+ All Categories
Home > Documents > RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore...

RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore...

Date post: 24-Mar-2018
Category:
Upload: hoanganh
View: 212 times
Download: 0 times
Share this document with a friend
102
822 I*AM»O library IRC lnt«matlonsl\Vater and Sanitation Centre " — " " ~ •••:. Tel.: +31 70 30 689 80 ANDHRA PRADESH 1 (INDIA) | I PROJECT REPORT 1 NALGONDA DISTRICT i RWS 1 E NAP D AP-III 1 C.P.W, S. Scheme to 226 Revenue Villages and 337 Hamlets in Nalgonda District, ANDHRA PRADESH. ESTIMATE COST Rs. 9742 lakhs VOLUME-II ANNEXURES ^ Chief Engineer ^ , $ Rural Water Supply * Q Panchayat Raj Engineering Department Q 4 ;^ Govt. of Andhra Pradesh. ^ -^
Transcript
Page 1: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

822 I*AM»O libraryIRC lnt«matlonsl\Vaterand Sanitation Centre

" — — " " ~ •••:. Tel.: +31 70 30 689 80

A N D H R A P R A D E S H 1(INDIA) |

I PROJECT REPORT 1NALGONDA DISTRICT

iRWS

1 E NAP• D AP-III1

C.P.W, S. Scheme to 226 Revenue

Villages and 337 Hamlets in Nalgonda

District, ANDHRA PRADESH.

ESTIMATE COST Rs. 9742 lakhs

VOLUME-II ANNEXURES

^ Chief Engineer ^, $ Rural Water Supply *

Q Panchayat Raj Engineering Department Q

4 ; Govt. of Andhra Pradesh. ^

- ^

Page 2: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEXUKES

S.NO. . TITLE PAGE NO.

1. Chemical and Bacteriological Analysis Reportfor Raw Water from Canal Source Al

2. Latest Chemical Analysis Reports for ProblemVillages under Excess Flouride Criteria A2 - A9

3. District Collector-Nalgonda-Approval forHanding over Ramasamudram Tank at Alwal toPanchayati Raj Engineering Department A10

4. Interpolating Escalation and Projection of

. Rates for1 S.S.R. 1992 All -A37

5. Model Estimate for Provision of C.I.Specials A38

6. Unit Rates for various Technical Component A397. a) Unit estimates for various Tech.Components A4Q -A82

b) Model Data Sheet A33 -A96

LIBRARY IRCPO Box 93190, 2509 AD THE HAGI

Tel.: +31 70 30 689 80Fax: +31 70 35 899 64

BARCODE:

Page 3: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANHEXURE-1

PAHCHAYAT RAJ IHTERHAL HATER QUALITY MOMITORING LABORATORY UPPAL

HYDERABAD.

Hectivtd rram; Dy.Executive Engineer, Nalgonda. Dace Received: 29»6U19Q9. District:Nalgonaa,

:i Lr.Ref. Parzicu- Name of Name ofthe tr.e

villaae Mandal

Date

colle-ction

plectra- T o t a l Total Chlo-Hitri- Sul- Irora Totalr, ,, cal con- „. Hand Flouriae . ,P.H . . Diso- ride rate phate as

* Q u c t l v " l ' Ivea n e s s FCtracrornnos . __ ., . as

CaCo3

10 11 12 14 15 16

2184 : ; ,G.Sagar Nidaraanoor Nidmnanoor 2 1 . 6 . 0 9 7 .51 337 206Car.^iWatar

1 3 6 o . b 52 Drent Nil Nil 120

218h c"0 3ore L t u m a r t h y C h i t y a l 2 7 . 6 . 8 7 7.4 0 960 592wel l PWSScheme(Proposed)

34 0 1.8 100 384

Excess Flouride

Note:- Specimen No. 2185 contains labricent Oil mixing after fluslinung thebore well the fresh water may be collected and sent to thislaboratory for analysis.

Sd/- Dy, Executive Engineer ( ?P>) ,Nalyonda,

Sd/- Junior Water Analysist.'

//True Copy//

Sd/- x x x .Executive Engineer,(PR) Nslgonda.

Al

Page 4: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEXURES

S.NO. . TITLE PAGE NO.

1. Chemical and Bacteriological Analysis Reportfor Raw Water from Canal Source Al

2. Latest Chemical Analysis Reports for ProblemVillages under Excess Flouride Criteria A2 - A9

3. District Collector-Nalgonda-Approval forHanding over Ramasamudram Tank at Alwal toPanchayati Raj Engineering Department A10

4. Interpolating Escalation and Projection of

. Rates for1 S.S.R. 1992 All -A37

5. Model Estimate for Provision of C.I.Specials A38

6. Unit Rates for various Technical Component A397. a) Unit estimates for various Tech.Components A40 -A32

b) Model Data Sheet A33 -A96

Page 5: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

*AHNEXURE-2

PANCHAYAT1 RAJ INT^nNAL WATER DUALITY ^DNITDRING LABORATORYOPPAL HYDERABAD. p - '

r.ECEIVED FltOM : 1JATE RECEIVED : ^-\ . c . S DISTRICT

o

SI.

1

LA£.a*'..

P A H T I C U L A H S

UJ

• - IU

u. O~i

5 ><

4.

UJ

I*- _ J

<

0

. O

FC

TIO

O Co

PH

7

L J

cf E

(J D O

o 2r

a

S - -

? £ ?cO

if

ot-

10

I1

1 s - •- - F

1 <D O to

J

•o —

O u ~

• * * m "**

LJ ""

it

- £

5 -5*m

1) j H j U J It

*

ir.

3 *>in

i t 17

fi£MARKS

IK

n

u—

\M

r " '

U

Juniunior W«UrA2

Page 6: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PANCHAYATI RAJ^INTERNAL WATER QUALITY MONfTORING LABORATORY(2-1 )- -'ny - - •

^ /J UPPAL, HYDERABAD

RECEIVED FROM : b ^ p, DATE RECEIVED : t "7 . DISTRICT :

he:,t .c.

P A R T I C U L A R SO <

u- DO 2

o

<Q

G

CJ

t

o = o s i t

~ •? LJ

D- < LJ

OJ " __ ! o• - t T ! _ _

s <= 7T,I ° " •=•• ° « " ^ REMARKS

I ! - » ' l 12 I n

ri) * CJ

^ — ^ - - ~0av~tv\ -

l 7 ^ :

A3 Junior Water Analyst

Page 7: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

"PANCHAYATl "RAJ INTERNAL TN/TTERTDUAn I Yi UPPAL, HYDERABAD.

/

c

1

. HKCEIV

LAti.Hfct.Nu.

ED FHOil -• V <p \ ft^ .

P A R T I C U L A R S

3

* ~ UJ

u- O

<•z.

4

-rt . - "

<

<

<

rDAtTE

1

o

r—< •

D

RECEIVED

i

cr—uL U

ou

G

pH

' 1

a.c

L

c

e

O

b

1

' -1-=

o

o• «

•To

'J

• c

c

/ 1

l>\

• : — o

r <:. sC

V

C

i- it

ri

o

: f

I

U .

12

• ^

E

!

DISTRICT':

» 1«I

S JO A tJJT •*t*. «

16

wc

17

HE MARKS

- L c y ]

£ .v^ .£ - ' - c \ . t

^ i D

r-U

Page 8: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PANCHAYATI RAJ INTERNAL^WATER QUALITY MONITORING LABORATORY^ UPPAL, HYDERABAD.

DECEIVED FROM ; 11ECETVED : ^-°>. DISTRICT :

o

c

o

u

_J

ou

pH IV - V I b o t i <: u ci

i•£ _ -

z f- E i ~ c. -^tj --:

. 1 " S-"i f: L

n*

nt ~

c &

o E

^vp.

^^jv^>

It

v

--i ~v

t 1.si.luuior

flfcMAUKS

A5

Page 9: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

'•• d

PANCHAYAT1 RAJ INTERNAL'WATER QUALITY MONITORING LABORATORY^ UPPAL.' HYDERABAD-

l'.E-ZIVEl> KHOM ; DATE RlCCEIYEl) : DISTRICT :

LAE.ne:.Nc.

I P A R T I C U L A R S

<

<

u. O

pH

^ 1

'I

^ Hi

REMARKS

4 I • m I n I i^ i i:;

- TSt

CT\ V N—

• n - • • 3

C5 1 .& SCO 2tO

- U V

t o -

\i

A6Junior Water

Page 10: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PANCHAYAT1 RAJ INTERNAL WATER DUALITY MDNITDRING LABDRATDRY' © UPPAI^/HYDERABAD.

/ !RECEIVED FROM : D-E£\ViL} C.Uvv-i-^(>^Vw DATE RECEIVED : ^ . t> . "5f| DISTRICT : N 1

o

zto

LAB.1

hef.Mo.

P A R T I C U L A R So < O Z

>.

u*OCo

CN

in

"1E

"fa

o

< *-• d

' - • E

c - - -o •? -2

^ to

r: ^

O £

REMARKS

1 i \ 1 I 8 I iO I t i I 12 f Ki I i-i I i s j 10 1 17

\~j

S.2_

A7Junior Water Antlysi

Page 11: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PANCHAYATI RAJ INTERNAL WATER DUALITY MONITORING LABORATORYi > UPPAL, HYDERABAD.

RECEIVED FROM : ^ E H . .Pi l . Cl-tvxW-DoAVvj DATE RECEIVED : DISTRICT

SI.

No

1

LAB.ReLNu.

2 t

P A R T I C U L A R S

X

AM

E O

F

z

4

VIL

LAG

E

o z

IJ- 5

DA

TE

0O

LLE

CT

I

l i

pH

7

_ »LJ ^

^ tJCJ ^

= gLJ

l . J

FU

io

c

s

>

"6"TO

r—

So

lid

y

i >-

mg

/lit

< O

n S

r—

i 1

1

CU

" O

CD

~aa

outauif)CO

1

mg

/lit

I

Flu

ori

d

i

i ••

" c Q m "i.H E^3 S 51

o -

l^ I 13 |

^ CO

Ll 1

OJ

2 o

lion

as

fm

g/l

il

16

REMARKS

17

<v^C\"nnv•V

v^o'

L . W - -w

.p.;5 - "^^-- <l-*cV!i.HA. ;

H-S

A8Junior Water

Page 12: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PANCHAYAT! RA^ INTERNAL WATER DUALITY MONITORING LABORATORY

RECEIVED FttLM : D t E , f'il. . C.W ~ V

UPPAL, HYDERABAD

DATE RECEIVED : r^<=\. & . DISTRICT

c

IS.

LAE.Hef.Ma.

P A R T I C U L A R S

u_ toO < u. a

O 2

o

AT

E

c

o

CJUJ_ j

aU

pH

u

CJ

LU

11

>

-ncoo

yo

ou

r

I 1IJ5 "o CD < <J cr.

I J t r ! j _ _ »

D V, O: Q

III

• J

S O

a>

"c.

CO

O10

ut

a

1 f o

r en— >" a — iREMARKS

n l i ! i I ir. 17

V - -7

C ~ ^ ' ^ ^ . . , f T - - ^^^ T V " ^ '

U ' ..

A9 A-Junior Water Auulyet

Page 13: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEXURE-i

GOVEP.riMT.MT OF AMD HP. A PRADESHREVENUE DEPARTMENT

From

Sri.D.Janardhan Rao, I.A.5.,Bistrict Collector,NALGCNOA.

LETTER MC. 3S/25O3/9C.

ToThe Chief Engineer,R.w.S & Administration,HYDERABAD,

DATED: 26,5.1990.

Sir,Sub:- BILATERAL ASSISTANCE - q.P,W,S. Scheme -: for providing water supply to 172 villages

and 2S1 hamiets in Nalgonda District - hariedoverof Rama 5amudrnm T-itik Fed by N3 Left Canalat 11/0 KM - near Alwal(v) to PR - Department -• Reg.

Ref:- 1. C.E., RWS & Administration, Hyd.Lr.No,25S25/DJ3/Projects/87.dt: 11,3,90.

2. EE., I&CAD, 13 Division, Nalgcnda, Lr.No,HD-1/235/24, dtt 10.4,1990.

3. RDb, Miryalguda, Lr.No.3/2479/90,dated: 3'.5,199O.

I invite your attention to the references cited,The Executive Engineer, Irrigation & Command Area Development,I.B. Division, Nalgonda in his letter vide reference 2nd citedinformed this office that he alongwith Executive Engineer(Panchayat Raj) and the Revenue Divisional officer, Miryalguda,inspected the Rama Samudram tank and expressed hi3 desire tohandover the tank alongwith the ayacut to Panchayat Raj Departmentfor Maintenance & Operation avoiding duel control (Copy enclosed),

The Revenue Divisional Officer, informed thisOffice vide refefence 3rd cited that he along with ExecutiveEngineer (CStM) Naqarjunasagar left Canal Miryalguda has inspe-cted the Ramasamudram tank and reccnimended the proposal ofhahding over the Ramasamudram Tank to Panchayat Raj Departmentfor utilising it for drinking water purpose and to extend theexisting irrigation facility.

Taking into consideration of all the aspects,approval is hereby accorded for handing over the RamasamudnamTank at KM 11/0 at .NS Left Canal near Alwala (V) to PanchayatRaj Department for providing drinking water supply to 172(Villages) and 281 hamlets in Nalgonda District which is undersubmission to Government to pose under bilateral assistance ofRoyal Netherlands Government v/ith a request to provide alternatearrangements for irrigation the balance ayacut at 24.10 hectorswhich ,is irrigated under Ramasamudram Tank,

//ATTESTED//Yours faithfully,

Sd/-K. Krishna Reddy,for Collector, Nalgonda,

1 For favour ofinformation Stnecessacy action

REVEMUS ASSISTANT.Copy to the Revenue Divl.officsr, Miryalguda,Copy to the Exa.Engineer (PR) Nalgonda.Copy to the Exe.Engineer (o&M) NSIC, Miryalguda|

Copy to the Executive Engineer, I&CAD, 13, Divn, Nalgonda,with a request to take necessary action to handover theRamasamudram Tank to-P.R. Department and also to providealtamata arrangements to Irrigate the balance ayacut at24.10 Hectors which is under Kamasamudram Tank,

A10

Page 14: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANHEXURE-4.

PROTECTION OF S.E.R. YEflP 3_o?-,_9-j

SI. l4iuie ofHo.

UE per £.2. a.

B'i-HB 86-89 % increased

Kates as per £,£.R. hates as per £. S, K. /wereas *

.... increased

H&-89 6&_90 * incraaaed BS.-90 BC-91 V.

Rate carrived **lor the ^year 91-92 ^

10 12 13

1 .

2 .

3 .

4 .

6 .

7 .

a.

C.R. £

40 am:

2 0 nun

tiavt:

'tone

'. cone

hatal

hecal

tor inorcar

tor filling

sco lie

20-00

29-50

46-80

81-40

4-50

i-50

3-50

10- 50

22-00

32-50

46-00

89-SO

4-50

2-80

4-00

11-60

1 0 .

1 0 .

2 .

9 .

1 2 .

1 6 .

1 0 .

0 0 *

1 6 *

5 6 *

9 5 *

-

0 0 *

6 6 *

22-00

32-50

46-00

89.50

4-50

2-80

4-O0

11-60

1 .

2 .

3 .

4 .

5 .

6 .

Sand 15 Km

Scone a. Metal &iiougn S-JJUC 10Km

Machine Crushedcrucified uictal30 KJU

iiricks 20 Km

BlastingGrt<irgc5

Gravel 4 Km

21-70

19-65

29-15

4 3-20

12-00

l i -35

21-70

19-65

29-15

43-20

• 12-00

1V-3S

upto150 uti thick 157.50 175-30 jo.30

21-70

19S65"

29-15

43-20

12-O0

14-35

173-30

23-10 5.00*

34-10 4.92*

5-i-lO 12.70S

107-40 20-OOX

5--20 15.55*

2-90 3.S7S

6-70 42.50*

12-20 5.17*

Leads

23-70 9.21*

21-50 9.41*

35-60 22.:2%

47-30 9.49*

13-20 10.00*

15-60 8.70*

23-10 24-50 £.06

34-10 34-10

54-10 5&-5D 9.98

107-40 l lb-15 10.00>;

5-20 S-45 4.80%

2-90 3-00 3.44Ji

6-70 6-85 20.17S

12-20 13-O0 6.55;;

23-70 27-35 15.40*

21-50 24-80 15-34*

35-60 41-05 15.3OX

47-30 54-40 15.01*

13-20 14.50 9.84*

15-60 16-05 15,70*

Cc.ntriRc? O.iar»es for

7.0251

5.02X

B.41*

13.31*

6.78*

6.33^

26.44*

7.39;;

.26-22

Ra.35-81

R t .

R s .

R s .

tie.

Its.

.64-50

133-87

5-82

3-19

6-66

13-96

8.20* Ra. 29-59

8.25* Ra.- 26-84

12.47*

-8.16*

ha. 46.16

58.83

6.61* Rs. 15-45

8.13* R3. 19-52

190-60 S.98 ;90-60 204-00 7-03 &-Q1 R6.223-3BA l l

Page 15: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 0 11

10.

11 .

12 .

1 3 .

Lintle/totuom edial's « liedUiOCKS

!>uu Sri easeO.tlJ u width

126.00 136.00

1 .

2 .

3 .

4 .

5 .

C.

1.

8 .

9 .

First classhtiioc i. brickiayero L.

..id classnation & brick

pii in net.

tun toazdaor

HjHiaii suaxaoar

icouc packer

Minluy tartar

ilijchine Kixlng

Vitii.at.incjcharyci

Lurtti war):lomy clayu o l l i 20 B

li. Oraveliingsails (12B) 20 B

ofcravel, 2DR(138)

SDR

UDR (16)

6.50

26-00

7.50 -

4i*-50

52-BO

55-50

66-50

104-00

7.20

201-5& 221-70

6-50 7-20

29-QD

20-00

14-00

14-00

17-00

4-00

7-00

22-00

16-10

16-10

19-60

4-40

7-70

7-50

52-80

55-50

66-50

1C.-0O

1O-0Q

1O-02

10-00

12-30

1G-00

15-00

15-00

5.88

10-00

10-00

136-60

7.20

7-20

29-20

22-00

16-10

16-10

-19-50

4-40.

7-70

7-50

52-80

152-50

7-90

24 3-90

7-90

10-C2

6—72

9-72

Labour ^ ia roes

31-30

24-30

lb-50

16-5C

19-50

5-00

fo-50

fc-25

54-45

56-10

1G-61

14-90

2fc-00

13-63

10-38

10-00

1C-00

10-03

7-90

1 j-90

7-90

32-30

fe-25

54-15

56-10

163-00

6-50

26J-OO

6-30

3Ei-00

24-30

16-rSO

16-50

19-50

5-00

6-50

26-50

2G-00

20-00

21-00

5-30

9-00

6.80

7B-00

6.89 B.97 Ks. 177-62

7.59 9.36

fa-35

37-55

34-25

1C-42.

9-05

6-10

£—10

7-69

6-00

5-BS

9-83

12-66

12-66

4-52

9-87

6-73

6-66 """" 5.-55

15-BS

l*-76

6-2 9

-01 9-01 . 2U-U51

-06 B-26

30-64

29-10

22-53

22-53

21-95

5.U2

9.78

9-28

8o-77

89-51.

A12

55-50

66-50

104-0O

6 3-05

73-15

Ili-SO

1O-00

10-00

10-00

61-05

73-15

114-40

81-0O

90-00

125-00

32-67

23-O4

9-26

14-22

11-01

6-42

92-51

99-90

13 3-0 2

Page 16: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

13

Hard rocklilcujtas.g IB(A) til)pto 3 lib.

22-50 24-00

Atxave 3 Qa54-00

Centring charges for OHS as

J Ujlciuia t o o "dug 3

I ULtHicjuuiatiuuiiiU and

} bottom. iii.de wall

CLU. Vtid

J Siae wall

) dome

;) toof aiaUtup

} Circular hibdciinu andcoiouia

-) Plinth btsaia

66-00

4 0-00

120-00

90-00

80-O0

95_OO

51-00

46-00

31-50

85-80

73-90

6-66

59-80 10-00

6-60

52-00 30-00

156-00 30-00

114—,o 27-11

89-00 11-25

123-50 30-O0

21-14

62-40 30-00

34-70 10-15

24-00 24-BO

59—10 55-40

62-40

34-7O

3-33 24-tiO 26-50 6-U5

59-40 63-50 6-90

P.H. Items

B5-80 a5-80

52-00 =2-00

156-00 156-00

114-40 114-40

89-00 89-00

123-50 123-50

79-30 79-30

62-40

38-20 10 -68

a5-ao at>-ao

52-00 52-00

156-00 156-00

114-40 114-4O

89-00 89-OO

123-50 123-50

79-30 79-30

62-40 62-40

3B-20 41-00

5-61

5-c3

2-20

7-33

7-05

10-00

9-18

67-07

87-68

10-00

10-00

9-03

3-75

10-00

57-20

171-60

124-7 3

92-33

135-00

84-B9

68-64

44-76

Cjvar in i t i a ll i £ t 5 ator convey .r m

Eel l i t over ;;initial Hi t•; m on partevery 2 aca.

10-40

3-15

13-50 2S-Q0

4-10 30-15 4-10

Qiaroea

13-50 13-50

f-10 A13

13-50 13-50

4-10 4-10

9-93

10-OS

14-84

4-51

Page 17: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10 11 -.2 13

ry polisned

as per 8bia20 A

Hard Gravell ing

53-90 53-90

57-75 57-75

5S-90 53-90 10-01

57-75 £i-50

53-90

63-50

62-50 S"— 06 21.02 9S-&-:

33-3tJ

0.50 Kw ieud tori-arui work

Canaclidat-ionv:itr. 2 'ionner o l l e r v,-itij

12-00 12-00

b_5O 9-40

iitouc 10/Sq.nut.. 300-00 -325-00

waieiinnan layers

12-00 13-1G

1&-5B &-40 10-35

B-33 325-0O 375-00

5-lfc

10-10

13-10

10-3 5

1S-3B 37S-0D

15-00

11-00

4 00-00

l i _ 5 0 7-8B .1&-1B

«•-00 12-00

10-12 410-00

tailing oi20-00 2O-00 20-00 -20-00

l-tad

20-00 20-00/aira

ofgruvcl 2 to*3Trol le r 150 mm -tankbund light junglec 1 eaxtsncs. " 7-00 7-00 1O-00 . 7-70 6-50 1C.-58 1&-58 SilD &-21 9-93

Ci tar ing ofl igr-t jungle

Cltiiiiritig heavyJ uiicii e

bcrub luncjle

1-25

1 - 6 0 •

0,55

1 - 4 0

1-BO

0-70

11-00

12-50

7-69

1-40

i-ao

t-70

i-60

2-00

C-BO

E. Vor): ieaosupto 3 lands 7-50 b-40 12-00 6-40

14-28

11-11

?-30 10-70

i-60

S-30

1-7 0 6-26 10-B4

&-67 10-77

1-88

2-00

0-80 -

2-10

0-90

5-00

12-50

< - - 5 3 •

11-49 -

2-30

1-00

11-30

Aiter 3

1 eying LJointing.

li-QO 13-00

3-73 2-05

10-00 li-20 14-70

16-49 2-05 2-05

li-30

A14

14-70

2-05

16-20

2-05

10-20 • 10-52

6-16

17-90

Page 18: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

H o .ul tile

i temt i ai> ocr —, —. B

fit— o? ••„ incrby 2 y increase

hece arrived:or i n s yuui:

91-S2

L/L of 150 im

Jointing of

2.05

1 5 0 luui

L/L of 20Gran

Jointing of2 00 uua

L/L of 250 iota

Jointing of2 50 wo

L/L of 300 nuaJointing of3 00 uui

L/L of JbO <iuu

Jointing of350 mm . •

5.62/iX:- 1.4Q".

