COMMERCIAL VERTICAL CLADDING
KAHU™
0800 ROOFNZ (0800 766 369)www.metalcraftroofing.co.nz
Architectural / Specification EnquiriesPh: 09 274 0408
Mobile: 027 603 1096Email: [email protected]
00 / 20 COVER SHEET01 / 20 PARAPET AND BALUSTRADE CAPPING02 / 20 SOFFIT03 / 20 FLUSH WINDOW HEAD04 / 20 FLUSH WINDOW SILL05 / 20 FLUSH WINDOW JAMB05A / 20 FLUSH WINDOW JAMB ALTERNATIVE OPTION06 / 20 RECESSED WINDOW HEAD07 / 20 RECESSED WINDOW SILL08 / 20 RECESSED WINDOW JAMB08A / 20 RECESSED WINDOW JAMB ALTERNATIVE OPTION09 / 20 BUTT WINDOW HEAD10 / 20 BUTT WINDOW SILL11 / 20 BUTT WINDOW JAMB11A / 20 BUTT WINDOW JAMB ALTERNATIVE OPTION12 / 20 METERBOX HEAD13 / 20 METERBOX SILL14 / 20 METERBOX JAMB15 / 20 INTERNAL CORNER16 / 20 EXTERNAL CORNER17 / 20 SOAKER FLASHING18 / 20 BOTTOM OF CLADDING (FLUSH)19 / 20 BOTTOM OF CLADDING (RECESSED)20 / 20 3D WINDOW FLASHINGS
DETAIL LIST
PRE-FINISHED PARAPET CAP FLASHINGNO FIXINGS ON TOP OF FLASHING
BUILDING PAPER SHOWN DASHED
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
METALCRAFT KAHU™ VERTICALCLADDING
METALCRAFT MSS PURLINBY ENGINEER
CONTINUOUS TIMBER PACKING
MIN
. 5.00°
BUILDING PAPER TO PROVIDESEPARATION OF METAL CAPPINGAND TIMBER SHOWN DASHED
Z
CLE
ARAN
CE
25m
m
5 GAP
20
15
ALTERNATIVE OPTIONBIRDS BEAK EDGE
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
HEMMED EDGE
STOPENDS TO WALL CLADDING
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
CLE
ARAN
CE
25m
m
Z
20mm CAVITY ORCAVI BATT
CATEGORY A
1. NORMAL EXPOSURE2. ROOF PITCH >10°
MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH)
MIN. 75mm (VERTICALLY DOWN FACE - PROFILED)
CATEGORY B
1. EXPOSED (HIGHER RISK)2. WIND LOAD EXCEEDS 1.5kPa.3. ROOF PITCH <10°
MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH)
MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)
Z
SITUATION 1
1. LOW, MEDIUM, HIGH WIND ZONES2. ROOF PITCH ≥ 10°
MIN. 50mm
SITUATION 2
1. VERY HIGH WIND ZONE2. ALL ROOF PITCHES
MIN. 70mmZ
SITUATION 3
1. EXTRA HIGH WIND ZONE2. ALL ROOF PITCHES
MIN. 90mm
PLEASE REFER TO E2 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.
PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 01 / 20
PARAPET AND BALUSTRADE CAPPING
2015
METALCRAFT MSS PURLIN BYENGINEER
INTERNAL WALL LINING
METALCRAFT MSS PURLIN BY ENGINEER
20mm CAVITY OR CAVI BATT
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED
BARGE BOARD
SOFFIT LINING
METALCRAFTMSS PURLIN BYENGINEER
PRE-FINISHED SELFDRILLING/TAPPING SCREWWITH RUBBER WASHER
INTERNAL CEILING LINING
COMPRESSIBLE FOAM SEAL. REFER TO MRM CODEOF PRACTICE VERSION 2.2 /2012 FOR REQUIRMENT.
