SUMMARY of NVVN’S VIEWS & SUGGESTIONS on CERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING
Transcript
Page 1: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

SUMMARY

of

NVVN’S VIEWS & SUGGESTIONS

on

CERC STAFF PAPER ON DEVELOPING A

COMMON PLATFORM FOR ELECTRICITY

TRADING

Page 2: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

National PX v/s Many (Region Level) Exchanges

View Point As Per Staff Paper

NVVN Views

Single National level PX recommended as against region level PXs

OK

Page 3: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Assignment of Transmission Capacity to Day-Ahead Trading Through PX

View Point As Per Staff Paper

NVVN Views

• PX shall handle trading and transmission clearance in a composite manner

• OK. It will be highly convenient to participants and RLDCs

• A pre-identified transmission capacity shall be assigned to PX for each inter-regional corridor. Any un-used transmission capacity from that reserved for bilateral trades shall also be added on daily basis

•To begin with, at least 50% of short-term transmission capacity should be assigned for day-ahead trading on Power Exchange to develop a liquid market.•However, the next logical step will be to have all trading on PX and replace physical bilateral contracts with “CfD” which will eventually prepare the participants for more sophisticated derivatives like futures and options..

Page 4: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Bids Based On Marginal Costs

View Point As Per Staff Paper

NVVN Views

Bids shall be based on marginal costs

• Market forces shall incentivise bids based on marginal costs in order to win higher volume.

• Bidders should have freedom to optimize their portfolio.

Page 5: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Price Mitigation View Point As Per

Staff PaperNVVN Views

Bid caps based on marginal costs can be considered. However, such caps to apply to bilateral trade as well.

• Double sided bids and uniform clearing price shall incentivise Sellers to bid based on marginal costs to win higher volumes.

• The clearing price and volume also depend upon the price the buyers are willing to pay for that volume

• Thus bid caps are not desirable.

Page 6: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Congestion Management

View Point As Per Staff Paper

NVVN Views

Market Splitting method recommended, but congestion revenue to be socialized among participants in deficit areas

Classical market splitting method only recommended –

Congestion revenue may be used for transmission system development.

Page 7: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Treatment of Transmission Charges View Point As Per

Staff PaperNVVN Views

• PX is a transmission user • Charges to be levied on per unit basis

• PX shall socialize all charges among participants

• PX is not a transmission user, its participants are. • Concept of applying transmission charges on an average basis is agreeable and suitable for PX trades. • Charges should be applied based on contracted schedule (or implemented schedule in case of curtailment during real time) • Other charges (scheduling charges etc) may also be applied on per unit basis and not per contract basis

Page 8: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Treatment of transmission losses View Point As Per Staff

PaperNVVN Views

Average losses for each inter/intra regional segment of the transmission system

• To simplify the process, all bids be referred to inter-regional boundaries so that PX contracts are balanced. • Actual injection and drawl schedules shall be derived after adjusting respective region and state system losses.

Page 9: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Organization of PX View Point As Per

Staff PaperNVVN Views

• PX is like a “trader’ • PX is not like a ‘trader’ but facilitates trading by others

• Multi-owner organization, limit of 25% on individual shareholding

• Multi-owner OK. • Leading Power Sector players should play a major role as key promoters

• Independent Board with five full-time Directors, including Chairperson and one nominee of NLDC/RLDCs. Advisory council to recommend names for approval by CERC.

• Board of Directors to consist of representatives of shareholders as well as CERC/ Government nominee in suitable proportion

• Only one/two Directors may need to be full time.

Page 10: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Organization of PX (Contd.)

View Point As Per Staff Paper

NVVN Views

• Membership for grid connected entities and traders having long/medium term PPAs

• To be defined more finely. In general, all entities eligible for inter-state Open access to be permitted

• ‘Profit’ is not the motive. Expenses to be met from membership fee and transaction fee.

• Promoters have to invest money and revenue depends on volumes. There is no guarantee for meeting expenses. So ‘for profit’ company in principle, for efficient operation.

Page 11: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Market Regulation View Point As Per

Staff PaperNVVN Views

• General Concepts• Emphasis on Regulatory intervention• Detailed rules to be framed by PX

• General concepts are OK. However, de-centralized markets are not tightly regulated. Self regulation to be encouraged. • Higher level regulations to be framed by CERC suggested. • Detailed rule book to be framed by PX • Market monitoring procedures to be defined by PX after further study

Page 12: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Timing for launching PX View Point As

Per Staff PaperNVVN Views

If PX is launched immediately, it may be hampered by lack of liquidity. On the other hand, it may be prudent to launch it in near future to send the right signal to investors and consumers about transparent market development

• General concepts are OK. However, de-centralized markets are not tightly regulated. Self regulation to be encouraged. Higher level regulations to be framed by CERC suggested. Detailed rule book to be framed by PX Market monitoring procedures to be defined by PX after further study Market development is a challenging task requiring simultaneous effort on multiple fronts with a sense of urgency. There is an urgent need to set up an organized platform for electricity trading. • Current trading market size is 12 BU. This is comparable with initial market size in some European PX. Further, massive and unprecedented capacity addition program both in generation and transmission will result in a spurt in trading of electricity in very near future. Thus liquidity does not seem to be a constraint. Availability of an organized market place will in fact catalyze more trading.• Development of a Power Exchange involves significant development effort which will take some time.• We feel that there is an urgent need to facilitate establishment of a common trading platform for electricity.