2.47

5.62/ix- 1.40

2.84

7.35/ir- 1,83

3.41

7.35/4.X- 1.83

5.86

6.40/*

L/L of 400 ana

Jointing of4 00 nun

L/L of 450 am

Jointing of4 50 nan

L/L of 500 HUB

Jointing of500 mm

L/L of 600 asa

Jointing of

6.49

a.40/4

- 2.10

7.309.87/4• 2,46

8.00

9.87/4- 2.46

u.ao

11.29/4» 2.82

2.70

7.30/i.- 1.S25

3.25

7.30/iX

- 1.625

3.75

9.20/iS

- 2,30

4.50

S.2O/4.X- 2.307.70

30.35%

31.57%

30.35%

3 2.04%

25.68%

31.96%

25.68%

31.39%

11.00/4- 2.75

6.70

11.00/4..2.75

9.65

12.85/4» 3.21

10.00

12.B5/4»» 3.12

11.60

14.70/4- 3.67

30.80%

32.01

30.80%

32.19%

30.48%

31.15%

30.48%

31.281%

30.14%

15X

5%

15%

5%

15%

5%

15%

5%

5%

15%

5%

15%

5%

15%

5%

3.10

7.66/4 - 1.91

3.?3

7.66/4 - 1.91

4.31

9.66/4 - 2.41

5.17

9.66/4 - 2.41

8.85

11.55/4 - 2.88

10.00

11.55/4 - 2.88

. 11-O9

13.49/4 - 3.37

12,1949

13.8fe/4 - 3.37

13.34

15.45/4 - 3.85

A15

Page 19: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

AC Pipaa 1/L 80 on

or 80 tcai

AC Pipes

Jois^ing of100 icm

1.94

3.47/t-0.86

of lOOum 1.94

- 1.22

2.55

4.55/4-i.13

2.55

6.40/4- 1.60

21.44%

21.39*

31.44%

31.14%

5%

5%

2.93

•4.77/4-1.19

2. 03

6.73/4-1.60

Coat of Matericile including conveyance Blasteng, Machine crushing

Sclognorage & Cess charges

o f zxi i n InitialKM

Cfcinveyuijca Hluotincj Machine Seiocmoracje 25X cesscnurgca • cnargeo crustiuig cnaryes crwrgus

cliarguu

costof line

per KtU

10

iiund far

iana rcr i l l l i n e

20 inn tiectilnt ciusned

_ 40 Uiu H. C*.

Hough 3cone

... Uricricc

caueCftS

., u o u o t c scone for1 Masonry RE

^ Ccunenc

^ .Polished sxonc

15

15

30

10

10

20

4

10

KM

Kit

KM

KM

KM

KM

5.82

3.19

133.87

64.50

-13.96

526.B0

6.66

35.81

26.22

2B.59

29.59

46.10

26.84

26,84

5Q.83

19,52

26.84

26.84

15

15

15

15

-

-

.45

.45

-

-

-

.45

.45

10 KM

1157.89

446,00

11.27

33.46

5.00

5.00

10.00

10.00

10,00

15.00

5.00

10.00

10.00

1O.O0

1.25

1.25

2.50

2.50

2.50

3.75

1.26

2.50

2.50

2.50

41.66

39.03

241.38

119.29

53.30

660.38

34.43

90.60

81.81

1JB0/MT

11000/HT

1181.66

A16

Page 20: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

cv t.c c~..zsr

81.NO.

8&-O9 Bit-SSlncruio

_1

1 .

2 .

3 .

4 .

5 .

6 .

7 .

B .

9 .

1 0 .

1 1 .

1 2 .

BO 'DUG CltOO 10

ICO su "

125 M •

150 MS "

20O«« -

250 au *

3C3 »» -

350 MI "

4 0 0 turn '

450 au *

5OO »* "

6 GO fab. "

2a.32

35.O4

-iS.07

54 .en

61^77

103,00

133 .a .

181,02

216.28

267,91

337.64

-C76.61

3S.CU

4&.07

54.07

ai.77

iOl.OO

133.00

1S1.02

. 21S.2S

267-.S1

-337^4

^7£.64

- 2O.CZ

- 4C.O7

- 54.87

- Cl.77

2O2.OO

133.OO

151.02 '

31G.2B

- 267.Ml

— :^37.M

,„_ .:"«3t»fr4

22.05

39. »5

51.39

63.69

9C.12

123.fcJ

159.60

- 217.22

261.94

^21.49

-405.17

372 17

13.9JR.

a-t.oij;

14.02S

1C.O7X

lS .S id

1S.47X

1S.77X

20.OOS.

2G.00X

20.00^;

2C.OO%

2 0 . CW

7OO B 9 9 . l l

51.39 55i-29

63.69 7J-48

9 t . i 2 I2J-2Q

123.6O 152.C7

25S.6O ' 197^14

217.22 26C.22

261.94 323.56

321.49 397.12

405.17 500.50

572.17 706.78

B99.ll 111O.65

25.3a:;

15.37K

1C.37J;

23.52S'

23.52X

23.52X

23.52X

23.52X

23.52U

23.S2S;

J4.-G3S

14 #4 3)b

14.505.

1-i.SOj;

14.5Oji

14.52s;

15«OO>i

•41.60

SC.5E

ei.is

225.58

307.22

370.47

454.TO

57-.O7

eos.-si

1277.24

ZS.OO .OOS —

i.eov; 4.16 6X 13.OtS.(on

li.OoJi

2C.25S

A17

Page 21: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

Si , C

Ci—29 o—uoZticr aaice

ID 13

1. 80 tt.

2. 10b u. fl

3. 125 u p

4 . ISO fcu 0

5 . 200 mm fi

6 . 2SO M 0

7 . 300 •*> p

S. 350 tMi p

V. 400 w 0

10. 450 *u ft

. H . 500 •»». fi

1 2 . 61X1 aw (A

: 3 . 70Clu t,

15 2&i

37

4S

6C

»S

:?i

235

305

360

447

56i

.15

.21

.74

.55

4.30

. 20

.2R

.44

.39

.02

.73

.35

2S.

37.

<13.

15

21

7i

66.55

ac.

171.

235.

3O5

36C

447

562

30

26

2G

44

.89

.02

.73

.35

2S.I5

37.21

4S.74

66 .55

SC.3O

mC. 26

J71.26

235.44

3a^«,U9

36O.O2

4C7.73

5C2.35

22.23

SC.70

ISO.21

20!;.54

2C1„53

367.O7

431.02

537.2O

790.Si

961.40

33.23

K..0OX

—-* +

13.

20.

12.

20.

20.

20.

IS.

20.

y»s

MS%

COS

*%%

oox

oox

ooj;

9S*S

ocn;

35.C1

5C.7O

75.66

117.96

153.31

205.54

2C2.53

367.07

432.O2

537.2O

790.91

961.40

E7

1 a r

253

349

.53

.70

f 1

.SO

.00

53^.66

P77,.' 0

S.76SS

23.52)(

9C.09

li

li

14

Ji

14

ie

.5OX

.5OX

.50):

.5OK

.!TOK

.77

290.71

399.60

SIS.17

611,O4

75S.9;

117C.15

HOTEt

TCJC

i=i»»e 2£.0Oliduty

.OUX

li.Ofij;

A18

Page 22: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

at pl Luri.ii 51967-08 at—n&

J-crcen->-30 8^-90 9G-91

Average

Increase

ci:199J-C2

11

A. *

2 .

3 .

- . .

• •

7 .

a.

9 .

' 3 .

11.

12.

13. "

eo i

1O0

125

1 5 0

2O0

2 5 0

300

3 5 0

4 0 0

450

5OO

6 0 0

7OO

uu {9

t o (9

re fi

«• ?

KB ft

Ma £

3 1 . IC

47.O9

5C.35

62.32

145.4O

19S.35

265.95

361.40

424.15.

S30.O0

21.2C

4.1. O9

5G.35

C2.3U

W5,4O

19S.35

265.95

361.40

424.15

530.OO

21.2C;

•17*09

5C.25

S2.32

145.4O

19S.35

265.95

361.40

«24.15

530.0O

3S.66

53.60

66.52

9a. 84

145.03

193.19

265.49

367.14

47E.35

57i.CS

7Q2.21

1030.SB

130-1 5S

14ii

14X

14X

1 «

32.66^

33.17>;

33.O4JC

32.36X

34..B6K

32.4»i

35.66

53.66

66.52

VZ.tH.

149.63

193.19

265.49

367.14

478.25

572.05

7O2.21

1O3O.H8

1304.59

41.14

C1.93

76.75

IOC.27

18C.C3

23C..63

327.95

453.51

590.90

7O&.64

8G7.43

1273.43

1611.54

li..35£

1C.36X

15.37H

IS.37^

2i.52>;

r.3.52^

23.52X

23.52V

23.523i

22.52V;

2S.52«

21.52*

23 S2S;

s

S

9

sIC

IB

IB

2 0

16

I S

16

1&

,7C^

.7m;

.cot

. 7 5 *

.esv;

.52%

.62*

. « «

.67*

.67S

»67X

cc.ir.67.9S

b-i.26

11G.B6

21S.O2

2CS.46

38S.B9

546.57

7O0.92

ft+i.lS

1O2&.37

1511.17

1912.41

HOTEl

bed tie uu-y

s.2S.G0* 26.25S

13.O6S

A19

Page 23: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

C.r»D. .T^TTTS ATO ^ yO". K.C.

S i . CiMO. OL

O^-SO StC—i'I

. .2

CIR jcirrs

1 .

2 .

3 .

4 .

50 BO

ICO Hit

125 »a

150 u

3C.2O

4Q.2S

61.27

3 7

-iC

5 6

01

-CJ

. 3 "

. 5 0

. 5 0

•-•

1 O .

1 0 .

I G .

2 2 S

ZtZ '

51%

17

*c

5 6

6 7

.en

. 3 7

,5O

.SO

E2.C0

61.03

BJ.CO

»i.O3

5. 2QG

6. 225 -

1. 250

D, 300

it. 3bD

• 0 . /"•" «

1 1 . 480

12. 5Q0 a

13 . SCO

1 4 . 700

15. COO

1 6 . S*OU O

1 7 . 1OO0

1 6 . 1200

5C.C2

£7.10

0 1 . 63

1OO.6O

132.57

7.55.23

1S3.LX/

236,«C

67.10

£1.63.

1C3.6O

1 Cr n j

23C.46

A20

50.C2

3S.25ji

r "

C l

S3

» i

. 0 0

. C O

. 0 0

.GO

e i

S3

. C D

.oo

. 0 0

.on

IS! . 02*

61.10 73.C1 2C.47 20.-:

6C.2O

Ci.53

67.10

C1.63

1OD.6O

i32.57

155.23

1G3,OO

236.46

60.52

S7.96

120.72

158.OS

166.20

219.60

2S3.75

SIS.54

2 CDt

2 0 X

2OX

2 0 *

2 OX

2«T

2 0 «

B O . 5 2

9C.96

12O.72

15B.O0

18C.28

21S.10

2C3.75

515,54

94.OS

112.34

156.66

203..72

240.55

294.66

332.69

£30.74

16.84*:

14.67%

2<J.7Oi

2S.O6X

25.13^" "

34.4KI

2C.B6K

22,34 >i

I2.20X

11.55'^

icasw

16.02%

16.37S

JG.14&

1C.2CS

K.IIJ:

105.63

12S.75

1^2.67

23i.35

27S.92

34S.17

i52.6<

71V..73

26.-S^ 26.25

Page 24: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

K joztrrr. AMD CCUFLIKOS FOII xc PTVX

2 3

CIO JOINTS(for t i l d*ases)

1. I O M

i» 100 asa

... 125 iu

. , 150 w

, . 200 M.

~, 2 5 0 mm

i . 3O0 at>

3 . 350 •»

;. 400 KU

, . 4&0 w

, . SOO M .

J. COO (MO

, . 700 u.

, . tQO JKI

. 1DO0 CM

u 1200ft KM

34.2O

40.28

51.26

£1.27

50.92

67,40

B1.86

101.76

132.77

157.50

104.91

244.35

37.o7

•4.37

-67.50

50.92

C7.40

. 81.86

101.76

132,77

157.50

164.91

244.35

-

5

S.32S;

10.15'-

10.17%

10.17*

-

-

-

-

-

-

-

£

37. C7

44.37

56.50

67.50

50.92

67.40

81.B3

101.78

132.77

157.50

104.91

244.35

52 . OO

61.00

03,00

94.0O

61.10

BQ.90

»C23

122.1C

15».32

189.00

221.89

2S3.22

567.55

a

3a

3 7

46.

3 9

19 ,

2 0 .

I S .

2 0 .

,19,

2 0 ,

1 9 .

2 0 .

.04*

.9O5t

. 2 5 *

.99*

.COX

.oos

,9V*

.OO*

.99*

OO*

*

52.00

61 .OO

Q3.OO

94 .CO

61.10

ao.9a

9C.22

122.14

159.32

189.OO

221.89

293.22

52.00

61.OO

82.OO

»4.00

05.16

1Q2.56

12C.46

175.91

258.84

3O5.71

36C.20

439.S0

-

-

-

-

-

39.37*

27.CiV.

2C.75*

44.02*

62.52*

61.75K

65.87*

49.CU*

12

15.73

15,8711

19.02J; .

16.47%

19.7OJ1

15.96«

16. MS

21.34*

27.50*

27.25*

20.65*

23.29S

6C.20

70.62

9S.7G

109.46

1O2.C0

12C.00

146.99

213.44

33O.14

389.00

473.80

541.05

HOT&l

<Sucy

5.60S !

25.00* 25.OC51

5,CO*

25.00%

i.ltX 4.16*

A21

Page 25: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

JUJD TOP. A~ ciaea 2

1 0

C.I.D. JOINTS

1 .

2 .

3 .

4 .

i *

5 .

6 .

7 .

0 .

» .

1O.

i l .

: 2 .

1 3 .

1 4 .

1 5 .

1 6 .

17 .

IS*

OO ma,

1 O O KM

1 2 5 ix*

ISO MM

COUPLXIP3S

2OO MB

225 M

25O M.

300 Ma

310 «•*

400 MW

450 Ma

5C- •

600 M

700 HU

000 Ma

9O0 M

10O0 MB

»?OG M4

34.20

40.28

5 1 . 2n

61.27

-

85*47

114.60

166.61

190.26

23t.9O

37.67

4»V37

56.5 j

67.50

32.76

95.47

114.60

16-.ol

198.56

23C.9O

WOTBl

s.aoii

9 . 3 3 7

4 4

5 6

67

. 6 7

. 3 7

•so

. 5 0

52

6 1

0 3

9 4

. 0 0

.OO

.ca

.OO

30

37

46

39

. 0 4 *

.4B%

.90%

,25X

J.2.OO

61 .CO

S3_OO

94.OO

5 2

6 1

C3

V i

. 0 0

.CO

. 0 0

. 0 0

6S.25

I5.£7)i 70.63

19.022 95.76

16.47% 109.40

65 . 25 89.48 37.13* 12.COS ICC.21

112.76

KS.47

114.60

166.61

19S.56

23O.9O

1O1.2*

116.06

140.36

2Q3r93

343.O*

2X2.42

337.66

614.33

2^.39X

21.40*

22.3»X

22.3?*

22.40%

22.4QK

1O1.29

116.86

140.36

203.93

243.O4

292.42

337^66

614.83

122.69

154.20

217.16

324.50

386.53

472.31

555,30

•359.07

21.1--*

3 1 . 9 i *

54.71K

59.16%

i9.Oi5C

6 1 . SIX.

64.45%

39.C51C

14.SOX

1I.11S

25.70X

2 7 , 1 J X

27.Its

27.»7%

2O.OOX

25.00%

140.40

182,12

272.97

412.00

491.53

6O4.41

710.78

1074.03

4.16X

Ixcltfj uuty

A22

Page 26: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

c1 o sv a- iicc

i . 2 . 3 . 7 . 8 . 9 . 1 0 . 1 1 . 1 2 .

B7-98 6S-39 8^-90 6^-90 90-91

3 .

4 .

6 .

7 .

8 . '

1 0 .

1 1 .

1 2 .

1 3 .

1 4 .

BO mm 4 7.09

1 0 0

1 5 0

2 0 0

2 2 5

2 50

3 0 0

tun

rum

mm

mm

mm

mm

4 3.74 P2

57.40

51.68

8c.63

73.18

lift.00

93.00

130.57

102.00

i^.00

10B.28"

- 198.50

1 f. .50

43.74

51.40

51.63

Hi..63

73.IB

116.00

93.00

130.57

102.00

141.00

10B.2B

I98.t3

15B.5O

4 7.09

4 3 . 74

57.40

51- 6B

B6.63

73.16

118.O0.

93.00_

130.57

102.00

141.00

1O8.2B

198.13

15B.50

54. 15

50.30

66.01

-59.43

90.62

H<. 16

135.70

106.95

150.16

117.30

162.15

124.52

227.05

IB 2 .28

1KC

1 Si

15*

I S *

15X

51.15

51.15

5 4 . 1 5

5 0 . 3 0

51 .15 66.01

51.15 59.43

51.15 99.62

51.1b H4. ] 6

51.15 135.70

51.IS 109.95

51.15 150.16

51.15 117.30

51.15". 162.15

91.15 124.52

51.15 227.85

51.15 . 182.23

1 5 * 62.27

57. B4

75.91

is-,:

1 5 *

1 5 *

1 5 *

6 B .

114 .

9 6

156.

34

5 6

. 7 8

0 5

15* 126.44

15* 1 7 2 . 68

15* 134.89

15* 1B6.47

15* 143.19

15* 26 2.02

15* 209.62

A2 3

Page 27: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

( * •

B. 1 0 . 1 1 . 1 2 . 1 3 . 3 4 .

1 5 .

24.

2 0 .

2 9 .

350 mm

1 7 .

1 6 .

1 9 .

2 0 .

2 1 .

400 mii

500 ntu

£00 uxii

700 tens

S00 ma

900 mm

1000 ntn1000 uiuC

1200 turn

305.33

237.82

386.*6

295.78

54B.72

417.57

710.99

585.18

873.25

1O35.52

920.40

1 5 ^

1 5 ^

15X

15%'

15%

1 5 «

1 5 *

1 5 «

1SX

1 5 %

1 5 X

54.15

54.15

54.15

54.15

54.15

54.15

5-1.15

54.15

54.15

54.15

54.15

305.33

237.82

306.46

295.76

54e.7 2

417.57

710.99

585.18

B73.25

1035.52

9 20.40

10ba.02

1255.63

54.15 108B.02

54.15 125S.63

15^ 351.12

1 5 - 273.49

15* 444.42

155i 340.14

15K 631.02

15% 4B0.20

15* 672.95

15>: 1004.2i

15S 1190.61

% 105B.46

P3

15% 1251.22 P2

P315% 1443.97 P3

3 1 .

467.59 15% ' 54.15 467.59

316.21 15« 54.15 346.21

1534 537.12 P2

15% 39e.l4 P3

A24

Page 28: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

..~r C3LW.S8 ?2

11

i v ao MM

2. 100 tuu

i . U J MB

4 . 2C w*

5. 225 M

6. 250 Ma

7« 3O0 u

ft, 3-0 *~.

9. 400 WB

10. 450 mm

12. 6UO B >

13. 700 art

14. 000 M

15. »O0 Ma

16.1OOO I M

12.26

J5.72

It.05

22.V4

29.O6

33.33

12.26

15.72

It.86

22.94

29.OS

33.33

45.00

P2

12.26

15.72

1E.B6

22.94

29. O0

32.33

45.OO

14.10

m.oa

21.69

26.90

32,44

3G.33

SI.75

£9.40

86.25

95. G 2

1O9.54

124.55

152.30

357.36

180.21

2OS.O4

235.E7

IS.DO* 14.10

li .OQi lb .oe

li.9'J% 2^.30

14.99k 33.44

15.OD* 3S.33

25.0OX 51.75

S9.40

06.25

.95.62

109.54

124.55

till.X*

180.21

2O&.O4

2-5uG7

14.10

l&.oa

21.69

26.38

33.44

3G.33

51.75

69.40

B6.25

95.62

1O9.54

124.55

152.38

2S7.36

ISO.21

20Q.04

235.C7

1 5 *

lb.%

1 5 ^

15).

15ft

l i t

1 5 «

1 5 *

15*-

15X

15S

15X

15X '

15X

15K

15X

25S-

16,21

2C.7S*

2- .94

30.33

33.45

44.07

59.51

79.81

99.18

109.96

J25.97

143.23

175.23

393.10

207,24

239,24

271.25

11,01%.A25

Page 29: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

P3

IO I I

ttO a

100

200

225

250

300

350

400

450

500

600

700

BOO

SOT)

10O0

14.15

18.34

24*54

35, 88

.40.36

46.35

55.45

l-i.iS

16.24

24.54

35.OB

40.36

46.35

55.45

1C24

24.54

35.aa

4Q.36

46.35

55.45

16,2720.96

20.22

41.26

4C.6*

53.30

63.77

1O5.OO

141.OS

177.1O

213.15

285.26

359.36

429.47

i*» sec;1 5 . C l *

14.9VX,

14.99*

14.99*

14.99*

17.11*-

16.77

2C.93

2S.22

41.26

46.41

53. 3O

63.77

105.00

141.OS

177.IO

205.26

357.36

429.47

5OO.OO

650.00

1C.27

2C.VU

25.22

41.26

4£«<I1

53 .30

63.77

1 5 *

1 5 *

1 5 *

1 5 *

IMS

1 5 *

1 5 *

1 5 *

1 5 *

1 5 *

1 5 *

1 5 *

24.12

32.45

i7.4*

53.37

61.2&

73.33

12O.75

162.20

203.66

32B.O4

410.96

493.B9

575.OO

747.50

A26

Page 30: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

R . C . C . PIPES PER R»t/pgR Km.