PRE-FINISHEDSOFFIT FLASHING
PRE-FINISHED FLAT HEAD WAFER-TEK SCREWFOR FLASHING
BUILDING PAPER SHOWNDASHED
METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEKSCREW
STOPENDS TO WALL CLADDING
MIN. 50mm
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 02 / 20
SOFFIT
2015
BUILDING PAPER DRESSED INTOOPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
INTERNAL WALL LINING METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILLAND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMB LINERBEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
METALCRAFT MSS PURLIN BYENGINEER
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
CAVITY CLOSER AS REQUIRED TO NZBC
COMPRESSIBLE FOAM SEAL TOFILL OVERLAP OF FLASHING
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM E
DG
E
MIN
. 50m
m C
OVE
R
MIN
. 10m
m C
OVE
R
SUG
GES
T M
IN. 5
0mm
DIM
ENSI
ON
TO
SU
IT
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 03 / 20
FLUSH WINDOW HEAD
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
WINDOW SILL SUPPORT BAR
LINE OF WINDOW JAMBLINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
METALCRAFT MSS PURLIN BYENGINEER
INTERNAL WALL LINING
STOPENDS TO SILL FLASHING
LINE OF JAMB FLASHING BEHIND
20mm CAVITY OR CAVI BATT
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
PRE-FINISHED WINDOW SILL FLASHING
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
PRE-FINISHED SECONDARY FLASHING
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
DOUBLE GLAZING WINDOW JOINERY
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
MIN
. 8m
m C
OVE
R
CO
VER
CLA
DD
ING
65m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 04 / 20
FLUSH WINDOW SILL
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOWJOINERY
LINE OF WINDOW SILL LINERBELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
LINE OF SILL FLASHING BELOW
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
METALCRAFT MSS PURLIN BY ENGINEER
LINE OF SILL FLASHING BELOW
PRE-FINISHED WINDOW JAMBFLASHING
MIN. 10mm COVER
FLEXIBLE FLASHING TAPEOVER BUILDING PAPER FORFULL WIDTH/DEPTH SILL
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
5mm
GAP
MIN. 2 CRESTS
PRE-FINISHED SECONDARYFLASHING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
COMPRESSIBLE FOAMSEAL TO FILL OVERLAPOF FLASHING
PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
LINE OF HEAD FLASHING ABOVE
20mm CAVITYOR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 05 / 20
FLUSH WINDOW JAMB
2015
METALCRAFT KAHU™ VERTICAL CLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOW JOINERY
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
LINE OF SILL FLASHING BELOW
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
METALCRAFT MSS PURLIN BY ENGINEER
PRE-FINISHED FIXING BRACKET WITH PRE-FINISHED POP RIVET BEDDED IN SILICONEOR PRE-FINISHED 8g WAFER-TEK SCREW
LINE OF SILL FLASHING BELOW
PRE-FINISHED WINDOW JAMBFLASHING
MIN. 10mm COVER
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SECONDARYFLASHING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
COMPRESSIBLE FOAM SEAL TO FILLOVERLAP OF FLASHING SUGGEST MIN. 50mm
DIMENSION TO SUIT
LINE OF HEAD FLASHING ABOVE
20mm CAVITY OR CAVIBATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 05A / 20
FLUSH WINDOW JAMB ALTERNATIVE OPTION
2015
BUILDING PAPER DRESSED INTOOPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
INTERNAL WALL LINING METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMBLINER BEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
CAVITY CLOSER AS REQUIRED TONZBC
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM E
DG
E
MIN
. 50m
m C
OVE
R
MIN
. 10m
m C
OVE
R
SUG
GES
T M
IN. 5
0mm
DIM
ENSI
ON
TO
SU
IT
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 06 / 20
RECESSED WINDOW HEAD
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
STOPENDS TO SILL FLASHING
LINE OF WINDOW JAMBLINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
INTERNAL WALL LINING
PRE-FINISHED WINDOW SILL FLASHING
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
20mm CAVITY OR CAVI BATT
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
METALCRAFT MSS PURLIN BYENGINEER
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
PRE-FINISHED SECONDARY FLASHING
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
WINDOW SILL SUPPORT BAR
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
5mm
GAP
MIN
. 8m
m C
OVE
R
CO
VER
CLA
DD
ING
70m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 07 / 20
RECESSED WINDOW SILL
2015