Page 13: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Developing a Common Platform for Electricity Trading in India

View Point As Per Staff Paper

NVVN Views

Power Exchange (PX) is a proven mechanism for efficient and transparent trading

OK

Page 14: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Mandatory v/s Voluntary Participation in PX

View Point As Per Staff Paper

NVVN Views

Voluntary participation to begin with, may be made mandatory after gaining experience

• Voluntary in principle • All day-ahead trading shall be through PX only • Allocation of open access to day-ahead trading is an issue

Page 15: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Double-sided Bidding v/s Only Supply Side Bidding

View Point As Per Staff Paper

NVVN Views

Double sided bidding is a better option

OK

Page 16: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Uniform Pricing v/s Discriminatory Clearing Pricing

View Point As Per Staff Paper

NVVN Views

Uniform market clearing price

OK

Page 17: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Day-Ahead v/s Same Day Exchange

View Point As Per Staff Paper

NVVN Views

PX at present may operate on Day-Ahead basis only

OK

Page 18: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Time blocks for bidding

View Point As Per Staff Paper

NVVN Views

Hourly Intervals OK

Page 19: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Operational Inflexibilities of Generators

View Point As Per Staff Paper

NVVN Views

Block bids to be permitted in addition to

single-interval bids

OK

Page 20: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Time line for PX View Point As Per Staff

PaperNVVN Views

• To fit into day-ahead scheduling process. • Final PX schedules to be decided by RLDCs. PX to re-calculate in case of any constraints

• OK. • However, RLDCs to provide binding information on available transmission capacity. PX schedules shall be binding and NO RE-CALCULATION OF SCHEDULES BY PX. •In case of a constraint in REAL TIME, RLDC may curtail the PX schedules.

Page 21: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Other benefits of PX

View Point As Per Staff Paper

NVVN Views

• Harnessing captive and merchant generation • PX as security against PPA defaults • Cross border trading • Facilitator of consumer choice

OK

Page 22: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Settlement & Clearance Mechanism

View Point As Per Staff Paper

NVVN Views

• Credible and viable arrangement required • A separate clearing house

• It is an important function of PX •A separate clearing house is not necessary. If required, it can be outsourced by PX.

Page 23: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

DEVELOPMENTOF

POWER EXCHANGE AT

NATIONAL LEVEL

NTPC LtdNVVN Ltd

Page 24: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

An initiative forSelection of PX Model for India

• Analysis of Indian Electricity Trading Market

• Study of International Electricity markets

• Consultations with MoP, CEA, PGCIL and PTC

• Development of DPR for PX in India

Consultants: Consortium of M/s NordPool Consulting AS, Norway and M/s CRISIL, India

Page 25: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Preparatory Work Done• A professionally prepared DPR

• Consultations with other stakeholders during preparation of DPR– Core Team– Workshop for stakeholders

• Full implementation plan available– Hardware & software issues– Procurement, Training & Implementation– Model Agreements– Business Case

Page 26: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Our Proposal• Power Exchange may be promoted as a separate

company by key players in power sectors and gradually provided with more diversified ownership and governance structure. CERC Staff Paper on PX also recommends a diversified ownership. It is common to find examples of PX promoted by the stakeholders in European Markets.

• Development of Power Exchange for physical delivery market is complex due to nature of electricity. Therefore, the design of the product, trade system and operational procedures require a thorough understanding of generation, transmission, consumption and trading of electricity as well as system operation.

Page 27: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Our Proposal

• The focus of PX is market development. In India, the trading market is small and limited to tradable short-term surplus. Therefore support and participation by market players is crucial for market development.

• CPSUs under the MoP are respective market leaders, possess significant domain knowledge, technical & managerial expertise and financial strength. They also have an experienced pool of necessary manpower to support the creation and operation of PX. Further, the Government Companies playing a leading role in the development of PX shall provide significant comfort to the market participants with regard to neutrality and transparency.

Page 28: S UMMARY of N VVN’S VIEWS & SUGGESTIONS on C ERC STAFF PAPER ON DEVELOPING A COMMON PLATFORM FOR ELECTRICITY TRADING.

Our Proposal• Accordingly, the following may be considered for

establishing the Power Exchange:• Power Exchange shall be promoted as a separate

company under the Companies Act with CPSUs under MoP as the initial promoters, who shall contribute Initial 50% of the authorized capital in equal proportion. (Authorized capital shall be of the order of Rs. 50 crores.)

• Balance 50% of the authorized capital shall be issued subsequently to State power utilities, FIs, Banks, Traders etc.

• Shareholding by an individual entity may be limited to 25% of the paid-up capital.

• The Company shall have Shareholders’ representatives and also the nominee of CERC/ Government in suitable proportion on its Board of Directors.