1 0

ft

2

3

4

t

G

9,

10,

• *

*

. 8O

. 100

M B

U K

. ISUu

. 200

. 225

. 300

4 J X

, 40O

,450 •

500 *

M *

M K

• U

JUS.

« ft

600 urn fj

700 a

600 •

m$

1*

0

• * >

£

P2

P3

P2

P3

P2

P3

P2

P3

P2

P2

i '3

P2

P3

u ri

if>2

P3

P2

P3

'i~

i"J

P2

C3

I'2/PJ

f 2

P3

O.O35

O.O35

O.O46

O.&ifc

0.O56

Q.O58

0.092

0.O92

C Tn»

0.11*

0.127

0.131

O.1S4

0.219 -

O.Q35

0.035

0.O46

O.IM6

O.O50

0.05S

0.0*2

0.0!; 2

O.1H

O . -

-

o.i bi

C.219

O.34S

0.38

C 2 6

•0.632

0.75

C.32S

C.Q35

O.(4»

0,. (46

0rO5o

O.OSB

0 rO92

O^OS2

O.139

O.114

0.127

O.23O

0.1B4

0.219

0.039

0.039

O.Q5

Q.O5

O.O64

O.O64

0.1CU

o.ic:

0.12

0.125

O.14

0.152

C.202

0.241

0.253

O.292

0.317

0.341

0.341

11.42*

11.42%

&,6»X

(i.6<Oi

1O.34X

10-34X

9.7SX

9.78%

1O.O9X

8.64X

10.23

10.14%

S.7B*

1Q.O4X

0.039

O.O39

0.05

C O S

0.U64

0.O64

0.101

C.101

C.12

C.125

0.14

C.152

0.202

G.241

0.253

0.292

0.317

0.341

C.341

c.ojia

03039

0.O5

O.QS

O.O64

' 0.O64

0.1O1

0.1D1

C.12O

O.125

O.14O

O»152

0.202

0.241

0.253

C.292

0.317

0.341

0.341

A27

0.418

0.695

0.759

G.418 0,08

0,625

1OX

1OX

lOii

O.O42

C.CK2

0.055

C.05S

0.070

0.070

0.111

0.111

0.132

O.137

0.154

0.167

0.222

0.265

0.278

0.321 .

0.348

0.375

Q.375

0.416

0,459

0.764

O.f 5

Page 31: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

C.I. PIPES

10 12 13

fi/3

- . 00

.. . 100

. . 125

- . ISO

. . 2OO

. . 250

, . 30C

* . 350

J. 4O0

. . 450

. . 500

i . 6OO

». 700

j . 750

. , aoo

; . soo

J.1OO0

13.66)

U.OO)

U.OO)

(4.00)

U.OO)

(4.DO)

U.OO)

U.OO)

(4.00)

U.OO)

U.OO)

U.OO)

U.ao)

K..OQ)

U.OO)

U.ao)

U.oo)

U-oa)

1OC.O9

12S.46

150.55

161.64

27J.O6

3dC.il 2

474.45

5BB.32

726.10

076.74

1031.50

1411.S1

1030.93

20SO.6O

;2Bt . i7

27»c.oa

3359.04

11* .

146.

213.

311.

419.

54O.

601.

64

07

70

14

23

fil

7 0

12.77X

12.63*

13.83*

I!.***

13.5(4%.

13.&4X

13.94%

-

11S.64

lit..75

146.07

213.70

311.14

419.23

54O.61

681.70

-

US.64

116.75

146.07

213.70

311.14

41^.23

540.61

661.70

11&.64

11C.75

14U.O7

213.70

311.14

41S.23

54O.6A

661.70

13Q.94

-

16S.76

251.11

36^.01

43:.3O

635.6O

091.42

975.25

117o.63

1466.47

1003.O2

2436.47

272t.75

3726.02

4476,20

10.13;;

-

lo.Zll.

I7.5i:

17.41*.

17.41k

17.57*

' 30.76S

S.flbt: 152.66

10.46X 277.37

IQ.4SV. *O<.^

10.45^ 543.74

1O.5OX 7O2.23

14.90X 1024.24

1072.77

1294.50

1613.10

2O71.30

409&.60

4223.80 .

1OV t

over

f t ;

A28

Page 32: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

C.I. L/A Class pipes (Length - 3.66 nits)

C.I. L/A(3.66 met.)

1

84-S565-86

2

B6-8767_86

3

Bb-8989-90

4

9O-91 *

5

Cost

6

feemarks

7

150

35C

4 0G

<!5<j

60C-

BOO

1000

300

ia 0

son 0

mm 0

icni 0

am #

UE;I 0

nuii J?f

nun 0

2.

f

e.

1 2 .

2 2 .

3 2 .

4 .

4 5

60

8 5

25

90

0 0

0 5

45

i-60

6.10

7.45

£.95

14.00

23-10

3 3.65

4.80

(6.12)*

(6.93)*

(e.?6)*

(C.4Q)*

(e.53)*

(5.00)*

(4.99)*

(7.87)*

3.40

7.80

9.50

• 1 1 . 4 5

17.90

30.40

44-.40

6-20

1-owerlnc u

(30.77)X

(27.67)

(27.52)

(27.B6)

(27.86)

£31.60)

(31.95)

(29.17)

Laving

12.30

12.27

12.09

12.14

1 2 . 1 3 •

12.20

12.31

12.35

3.82

8.76

10.65

li-oi

20.07

34.11

4S.87

6.97

1 5 0 OK: 0 •"-

3 0 0 ICm 0

3 50 mai 0

4 00 ma 0

4 50 as; 0

600 mm 0

BOO BTJI g . . • -•

1000 our, 0

3.75

7.26

7.68

9.93

11.09

15.83

2C.63

27.19

3.93 (2.OB)*

7.65 (L.OB)*

6.06 (4.95))i

10,42 U.93J3.

11.65 C5.05)*

16.63 (£..05)*

• 21.67 lz..O4)Z

2G.55 ;s,oo)*

5.19

10.10

10.64

13.76

15... 38

C1.94

37.6ti

Jolntincj

£32.06)

(32.03)

(32.01)

(32.05)

iZ2.C2)

(31.93)

(31.93)'

C3i.es)

12.30

12.37

12.32,

12.33

12.36

12.31

12.32

12.33

5.83

11.35

11.95

Z5.46

17.28

2^.65

31.11

•=1.23A29

Page 33: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

P.S.C PIPES IB Kga/Cum

51.Ho. Dlawater Rotas of 1990-91 Kataa of 1991-92

1.

2.

3*

5*

6.

7.

10.

11.

3OO so

350 nta

400 nu

45O.KM

500 aw

600 m

700 NU

BOO BM

9 0 0 MM

10OO M

12Q0 am

3B0.00

475.OO

530.OO

57O.OO

621.00

745.00

885.00

1110.OO

129O.OO

1545,00

2130.00

437.OO

546.00

609.00

655.50

856.75

1017.75

1276.50

1483.50

1776.75

2449.50

Motet IS % Avmrag* annual i.ncre*»tt 1« noticed In re«pectof R.C0C pipes* over tiitt p*st year*. Tnc AUUPaverage increase la considered for P.S.C plp«ta alaoand Rates at 1991-92 ratttd worJtad out operating•vsrtgt annual lncraaaa on 1990-91 rates .

A30

Page 34: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

HATES OF AC.CL.10 PIPiTS

D i d

i •

BO

1 0 0

125

150

liOO

JOQ

1 5 0

4 0 b

4 50

SOD

6 0 0

IKITIA: COSTPipes CIL> —

JlolQUi

2. 3.

41.60 15.05

50.56 17.67

65.0& 2-;.69

81.16 27.37

138.77

1-7-1.54

225.58 -

307.22

370.47

454.70

57 3.07 - 8

E>~ISE DUTY SALES TAX TR All SPORT*—Coup- Pipe 6 Coup- Pi pea CID Cou- Pipes

l iny: . . (2c .25j ;Hlage ( l i .06XJo. i - p l l - (-4.00lit:-, ngi.. ",. up-

U . 1 6 ( 1 3 . 0 6 to%) %) 150

10.92

13.27

17.08

21.30

20.88 36.42

26.40 45.81

32.43 59.21

45.66 80.64

59.08 97.24

69.98119.35

3.1^,21,2.47

6 .

-

-

-

-

3.-4 3

4.28

5.30

7.87

10.42

12.46

16.33

20.69

C

fc.

7 .

4 3

6 0

fc.50

1 C .

1 6 .

2 2 .

2 9 .

4 0 .

4 6 .

5 9 .

£ 0

1 2

7 9

4 6

1 2

38

3 8

74.84

1 0 5 . 7 0

6 .

0.62

0.73

1.02

1.13

-

-

-

-

-

-

-

-

-

2.72

3.44

4.23

5.96

7.71

9*13

11.36

14.77

Uiu.*

1 0 .

1.66

2.02

2.60

3.24

2.77

3.49

4.51

6. 14

7.40

9.09

11.46

16.18

.TIO11 TOTi.. *. Cou- Pipeson pl i - perpi- iigs. tat.pea. (2.0013.06 %) .

1 1 .

0.21

0.26

0.33

0.42

-

-

-

-

-

-

1 2 .

-

-

-

-

0.41

0.52

0.64

0.91

1.1U

1.39

1.74.

2.26

. 13.

59.82

72.73

93.60

116.74

196.0B

246.63

316.76

43i.l2

523.49

64 2.52.

809.80

114 3.76

A LCID Cou-Joi- p l i -n u nqi.,Per t-erlant. hoit.

14. 15.

15.67 -

18.40 -

25.71 -

28.50 -

- 27.44

- 34.64

- 42.60

- 60.40

- 7b.39

. - 92.96

, r 115,47

r, lso'.ee

lot&l

1 6 .

75.49

91.13

119.31

145.25

223.52

231.27

361.36

494.52

eor.ae

735.48

925.27

J294.64

Cost of L/L UZ/T and Join-ref1111- ting oftig t.1 i. T plpe-

- • l ine

UKT.

1 7 .

23.08

23.0B

23.0B

25.00

25.00

25.00

29.91

29.91

33.55

3.3.55

37.61'

4 3.59

L/l.

l£i.

2.93

2.93

2.93

3 .10

3.73

4.31

5.17

8.85

10.00

11.09

12. 19,

13.34,

J

1&.

1.19

1.68

1.66

1.91

1.91

2.41

2.41

2.B8

2.BB

3.37

3.37,

3.85.

ID tiiicostperKKT.

2C.

Cost of^Deciaisfc" 16^ oncost.

102.69

l i e . 8 2

147.00

1 7 5

254,

312.

398.

536.

. 3 5

. 1 6

. 9 9

. 8 5

. 1 6

648.31

783.

975.

135 = .

. 4 6

, 4 4

. 4 2

2 1 .

15.40

17.82

22.07

26.30

38.12

46.95

59.83

80.42

97 . 25

117.52

146.32

203.31

sur.cries

2 2 .

0.01

0.01

0.00

0.00

0.02

0.01

0.02

0.02

0.04

0.04

0.04

0.02

ID ciilcast of

1 Hie kei

21i.

118.10

136.65

169.05

201.65

292.30

359.95

458.70

616.60

745.60

901.05

1121.80

1556.75

aptx> 150 mm dia 4S» on Pipes value + Sales a t 13.06«. About 200 mm dia 2% on pipes & Cbupllnge value.

* • K/'Ji ucava t lou & 'lirenctussWatering L lanspiug.

A31

Page 35: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

RATES OF AC.CL.l5 PIPES

IHITIA: COST EXCISE DOTYPipes Coup-

5AI.ES TAX TRAHSPORTATIO MPipes S i t " Coup- Pipes Coup- Pipea CID Cou— P i p e s £ . " . Cou-

Joints Hugs. {26.25^)llng6 IIJ.06>.Jui- p l l - (4.00 on p l l -rit:.. nya- V up- p i - «y».

U.16(13.06 to pcu. (2.00%) %) ISO li .Ofc %).

VW> X)

T O TPipesp e r

A :.~ CJ o i -nt aP e rturn..

Cou-[)11-mjL.He r

loralCost oft/T andr e f l l l l -ucj K i. T

L/L tJoin-clncj ofpl)H>-11 liep e rHUT.

costpi;rHHT.

Cost ofipeclilBt- 16« oncoat.

L/L

localcast aiplpr-1 tin l e iHUT.

2. i. 5. 6. 7. 8. 10. 11. 12. 13. 14. 15. 16. 17 . 16. 19. 20. 21. 22. 23.

0 0

.21

ISO

J 0 0

.'.50

1 0 0

i 5 0

1 0 0

150

. 0 0

4—06

53.73

71.61

96.09

166.82

212.59

29Q.71

399.60

519.17

611.04

759.92

1170.15

l i .

1 7 .

2 4 .

2 7 .

05

67

70

37

-

-

-

-

-

-

-

_

11.05

14.10

5.SO {J.63 - 1.6B 0.22 60.53 76.21 2.1.0B. , .2.93, i . 19, , 103.41

7.02

1&.U5 r- 9.3B

25.22 - 12.55

25.50 41.79 i.19 21.79

30.02 55.BO 4.91 27.76

36.75 76.31 6.22 37.97

53.36 104.90 9.13 52.10

B2.S3 136.26 14.05 67.60

97.25 160-40-16.73 79.80

116.45 199.4a'20.I7 99.25

0.74 - 2.15

1.03 - 2.87

1.14 - 3.84

- 3.33 3.33

- 3.92 4.25

- 4.80 5.B1

- 6.97 7.99

- 10.75 JO.38

- 12.70 J.2.22

- 15.47 15.20

- 17.69 23.40

0.2B

C.3B

0.S8

77.28 18.41 - 9S.6C 23.06 2.93 1.68 123.29

103.29 2S.73 - 129.C2 23.06 2.93 1.68 156.71

136.20 28.51 - 166.71 25.00 3.10 1.91 196.72

.52 235.73 - 33.54 269.27 25.00 3.73 1.91 299.91

.60 300.40 - 39.45 339.85 2S.00 4.31 2.41 371.57

,74 410.80 - 4B.S1 459.31 29.91 5.17 2.41 496.80

,07 564.68 - 70.53 635.21 29.91 8.85 2.88 676.85

,65' 733.63 - 108.98 842.61 33.55 10.00 2.88 8B9.04

,94 863.46 - 128.62 992.08 33.55 11.09 3.37 1040.09

37 1073.85 - 156.46 1230.31 37.61 12.19 3.37 1283,48

71 1653.53 - 180.26 1833.81 43.59 J.3.34 3.85 .1894.59

IS.51

18.49

23.50

29.51

44.99

55.74

74.52

101.53

133.36

156.01

192.52

284.19

0.08

0.02

0.04

0.02

-

0.04

0.03

0.02

-

-

T

0.02 .

119.00

i 4 i . ao

1B0.35

226.25

'344.90

4 27.3 5

571.35

778.40

1022.40

1196.10

1476.00

2178.B0

A32

Page 36: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

RATES Ct' KZ.Z-.20

^ COST DUTY SAT.ES TAX TRA11S POR T ATI 01! A L ~ ~ Cost, of L/TT lotul Cost of butanes 'ID t i lPipes ZZJJ Coup- Pipes Coup- Pipes CID Cou- Pipes £. I. Cou- Pipes CTt Lou- 'local E/T and Join- cost Specials cost-of

Joints lings.. (26.25«illag& (l3.O6Xjai- p l l - (4.00 on p l i - per Joi- p l i - r e f i l l ! - ting of per fc I65i on plpt-nts. ngs. % up- p j - ngs. fc::.. nts ngs. rig W u T pipe- HKI. cos t . l in t ker

(4.16(13.06 to pea. (2.00 Per Per l i n e «!-•%) X) 150 13.06 ~) . hmt. knit. per

dlu .X)

L / L

£.. 7. & - 11. 12. II. 14. 1 6 , n. IS. 20. 2 1 . 23.

:oo

•25

:oi>

i6Ci

:00

>.bii

iOG

150

. 00

500

ZOO

4 5 .

6 7 .

8 4 .

l i b .

219.

28 3 .

16

98

26

8 6

02

46 -

399.89

546.

700.

B44.

1O2'J

1 = 11

1912

S7

9 2

15

. 3 7

. 1 7

. 4 1

15

17

24

T:

-

-

-

-

-

-

-

. 0 6

. 6 7

. 6 9

. 3 7

3 6 .

4 6 .

6 8 .

1 0 3 .

122.

1 5 1 .

177 .

2 6 3 .

-

-

-

-

0 5

12 .

53

24

2 0

B8

10

69

68

1 1 .

1 7 .

2 2 .

3 1 .

5 7 .

7 4 .

85

84

11

2 0

49

41

102.35

143.

133.

221.

270.

47

99

59

21

396.66

502. 00

4

6

-

-

-

-

. 4 7

. 1 6

8.04

11

18

22

27

32

50

. 8 3

. 3 6

. 0 4

. 0 0

. 02

. 0 7

6.00

B.ee

11.00

15.52

28.60

37.10

50.92

71.38

91.54

110.25

134.44

197.36

249.76

0.63

0.74

1.02

1.14

3.27

- 4.59

5.94

8.91

- 13.47

- 16.04

- 19.73

- 23.20

- . 35.08

iJBl

2.72

3.37

4.75

4.38

6.67

7.80

10.93

14.02

16.88

20.58

30.22

38.2 5

0.24 - 64.96 15.68 - 80.64 23.08

0.36 - 97.76 18.4] - 116.19 23.08

0.4-1 - 121.1S 25.71 - 146.89 23.08

0.62 - 170.9S 2 fi. 51 - ]°<i.46 25.00

- 0.50 30S.41 - 33.29 342.76 25.00

_ 0.70 4OG.64 - 46.57 447.21 25.00

_ 0.91 55C.96 - 60.42 611.36 2y.91

- 1.36 772.35 - 90.34 862.69 29.91

- 2.06 990.47 - 137.09 1127.56 33.55

_ 2.46 1192.87 _ 163.42 1356.29 33.55

- _Si02 H54.SO - 200.95 1655.45 37.61

- 3.55 2TH.41 - 236.46 2371.89 43.59

- 5.37 27Oi.42 _ 359.20 3061.62 43.59

2-93 I i l9 107.64 lttll

2.93 1.68 143.8° 21.5H

2.93 1.68 174.5S 26.18

3.10 1.91 22°.43 34.41

2.73 1.91 373.42 56.00

3.73 1.91 477.H4 71.67

4.31 2.41 448.01 97.20

5.17 2.41 900.18 135.02

8.85 2.88 1172.8.4 175.92

10. 00 2.89 1402.72 210.4.0

11.09 3-37 1707.52 256.12

12.19 3.37 2431.04 364.65

13.34 3.85 3122.40 468.36

0.04

0.04

0 . f>4

0.01

0.03

0.0<t

0.04

-

0^04

0.03

0.01

0.01

0.04

324.05

165.50

200.B0

263.05

4? [J.45

645.55

74 5.25

1036.20

1348.SO

1513. 15

3°63.SS

2795.70

3590.80

A3 3

Page 37: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1

L

I

t

2

1OO

15O

200

600

700

*

c

~~ 4

n

-

66.3*

86.10

126.44

-

20.79

24.94

3C.33

672.95 : 143.23

S65.7O i 175.23

i

(-_•

c'

cli

"c4 - '

c •

- "

10 J 9

12.47

15.16

IPr !•••'. E>, c

u "~

t. "~

r li

t: u

6

0.055

0.010

r: C O

U t, ~~

t: n oC J-1 Ufsj t'.

h- T. G

7

2.15

3.50

a ATE a or K.C.C v i CLA^JS E*

—• —i

G M in -i

r-< r~\ tr.•- o c -

&

ai.4B

112.15

0.111 '• 5.55 J147.15

71.611 0.764 30.20 1762.76

67.61 iO.764 : 3B.20 1991.Si

T

•i-'J

o

CJ

• rj

C

I."

_ —

-

t

-i r-

-

_

_

-

->• c:

r- ft/i t >

^ . i

^ . - - • - t

[J r

r ^

i : :::

H

{ tCJ

L

u: zr

u.

t rI, p r •

£

i . LP U>

-I -'"it;

f * " " £

r-» r • r :

;. "j » .

i

I. <• ^

t . -

r *

C

:-: I -A

i- • — i •

15

9.50 ; 90.90 j 23.06 , ft.66 . 122.14 i 16.91

13.15 125.90 ' 23.CM) ' 13.01 162.OO

11.17 164.32 25.QO 17.36 206,66

91.34 814.10

24.30

c : l <

-^ [•

:: -1• . i

L'l

H

L- £•

H

HU5

f 31.00 -0.02

43.59 52.06 96S.77 i145.47 : O.O1

.15.70 11O1.21 1 43.59 60.76 1211.56

S 1 . " 1! I " " - ' 1

i 1 - 1

!

A34

101.73 L ° ' 0 1

1O6.3C

U1S.2S

11393.30

! i • • 1

- : j - i

i

i - i

!

.

i

\

r

. .

t

Page 38: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

.1

• • • • -

i :

i .-•

j:

1| 300 •

• :

350

400

450

500

6OCI

700

6 0 0

9 0 0

1000

1100

1200

'-

437.00

546.25

60S..SO

655.50

714.15

656.75

1017.75

1276.50

1463.50

1776.75

2113.15

2449.50

—A

r.ucV

u

0

±J

ou

• : •

73

120

162

2 0 3

3 2 8

• -

. 3 3

. 7 5

. 2 0

. 6 6

. 0 4

410.96

4 5 2

493

. 4 3

. 6 9

575.00

747

6 5 6

971

. 5 0

. 7 5

. 0 0

Ecci ,

01- •

L i

r~l

0o

Hi

c4-1

c

-

36.66

60.37

81.10

101.83

164.02

205.4B

226.21

246.95

267.50

373.75 ..

429.65

485.50

. |i1

Li

i tf tI. L

ac ou

J- 0

" ~

' .

0 .

0 .

0 .

0 .

0 .

0 .

0 .

0 .

1 .

