer rate 14 – 32 MBs
99% of successful transfers and 990 GB have been transferred
October-November, 2006 (CNAF as FTS T1 for JINR)
Transfer rates less than 2 MBsRatio of successful transfers ~20-30%
But we need in dedicated solutions now!
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
New magisterial course on e-Infrastructure.could it be in the form of international cooperation?
Manpower:• involve regional universities• new intervention to major universities:
MFTI+RRC KI MSU+JINR MEPhI+RRC KI + ... StPSU+PNPI ++
To 2nd year of RDIG/EGEE-II and toward to EGEE-III
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
To 2nd year of RDIG/EGEE-II and toward to EGEE-III
To get new apps and users:• grid core services should “know” Windows jobs (virtualization technology)• grid core services should “know” MPI clusters (of small/medium size) - “90%” of jobs usually asked supercomputing (parallelizing) in reality could be parallelized on (max) 10-15 CPUs.
Stable core infrastructure:• search for new application areas and users• new resource centers should come with new users and applications
http://www.egee-rdig.ru V.A. Ilyin, Russia - EU, 24.04.2007
• Stable operating of RDIG as full-functional segment of EGEE-II in production mode• Stable “24x7” providing basic grid services at national level, involvement in grid operation management in EGEE-II• Stable functioning CA at national level• Start of massive user support• Start of chaotic use of the grid by LHC users
RDIG has started the (long) way to the sustainable grid infrastructure. EGEE-III - to form Joint Research Unit led by RRC KI. The idea on EGI has got interest and support by RDIG community.
To 2nd year of RDIG/EGEE-II and toward to EGEE-III
Flagship applications: LHC, Fusion (toward to ITER), nanotechnologyCurrent interests from: medicine, engineering, ++