METALCRAFT KAHU™VERTICAL CLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOWJOINERY
LINE OF WINDOW SILL LINERBELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
METALCRAFT MSS PURLIN BY ENGINEER
LINE OF SILL FLASHING BELOW
PRE-FINISHED WINDOW JAMBFLASHING
MIN. 10mm COVER
FLEXIBLE FLASHING TAPEOVER BUILDING PAPER FORFULL WIDTH/DEPTH SILL
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SECONDARYFLASHING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
MIN. 2 CRESTS 5mm GAP
20mmCAVITY ORCAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 08 / 20
RECESSED WINDOW JAMB
2015
PRE-FINISHED FIXING BRACKET WITH PRE-FINISHED POP RIVET BEDDED IN SILICONEOR PRE-FINISHED 8g WAFER-TEK SCREW
DOUBLE GLAZING WINDOW JOINERY
LINE OF SILL FLASHING BELOW
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
METALCRAFT KAHU™ VERTICALCLADDING
MIN. 10mm COVER
INTERNAL WALL LINING
BUILDING PAPER SHOWN DASHED
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
METALCRAFT MSS PURLIN BYENGINEER
PRE-FINISHED SECONDARYFLASHING
LINE OF SILL FLASHING BELOW
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
LINE OF HEAD FLASHING ABOVE
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED WINDOW JAMB FLASHING 5mm GAP
SUGGEST 50mm
DIMENSION TO SUIT
LINE OF HEAD FLASHING ABOVE
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 08A / 20
RECESSED WINDOW JAMB ALTERNATIVE OPTION
2015
BUILDING PAPER DRESSED INTOOPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA BUILDING PAPER OVERWINDOW HEAD FLASHING SHOWNDASHED
INTERNAL WALL LINING METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMBLINER BEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
CAVITY CLOSER AS REQUIRED TONZBC
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
5mm
GAP M
IN. 7
5mm
WIT
HO
UT
HEM
ED
GE
MIN
. 50m
m C
OVE
R
MIN
. 10m
m C
OVE
R
SUG
GES
T M
IN. 5
0mm
DIM
ENSI
ON
TO
SU
IT
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 09 / 20
BUTT WINDOW HEAD
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
PRE-FINISHED WINDOW SILL FLASHING
LINE OF WINDOW JAMBLINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
INTERNAL WALL LINING
STOPENDS TO SILL FLASHING
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
20mm CAVITY OR CAVI BATT
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
METALCRAFT MSS PURLIN BYENGINEER
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
PRE-FINISHED SECONDARY FLASHING
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
WINDOW SILL SUPPORT BAR
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
5mm
GAP
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)M
IN. 8
mm
CO
VER
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 10 / 20
BUTT WINDOW SILL
2015
METALCRAFTKAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOWJOINERY
LINE OF WINDOW SILL LINERBELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
METALCRAFT MSS PURLIN BY ENGINEER
LINE OF SILL FLASHING BELOW
PRE-FINISHED WINDOW JAMBFLASHING
MIN. 10mm COVER
FLEXIBLE FLASHING TAPEOVER BUILDING PAPER FORFULL WIDTH/DEPTH SILL
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SECONDARYFLASHING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
MIN. 2 CRESTS 5mm GAP
20mm CAVITYOR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 11 / 20
BUTT WINDOW JAMB
2015
PRE-FINISHED WINDOW JAMB FLASHING
DOUBLE GLAZING WINDOW JOINERY
LINE OF SILL FLASHING BELOW
METALCRAFT KAHU™ VERTICALCLADDING
MIN. 10mm COVER
5mm GAP
INTERNAL WALL LINING
BUILDING PAPER SHOWN DASHED
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
METALCRAFT MSS PURLIN BYENGINEER
SUGGEST MIN. 50mm
DIMENSION TO SUIT
PRE-FINISHED SECONDARYFLASHING
LINE OF SILL FLASHING BELOW
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
LINE OF HEAD FLASHING ABOVE
LINE OF HEAD FLASHING ABOVE
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED FIXING BRACKET WITH PRE-FINISHED POP RIVET BEDDED IN SILICONEOR PRE-FINISHED 8g WAFER-TEK SCREW
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 11A / 20
BUTT WINDOW JAMB ALTERNATIVE OPTION
2015
BUILDING PAPER DRESSED INTOOPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
METALCRAFT KAHU™ VERTICAL CLADDING
PRE-FINISHED HEAD FLASHINGWITH 15° FALL
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILLAND JAMB
METER BOX STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED 'U' BRACKET FIXED TOMETERBOX BEFORE INSTALLATION
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
INTERNAL WALL LINING
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
CAVITY CLOSER AS REQUIRED TO NZBC