1 .

1 .

1 .

. . .

265

3 21

375

416

41B

695

760

625 .

6 5 0

7 1 0

710

890

c- -4, ^

C O

-H

ia O O

U t>0 0 -CC ~*tr, n oZ ±i UHi frj

7

-

13.25

16.05

- 18.75

20.90

20.90

34.15

38.00

_ 41-.25

82.50

85.50

_85.50

94.50

A35

KATE 9 Of

O J t •'

t •. a- i -'i

c +J *

t 4* in

li o O n

r-l r-+ if"

t. • o c •

o i- oi - . « i ( - l >

Ei

466.91

627.67

709.35

778.23

699.07

JO96.96

JL330.84

JL564.69 '

2236.00

2626.30

1029.50

-

V

I )

' J

t ]

4fJ

b-j

•*-l

aX'

cu

-

-

-

_

• -

-

-

-

-

-

-

-

PIPES

o.cur.

- • •

'• it

, i ntt 11~t t.i

ii --i

Ii (J^ ( j

h.. ^

C o

iv CD fLJ (J

-

-

-

-

-

-

-

-

-

-

-

-

r --^ '1. < r l

c*f C

; »

/ - rLI t j

5c.

7 3

82

9 0 .

104."

82

. 2 4

7a

6 1

)2

128.01

155

162.

31

5 0

216.30

260

300,

353,

1

94

7 5

54

uu

U X" i <U

C r-t +<-' O

r [).—c r

r i'

54 3.73

700.91

792.13

669.04

1003.99

1224.99

H486.15

;i747.28

UO69.80

2496.94

J2929.05

3363.04

1

j

1

( ^ 1i.' '• 1

• • " ' —

I.

(I

t -1CJ

CJ ^I

" H

29.91

29.91

33.55

33.55

37.61

j 43.59

43.59

43.59

43.59

f 43.59"J

j 43.60t

43.59

I

1

c

T . T j t>

r. £

o IT.

C» * - r :c r *- -

- ^ - \ Uj

£ ' t •

i'

26.04

30.38

31.72

39.06

43.40

... 5 2 . OB

i 60.76

69.44

78.12

66.80

95.50

104.16

I|

TT"I £

• t"C

I - <

' t!1

^_

' n

:> _

<" *

0 *

" ' •

I :

599

7 6 1

6 6 0

9 4 1

. 6 8

. 2 0

. 4 0

. 6 5

JO05.00

1320 . 6 6

1590.50

i860

2191

2627

JO 66

3530

. 3 1

. 5 1

. 3 3

. 1 5

. 7 9

-

r

c

- i :

' ' **

Vi

i-J C

n oO Vit> c

11 *Z

; u i

- • - £r

£J (1 - :J r~i t

i o

89.95I

; i i 4 . i e

1129.061

141.25

1162.75

(198.10

233.58

p/9.05

32B.73

394.10

460.25

f29.62

t- I..- (•

• • j

C t-r,. —•

LC C

— t '

L -

r- -t

t "

...02

'. 0.02

; 0.

L-1 "

0 .

• 0 .

I f .! 0 .

i o .

r*i o .

ij

— j —

i

04

04

0 2

04

0 1

0 2

10

04

i f .

11

'—, •

" ' ^

U

£iC i '

(' C

' ' £

. . . . .

1 ,

689.65

075.40

989.50

1082.90

p47.7S

1518.80

1829.101 :£139.10

2520^25

J021.45

: ISM. 50

• 060 .45

.

_

Page 39: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

' 1

r

c

c'CJ

I

«

BO

100

.! 150

J 200

1• i

1

j

'225

250

3 0 0

350.

4 O 0

, j 450

• r

•T

-ff

5 0 0

6 0 0

7 0 0

| BOO

\ 1000

[ 1200

i

-.

c

CJ

t

c;Jcu

- •

| 62.271 Z775.91

114.56

156.OS

172.68

lbfc.47

262.02

351.12

444.42

537.72 J

631.02

671.63

1004.24

1190.61

1443.97

2101.00

a

0U£1UcWmaVI

0U

';

ie.7i

24.12

32.45

47.44

33.37

61.29

73.33

120. 71

162.20

203.66

326.04

410.96

393.10

493.89

575.00

961.00

ei,01

to

73uHi

c.'.':0u

5

9.35

12.06

ie.22

o(iC Hr. £>ittb'.' t*C ClC Ctj

** 1 ^LIl » •

JJ tj

6

0.0i2

0.055

«c •

i* ifi ri

'<-• c cj• * ' ^

i. a-t) << .t - C ' .i'. n CiAl Ut. -1 CH X* O

7

2.10

2.7,

RATES or

u. c

"' £ t

^ n C

* . ^H r . -i-

t «J LTI(1 !• 1 I 4U Q t ' r i

,-i ^« IT:r. O C •

JJ U f- ^iC n Cii- >t H O

g

73.72

90:72

0.070 1 3.50 134.28

23.72 | 0.111

26. 6B

30.64

36.66

60.37

01. 10

101.83

164.02

205.48

196.55

246.94

2B7.50

480.50

0.137

0.067

<&>JJD

T3

C'Vt

(j

t,Jj

ctlu

9

-

5-55 1" 185-32 f -

6.B5 : "206.21

8.35 225.46

0.265 j 13.2S ; 3 1 U 9 3

0.321 16.05

0,375 j 18^77

0.418

0.4 IB

0.695

0.835

-C.S2S ;

1.710

1.690 i

i

|

20.90

20.90

34.7?

41.75

41.25

87.50

94.50

A36

f

427.54

544.27

660.45

815.94

1111.86

1242.54

1476.80

1816.97

2976.00

-

-

-

-

-

1 1

ft.C.C. P3 PIPES

O1

c •

a IT-« 3

•J T>

~t £i

it -ri• ' • > , '

^ - Ll

1 nj

O f

u u

1C

-

• •

<• c0

(\ •*> oVZi *

—* -—(r? O

\J

iliL Uft X

•** ^* ^-i

> " °i- r

-i - U

••-' Tl j -I c Eh- ^ a.

6.60 , 82.32

C C'

It '•

i. .':n

• t : fO hLI (-

c" i " j-• ~itj- 1

r. " 6J . E !

r< ;IT.

i.< t 'r:

t D

23.08 . t.94

ea.t-c-

c,I

V -

: i -f i ;l> -

»j ^

O c

. . . |

% c

112.34

1O."5B~ 101.30 ; 23.08 '. 6.68 133.06

s 1- * * • - " *

1- I. ^

o c

: | 7 .. , i ; t f

• c(• C 1.

J6

16.85

19.96

i

- . i.

i

C I-

( •.

I- I

X. -: - • (

0.01 ,

r -

H

-•

r-t

t

T- £•Li

t. ^£

it 1( C

1 i.i Ct --.

if>

I 0.0 3 j t'5-ivo 5 •

| . 15.67 149.95 23.08 13.02 lSC.Ob J7.91 0.04 21s.o;.

1 "-

-

-

-

-_

-

-

-

-

21.62 206.94 , 25.00 17.36 249.30 : 37.39 0.01

24.06 230.27 ; 25.00 19.53 274.80

26.31 251.77 j 25.OO 21.70 298.47

| 41.22 : 0.03

| 44.77 f 0.01

36.40 34B.43 "j 29.91 2£.O4 404.28 | 60.64 t 0.03

49.89 I 477.43

63.51 ' 607.78

29.91 i 30.38 : 537.72 ; BO.65 | 0.03

[ 33.55

77.07 . 737.S2 ; 33.55

95.22

129.75

145.00 -

172.57

212.04

347.30

P 1

911.16 ; 37.61

;1241.61

1387.54

j 43.59

1 4 3.59

1651.37 j 43.59

2029.01 | 43.59

.33 23.30

43.59

34.72 j676.05 -

39.06

43,40

I1101.401 t -

810.13 121.51 i 0.01

992.17 148.82 j 0.01

52.06 11337.28 ; 200.59

60.76

69.44

86.80

104.16

1191.B9

1764.40

j 223.76

j 0.03

{ 0.03

1264.66 | 0.04

2159.40 |323.91

3471.05 520.65

;o.o4

i - '

2BC.70

316.05

34^.25

46>.95

616.40

777.45

931.65

I1141.O0 _

JS37.9OJ1715.70

2O29.10

463. 35

991.70

Page 40: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

KATES CF CI.I7A CIASS PIPES

02

.

i

c

c*>.

K

c

D

4JHi

0u

ct ;

O •,1 41e xa a4->

C C-rt -rt•U -OB 5O M•^ Uco

in rt0U «•

- r t

41X

o

VI

ou

J5o

c•H4JJO

ouX

o

tau

o<c-rt(D

o4 '

I )

(0Q'

O

O

JX

^ 1

E

?

c

*^1 ^O

«

L,to

O

OSi

3

- i H

c a:

fj (?-

to a

o o

- I

c•** < t

i> -H

rox:u

** *J«) v> ^

3']m 4i

10 11 12 13

1. 150 nintf 27T.37 - 55.47 332.84 23.08 3.82 39.02

2. 30tJ mro0 702.23 140.45 B4 2.68 29.91 6.97 82.62

3. 350 mnitf 1924.24 204.85 1229.09 29.91 8.76 96.39

4-i 4 0 0 xau0 1072.77 214.55 1287.32 33.55 10.65 109.02

5. 4 5 0 rvarO 1294.50 215.90 1553.40" 33.55 12.B4 160.66

6. 600 ium0 2071.30 414.26 2484.56 4 3.59 20.07 218.03

7. 800 nnif* 3 360.05 672.01 4032.06 43.59 3 4.11 286.89

B. 1000 mnj* 49 23.80 984.76 59 08.56 43.59 49.87 470.49

1.31 5.83

3.17

3.93

4.92

6.23

7.87

9.51

13.44

11.35

11.95

15.46

17.28

24.65

32.11

42.33

49.98 405.90 60.89 0.01 466.80

104.11 976.70 146-51 0.04 1123.25

121.03 1380.03 207.00 0.02 " 1507.05

140.05 14 60.92 ' 21S.14 0.04 1686.10

197.01 1733.96 267.58 - 2051.55

217.62 2798.77 419.6 2 0.01 3 218.60

362.62 4438.17 665.74 0.04 . 5104,05

576.13 6526.28 979.24 0.03' 7507.53

A37.

Page 41: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

PROVISION ar c.i.SPECIALS - MODEL ESTIMATE

RECAST ESTIMATE FOB HAW HATEft PUMPING MAIH FROM JACKWELL TO HEAD WORKS <f It.TEK BEDS)

C . t - , V . . S . SCHEME AT IBRAlilBPUH

ESTIMATED CCCT: Ha . 1 . 8 0 LAKHS

Pltovrsior ic HADE

• A1JU OTliiK MATERIALS

- . l i u , UCLOIIU Amount

1 . 700 Hmt. A c . C l . l . plpou -4C0 nn d i a Ka. 2.05,310

2. 150 Hoi. Ac. Couplings -JOG ntn dia • H6. 24J.320

3. 97.50 hint. C . I . L / A Class pipes 400 mm

ciia. at . 1,09,600

-;. 20 Hoa. C.I.D. Joints,, 100 inm dia Hi. i ,57

t. Cout of jointing Midi Rubber sheetior C.I.L/A pi|iea. Kn. 915

6. Liioour charges for GlooLowerlng.jointing of CI L/A pipes with Hutao l t s . «s. 1,983

V. Eartn excavation of trench workfor AC i-lpuu including laying &jointing. Ha. 25,62O

0. . tjrtJi worX exciiviition tar CI D/T

i-ljjeu -ad Jointing . Hi;. 4,202

9. bed Concrete £or CI J,/A S/i "ipes k i . 1.50O

10. 4 00 mm die CTI D/F pipes .

a) 2 mtra. long 7 Houjb) 0.90,ntrs. iong. 1 No 1 Rs. 29.1B6c) 0.60 intrs. long. 1 No 1

- percentage of provision tor uj-uclulo,Ciictli uork e t c . , coinulet*. ,,

A38

THE RECAST ESTIMATE AS roi.LOl.'S;

SPECIALS, VALVES £.

j . t l o . Provided,

1. 1 Ho. 4C0 mm dia S lu ice v i lveo Rs. 26,000

2. 1 Ho. 4C0 ram dl£ hefiex valves its, 6 ,200

3. 1 No. BO ni/n el a Air vulvc i Us. 720

4. 1 No. 203 ircii did ^coui v i l v e ilc. <,620

5. 1 Not. 400 nrf d i i C.L.Tdil plt:ct:u. Its. 1,600

6. 1 H;. CI Air T 4C0x4OOxBG ka. 800

7. 1 do. CI fccour T 400x400x200 its. 900

8. 3 Hoa. CI D/F, e.6p mtr». lcngtfi.ZOCJ urn d l a . !(£. 1.6B0

y. 1 Ho. 2C0 mm dlu CI ducktoot ticrici. Hs. 77O

10. 1 No. 2QP mn di6 CI iieml Circular

Bend . Us. 600

11. 2 Nos. 400 ircr. cil£ CI 90° bcnot. Ha. l,5":0

12 . 1 »o . 40C mm dXa CI tuck foot tienci. f»s. 850

13. 3 tlos. Construction of CtiauibciB for

v*Iveu, . Ka. 9,0OQ

14. I Ko. -do- Air valvu. Ha. 2,200

1b. Earth work for E/F CI P ipes .0 .60 m . Ka. ISO

16. Labour ci,aitjce tor Valves i Sjie^lula. Rs. _5,34 3

Rs_;__62L933

Page 42: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEXURE-6

UNIT RATSS FOR VARI0U5 TECHNICAL COMPONENTS

OHSRs Rate oer Litre

1) 40,000 litres OHSR Rs. 4.50

2) 60*000 Litres OHSR Rs. 3.50

3) 80,000m& 1.00 lakh litres OHSR Rs. 4.00 (due to extra

column)

4) 1.50 lakh litres OHSR Rs. 3.00.

5). Above 1.50 lakh litres OKSR Rs. 3.00

GLSRs

1) 10,000 litres GL3R Rs. 3.50

2) 20,000 litres GLSR Rs, 2.75

3) 40,000 litres GLSR Rs. 1.70

4) 60,000 litres GLSR Rs. 1.20

5) 80,000 litres GLSR to 2.00 lakh Rs. 1.00litres GLSR

6) 2.50 lakhs litres GLSR Rs. 0.56

OTHER WORKS

1) SUMPS Rs. 0.75/iit

2) RAPID GRAVITY FILTERS Rs. 0.56/1 it

3) PUMP SETS Rs. 3,000/H.P.

4) PUMFIHG STATIONS Rs. 2,000/SOn

5) OTHER 3UILDINGS Rs. 2,430/SGn.

A39

Page 43: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEXURE-7-*

ABSTRACT ESTIMATE BOR COUSTR'JCTICn OF SL.UICE AT THE

CAHAL FOR I 1104 ,

Ma.S I .N O .

Quantity Particulars P-ats Amount

13 3240.00

2) 1 2 0 . 0 0 Cum

3) 3 6 . 0 0 Rmt

4 3 3 6.00

5) 100.00 Cam

5 3 7 0 . 0 0 Sim

7 3 L . S .

83 L . S .

Earth '>'hrk sxcnvation anddsoositing at soil '-'ith £ni n i t i a l lsad c£ 10 Mfcs. andl i f t 2mts. for cutting th°can'al bank and re f i l l ing ;:hesain? after construction ofsluics including sectioningand roll ing e t c . , complsts.

200.00

l a y i n g of C. C. (1 : 3 : 5 3 ' -.is ! ng40 rrxn g-5a«e metal £-?r leve-l l ing course including ccstand conveyance of a l l mate-r i a l s gnd lab |3urcharg"3 completednclurilng r^inonqa ?indc«sscharges complete. 537-'15

Cbst o£ 900 rvm0 RCC P2 cl-isspipes with ne-'ess-ary col larsincluding cost nnd cor."9yancsof -ill materials FTKI labour

L. S.

jointing of 900 rnnij?P.CC ?2 class nines' i n c i t i n g.lifting, ali.gnrnf?nt- ?nd joint-ing 1:h= collars includingall labc.ir charge*

Construction o£ CP.S masonryin CM (1:33 2nd sort inclu-ding cort and conveyance o£all' n\(?.t&rial's -?nd 13h^>Tcharges includingseinorageand cass charges complete.

4 3 2 . 6 0

w i t h r n i n e n ^ f V r * - ^ r 3 ° 0 . 0 0( 1 ; 3 3 2 0 nun f !i I c-!'. I n - : t I ' d ! r i ' -

c o s t a r « j c o t i v f y s i n i i p o f a l lmaterials and lnbour r lp ' i sscomclate including s^inorageand cess charges complete.

Supplying and " i x i n j of mi I.ds t e e l works su'jh ••as ' ! . S , r o d s ,channels, gate with, wirsmeshetc.

Provision for qnfors^en items.

L . S .

10Cum

dm

1 P.Tlt

1 Cum

37m

64800-00

76494-00

60000-00

649-Cn

43260.00

2730-00

Tbtal

20000-00

32063-00

300000-00

A40

Page 44: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

DETAILED ESTIMATE FOR THE CCIISTfVJCTIOtJ OF SLUICE AT THE

CAMAC, AT ALWAL VILLAGE POP C. t1 . W . 3 . SCM'vMF HAr,O<'[IDA.

. , l " Particulars Mo. L 3 D QuantityN O .

1) £'••=)rth Work: si ' / jgv^tion and• d e p o s i t i n g .it s o i l witii an

in i t ia l l.e=5d of 10 Htr-.and lift: 2mts. for cutting-canal bank and refilling :the s rne after constructionof 4.u.tc(? including sect ioning . , 1 M 5 r4_2 9 . 0 37'1O.OOand rolling a t e , complete. —'-a- 2

2)- Lamina of C.C. (l • 3 15) u s ing I40irinrgazs met^i^for l eve l l ing.course including cost gnd

conveyance of a l l mater ia lsincluding seinorage £t cass 1x1 21.00 S.00 t 0.50 63.00charges compj.ets.

Alround the pipes 1x1 18.00 3.00 1.50 81.00for improving base a t

canal Aid for addi t ional soundness 4.231 3 1 4 , M8.29Cum

Ceduct for pipe portaion 2 : - ^ — ( : ; < L " < 1 9 - 0 0 ) 2S.28Oam

Net quant i ty 149.29-29.29 = 120.no CUn.

3) Cost of 900 rm<0 RCC P2class pipes with necessaryco 11 nrs incluriing cost ?!ic'conveysmca of a l l mater ia lsand labour charges. 1x2 IC.no - - 36.00R.M

4) Laying and jo ;n t inn ,of 900mm 0 B.CC p2 cl^ss pipesincluding l.i. ft*;ng, a l ign-ment and joint.iny x i ths

•co l l a r s including a l llabour charges , ^ 1x2 18.CO - - 36.00ft.M

5) Construction of CRS masensyin On (1:5) 3ml sor t incU-Vding cost and conveyance ofa l l mater ia l s 2nd labourcharges including S/j'c chargescomplet9. " l;;l 6.00 (J • 5+0.4 5) 9.00 97.20Construction of two re ta in ingwalla in front of the pipe's 2*l/2 3.00 3.00 0.90 9,(DOIS

Deduct pipe portion 1;;2 3 . 14 2 (1x1x3.6)4

Met qu.-rit

105.S5Cum5.55

lOO.OOCuin

Page 45: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

5. Plaster in' vlth- camentMotor "(1:3) 20 rrm >.hickincluding c/c of' a l l

ri?.i5 -7-ry.1 Labour

Inc 1 udirt'j s e r i r i se ess"charcfsscompl'3'y2»

' ^ t s r s i ^ a l'-'l 5.0^for retaining -.vails 2x:/2 3.00 9

3

*** i

1

. 0 0

. 0 0

. 57

.57 S

.57 :fr,mts.n. mts

L.S for top ofretaining wall

Deduct n i ts sor-ion 1x2 (3 . M .?) l . n0 1.004

list quanlty 70.00 Cum7) Supply : m =sr!cL Fixing

of mild st^ei v/orks. such as f-!..5 rods, channels1 . '.

gate with v;irsmesli e t c . . - L. 3

• . , i , , i ;

3) L. S. for 'infsrsasn item L,.S.

A42

Page 46: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

C . P . W . S . 5C!ifME TOi: V I L L A C L J IN NAIGC'.'DA 3ICTRICT

»

AM.STRACT F.iVV I tih <:<'•: fCJf COflV^I'.TrM'J '1'IIK E X I S T I f.1^ HAPA.'JAMUUHAM

• TAJIK TO SUMMER STCRA'JF TAMK AT ALWAL (,V) .

3 1 .N O . Description ti tv Amount

Clearing ii:;h- Jungle f.romexisting bank bund both sidssU/S & D/s

l?2C0Sq .m

1.3R 10Sq .,TI

3610.00

Earth wcr!: s::c^Mticn anddepositing or, bank with anadditional ls-?d cf 0.S0 Kmover initial Lc-nd of 10 mand tv.'o' acditional lsft QVI?initial left ;; 2 m in h^rdstiff claj-/ stiff j3.C and r?dearth soils including consolidation v/ith 7T. Roller inclu-ding w otter I. nn a t e , cow|;l!:*:»for fai?in^ ^nd strengtheningof existing t-^nk bund andforming new tank bunH.

2'!5OCCCum

2 9.CO 1 Ci-m 710S000/-

• 3 . Col lec t ion -nnd s.unply ofgravel and stcrthg at s i te^or premer*curcrrionts j nnspreading the ;amr- over fccnkbend for gr^vs»l casing Incl"-ding cost ind convc^-Ticc ofal l materials ?nd bqver chcrgi

!67 . 3 3. CO 1 CUT>

4 . Rough stcr.e dv/300 mm thick forincluding CO.T1; y-^nc? of =>H .Tifltlabour charges c

1'! 5 7.00 123.35 1 Cum 35100'!. 00Cum. , , '

and

li.S. for unfersean workssuch as grout ing to r e v e t -ment and b l a s t i n g theboulders etc.,

L..' 632975.00

5O00CP.00

A43

Page 47: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

DETAILED ESTIMA.T3 TCP. CC'1T."T'.TT*I THE EXISTING

RAMA8AMU7JHAM TAMK TO Si'*" T J» ST?PACJE TAMK AT A (•/) .

Mo. Description MO .

3

Quantity

1. Clearinr zc:!-' Light Junglefrom existing tsinkibundboth sides I

1X2 800.00 12.0°m

19200 Sqm.

2. Sarth vcrk <2xciv-->tlon anddepositigd on bank with anadditional le?d o£ 0.3 Kniover initial l=arj of 10 mand with two additional

, lifts over initial lift ** of 2 m in stiff 8.C, red

sarthr and ordinary soilsincluding beaaking clod?and sectioning and rolling

. jcfcs with 2 Ton Roller in-cluding watering for raisir^nd strengthening the bundandf to lavel the tank bundarea.

1X1 7'!0.0? ( 3-J-39X9-2 .5^22X5) 92S85m 2 2 Cum.

the tank bundarea

XI 700 700 0.30A. V

145000 - 9268S = 151315 Cu"i will br; utilised fcrforming the new bunds in the oth?r iaai four

2'1SOCOCum.

3, Gravel casing to 'V/S sideof the tank bund.

1X1 740 20.12 0 .20 4467Cum.

Rough strris dry packing30 cm thick for revetmentincluding coot and conve-yance of all materialsand labour charges complete. 1X1 740 20.12 0.30 -446T Cum,

5. L.3 for vnforseen items suchas grouting to revetment ifnecessary etc.,

L.S,

M 4

Page 48: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

DATA 511EET

1. Earth work e*c v;r\ticM anc', dcposit.i tig on hnnk with anadditional le»d of 0.50 Km over- ini.tj.o\ led of 10 mand two additional lift over initial l*£t 2 m in h-nrdstiff clay, stiff 3.C ?nd red Ofirth soils includingconsolidation with stone roller (2) Tonnes includingwatering for raising the tJ

10 cum cost OS Earth work = 99.8^/10 cum

0.50 Km lead for earth work & 15.50/iCum =155;-00

Add 3 lifts 11.3Q/3 lifts = 11.3C

Add watering and ccnrolidaticn %itthstcne = 12.00i

roller o£ 2 Tonnsa • xx :txRS

Sundrias - , = 1 , 8 6

290.00

Rate per ICum = 29.CC/lCum

2. Collection c£ gr?vel and stocking at site for prerand spreading the same for ciravel b:se to tank bund.

1 Cum cost of gravel 9.06/ ICum = 8.S5

1 Cum Iced for gr.i»el (4 Km) 1Q - 52/ ICum =19.32

1 Cum spreading gr4vel 4.82/ ICum = 4,R2

3 3.00

a Rough stone dry packing 30 cm thick for, revetment includingccst and conveyance of all materials and labour chargescomplete.

1.10 Cum cost of Rough stone of -siss 3Cn mm «•• 13.?6 = 15.35

0.40 :ios wodder or stanq packer •? 21.95/aach = 0.78

1.10 *Ios Man Masdoors - ' 22.5 3/each = 24.78

' 0.70 Mcs. women'Mazdoors p 1? 2 2.5 3/each = 15.77

1.10 Cum lecd Cor Rough sfc-tis (lCICm) 'J 53.3C/lCum = 58.63

123.35/1 Cum

4. Clearing light Jungle ' = 1.3S.

M 5

Page 49: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

DETAILED CUM ABSTRACT E3TIFIATE FOR CONSTRUCTION C? OFFICERS

QUARTER FOR M.A.P. NALGOtJCA.

51.M O .

I

Eescriptioitam.

2

n ofMo.

3 4

3

5

V

6

Qty

7

Rate

8

Amount

9

. Earth work excavationin H.G.soils for foun-dations witli initiallead and lift as per Istandard specification \

IAlround Building

C/W between drawing ,room and. k i tchen, Dining

C/W of Drawing room

C/W of Dining room '• Kitchen.

C/W of Bed room, Bath.room.

l x l

l x l

l x l

l x l

l x l

1x2

l x l

l x l

l x l

1x2

l x l

l x l

47.28

8.13

3.34

1.54

7.75

2.74

1.24

3.30

1.50

0.34.

2.00

0.90

1.20

1.20

1.20 '

1. 20 1

1.20

1.20

1.2C

1.20

1.20

I, 24

1.20

1.20

Total

1.20

1.20

1.20

. 2 0

1.20

1.20

1.29

1.20

1.20

1.20

0.15

0.15

68.083

11.779

4.309

2.217

11.160

7.391

1.786

4.752

2.150

1.011

0.360

0.162

116.132

of Bath room

C/W ^f 9a th room

L/W of Verandah

C/W of Varandah !

<VJd for Project ingp i l l a r s .

AdtJ for Steps in front.

Add for Step's in Read.134-20 1553-00

2. Cement concrete(lt4;8) using of40mmguage H.G. brokenmetal including pqst

A46

Page 50: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

d conveyance of a LIfTtatsrial and labourcharges, '.-fat?r l<*ads,curing for f i l l i n g 'foundations' as per ^'standard s p e c i f i c a t i o n s . <

AI round > 1"1 '••17.2P i . ;o 0.30 17.02C

C/W betv.-een drawing, din ing 1::I 9.19 1.20 0.30 ,1. M :

and Kitchen. " ' * " • •

C/W of Drawing room

C/W of Drawing andKitchen

C/W of 3?b room A 3ath£/w of Ge-ehroom

C/W of Bath room

L/w of Verandah

C/W of Verandah

Add for project ion inpi l - lars

Add for steps in front

Add for steps in rear

lxl

IX 1

lxl1X2

lxl

1"1

lxl

l:<2

lxl

1 .

7.2".

1.

3.

1.

0.

2.

0.

34

5-1

7-4

21in

30

3 4

00

90

1

7

1

^

1

1

I

I

11

.20

. 20

.20• 20

.20

. 20

-20

. 20

.20

.20

0.

0.

0.0.

0.

0.

0.

0.

0.

0.

30

3 0

3030

30

30

30

3 0

150

1*50

0.

2.i t

C .t

0.

0.

c.0 •

202

5547?0972

•'• 1 9

t aq

540

:-M

350

3. R.R. Strns masonry inCM (1:5) using H.G. stoneinpluding cost and', conva-yance of all material,labour charges'., caring etc,compl3t9 for fill, ing offoundation as per S. s . forfinished iftem of vork.

2 9 . 1 2 7 c-jn 5 3 3 . 3 0 1 5 6 9 3

A47 •

Page 51: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

A I r • • • i i i ' 1 t - , h i » h i i I I f M na i y ] 1 ; , ^ > ' r? - ' i n n ,1 ••, ' i - i i | i t

I V W l)'M-.-,r»n d r a w i n g r o o m j , ^ .<?..)" o . ^ ' J 0 . 4 = 1 . i "= !

' ' • / ' • > • < ! • ' • • - • • • i n g r o o m ' l ' - ' . l ' 1 . ' • 1 " . ' i n > ' . ' , 1 r- ! . - f M

C/W o f r a w i n g • r o o m a n d i ;>^ !.>">•: p ~o n .| s o - ; ;

C/W o f =ed r o o m , A b a t h J , , J p _ Q 5 r j # q n 0 _ . } 5 3 . - = -;

L / W o f H a t h r o o m ' j . , j T , r u n UQ 0 1 ? ? 1 = 7

C/W o f 0-Tth ro.cm ( v j i.^-i Q.-o n 4 ' , n^>'-?3

L/W o f V e r a n d a h 1 ; < 1 i < e n 0 . - 0 0 . 4 = 1 1 = 0

/VJd f o r P r o j e c t i o n o f | . , 2 ' n . v ) n _ i n 0 . 4 ^ n 77=;

2nd FOU':1::;^

AL round i!i= Bui ld ing l x i 47 . 7n 0 75 n 4 ' 1- ?-7L/W n™ 1-•...•/»on Drawing rocm-Dinlng-Kit"Men room . ,

C/W Drawing room , ,,^

C/W Dr'TJing' St Ki tchen , . ; 1

C/W FVvi r-om A Bath ,.. j

L/W of 3-i V.\ room ,,,-,

C/W of 3-th roomj , , . ,

L / W o f '•'••» 7 3 n d a ! i , j , . ,

C/W of Verandah , , . , .

Md for p i l l a r s . ly2

3 .

! .p _

3 .

1 •

1

1 .

r>

6

7n

no

2^

19

«^

7 ^

a ;

3 •!

P 7 =;

0 . 7 ;

" . 7 "

" , 7S

C.7--

0.75

n . "

0 . 7 5

nfi

p

ri

n

n

0

Q

. 4 5

. 1 "

. 1 =;

. 1?

. 4 5

. 4 ;

. 4 5

. 4 5

. 4 5

1 .

n

-1

; ,

n ,

t

n.

3 1 3

? " 3

'. 7 1

I/I

- 0

5?a

4. C.R.S. masonry in C.n 1:52nd rorrt ••-.s'nq I W s t o n "i n c i n d - l n g C / C o f a i l m a t e r i nl a b o u r c h a r g e s , c u r i n g e t c . ,

- ' » - i 3 9 5 . 4 0 24 5^4"00 j

A48

Page 52: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

complete r'nr finished themOf wot!': nr !»?r 5 l-.,inclfl rdspecification for Basement

AL roundL/W

C / W

c/wC/W

L/W

C/W

L/W

C/W

Add

b * 3 *~

o fo f

of

o f

of

of

of-

f o rpillars

AdrJ

A.dd

f o r

1

f o r

the building ,•

•••••r--r\ D r a w i n g , D i n i n g

" ' • ' • • ; i n a r o o m

Sin ing and Kitchen3eo, 3ath and 3edSa thi3ti t h

verandahVerandah

projection of•

steps front

steps'Hear

1x1.1 ;; I

!:: L

i x l

1x1

1x7.

1 x 1

1 >: 1

l x l

1x2

l x ll x ll x l

ixl]»!i x i

4 7

1 .

?. .

3 .

3 .T

3 ."i4. #

0 .

22'2

000

. 7G

O(J

I1'• * ~

3 4

84

90

10

, 34

n n>nn

. "0

. ?0

. 9f"

. 9 0

0 .

0 .

0 .

0 .

0 .

0 .

0 .

0.

0.

0

000

0Q

0

50

60

60

60

60

60

60

, 5 0

. 6 0

.50

.90

.60

. 3 0

.90

.60

. 3 0

0 .* o

0 .0 .

0 .

0 .0 .

0 .

0 .

0 .

00

• 0

Q

n0

T

^M

f.n

60

60

' • 0

60

~0

, ^0

.20

.20

. 2 0

.20

. 2070

C *"!

17 .02

3 .10

1 . 4 I

0 . 7 7

3 . 0 0 6

:>.. 4 04

0 . 6 6 2

1.404

0.7560 , 2 4 5

0.350.240.17.

0. 1520.10<30.054

i JT7\T~Cain

5, Flush pointing to basementwi th C. M .(1:3) to C. P.. S.Masonry including C/C ofal l matsriai, labour chargescuring e tc . , complete forfinished itam of work

Altound t!is building. 48 . 94 0. 50 156.45 45900

A49

Page 53: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

6. Infi l l ing the basement-with 9XC3V3 tidn noilsother than sand withwa^rlnrt -ind tampingcomplying to the stan-dard speciiicajtion.

Drawing room:. ,

Dining rocm

Kitchen rocm

^e'randah

3ed room :

Bath rocn

Hail

1X1

ixi

1X1

1X1

1X2

1X1

1X1

• • ;

3

,3

3

.3

c,

1

, 24

.?c

.34

.,20

.34

.14

.74

3.?.!

2 , 1 •!

.2.1 i

1,22

3.?4

1,94

3,?4

To

0 , •! 4

0.45

0.45

0,-15

0.4 5

0.4 5

0.45

tal

9,2?

3,4 66

3.215

1 .755•

11.8-13

1,771

3,085

34,527Cum

56±10

4_5 195.00OJrn .

7. "tip^r .•» " u c t u r ? wi thbrick in^Sfincy in C, M(1:5) using Ilnd classbricks including cost "gnd conveyance .of a l l .

• material , labour chargesscaffolding, curing a t e ,complete for finished i t ;of work as per 'S.S.,

A1 round the huil.H1.rirr

! , / ' . / . ! « • > • • • ! i Di .-,v i ' n . j -

!•:: tchen.

C/W of Drawing

C/W of Kitchen-Dining

C/W of Hail

C/W of Hall

Aid for 3rick p i l l a r s

1X1

1X1

1X1

1X2

1X1

1X1

1X1

4 7

7.

4 .

2.

5.

2 .

0.

. 28

04

20

40

51

10

35

0.3"

0.3 5

0.35

0.35

0.35

0.35

0,35

1 .60

3.60

3.60

3,60

3.50

3,50

3.50

5 " . ri 7 ?

9. 373

5,297.

6 ,0.1 5

a. 202

2.54 6

0.341

A50

Page 54: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

Add for p a r a p e t . w a l l '1-1 • 47 .28 0.23 0.45

b)

c) Deduct

'1 .89 3

Deduct for Cttorswindows

W l •

(Almirah)-

Deduct for Linteli

t

and

D

D l

• W

V

A

s over

D

Dl

wW2

A

\"1/C?

1X1

. 1X4

. 1X7

. 1X14

. 1X5

1X9

1X1

1X4

1X7

1X5

0

.1

0

0

1

1,

1.

1.

1 .

1 .

0 . 9 0

.7S

. 5 0

. 9 0

. 5 0

. 2 0

.38

,21

.96.

, 3 6

, S *

Q

0

o0.0 ,

0,

0,nV 9

r>

0 ,

0 .

. 35

,35

.35

,35

,23

35

35

:s3 5

3 5

2

1

2

1

0

1,

0 ,

0 .

0 .

0 ,

0 ,

, 0 0

. 3 3

. 2 0

. 2 0,30

,83

13

15

15

15

15

96

5

-)

2 :

0 ,

2,

14 ,

0 ,

0,

0 .

o,0.

.97 2Cum

,570,130

, 5 2 0

. 6 4 6

. .Q0 2

,52 5

, 723Cum552

052

• 1 1 1

4 99

4 3 5

tor 3ed blocksD

Dl

W

w*A

2X9

Ixn2X4

7X2

2XS

2

0

0

0

0

0

*23

. 2 3

. 2 3

. 2 3

. 2 3

. 2 3

2x250.350 . 3 5

0.35

0.350,35

2x

0 .

<D.

0 ,

0 .

0 ,

.±515

1 5 •

.15

15

15

2r>

M

o0

0

x2±i

, 2 1 ',?2.3

,093

, 154

.1.10

,51 'Cum

D 2 d U C t i O n S = . . . 17,382 Cm ' 73 **n 536,70 46695M f !• ' - t i i r r i t - I l -v o f 1 ' "

Brick work ' r " ' n

A51

Page 55: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

8. "R.C.C. (1:2:4) mix prop,using 29mm <;c crushedmetal including co3t andccnv?yanc9 of a l l materiallabour charges, curing,,watering c?ntaring, inclu-\ding cost grid Sabri^^ci^n ^s teel as ?er 3.S.,,

a) For Lintsis ovsr

D01w

w*A

1X91 'r^

1X1

1X7

1X5

11

11

.36i i

.?«

.36

C.33n •) -

2, 3 ;

0,35

^ 2 ~

0 .

o

0.

0.

0,

T *

i < ;

15

15

15

0

Q

on

,5! 2

. ••! 1 1

.•199

.13-

b) For 3r6Ssii.~er for verandah1206.35 2472.00

1 V ' .1 . R ?. 0. T~

n , i ? o

1206.35 519.00

9. c . c . (.1:2:4) for; Bed 'ol->r:ksus ing HG me",?. 1 i nc lud ingC/C of a l l :H5t-ri-?i, L i h c i rcuring ^ t c , ~ciipir;ts Earfinished it:e^ i;*-;ork, •

Qty. is per item Mo.7(c) 1206.35 737.0C

Page 56: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10. R.C.C, (1:2:1) -nix using20mm ri'J cru.^h^d metalincluding C/C of a l lmaterials/ labour chargescentsrirrrf; c^'ing bute::cL:r!ing as1: ? f .^hs^l-ind Its Cabrica'Lion foe-sun shades of I.SOCTIprojection beyond^facsof wail as ;;»: S.3 . ,

On windows

From Fortiori

windows w

Windows w$

Verandah

Add for shelves

. 1x1.1X1

.1X2

.1X6

.1X1

5X3

. ,t

i

• 1

• ' 1T

1

. 3 0

,'-0

. " • • ?

, 3 6

<^0

. 3 5

4 , 3 0

i

3

3

n

2

, 1 ?

, Z5

Prut

55*55 2346.00

P.C. C. (.1 :,-;:,!) mix20mm gu irje !'',' mr;talcludi.ntj cost and conve-yance of a l l niatsr i^ls ,labour charges, curing/

for Poof: s l ab .

D i n i n g , K i t c h e n , Drawing i x i B. ' .P

Verandah l x l 3 ,f!O

,33 0 , 1 2 5 7 , 7 9 2

.50 0 , 1 2 5 0 , 7 * 0

Oath i Dsd rocm 1X1 4 . 2 0 -• 11 .36 0 , 1 2 5 t ,22'.

Deduct for ocsn aortion ivi T T O

15,432

C.125

«• , 1244.20 13280cum ' ~ ^ r

A53

Page 57: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

12. Plaster ing with C , M ( 1 I 3 )12mm thick includingcost and conveyance ofa l l material , labourcharges, cv.ri-17 with a l lwater iT-nri^, J; .<; per 3 .3.for £ in.i.sh1?'1. item of workfor c e i l i n g .

Dining .

Kitchen

Verandah

3ed .

Bath

Corrido

Hail

. J

Deduct for •: fen ing

1X1

1X1

1X1

IX 1

1X2

l x l

l x l

*X1

3 , 5 0

. 3 . 9 0

.3.<SQ

. 3 . 5 0

3..60

1 .'10

2.7R

2 ,00

'7,30

2.40

2 .1 0

1 .BO

•1 . 2 0

2 . 1 0

P , ? 0

4 . 20

1 V]

•13. iKiperiio'.is c^at overP..G. . r^of rlab vithCM. (1:3) \2:-n th.ick v/ith.Acccproof povdera* atIKq 1 n,Tj ™ f T^mant .In —c l - i d i n g c o s t -inr! c o n v e -y ' T n c of n! ! ;r\n t=>r.l ••? I ,

. , 1 n b ' i n r ' - l i . - i r •;'-.•;, c i r f . t r j w f ' h

a l l W'U?r 1-i^is for f i n i -shad item oi work as psrS . 5 . ,

3.20 2 , Q C

Dini'ng-Kitcl-.s

Verandah

H a l l

Bath and Cod

r.-Drawing 1X1

i x i

l x l

1X1

? . i n

3.90

2 .44

-' . 2 0

7 , 5 2

1.60

2,3't

. 11 .86

23, JO

3,5-4

' ,11

30,21

2,50

p, i n

9 3 . 7 5 2

6 2 213.10 18793']m HJJ . I ^ ^

: T 1

; . 090

7C9i t r , n ( , 284.35 3429

^ . .

A54

Page 58: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 r

14, Pt-i.ihPr I nrj In C. M { I • "i )

walls including costand conveyance of a l lmaterial anrl labourcharges', curing e t c . ,coi"plr:t;'? for finisheditem -of wor-s as parstandard specification.

Drawing- ' 1X2 . ' ( 5 . SO-f-8-. ?.C)

Dining • 1X2 - ( 3 . 9 + 2.-10)

Kitchen• !'<?• • ( 3 . 6 + 2 .4 )

H a l l • , 1X2 • ( 2 + 4 . 2 )

Bed • 2X2 • ( 3 . 6 M .2)

Carridcr'. 1X2 • ( 2 . 7 8 + C )

B a t h • ' 1X2 ( 2 . - 1 0 + 2 . 1 0 )

P l a s t e r i n g v / i - h C . M f . i : * )ii. **„ thick for, outside wallsincluding cost and conve-yance of a l l material,labour cirina e tc . , com-plete for finished ttern ofwork as rsr 5.3. ,

Drawing i ^ini ng

Drawing St ining

H a l l

H a l l

Bed

Sed-3ath-3ed •Bed

1X1

1X1

1X1

1X1 '

' 1X1- '

i x i •1X1 .

7 . 6 2

5 .34

2.002 . 0 0

4 ,28

11 .354 .28

3.50

3.50

3,50

3.50

3.60

3.SO

3.50

•59

15

,t T

4 4

1 1 2

20

32

,34 :

.36

, 20.64

,92

. 02

. 4 0

Inductions

Met

i Dl

Quantity.

1X6 .1X1

00

, 91"1

.7522

.00

.00

• 3 ^ 7

i'J

. 7 7

.ao~,37

. 1 7

fin

3.60 ",432

3.50

3.50

3.60

3.GO

3.503.60

21,0247.20

7 ,20

13.40

: : , 5013.30

182.00 6472.00

A5 5

Page 59: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

VerandahVerandah3rick p i l la rMd for parapit

induct

1X11X1LX1

lxr

1.67

3.47

1.36

4 7 . 2 8

5-

3.50

3.60

3.50

1.3

. 6 . 0 1 .

12.472.

4.396

53.426

Net Quanti ty 194. 4SSim.

j/p >3 9 i q t, . ^

D

W

Wl

2X3

1X4

1X7

0.90

1.50

0.90

2,00

1.20

1.30

214.62.1

5.'SO

7. 20

7.56

20,16

130.15 3698.00

I 1 6 , Flooring with. Shabadstone 40mm thick set inCM (lt6) over'a bed of10CM thick C.C. (1:5:10)and pointing with1 CM(1t3)including co3t and conve-yance of all materiallabour charges, curing etc,complete as per S.S. forfinished item of work,

Qty. vide Item Mo. (13) 93.7^2 1179.40 11053Sqm. m ^ 00

17.' Supplying and fixing ofbest teak wood fullypanelled Cbors with a l lfixtures 3iich as toweroolto, hlngers, audrop etc ,compie t9 as P 9 r Drawingsspecifications in A.P.D.s.Sand fixing in posi t ion.

D 1x9Dl ' 1X1'

0.90

0.75

2.00 16.20

1.39 1.37

17.57Som

1901

35 -QQSft.

16067.00

A56

Page 60: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

13. Supplying andi fixingof b^.^t t°?l; v;codW ! l l i l o w . ' t i l r | I y {1 1 xrfi] '

w i t h lfjmiii^ ft. 3 . r o d sat 10cm, C/c .incifixtures, towsr boltshandle ett , complete asper A.P.D.S.3.

' W 1.50

0.30

1.20

1.20

7 . 2 0

7 . 5 ?

1-1,75or 158.79

Sft .

32,00 I3C13.C0

Supplying an-.! Citing ofR. .Jal i ies(0.50x0.30m) 14 t!os 50,00 700.00

P . R

20. White washing •,-;i th bestshell-Lime in tv/o coatsto the'walls Inside -andcei'ling including costand conveyance.of allmaterial, labour chargesfor finished i t'sm of workas per 3.3.