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM E
DG
E
MIN
. 50m
m C
OVE
R
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 12 / 20
METERBOX HEAD
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
METER BOX
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
METALCRAFT MSS PURLIN BYENGINEER
PRE-FINISHED SECONDARY FLASHING
INTERNAL WALL LINING LINE OF JAMB FLASHING BEHIND
20mm CAVITY OR CAVI BATT
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX. PRE-FINISHED FLASHING FIXED TO
METAL ANGLE
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
STOPENDS TO SILL FLASHING
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
STOPENDS TO WALL CLADDING
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 13 / 20
METERBOX SILL
2015
METALCRAFT KAHU™ VERTICALCLADDING
BUILDING PAPER SHOWN DASHEDMETER BOX
TIMBER PACKER
20mm JAMB BATTEN
LINE OF SILL FLASHING BELOW
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED JAMB FLASHINGFIXED TO METERBOX BEFOREINSTALLATION AIRSEAL ON BACKING ROD
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
INTERNAL WALL LINING METALCRAFT MSS PURLINBY ENGINEER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
SUGGEST MIN. 50mm
DIMENSION TO SUITPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
LINE OF HEAD FLASHING ABOVE
LINE OF SILL FLASHING BELOW
20mm CAVITY OR CAVI BATT
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 14 / 20
METERBOX JAMB
2015
METALCRAFT KAHU™VERTICAL CLADDING
20mm CAVITY OR CAVI BATT
PRE-FINISHED INTERNALCORNER FLASHING
BUILDING PAPER SHOWNDASHED
STRUCTURAL COLUMN BYENGINEER
METALCRAFT MSS PURLINBY ENGINEER
PRE-FINISHED FLAT HEADWAFER-TEK SCREWWITH EPDM WASHER
PRE-FINISHED SECONDARYFLASHING
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED
PRE-FINISHED FLAT HEADWAFER-TEK FOR FLASHING
MIN. 2 CRESTS
PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 15 / 20
INTERNAL CORNER
2015
METALCRAFT MSS PURLIN BY ENGINEER
20mm CAVITY OR CAVI BATT
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
PRE-FINISHED EXTERNALCORNER FLASHING
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIREDBUILDING PAPER SHOWNDASHED
METALCRAFT KAHU™VERTICAL CLADDING
STRUCTURAL COLUMN BY ENGINEER
PRE-FINISHED FLAT HEADWAFER-TEK SCREW WITHEPDM WASHERPRE-FINISHEDSECONDARY FLASHING
PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
MIN. 2 CRESTS
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 16 / 20
EXTERNAL CORNER
2015
BUILDING PAPER SHOWNDASHED
METALCRAFT KAHU™VERTICAL CLADDING
PRE-FINISHED FLAT HEADWAFER-TEK SCREW FORFLASHINGINTERNAL WALL LINING
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED
METALCRAFT MSS PURLINBY ENGINEER
PRE-FINISHED SOAKERFLASHING TO LINE UP WITHWINDOW JAMB ABOVE
20 mm CAVITY OR CAVI BATT
METALCRAFT MSS PURLIN BYENGINEER
SOAKER FLASHING ONLY REQUIRED TOLINE UP WITH WINDOW JAMB ABOVE.REFER TO MRM CODE OF PRACTICEVERSION 2.2 /2012 FOR REQUIRMENT.
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 17 / 20
SOAKER FLASHING
2015
BUILDING PAPER SHOWN DASHED
INTERNAL WALL LINING
METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
CAVITY CLOSER AS REQUIRED TONZBC
PRE-PRIMED SKIRTING
CONCRETE SLAB
MIN
. 50m
m L
AP
VEN
TILA
TIO
N G
AP
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
METALCRAFT MSS PURLIN BYENGINEER
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
20mm CAVITY OR CAVI BATT
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL
10mm
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 18 / 20
BOTTOM OF CLADDING (FLUSH)
2015
BUILDING PAPER OVER FLASHINGSHOWN DASHED
METALCRAFT KAHU™ VERTICALCLADDING
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL
MIN
. 75m
m C
OVE
R
5mm
VEN
TILA
TIO
N G
AP
INTERNAL WALL LINING
PRE-PRIMED SKIRTING
CONCRETE SLAB
CAVITY CLOSER AS REQUIRED TONZBC
5 GAP
20
15
ALTERNATIVE OPTIONBIRDS BEAK EDGE
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
20mm CAVITY OR CAVI BATT
MIN
. 50m
m L
AP
HEMMED EDGE
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
ScaleDate Sheet
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
Rev: R0 1 : 2 19 / 20
BOTTOM OF CLADDING (RECESSED)
2015
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
COMMERCIAL VERTICAL CLADDINGKahu™
CVKACV ScaleDate SheetRev: R0
20 / 20
3D WINDOW FLASHINGS
2015
HEAD FLASHING
JAMB FLASHING
SILL FLASHING
FLUSH WINDOW FLASHINGS RECESSED WINDOW FLASHINGS
HEAD FLASHING
JAMB FLASHING
SILL FLASHING
METALCRAFTKAHU™ VERTICALCLADDING
ALUMINIUMWINDOWJOINERY
COMPRESSIBLEFOAM SEALBEHIND TO FILLOVERLAP OFFLASHING
ALUMINIUMWINDOWJOINERY
METALCRAFTKAHU™ VERTICALCLADDING