Qty, As ver Item t-'d(13) ceiling

dty. As c?r Item Mo.( 1 4 ) •

87,35

3 5^-C'C1

4-12,96Sum,

1 6 . 5 0 731.SO

21. Snowcem painting in twocoats over priming coatincluding cost and con-'vsyancs of all materialslabour charges, a t e ,

• complete;

AS 7,

Page 61: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

3

Q t y . a n p e r I t e m Mo. ( 1 5 )

Q t y . a s p e r I t s m W o . ( 5 )

19-1 .-fi

2 9 , 3 5

223,82 137.65 4200.00

Painting new wood

Windc.-.'s wi. til re'Tdym;Lxed synthetic Ena-mel paint in twocoats over primingcoat .'ncluding costof n n-iint, l^b'njrcharges, al l inci-dental charges suchas brushes snad en-pers e tc . / completefor finished item ofwork as per 5.3. ,

Doors D • •'

Window WWl

1 X 2 K 40 .0 .

1 ,

0 .

90

7.5

50

90

2.001.93

1.20

1.20

36

3

19

20

PC

,'! 5

,06

. 3 0

.79

, 1 0Si tin .

'23.CO 1802.00

23. Fabrication chargesof s tee l includingcost of binding wirefor finished item 'ofwork as per drawingsand les ions .

1.5 T 9CC.00rn»T

1350.00

A53

Page 62: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

"?A . Ojflt: "tinl O > n v y i i n c sof Steal i -

1.5 r ngou/-

25. Provision for watarsupply and sanitaryinstallations 10000.00

26. Provision forfittings- : 20ooo.oo

77. L. s . £cr otlisr unforssean items ofwork.

L.S

for Sq.ra (Average) - 2S0000

11681.00

Officers Censer Per no. Rs. 250000.00

24 27.10

Say Ra, 2430.00/Sq.m

A59

Page 63: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

HOIlEi. DETJUUCE) CUM AH2TIUCT KSTIKATX TOft. CONSTttUCTCOU o r G . U . C . I t *

4OOOO OHUK 6OOOO OiUK l . o o Lk Lt* OHttft l . S U Lta OHSH

R*to Anount K«to Amount Oey »Mrmnt Qty kitePar

toomt

1 0 11 12 13 16 17 I S

Jtartn work 4DtQ<v*tloci

ftO a and l i t e of 2 •in foartl oxavaXl; aoilaaa |*«r s .£ 20fi tarfoundation

i) for outar coliuma

l) tot innar coluaua1x4

1x4

2

2

. 0 0

. 0 0

2

2

.oo. 0 0

l.SO

l.SO

- :

14.42CM.

13«.3O1 L

17.34 13*.30 233.O0

24.0024.00

4&.00CUB

134,30ID 6iii

74.73Cum

134.3010 tu»

1OO4.00

2.* l>aylag of J»l«4.a cutestetincrat* (lt4iB) pn>-CMtlog -40 an II.G.« t * l including c/c ofall M C i d t U asd

alxlngg c

and Gtttmr Aacldantalor «peraci.oa*l c u t -geatoe

1) for Out*r coluaoa 1x4 2.00. 2.OO 0.30

11) for iauar coluwu 1x4. 2.O0 2.OO 0.30

. .- * .«O

533.30 1538.CO i . 4 6 8CUE

533.3O 1850.OO' lCuat 533.30

T*C£5-5120.00

— 11.21 533.30 5979.00Cue

UCZ ( I ( ir2i3)us lug 20 • * u.eM U l of

Uj blasting'Oing c/c «f a l l•acadala and labourdiacffaa nixing MC«Claad. curing a te . ,catqplata tor fiaiabadltau a£ wack aa par&.&. for foetlngi

A60

Page 64: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10 13 14 16 17

1) tax baaa 1x4

li) Wai Txapocoldtl 1x4

1.70 1.70 O.15 1.734 1.176 1.734Cut

O.a6(1.7a+O.4i)+«1(1.23+O.<1) 1.46 1333.10 1S46.OO 0.33 2 * 1 3 5

j ^ Cum ICUB 1 .406 1 3 3 3 . 1 0 2000 "*

tor l£w*r colutwut

1) I or baa* 1x4 1.70 1.70 O.15

11) *axpax

i i i ) Ring

lit*LI.34 (1.70a+0.«a)»4.(1.2a*O.4:2)

1.734Clm>

2o'13S

7.738 1333,10 10316 18.72 1333,10 14291.00CUM ~1CUM CUM lCum ~

3.77 1333,10 5026.00CUB 1 CUB

4 . V.fc.C-CU.H2l3)ualag 20 «u it.O i»ot*l(traalc* vaii»ty obtain4x1 t>y biaatlau lnclu-dlny c/c of all Mtori -ala aud latuux ctiarge*f*l Kt flj watac lend au*lcueing • i c . , ccuploc*tor tinltfd i t u ofwack <i par 6.a torcoluwu tax outccceluwt.

1)

11)

1 1 1 )

l v )

111l l

0

5

•lewnva.1

fee i

to 6

t o

ground

Si.05 at

1x4

1x4

1x4

1x4

0.30

0.30

0.30

0.30

0.30

0.30

0.30

0.30

0.70

b.OO

3.OO

1.O5

2.124 20O7.90 426S.OO1 Cua' ' 1.1O6 aOOT.SO

CUM

l.oaCUM

O.36CUM

2037.601 Cvm

2IBS.OO 1.0» 2O22.75 2185l.CWCUM 1 Cua CU

4120

2022 t7S 216S

2.16 1007.90 4237.00y

1.0a 2022,75 2105.00"Coo

1) fc*lwn 0found level l x4 0.30 O.30 0.70

It) 0 to 5 • 1x4 0.30 0.30 5.OO

H i ) 5 » t o « « 1x4 0.30 0.30 i.OO

lv) S o to S.liai 1x4 0.3O 0,30 1.15A61

0.252 1Cua I

1.80 j 2OQ71 SO 412O

2022.75 2185Dun ~

2037, 60 B 44

1.0«

2.52 2007.9O 5663.00

1»*7 2O22t75 2974.00Cua CUB

0.612 2037r60 • 1241.00Cum Cum

Page 65: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

11 15 i a

ctalV.H.c.c UiD' i i i )ualo; 10 u li.C.with Eequir*d q u * rof *t»el locluilug c/cof *1. u c c t l ' U ,laixiur cji*rg«», curingM>LC: i««i, centering

b u te t c . ,

uuil utI *ud i t s ±*Lrlc»-cjitrgaa tor t l o l -Itca of wart: *o

p«r fc.£ for br*c*b.

1, tor Queer columoa

ij b«lcv ground 1x4 5.22

11) C to 5 at 1x4 5.22

i l l ; I m to « Bw. 1x4 5.23

2* tor inner columns

1) u*iov groilevel

11) 0 tu.5 at.. 1x4 2.53

1X1) t m to ft ««., 1x4 2.53

Li.2b LI,45

Ci.25 U.45

0.25 Q.4S

1x4 2.53 0.25 0,45

0.25 Q.45

0.25 0.45 l.OlCuai

3S33.OO 1 . 1 3 4 l t * 4 6 . « O 22OS.OO 1 . 1 4Cum Cuiw CUA

1 . 1 4Cua

19S1.OO 1.134 1^61.75 2225.00 1.116

1&46.QO 926^1.00

Lruu.

1961.75 4610CAB*

4439Cum

1961.75 2236

2.232Cuu

1.1*6Cuo

I»46,V0 414u.OO

sias.op

v.K.C.C ( l i l ^ i . 3 ) prop,uaiog iC H H.C.

at ot«*l including c/co£ *11 MtcXlals l«t»urct>*rgok, cueing, M*t«i-l«»d t centaring cAargvm•uctt *» oj>»r»t.iciii»i

•nd luclavntkl ci**ii/o», e t c . ,ccuplat*, out •jcciititng

coat mt «(.«•! and i t»t*iitlc*Ilon cuargea tartinlau«J Icua at wutt•a J>«t £.4, toe LiotLcaarlug

Page 66: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1O 11 14 17 I S

1) tar suc t r column TT

11) t»r Inner coiuaaa TT

7.BS O.3S Q.«Q

1.00 0.30 O.3O 1.O3Da

1B37.9S 1893.00Cuu

1031.95 24 OS

3.45

1.13CUM

1837 .95 S41B

*Cu2 1 I " " * - 9 5 0*30,00Cm -

1.429 1831.95 2621.00Cuts CUB ~

S .

1* V.fc.C.C (Ii l) '2i3) prop>nainj 20 am U.Q. natal

of *t*el Including c/c

lauour cjtargau auctt aa•ud iuc i -

out cuccluliiigcait of ateel anU Ita

tat flnlati*<l l t*u of ^•a par a.fi tor

V.k.C.C. (ltl|T2t3) pttilag 20 MO li.a. ancalwltx; requlrad qu«atltjof ac»til Including c/cof »ii avBCoirlala aad -

cbar^aa, curingl d i

aucb *aand lxicio*bt

etc . , couplet*.but uduUng coat of•te«a «nd ita fabric*- TT$tloa cbtegma tec tlai-

abad lt«a -of wcrk aa pars.S, tot l

O.2 O.30

9.1O 0.SO O.1O 3Q25.10 7716 2.60 3O1S.70CUM

7B67.OO

U. V.t.C.C ( 1 I 2 ) 2 J 3 ) ptQpiualog 2O mm. li.O. awtalwltt raqulrad quantityef a&aal 1 Deluding c/cof a l l tutorial* andlabour cttargsa, curingwater l*ad, cantsrlugcbargsa, a t c . # couplac*but aotcludlag coat ofataal and, Ita <<tiar.lcationcnargca toe tlnlatied

lt*m of work aa per 5.S A63

Page 67: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1O 11 13 11 14 15 It 17 IS

tor <•*!!•

tt. aide w*iia

1) IS OH ttUck

It I in tl)l f?K 2 ati _ «.1O 0.10 2.15 3.76 20*6.70 7770.00 5.36 2Q66.7011 Citu CUM C M CUK

:o. v.u.c.c (ujUog 20 M U.S. **at*lwlt-b required quantity•f etael including c/c

t « l

cn4iirg«i> curing

o i I t *

lor £lnl«bed ltea otmock *i per i». fl farInner col KITH in tank

Jet. «tcj> 9.» toUnd atep 11 to 13.05

U V.k.C.C ll i lTiiS) pruji.20 aw U.S. Metel

of »t«cl loclullng c/cat »11 »«t.*rl*l* «ad

curiascentering

ail

but «xclodlng coat of«c«»l and ita ikiirlcatlocctuicg** for tXaXmh+&I tw of work aa per6.8 tor t*v ri»g glrd-r,

llOfli.OO S.*7 3068,70 11316

1.5361CUM I

1.7B2!Cu»j

16714.00

0.30 0.30 1.95

0.396 2057.25 S1S.OOCuu Cim

0.70 2O52.4S 1437 O.738 207at3O 1510.00CUM CUM

**°° °*30 °*20 C.75 I s 6 6 0.754 2887.55 lS7i.O0

12. V.R.C.C (Iiir2i3) trous lug 20 ana U,G. atettlwith r«7atr*d cjuaatlty

" oi icwl including c/cof all »at«xiftla aodlabour cturg«a, cue Inswater, lead centering* A64

Page 68: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

JO 12 13 14 15 1 6 1 7

aucb * • operatio-n»l and Incidental char-aaa tor fJjUaited lfcaaof KOtt t i per £.£. torSOJJ

IT 6.5' 0.15 2.3«2 IBS5fr30 1853 2.37CUM CUB Cum C U B

1BSE.30 157oS>C u t

8.47CUB

1B55.30 15715.00

li.fc*tilling the founda-tion and M*a»eat Hi touc4v»«] •allv,(*tiwr than•and) coaply.lng KILU *c*n-dard •pedf-loatlooa tilthnitcxjog, t«flping, inclu-ding fcj«*)ciity oi

Hat

14. bu jjljriiiy aud fi«lngof K.C.C. ptacrlal of600 •« • • yc: at«ao«rd

16. fl/r of t*fC.6 Hfttit typ*cover 6Q0 M jf

ut lly proot vcixttili

ulir*.

1 No.

2 No*

2 Mo.

1O.O77 bfcf4S 57.00 10.99 S6.4S 61.OO *O.CX) 5 6 ^ 271.DO 4D.2D 56.4S 27i.O0ID cm CUM lfj CUM C<MO US CUM CUM 10 CUMCUM

1U*. 806.00 700.00 1 K=. 7IM.O0 700.00 1 Mo. L.S 700.00 1 No. 700.00 700.00SEH "I S«cE

1 wo. 7SO.O0 750.00 1 Ho 750.00 750.00 1 Mo fc.S 1500.O0 1 Ha. 750100 " 750.00Xacti T~ E

21MQ. 150.00 750.00 1 No. 750.0O 750.0O 2 Mo. t . S 1SOO.O0 1 No. 75O.QO 750,00

17. S/r of K.C.C ladder of•pprovaJ daaiaa 450 m»)) wldtb laa ld* .

iO, S,/* o£ fc.C.c acair*cap uutalda Ute Tank

j ) ( O t - 1 No. 2OOO.OO 2000.00 INo. 20Q0.00 2O0Q.O0 1 No. L.8 2OOO.O0 1 Ma. 2000000 20O0.OOkach E _ Kadi

1 Ho. 2OOOO.OO 2OOOG.OO 1 U0.20000.00 2OOOO X I Ho. L.fl 20000 1 Koi 20000.00 20000.00

. f>/r of utccr larval1 Me.

o1 H o . aOOO.OO 3OQO.OO 1 N o . 3OOOtOO 3000-00 1 N». V.a 3000.00 -1 Uo. 3OOO.O0 3OOO.OO

:0, aft of llgtitealng•caatoc of approved H n - X No. 6OOQ.O0 6000.00 1 No. 6000.00 60O0.O0 1 Mo. L.S 6000,00 1 NO. 6OO0T00 6OO0.O0

A65

Page 69: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

a » 10 11 12 13 14 15 16 111 10

. O.I. H»nd callingwith H/3 angular lionat top all rauad the tankloci ml Ing c/c of all itatcrlalaaad laoour cnargaa, placing laps i lUw. centering and curingetc . . cmplat* lea fabricationcbargsa awa per drawing L.S -

. painting tdtb mourn COM of app-roved colour, tnra« coici ovar• prla*ry coat Including c/c of

all u t i c l U i aaoom cbargaaace., cafiHtt

. frevlalon tor OX/CI pip* ccooa-for lnlat and outlet,«cu axraatar acrau-

g locludlng alulca v t lvu ,wo*al duct foot, ttaiula, ball

K C , 4 ccajjiaUt ~

;i« ProvleloD for fixing cnargaator pip** c p c d a l a accaaaerlaa,H(i»al, valvaa, e lulc* valvaa* lit-raadlnQ c b u g u anc other labouranacgn* c / c of a l l ataterlala and -a l l labour cnargea a t e . , cca$>l*t*.

1 No. 5 0 0 0 . 0 0 5O0O.0O 1 Mo. SOOO.OO 5 0 0 0 . 0 0 L.a SDOO.OO 1 Mo. SOGO.eO S0O0.0O

1C1.73- 1BJ.65 341O.0O 181.20 167.6S 3513.00 446.33 1BT.65 07*6.OO 4*0.»74 167.65 92.O3

1 kt*f Sqa It) tiqu

L.O 50000.00 SOOOC.OO i-.U 5OOOO.OO 50OOO.00 L-6

W tOOO.OO 6000.00 U.B 6UOO.UO 6000,00

1 . 510 k)K tujm 10U]a

soooo.oo suoou.oo soooo.oo

1..6 6OOO.OO l-.S 60O0.OO tOOO.Ofl

tor la t t cr lng withc i afiprovaa colour as

f dtptnwntO'flcar a t e , coteplate.

L.fl 2000.00 20O0.OO L.6 2OOO.OO 20OO.O0 - L.fl 2000.00 L.S 2000.00 2000.00

fox drain, naaracour ovu flow arxangwaantaand flxlnf) at alt* of nacaanarand brldga on mag* u i la cai(li6)

plpa cap a t e l

i..6 2OO0.OO .. 20O0.O0 L.8 2000.D0 20OO.0O - X..S 2OOO.OO L.fl 2OO0.O0 2O00.0O

21, C»»t *t a t*cl and caoveyaoct

fabrication cbaroaa of ataalluoluding c*st af buildingMica ***& placing 1A peaitlon

xtt tor uacorcaaaaaucb daarlno and

g bn« aito t*tlit ravjulrad lovoi a t e ,

fc •deletion ate..

2 . 0 0 11OOO.OO 220CO.OO 2 . 4 0 tlOOO.00 264OO.00 1.OO HOO0.pOi0t7?0OO 10 11000.00 11O0O

ma RF

2.OO 9OO.OOftr Rf KT ^a HT KT

L.fl

UNIT PtUCCA66

17441.OO

1BOOOO.OO

34326.00 -

210000.00

L.U 01001

40OQO0.00

4.OO/U.t

70296.00

4SO0O0.O0

3.00/Llt

Page 70: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

MCOEL IJSTAIIED CUM ABETOP.:rr ESTIM'.TE r <~i>. C. ~T! STRUCT I Oli CT R.

1C, 000 H - r e n c c u a c i t y 3C,00C =ic Irv I . - 0 . j ' U i ; l~s

Description cf No.Kateper Amount Q t y Itnte

per Amount D t y k - ^ e An.ou.itper O t y Amour)

10 1 1 17 18

tarth v;crl: txcava^ionIr. f ouxiaa^ion ani cspei-

or. uant: v;lthl iea3 cf 10 rats,

an:: l i f t of 2 OT£.. inJudiny on:- ciav soiislike li.C.kea eartr diidordinary ;,TBVCUiit=2~:n:j t j 11 in:: out cfwiitci etc., aini'jiite iis

per t . i . 20b

«L2.75 0.90 0.90

Cum13-1.30 ti-00 C.13 13-1

10. 3 0

CumG1-00 14 .92

Cum11

14• j

^_30Cum

200-00 IE. 56Cum

131 3

••..30Cure

laying of olain cementconcrete (Ii4»a) rr.ix using40 nin 11.G. netal -f tropvariety ODtaiiKC IT,- blast-iny incluilimj cost andconveyance of al l material

laKttay charges, watering,, curing, n-.ixing

ctiaraus e tc . , complets torfinished Itern of worh aspur 5.S. for fourJatiDn Ded.

t; •?.. StoDu maaoiir">r in-enient incrtar ( l : 5)ui.j;uj h.G. store incluSlnycosv arii ccnveyens*; of= 11 material ar<3 lauourcnaraes such as cicrcarmixing, curing, wacerinaand -other incidental andoperat.ioniil charges torfinished item cf work usper S.£. £cr fi l l ingfoundations.

TTx 2 . 7 5 0 . 9 0 0 . 3 0 3 . 2 2Cum

533-30 1243.00Cum

6.13Cum

5 3 ^ ° ^269-00 14.92 53^30 795T.00 23.02Cum

^ 533^0

llx 2.75 0.60 G.60 13.71 396.40

A67

Page 71: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

11 12 1 3 t a

Z.H.S. masonry iz CMlliS) using 2nd s ; ~i.G. scone lacluiiag:ost anJ conveyance ofj l l materials are:lul>oar criditjes ai site;udi i : mixing ro^rrar,rurluu watering aai etherincidental and opsra-- i on u 1 c ria rtie si crfinianed item of v-rrkas pur S.S. for cas

^ef Il l ins the basementand foundation uizr.r>ie excavattld sci is other^han Bant comply in: tothe standard 3De=ifica-^lon including wa-eringcainplng art! brtar-irsgof eleds and a l liaDoc charges e t ; . ,;oitfi letu .

0.4 5 0.50 2 . 4 1Cum

432.60 B41-00 13.32 432.50 5T62/

2.32 0.50 12-00Cum

/ Layiijg of pialn cetaent* concrete tli*)6) - ix

us In9 40 mn KJ metalof trap variety cc=ai-ned ty blasting inclu-ding cost ard conveyanceof al l material aselabour charges, curingtamplog mixing ezz.tcon()lete for finisheditem of w=r/K as perS.S. for bottom

flooring.

•i V.K.C.C. (lil*l»3> crop,using 20 mm H.G. re^alwith required Btte 1 quanityincluding cost aniConveyance of al-moterlol and labcurctiaroetE curing mixing,centering charges suchas incidental and ope-rational charges e^:., . :complete but exclailna

-cost of steel And isa ...

per

0. J5 2 . 1 2 5 3 3 - 3 0 64r>-00Cum

11 X 3 . 2 *0 - 1 0 1 . 4 1 1 2 4 b . * 0 1 0 0 1 . 0 0 2 . 0 4 1 2 4 5 . 4 0 2 5 4 1 - 0 0 4 . 1 4 1 2 4 5 . 4 0 S 1 5 6 . 0 O

for floor slabS.S, '

A68C o n t d . . . P a g e . . . 2 .

Page 72: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

11 13 15 16 17 18

V.R.C.C. (I:l^i3) Prop,using 20 nr li.G, netal wiwith requiredquaolty ct steelinclttjlnc costjti3 convey a nee ofoi l mater'la * endlabour charges,cur lug mixingcentering criargessuch a£ incidentaland operationalcharges e t c . , coit.-plete but excludingcost of s u e l andfcabricatior. chargesior side wills asper standard spe-cif icatloas.

Tx X3.3O 0.10 1.75 2522.40Cum

* . 3 4

Cum

2522 .40 10447 5 .126 2522 .40 129301 11.179 2 3 1 9 8 / -

V.R.C.C. £li2)4>prop, using 20 nH.G.mstal withrequired steel qt i ty inclailng costand conveyance ofal l materials andlabour charges,mixing centeringcharges incidentalatrf operationalcharges e t c . . com-plete but ex=ludin:cost of s u e ) andi ts fabricationetiarges tcr Top reefslab as per S.S.

Ueduct tor maoholt:cnvtr

Flush pointing loCm (Ii3) 12 mmthicX to C.Bs ,masonry 1-.eluding c=stand conveyance ofall material labourcharges, - c-^riog,watering lead etc. ,

- complete fcrbasement-.

TTx 0.10 0.908 1244.20 1097.00 6.30 1244.00 1330.00

rr x o.6'

TT 3 . 2

' 0 . 1 0 1-S190.BG2Cum

0.3 5 4^67 1 5 6 . 4 5 55-00eqm

A69

Page 73: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

11 . 1 3 14 15 IS

v.Ft.C.C. hand railingwith VRCC posts at topnIround the tankIncluding c/c of allmaterial, labour chargesplacing In positionceBeerlnc and curingetc . , complete butexcluding cost ofsteel arci fabricationcharges as perdrawingposts at 1. San intervalsHailing & 0.3m intervals.

752.00 750.00 10D0.00 L.S 7 50-00

Snow cere painting intwo coast;; even primarycoat including costiinci conveyance of o i l ,jrutcllu) arvi labourcliui'Uei e t c . , completefor finisned item ofwork at per 5.S.

ftasement TIX3.2 0.35 3..52

Side 1.75 17-50

Tup slab

Deduct tor manhole cove

tarth work excavationfor fcundaticn anddepositing on bankwith init ial lead of] Oni ord l i f t of 2miti loaniy and -clays o i l s like E.C.Red .so i l s and ordinarygrobe3 so i l s e tc . ,cciiuplece for platform alround thetank.

4.35 1.00

11.0032.02

Sqw

0.28

t.'nsqm

..s-s

187.

B £ .1G

65

BOCum

596.00

18.00

52.11sqm

1R7.65 97B.0O 92-G2 167.65 i 7 3 8 . O o10 sera. . sqn 10 sgro

3H7.0O

A70

Page 74: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 0 11 12 13 u is ie n

... Laying of ccement concrete(] • 4 • 8 > prci..using 4t iwr K.G. metalof trap v a n s t votrtulne- incluiitKcost an- ccrr-veydoct cf c l ! materialorvi laocuc cnaraes

rnixln; tacnpi^g witruater ieaas sec, ,complete for i l s i sItem cf wcrr as perS.S. for pia-forn

al I K I U : ing cost •ccnveydr^re of aZJ

, curing, fixinwater lead -ampinaetc.,complete for flnisneditem cf work tor piat-

for Tin: of platform(Korb)

1.00 0.15 2.54 533.30 1093.00Cum

rrx4.27b 1.075 0.15 2.164

TT

.Supplying and Sfixing 1 Ho.of R.C.C. phsnial

.600 nnvE as t>srstieclf icat icas.

Supplying sec f i x i c ;of C.I . l i g r t typeinanhoic caver withrcuub of 60C nrrjj

1 Ho,

xS.15 0.10 0.10 0.165 1206.3 5 2810.00

Cuin

L.S • 700-00 L.S - 700

L.S 500.00 L.S. 500 1OO0

L. S

L . S

700.00

750.00 500each

Supplying and fixing 2 Nos.qf fly proof ventiiarors^ ith fiece ssdr. copw r '

L.S. 3000.00 L.S. 500uacli 1000 500 1000.00 L.S. 5 0 °

eacrtj oach

700-00

1000-00

1000.00

Supplying and

. . p tTm K with 30C non vJnd G.I.Pioes 3/4"steps at O.Sr 0 / c A71

Page 75: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 0 II 12 13 14 16 VI ia

including cost ard l No,conveyance cutting,(tiding arc al liab-ur chatties e t c . ,complete anr- emceadedand bottom floor-ing and top slab out-

L.S 2000.00 US. 2000.00 i.S 300C.OO U S . 3000.00

Siipu lying of BCC 1 liei nii loe iaduer.

iriOO.no 1000.00 U S . 1000. 0O

iTovlaion for CI/~Ipiue specials connect-ing tor Inlet, outletoverflow, ani scourarrangements, cuckfoct bcftJa etc. ,

L..S. 7500.00 L.S. 7SO0.OO L.S. 1000Q.OO L.S. 10000-

Provision tor fixingcliaroes cf C.I. lnietoutlet pipes etc . ,complete

L.S. 7 £0.00 L. C. 7 50.0C 7 5C.OO L.S. 7 50.OO

l_j Provision for lettering-:ith painting ofapproved colours.

J-ySupplying and fixing 1 No.of water levelindicator of approvedpaptcrn with necessarywire gauge pullv in-cluding cost aiiiconveyance cf al lmaterial and labourcharges etc. , corrolete.

and conveyanceof steel used forR.C.C. items of work.

L.E. 750.00 L.S.

L.S. 500.00 L.S.

750.00 L.S.

500.00 L.S.

L.S.

500.00 US.

0 go 11000/MT 9900.00 0.40 U0U0/MT 4400.00 500Kg 1 IOOO/MT 5500.00MT t*1T

750.00

500-00

11000 25124.00

A72

Page 76: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10 11 12 M 16 17 IB

, • abncaticr cha roesaf s t e t l i " iiri in;cost uf ijirii in? w; rejiii plecirx in3osJciori e u . ,

0.90MT

9oo/nr? B J O . O O 0 . 4 0 900Arr 36C.oo SOOKUS vno./nv I S Q . O O 2.284 S00/MTMl'

205C.0O

' '-rcvls 1 cr. : : runfcrseei. i^e

2141.00 US 6572.00 L.S 12l3i .OO L.S.

T o t a l c o s t of 35000.00 50000.00 TOOOu.OO

41601.00

17SOO0.0O

A73

Page 77: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90
Page 78: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

b) i i ) S t e i n g upto GL &30 Cm above GL. '22 10.13 x 0.25 x 4.30 34.25 2522.40 86417/ -

4. RCC (I t4»a) ) mix for20mm guage t r a pcrushed metal i n c l u -d ing C/c o£ a l l 2xTExHxHXTm a t e r i a l s and a l llabour charges e t c . ,complete for dome topslab with 0.075 mts.

TT • 5.43 Cm

5. RCC (It 1»*J3) mix fortop ring beam.

2 2

Deduct Man lob cover lxl

Supplying & Fixing of •RCC' Ladder inside 45Cmwide with stspa 30- cmC/C inside the sump fortop of dome slab tofloor slab dulv embadedin CC bed including c/cof a l l materials labourcharges etc. / complete.

10.45 x 0.30 x 0.30

0.50 0.50 0.075

!to. 1 nc

2.95

0.30

2087.55 6153/-

13 5 5.30

1200.00 2000/-

7. S/F of fly proof vent i -la tor with copper wiremesh of approvedpattern ;

8. S/F of C.I. light type_ man lob cover with' frame 60 x 50 cm siae

in dome slab.

4 ; :os .

1 Mo.

4 00.00 3000/-

500.00 750/-

9. S/F of RCC phenoil 60 cmdia on top of slab ofapproved pattern.

1 No. 400.00 700/-

10. Cost and conveyance ofsteel for RCC steming.

11. Fabrication charges ofsteel .for RCC.

12. L.S. for U/F item asper actual work doneand inside plasteringand for over flowinlet pipes etc . ,

13.Snow cem paint 3 coatsfor top dome, sidewall'above C-Lt etc. ,

14.Mand railing overtop dome.

3.503 NTT

3.50a MT

105.00# Sqm.

11000.00 38500/-

900.00 3150/-

L.S, 25660/-

137.55 1970/-

L.S. 2000/-

A75

Page 79: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

5 7

Provision for overflow and drainacja /

pipe including •driinage area rVsitem3 and escalating.

27970/-

Total Rs. 3,00,000-00

Unit prise = 0.75/litre.

A76

Page 80: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

MODEL. DETAILED AND AaSTBACT ESTIMATE SOR THE WORK

CONSTRUCTION OF PUMP HOUSE OF SIZE 10 X 4 MTRS. 3

g . *..«!,<*,„ of wor*. "• g™-*; „ ^ ^ ^ ^Per

~T, T. \ J7 ~4~. ~T~. i^ T. 8~T 9 .

1. Sarth work excava-tion in H.G, soilswith an initial ,lead and l i f t in-cluding all labourcharges etc., com-

h pieta.

134,20

4 2 6 . 0 0

Long

Cross

walls

walls

1x21x2

11.3.2545

0,0.9090

1.1.2020

247

31

.30

.45

.75

2,, Laying of plaincement concretebed (I»4t8)using 40 mm H.O.metal of trapvariety obtainedby blasting in- •eluding C/C ofal l materials andal l labour chargesetc . , complete forfinished item ofwork as per s. s, forf i l l ing foundations*

Long walls 1x2 11.25 0.90 0.30 6.07

Cross walls 1x2 3.45 0.90 0.30 1.86

7.93 533.30 4229.00cum.

3 . R. W.Stone masonryi n a . m . ( l t 5 ) u s i n gH. 3.stone includingc/c of all materialsand labour chargesat site such; asmortar mixing, curingwatering, and otherincidental and opera-tional charges forfinishing Item of worketc . , complete*

A77

Page 81: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 2 . 3 . 4 .

3 . ' Long wallaCross walls

5. 6 . 7 . S . 9 .

1X21x2

10;3.9573

0.

0.

60

90

0.

0.

90

90

11

4

25

.32

I05~37cum. 395.40 6275.00

4. C.R.S.Masonry in CM(liS) H. G.atone including c/c/ of allmaterials and labour chargesat sits such as mo»t»r,miaingcuring water lead ate. , com-plete £br finished itam of work.

Long wall :

Cross 'wall 1x2

5. Fining basement with excava-tsd soils other than sandcomplying with S.S.

103.80.90

0

0.45.45

0.

0.

60

60

5.83

7.93 432.50cum. 3431.00

Room 9.90 3.90 0.45 17.37 56.45 98.00cum. cum.

6. Brick raa3onry in cm(it6)using 2nd class brick andall labour charges at sitesuch as morter mixing,curingwater lead «tc»# ccrapletsfor finished itam of workas per 3.5.

Long wall

Cross wall ,•

for parapet.wallaround.

DUDUCTIONSJ

Oty of ULntal St bad

Windows

Openings Ebor

Openings Windows

Beams '

Bad :

Net

1x21x2

lxl

lxl1x4lxl1X4

2x21x6

4x4Qty.

'104

29

11

10

0

0

0

32.

.70,00

.88

.65

.45

.22

.30

.30

.30

.30

93

0.

0,

0.

0.

0.

0.

0.

0.

0.

0.

3515

23

3535

35353535

353.41

3,3,

0

0

0

00

0

0

0

,00

,00

.30

.10

.10

.10

.45

.15

.15

.1529.

22.9.

33.

-Ii32.cum

0.

0.

0.

0.

0.

0.

2,

47

40

97

0693' *

05

20

50

18

06

09

.2L. 3*4152 cum. 5B6*

A78

Page 82: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

S/S of Ebor with best teakwood including wrought andput up etc.,complete*<

lxl 1.22

1 Noor

2.13 2.50 Sqm.or

23.00 Sft.

85.001 Sq.ft. 2380.00

3. S/T of RCC Jaliy ventilatorsincluding c/c of all materialsand all labour-'charges etc.,complete*

1x4 0.45

9. S/F of fully panelled.windows made of teak frame' witii shutters and fixing >'of 15 mm*iron roads 10 cmc/c including c/c of allmaterials and labourchargesetc* * complete*

0.30 4 Nos 30.00 120.00

1x4 1.00 - 1 .20 4 . 3 2

or52.00sq . f t .

32.00,Each*

4264.00

10 , Concrete cement (11214) using20 mm H.G.metal includingc/c of all materials andlabour charges etc. completefor bed beam

ForForFor

doorsWindows

Beaming

1x64X4

4x2

0

0

0

. 3 0

. 3 0

. 3 0

0 .

0 .

0 .

35

3535

0 .

0 .0 .

151515

0

00

0

. 0 9

. 25_.1S

. 4 0 1206 .35cum. 483.00

11.RCC (l»2:4) prop.using 40 rrniH.Q. Metal and inquired quan-t i ty of s l ice including c/c ofal l materials and labourcharges ate*, complete «ushas centering,mixing,layingcuring,water lead and otheroperational charges excludingcost of steel for Lintels.

Ebors 'Windows

'lxl1x4

11

. 6 5

. 4 5

0 .

0 .

3535

0 .

0 .

1010

0

-20

. 9 3,.20.. 25 1206 . 3 3 302.00

cum.

A79

Page 83: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 . 2 . 3 . 4 . 6. 7. 9.

12.RCC(li2«4) using 20 mmH.a;Metal including c/cof a l l materials and a l llabour charges e t c . , com-p l e t e for Surrey shades of0.60 mtrs. Projection ex-cluding conatrcting s t ee l& i t s fabricat ion.

for Eborsfor Windows 1X4

1.651.45

Pint* Pmt. 414.00

13.HCC (i(2«4)using 20 mm.H.G.Setal including c/ca l l materials and labourcharges using 100 Kgs. ofs t e e l but exfcluding cos tof s t e e l and fabricat ioncharges.

for X benHLs 1x2 4.70 0.30 0.45. 1.2S3 1206.35cum. 1 cum. 1531.00

14.RCC (H2t4) using 20 mmH.G. Metal including c /cof a l l materials and l a -bour charges e t c . , using80 Kgs. of s t e e l but ex-cluding cost of s t e e l andfabricat ion for roof slab0.114 mtrs. thick. lxl 11 .90 5 .90 0 .114 8.00 1244.20

cum. 1 cum. 9954.00

15.Imoervdbng coat p laster ingwith CM(li3) 12 mm thickusing 1 Kg of Acco proofpowder per bag of cementincluding curing waterlead and a l l materialsa t e , complete*

Hog slab l x l 11.90 5.90 70,. 21 234.3 510 Sqm. 1996.00

IS,Plastering with,CM(1i4)12mmthick including c / c of a l lmateriala, labour charges,curing scafrldlng water leadetc . ,complete

Outside alround l x l 30.80 -' Top of parapet l x l 29.38 0.23

Inside parapet l x l 28.96 -

A80

3.30 101.S47.47

0.23 6.66

Page 84: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 6 .

2

DEDUCTIONS

Doors

WindowsVentilators

Net quanti ty

3

l x l

1X4

Ue4

- 115.77 -

4

1

1

0

1 0 .

. 2 2

. 0 0

. 4 5

53 -

5

-

-

105 .

6

2 .

1 .

0 .

24 Sqm.

13

20

30

• 7

5..

4 .

0 .

1 0 .

19

90

54

53

3

190.15

9

2001.00

1 7 . P l a s t e r i n g wi th CM(It5)' 12 mm thick including c/c

of al l materials and alllaibour charges e tc . , foSinside wall.

Inside room l x l 28.00 - 3goo 84 .00Sqm.

182.00 1529.00

19.Plastering with CH(lt3)12 mm thick including c/cof al l materials and a l llabour charges e t c ,

Ceiling j lxl 10.00 -

19. Flooring with cementconcrete(IISJIO) using40 nun H.G.Metal 100 mmthick and top plasteredwith CM(li4) 12 mm thickincluding c/c If a l l ma-ter ia ls and all labourcharges, lxl

4,00 40.00 215.10 860.00Sqm.

10.00 4.00 40.00 561.25 2645.00

.20.Pointing with CM(H3) toCR3 Masonry for basementcost and conveyance ofal l materials and labourcharges etc.,complete

Alround. lxl 31.20 - 0.60 19.72 156.45Sqm.

293.00

21.Painting to Eoors andWindown -«d th best enamelpaint in two coats includingc/c e tc . , complete. ' •

Cool's,Windows

UC2V4

4x23/41.22 . -

1*00 -

2 .

1 .

13

20

5

13

19

. 3 4

. 2 0

. 0 4m.

22S.OO10 Sqra 428.00

A81

Page 85: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

22. *taite washing in two coatswith best shell line includ-ing c/c of al l materials &labour charges e tc . ,

Qty. ,3s par item no.18 & 19

23. Colour washing to basementand outside walls with graycolour including c/c of allmatsrials and labour 'charges<etc,

t

Qt7. asiper paintingitem no. 16 +• 20.

24. Provision for Electrificationincluding rain water spouts.

25. ?ro7ision for I.S.3.M.B. 200girder for lifting the pumpsand lowering the pumps.

2 Mo3 4.60

25. Cost and conveyance ofi Steel*

27. fabrication charges of Stsel.

25.40

28. L.3. for u/s item.

124.00 16.50Sqm. To m . 205.00

123.96 24.75 307.00

L3 500.00

233

500Kgs

.sa L.5500Kgs

900.MT.

L.

TOTAL I

*

00

3.

5000

5500

450

7060

80000

.00

.00

.00

.00

.00

10 x 4 mtrs. siza pump room «

Sa. 80,000.00

A82

Page 86: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

ANNEJCURE-7bHODttl, Q^TA SHSrt

No. Quantity Dtiacription of

1. 10,CO larth wcrfc' «xcav*tion in foun-dation and <J*pc«it.1.Di? onin a l l av*il?bls flcil« lh?rd s t i f f clay t o i l s J.iktfinary grsvel s^ils withlend of 10 H and l i f t ofelirJing b-ailiag out of•nd a l l labour charge atccrr?l«te. Add 3 extra

89.51 10 Cun

iatti7M in

?.• 1*00 Cu* Laying of plain : ab?d ( 1J5«10) using 40 x 110 P ? ^ 1of trsp v«ri«ty obtain* \ by b lvj -

' ting including coat & c-mver?ncsof t}.l materials i>od la'?cur char-ges tecping, cowplst* .for fl i i i-shrd item of worfc ma per 3.3 forf i l l ing foundation.

0.30 Cua Coot of 40 m HQ mtal & ccnvo- 119.29

13X labour irpcrtation

7.0" j

0*46 CumO*132Cure0.16 Cum0*06 Hoa.0,14 Re*.1 . 1 3 0 MOS.

1.40 Koa*

Coat of «*nd and conveyanceCast of eamant 6 Cinveyar.caHand aijting ch*rg«alei c i ' sa ms cnIlnd c l a s s reasonMan ra^sdoorWoman loaadocr

41.5<S1900.CO

8.5.238.5423,1022*5322.53

• •

MrC2a

Sach•

i ?250

2

.','J

«t?

3.1

j l S

, 60

,57

*3.«.

, 3 f

,5 3

13X labour pSundries on 81.34.

Cum Laying o f p l a i n cerr*ntb«"d ( I t 4 i 3 ) u s i « 7 40 irmtal of trap Tftristy obf.ai:i*dby blasting including csct andconvoyinc^ of a l l raatsrixif vrlai?^»ir charg«scuring mixing ? t c . csirpl'Sts fcritem of work ajdaticn

0*?0 Cua» Cost °f 4O ""• tI3 natal0*15 Cam Coat and conveyance of0.1S5 IIT Coat of cetmuie 6 convwyanca

A83

119.4 1 .

1300.

29

0 0

*

31.",15

10

Page 87: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

Q.<1S Cum Hand mixing9:06 M»«.0*14 (Ton*l»aO tics.l9i0 Mca*

4 .1 ,00 Cum

1*10 CUM

0*31 Cum

0*34 Cum

0,097 MT

0*54 lloa.

1,26 Ho*.

1,40 Nca.

1.40 :;a«.

lot claas nujona

Ilnd chhssa Mien*

Man fcaadoor

Woman autsdoor

13JS isiporh.^£*nn

5,8338.54

2?J»022.53 I

J1

2 . 5 T

• 2 , . 7 1

4.0 740,53

31.SS

10.20

533.30

R.fi stone masonary in CM(l»5)r.*ing W3 stona lnc'.udiogcost stvd ts&Kwxcotrvpysn—e Q£al l material and labour char-ges at s i t e such tar mixing

1 siting* watering and othrrincidental and operationalchsrgas for finishod item ofwork.

Coat of R.R oton* and conveyance 53.30

Hand mixing charges 5,83

Cost o£ sand «nd conveyance 41.65

C»st of cement and corrv«yanc« 1300,00

Iat c lass masoni 39.04

Ilnd c lass fn»»cns 29.10

Han moidcor 22.53

maadoor I

Cum

MT

5?.53

1.13

11,15

29 ,.55

13X labour, importation 3undrisa

l»X0

0.34

5. 10.00 Cum

Scifolding charges for stone

1.10 RR sccechargss

1374 for labour inportalfinn on 134.06

Reffilling th« foundationbnsTT.ent with e;:cevated *ndothet' than a-irvi coirplying vdL«tand#rd specificationwjitsring/ tan^»ricg andof clo<?.3 and «11 labour chtxgaaetc.* complato,1/2 the rate of E/w excavtticnadd for wataring and tamping•i££t 3S2CA «nd 208

G3.7I

S. 100 Cura C " 3 tsiacnary in CI! (It 5) 2ndin-basement u^ing IK3 stcne inclu-ding coot and convr.y.inc* o£ allmaterials and labour charts:! etstia as mixing mcrtar, curingwatering and othar including andoperational ch«rg*a for jitem of wor.t par 3.a

AS 4

Page 88: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

^r~

0,60 Cum Cost of cut «ton« 6convey*nc« ?Q.6OO.SQ Cunt Cost of R«R. Ston« and conv<*y«nc« 53.300«32 ' Cum Cost e.^.aand zand conveyance .1.66C»75 tloa. l a t c la s s gMflon ' 33.550.092 Mr Coat of cement conveyance 15U0.C00.320 Cum Hvid ch*rg<?« 3.T1

51.362*5.5313?332?,?3r?,.io1..CS

1*75la 10 Has1,50 Hos.

J..501.50

Ilnd c lass mesonstt»n masodoorTfornm

3y. labour Importation Sundries

Scafolding & ciiargea0.32 gage aton*

2?22

.11

.5.1Each

I"I1

c

I :

•' n

»,,»a

,3a

- • • — - -

5,12 No«.J*Z". Cun

0»28 Cum0,05 tTTQi-iz no*.

Supar atructure with brlc.'ton CM ( l tS) prep, usingbricks' including cost and ofa l l n?!teri»la an<3 lnboiu: s c e f s l -ding# curing cliaucgsa with

cenplata for f inished i t e n f~x3,3

Coat of bricks «nd conveyanc*Cent of aand and conveyanceH*nd mjje-ing chergasCoat of cemant and conveyanca1st class brick lajar

0»70 Hoa* Man2.10 Hoa, Woman mazdoor

5,».l.i Ho.. Sc charges for

SS0.38

11.665 . S3

loou no

3*«S42?*10 j22.53 I22,53 j

8.33

1.00 Cum Csir.mt concrete in C31 ( l « 2 i t )using 20 Bra H3 matal obtainingirtclwding c«»t airii of. »11 matsri-.la•nd labcur charges.such as oorcarmixiag curing centering e t c . ,

l t for f in ished itom cf *a

A35

l.'.,cr..1,12

12^20xitrt

Page 89: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

0,?2 Cum Coot o£ 20 ram fK3 metal & -";nveyfnc«0*16 Cum Cost sand and conveyanceO»33O fltr Co«t of cement and c«nvey«n<:e0*160 Cum Machine nixing charges0.12 Ho*. 1st c l i aa jwson0,23 Hoa. XInd c l a s s naaon2»1Q {las. H n ressdoors3*50 tie*. Vsiwn maadoor

13X labour importation38.33

far 29 ranSand

241.3*341.66

1900.009.7.?

33,6429.1022.53

Cum 2219

627

8,

.or>

.00

.ID

l<0

126*1*

13,

132(7.

cs70

9.1»00 Cum Caracnt concrete corcant in (11 214) pr«p. uiing 20 mnsetal sfcta ncd by blasting inclu-ding cost and conveyance •£ mntocicl*«nd lcbour ch?r7O3 raizing curing, cen-tering «tc . # finished itaa of w»r}t as

< per 3,3t

l»00 Cure Rats of (1:2:4) as pec Iteta No.l«00 Cun centering charges baa>» Isab S»3,fl 44,76

232-L-13

1023,70

XOTJVia"

10 *)

l«0O Cum

1.00 Cum

1.00. Cum

fcjt

Cement'cohcreta in (Ii2r4) prep.20 tm HO metal Including costand conveyance of all m*ter.ial«and labour charge* such mcrtarmixing centering otc.j ccirplstifor filling item ef work as per8,3 £sr Bed

Rats of C,C (It2t4) as item No.

Centering charges for bed block 177 .62

SunJriss

10 J3

117

0

,70,52

,03

35

11. 1.00 Cum R.C. 5 U t 2 M * prop using 20 rrtnguage HO metal & rsquired quantity

; of site including coat and con-veyance of all m«terialsand lsbcurcharges etc., plots such as centering*

nixing, labouring waesr lead & otharoperational 6 including charges butexcluding of steel and fabrication

for llnterls*

1.00 Cum Cost of'(lt2i4) item Ho.' 8

1,GO Cum Centering charges

A86

1O2J5

t~' •»

r>

.70

,03

Page 90: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1 2 . LOO PJTf RCC (It 2t9) Prtp using 2V mn ff'3 (fst0»fiO t-t vid« project ion b^yo^d f?cfor cha»jje3 with required quantity

of including and otlirr ccrrirtJ-;#n-vl »tid inc idrnts l charges Inc lu-

ding curing <*«ter laad c'"-# ec^-pletu far f in i sh of woi.' as parS,If . for SUN SHABS5.

Coat of C.C(1»2*4) «8 per i t*n Mo. a1039.70

Centering charges 9,2^ for Rnit 9,23

•41,29

13, 1,00 Cum

1.00 Cua

RCC (1I2I4) prop, uaing 20gua^« IK3 brokon siet»l vithquentity of steel Including ccatconveyance of all materials*chirgaa curing watering lsad cint~ringchasgra such *a cpsrationsl »rd inci-dental charges ctei# cpnplots Irtexcluding co3t of sts«l ar.d StblJisa-tion charges 11 ma ttilcJc 3LA3

Rate, of OS (lt2M) *a item No, 3

Cantering charges 9 2 . 3 3 2?.*, 31 Cum

l»00 Cum RCC ( l i 2 i 4 ) prop«us log 20 rrngu«ge broken ratal with requiredquantity steel matacialt l«bour chnrgsw»ter lead eeotucing ciiarg^a cycra-tion-al and incidental chtrg-j ccTrlctebut excluding csat I ts fabricationcharges sid« w?il.la (10 cm thick)

1.00 Cum Rate of cc (It2t4) as psr item co. 8

0*8 Centering charges ?2.33 Cun

102'

" 1 .

1101 ,'5-i

IS. 10*00 Sqm Iirperviovs co*t plastering withCM(lt3) 12 mm thick uaing 1 kgof A proof power per b«$ of crricting curing water lead aod jfcnllmaterial etc.^ ccn»plete forfinished i.tea w-jr)c as per S.3

0.15 Cum Cose of sand and0.13 Cum Hand mixing charge*0i072 Cost of cem«nt «yy1 convey«rv*;eO«33 No«* lot ci*s0 mnnacnO*77 M«*. ilnd ei»isB m«naona AS7

4 1

33.C

J..7T ;f-0

12.73

Page 91: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

Q.SO Sae. M«n »azd«or0,10 IT**** w»w*n tnazdaor

22.3322.53

36,04

), .51 Xg«. Acc^proof cementSceaarags charges £«r sand

10,00 Sqra Plnptsring with C,??(lt") 12 crraincluding c / c «£ a l l si *?charges* curing r c a f f y H i n ge t c * , cairpleta fcr fJ.nJ »h«di

•iO.QO

0,15 Cum Coat at saiui and c»nvey -nc«O»1S Cum Hand mixing charges0*072 MT Coat of cement & convejanca0*33 Hsi , l a t c l a s s mason0«77 BDS. l lnd c l a s * nwaon

O9SQ Has.

l«10 Noa.27.5 i

SO.CO

c >.?<

7.12,10

13. 10.00 Sqm Tlusb pintlng t» CR3CV (it 3) Fr»P» including castand convejance o£ all mstrlabour charge*^ curing f»terlead charges etc.* cotnplst^ aspa r 3*3

0,50 Cum Cosr. *£ Sand rnd c»nvayanc«

0.06 Cum Hand mixing charges

C»at o£ cement and canvey«nc*

1st class bricks layers

Ilnd class brick layers

Han mazdoor .

w*man maidoors

0,0290vi8 Nca.1.12 ties.0«SO N^o.1.10 lloa.

labour F

17. 10.00 Sqm Pluatnring vith CM(l»4) 12 imthick including cost -and conve-yance of al l materials an4

l*bcur charges curing, sca-ffolding, vater lead e t c . ,complete far finished itraa•f work as per 3.3

0.1S Cun C»at of sand and conveyance0»J5 Cum Hflnd mixing chargesO»OSifT C«»t of csment »nJ <canv«y«nceO«33 Nos. 1st class brick layer A88

41

u.

19C03B2?

22

i.GS

. 0 0

ao, 5 3 I

I

2*19

55.10

IO,SJ37., S3

3G 5?

11^33

lSS»-33

-ti.se\ . i v

'1500.00

6,71p.n?

1 0 2 . f - 0

12^5

Page 92: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

0*77 So*. ( IInd class briefc layex

0*50 Hoa. lun maedoor I

Sos. Xoman atazdoor j

7 l , i> 13X

IS* 10,00 Sqn Whit* washing in tw» coatingswltii best shellliM* includingcoat and conveyance of all ma-terial* and labour charges«t£«< collet* for. fiaishedItem •£ w k as p*r 3*3

2f«10

22.53

22.40

36,04

9,25 -

190415

It* 10*00 Sqm

20. 1,00 CUM

0.92

0,46 CUB

to doors and windowswith best enamel paint in twocoats including cost and con-Teyance etc.. complete*3.1.^ (PR) Kurnoolrat*. Meao.Mo.

Cement concrete in (ltlX2t3) prop,using 20 MM HO metal obtained byblasting Including cost and con-veyance charges such a« mortarcuring centering etc.* completefor finished ltoa.o£ w*rk asper 3.3.,

C«at of 20 en WJ aetal andconveyance ,

Coat o f sand and

conveyance

0*441 KT Cost of cement and Conveyance

0«28>*s ZInd class Masons

0.12 No** 1st d a s * saaon«

0*10 Mo** Man awzdoor

3*50 Mas. WosMn waadoors

1.10 Cuai Vibrating citargo*

241*38 222.0*

1900,00

29*10

38.54

22*53

22.33

9*28

139*93

III•

837*90 - •

4,53 . , .

'- 126*15. • •

9*28

Sundries 0.01

1245.40

21. 1*00 Cua

1.00 Cuai

'LOO Coa

RCC (ltlX2i3) pr«p. using 20 mmHO gauge br»ken Metal with re*quired steel quantity Includingce«t and cvoveyanc* «f all aate-rlals^ labour charges coring* waterlead centering charges such as- operation and Incidental chargesetc** but excluding c*>*t e£ stealand fabrication charge* £«x lU b •' '

Rat* of C*C <lliy2«3) as per ltea So. 20

Centering charges SSR 232L-13, vibrating charges . , •

A89

12

2 3 3 . 3 9 M1 >!>-.,'0,03,-.

Page 93: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

1,00 Guro VRCC (ltlK2t3) prop, usin-r 20 mmHO with required steel qu*:itifcyIncluding c»»t and cenveynce ©f• 11 mater 1*1 labour charts*curing water lead centering ctaar-g«a such »» •peration »r<-J inci-dental ch*ry«* etc.« cst1" latsbut excluding, esat of.at--.-Bl andfabric*ti«n charge* •£ sfaol as3,3 f«r side %all« .

1*00 Cum Rata «f C.c (li l /2>3) as rittm 20*

10*00 CUM Cantering charge* Circularaurfaca

f

Add (2) l i f t *

10^00

straight

124*73 Suntfj

14.81 C\

l2iTrlQ

rieji 12t7#30

• isuav •-

92.33 --923,30

23* 3Ct Supply «nd delivery «f £ullfpinnellsd Door* awda •£ TsaKwood frvnee with 4"X3a scanting?with double ahuttors incluaivsof a l l fixture* and furnlturs«stc## complete * • per A*?,3*3 butexclualva of fixing at s i ta fartha f»ll»wing aistta (appraved byth« 3*JB,« (PR( Kutnool dti 10,4.1*07) .

a) 4*-«" X 7»-0'

b) 3»-8" X 7*-O"

C) 3»-0" X T'-O3

d) 3»-3»"X 6*-6"

a; 3»-3" X «•-«'

£) 3»*0w X S1-*"

05/3f7

2 1 . Supply «nd delivery of fullypannelled windows mad* of TaaJcflrarae with **x3" acutioy with•helteira and fixing •£ IS w

irMi rvda inclusiv« cost of al lfwiterlal* furniture 'and fixture*etc.* eonpleta mm A.P.3«3,. ButeneluaivB •£ fijtl;^ charges at•t«a £*r ti»« fallowlngt sisea(approved by Scl?3# PR Kurnooldtt 14.4*1987)

a) 8»-0» X i'-6"

fa) 3"-0" X 4*-tf"

C) 3«-0- X 4*-0"

a) 3'-3- X 4»-0"

Page 94: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

28* 10 Sqra flooring with shabad it«us -iO rathick set in CM (li6) «v<r Cl b«dlt5tl0jU3lng 40 urn gaug« H.O.Gm«t«l and pointing tilth CM(lt3)including cost and c«nv»yarc«of all material* lsb«ur chargescuring e t c . , compl*t* £«r f in i -shed item of w«si; as per Tt*n-dard specification

3habad *t»n«

C«n«nt mortar

X class mason

XX class

0.47 emu

0.13 Cum

0*96 Cum

2.24 cum

2*20 Cum Man raacdo«rs .

2.10 Woman raasdoora

1 Cusi C«st of C.C liStlO

0.05 Deduct cost of CM It3

labour importation

USi.M lOSqm 4PS-00

503

30

29

22

22

471

953

.51

• 10

.53

.53

.10

.18

1I•i

Sundlries

€037

45

73

471

) 47

22

1133

.41<,09

.13

.34

.10

.97

.05

.10

2S. S cun V.R.C.C [ItiyZt3) pr«p. for Bracks

1 Cure C«st of C.C (li1^2*3} >

10.22 SqraCantaring charges 0-Smts. 68.64

1245.40

701.50

Tor 5-8 KTa

1 U.ftltS 1:3

1.00 x 41,66 1.0 X 41*66 Sand f r 8 - 11 MT

I Lift0.24 X 1900 0.48 x 1900 C«B«nt1.C0 x 5.82 SA2 nixing

1.00 x 5.82

503.48 959^43

t-:.84

14.84

1551.74

1S76.58

10 ? Snow c«di painting in twtjeoatsever priiaary c«at Includingcost and c«nr«y#»nco «f allnaterial and labour charges«tc.» coinplat* for finisheditem of verfc as p«r 8»3

3*5 Kg Cast of iinev c«

0.50 Ho X class mason

paint

!aS0 No. Man 6

10i Sqm

Mid««rs

Scaffolding charges £*r X and IIfl?or as p«r it«a l*o. 232 zm234. A91

30,

38.

22.

a.

00

64

53

93

M.R

Sach

a

10 *jf

101.1?«

~ *

,C0,32

a 8*IG

Page 95: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

L.3 Bruahe* 100 mm wida 4 Nes».L.3 t*»r coir r»pe for scaffolding

13* Labour iaportation 42«77

L314.500.S0

5.33

107,53

28.10 Sqm Plastering with CH (1«5) 12 «THthlch including c/c of a l lmaterial Aafeour eh*rg««, curinge t c . , c?rrplet«

0.15 Cuni Coat of sand0.15 Cum Mixing chr.rges0*5? UItr Coat of cetuent

0.33 No. I clasa nvasoa

0,77 II class aaoan

l.S H«* Man and woman maxdoor

0.5 KM f2 K.H water lead

13%labour lnportatlon

41.665.32

1900.00

38.5*

29.10

22.53

Curea

HT

Sachm

K.H

Sundriesmm

6

0

31

12

22

47

10

0

.37

.70

• 75

.10

.31

*71

• 02

31

10 Sqm flooring with C.C (liStlO) ualng40 mm H.B.<3 metal 100 ma thickand Top plaaterad with C.M(lt4)12 trtu thick including cost andcorrv«yanc« of all material*labeur and »tner eperationaland incidental char33s includingdaring Mixing* water lead •tc,cosplete for finished. i£e» «fw«rk aa par 3*3.

1.00 C m Cost of C.C (ltStlO)

10 3qm Plastering with C.C It4 we matMcJc

1 Cum V.R.c.Cof OHSJt.

1 Cxm C«st of R.C.C

1 COM centering Charges

1 Cum

1 CUM13.33

propl f«r footings

foref OHSRCost of C.C (ltlK2»3)Centering charges 0-5 mta

I5-6

Add 1 Lift .

A92

471

190.

1245

1245

87

.10

15

• 40

.10

.S3

Curs

•471.

X 3 J T

121"-*

1215.

XD

15

\Q

•*0

57.20

14.81

7S2

o

2C01

11

.47

.03

2022'75

Page 96: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

. Icum V,R,c.c (1,^2,3) P

King girdar (eutor )

1 Cum coat o£ cic tltiyitZ

8*2 Sqw Centering Charges

2 lift* wpt. 8 m

f o r

33. 1 Cum V.fl.C.C UtlY2t3) prop. £«r bottom

.1 Cum Coot of.C.C

3*33 Centering charges

Add 2 lifts

34. 1 cu« v R c,c (1.U2.3) prop for Top

I cua Coat of c.C

S.66 CanteringSqra

3 lifts

35. 1 co» V.R.C.C (1,

1 oum coat of c.C

U*66 97a Cantering ch*rg«a

3 lifts

T#p ring

14.84

171.CO

14.84

814.39

14.34

1281,00

63.64

14.34

e«ch

«ach

12*5

552

0.

1*37,

1215,

55 4.

2?a

0.

.40

.94

a'SO

.03

.55

• SO

,30

51

.02

133?.JO

1245,{Q

565.75

41

0

1755

1245

737,

.52

.01

.30

• SO

.33

36, 1 cum V.R.C.C (lilK2«3) prop f»rcontilaur slab

1 cum coat of c.c lliiyiil)

10 Sqm Cantering chargwa

2 llfta

3id« walla.OHSR

1 cua vncc (1

Centering charge* A93

171.80

2*14.34

1245,40

1760

3005

29

0

.00

• 10

,53

,"2

3O2S.7O

92,33

Page 97: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

37* 10.«o cun Earth work excavation anda* baoJe with an additional bed at O.S K.mever initial lead cf 10 n ?od 2 addi- 99.84 10 Cum 93.34tional lifts over initial lift o« 2min Hard •tiff,a.C and ret" *cth soils

' including consolidation *.' h etcnereller of 2 T Including Y Km lead

t: K2 Km lead

1 ' 13% L.I

12IS

. 0 0

. 1 8101

CunCua

1 2 .1 5 .

1 3 .

0 .

5018

74

30. Collection of gravsl mod a ;icW,ng• t ait* f»r pi«nea*ur«n9"t» and•praading th« »*«• for g iv*l b*sota'tank bund

1 Cum Cost of gr»v«l 34,43

1 cun l«ad for <jrav«l(3Ka)

1 cm sprttding griv«i 34*00

^i «ton« diry p*c!tin» 30 en39* thick,r«v«tm«nt including c/c

of a l l «at«rlsL and labour

1.10 Cost of rough stone «f s ize 300 • 153*30 53,S3

0*40 Saa waddar 21*3.CO 3c'3

1.10 • Han «azdoor I i i *-. *o <;0*70 * Kenan nazdoor |

Labour iaportation 49.33 C,U

?..-%*o

cleariag heavy angle as per 10 2qa 2*201990-91 •

ifG3

Scrubb la CO

40. 10 cum Sartn work open wall excavation Inloamy clayey. a.C sails* r»4 e*rth

i and erdinary gravel depositing oabank with lead of 20 Mts inclu-alve all lifts above water level.

a) 1st mattu(above water level)erdlnary gravel a« per Ho. 9a 39.SI 10 Cvn C2.51PHD 3SR

10*00 b) Balew water level4 rats asabere Add for Bgillng of

A94

Page 98: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

A.RHI.NAL60N0A PPOJECT.

+ h '*kxnimvrthy. /rt

Page 99: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

M A t

\

\

\

\

\

}

By

l

\ — —

\

\

\

\

\

D SB*! M

ail, if^c

\

\

\

\

\

_ Tfiamvflctctpctfic.

Viirinapojii

/ A

w^f **a Its

;

,260 + 3 O I y f eTirmo&pttr. y i

\

- . ^. ^ t«;Gn3(iapcil(i j^+'*

jfPQdtiapo ra n

antpal 3TT

* — IsunKOSiTn ^ Vf » * 1 «f?« ^ ^

wofaJtonda /

T H i * 1 #L nunQU

f / (ivnorcpaft^^

^M<*>tHBKtt(pa)C\ _

• Wapftll, J y ^

V ^ ^ ^ Jwaudefi-

, X*^^C _ _ **"'"n l r ~ ~ - ^ *

^ Scirepalli \

t

/

^k^»^

^ ^ f

doJthato |pa it< ,

i

IK. vattitoo ^^H

\

^ \ X

r*vdit>a&L +ni

nonpoll,".

I^/ • konoof

*** •

j \^f More pa fill

* (SS.

^T>^ MOfOnoi' ^ * «0

\

\

\

\

U+2y potnvt- "Smpovdt

9 iMe<tort

V

V

t-205

erta

1 ,*2lS

AG ~ .

\

V-. f

3rrl

a m .

\

fy

Parvt

Js

ff

——

Torqol.

\\

A

v • ^

yac£aram

f •\pe.6&QaudeTi

I •

& li% 1w/

\ \

Z f f*>(Kfe

PHASEl

^5TAf<K

XMU»f

• Crr;

3TnpoJJi.

\ J Q• \ >v >^^*

Mw V

R /

t

Saoar.

Xvijoi/aptif; (north

•jsiuCLptsti-

INDEX.

^^^^ GiAA ttt^X*

A EXISTIM<;

, Koruilmp**.li.

norom

* - •

*ASA4A*<MAM£

mAf/V4

CH£M£5

Page 100: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

II Karth work excavation In II.? »«itf below water lev«l and Urpo*'.ting

on bank with initial l«»d »f JO wnincluding all lifts and bailingout w«ter.

* a) ulXnd M t t 8 r Thick the cat* »>t 10 cumper itam No. 123 86.77l S *

10 cum Balling out watert

b) Third Matter

5 tine* Initial rate 9 86.7 7• I •

Deduct 15* 43?. 35

10 cum Balling out water (-) 85.07

200,20

0.02

10 cma Balling *£ water

260

200

421

.31

^00

.35

c> rourtft wttar "503,30"

7 timea th« Initial rat« « 86,77 • — ^ — —

Odduct 1SX

10 cum Balling out water.

d) Fifth raattar

9 tlt*Q* in i t ia l rats 86.77

Deduct 15X

10 cm Balling out wator

780

117

.93

.13 6Q3.79

200.00

C.O.I

BC3,.»0

•) Sixth matter

12 tliM* Initial rat« o£ itea 123 e?3.0486.87

Deduct

XXX Carth trark excavation in 3. M.IKremavaisle by piekane* brow barbelow water level and dtpefltng00 bank with e lead of 20 m ln-eluelve at all lifts and bailingo£ water*

•) Sixth aat&ax

12 time* the initial rate 99.001198.90179.82

Deduct 15* 200.Q1

•A95

Page 101: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10 aim Balling aut vatar Q.03

4

1473.73

Rafllllng with axcav«t«d moLlm(othar than sand) complyingwith standard specification(SOX •£ normal ratos of aarthwark «« adcpted and dl£f«r«nc«ot 3.3 20 A'and 20S cttei forbrtalclng eleds* watarlng 6 t? ra-ping) «

a) Ordinary graval •• par Itwo ., ._Ho. 9B • 5% at rata dl£f«r«i»c« so.7 7o£ 208 A 20A

i99.34-89,51

10 Cu b) Htrd gravel as par it«aX2 B

Olffsrenca of 203 & 20Af . 99.44-99.31

c) Soft dlfilntagrated rock a« 'par lt«m no. 14 # SOX 99.90

Dlfftrenca of 20 A & 20S -•

4310

SI

43

1U

53

. 3 8

. 3 0

, * 3

.33

. 3 3

. 7 1

A96

Page 102: RWS 1 E NAP • D AP-III - · PDF fileRWS 1 E NAP 1• D AP-III C.P.W, ... 218h c"0 3ore Ltumarthy Chityal 27.6.87 7.4 0 960 592 well PWS Scheme ... H&-89 6&_90 * incraaaed BS.-90

10 cun sailing «ut water Q.03

A96

1473.75

43* RefilXi.na with excavated aoLXm(other than sand) complyingwith standard specification(50* of normal rates of aartbw*r.*c «« adopted and differenceof 3,3 20 A and 30B rates forbreaking clods, watering * t?rn-plngj•

a) Ordinary grav«l as per £t*taNo. 98 • 5X os rate dlf£«r«iice«£ 209 S, 20A

i99.84-99.51

10 Cu b) Hard gravel as per itera12 B

Difference of 208' . 99,44-49.31

20A

e) Soft disintegrated rock asper item no. 14 • SOXDifference of 20 A & 203

as.77 4 3 .1 0 .

S 3 .

i 3 .

1U.

5J.

9 9 ,

3 8

30

13

33

33

71

,90


Recommended