+ All Categories
Home > Documents > S.1.001-Pondasi, Lt. Basement-R2 LayoutA (1).pdf

S.1.001-Pondasi, Lt. Basement-R2 LayoutA (1).pdf

Date post: 26-Jan-2016
Category:
Upload: rijalian
View: 221 times
Download: 0 times
Share this document with a friend
Popular Tags:
1
R Q P O N M L K J I H G F E D C B A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 K1 K1 K1 K1 K1 K1 K1 K1A K1A K1A K1A K1A K1A K1A K5 K5 K5 K5 K1 K1 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K1A K1A K1A K1A K1A K1A K1A K1A K1A K1A K1A K1A K1 K1 K1 K1 K1 K1 K1 K8 K8 K8 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K1A K1A K3 K3 K1A K1A K1A K1A K1A K1A K1A K1 K1 K1 K1 K1 K1 K1 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K3 K3 CL K8 K8 K8 K8 K1A K1A K1A K1A K1A K1A K1A K1 K1 K1 K1 K1 K1 K1 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K3 K3 K3 K3 K1A K1A K1A K1A K1A K1A K1 K1 K1 K1 K1 K1 K1 K7A K7A K7A K7A K7A K7A K7A K7A K7 K7 K1 K1A K1A K1A K1A K1 K1 K1 K1 K1 K1 K6 K6 K6 K6 CL K6 K6 K6 K6 K1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB3 TB3 TB3 TB3 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB3 TB3 TB4 TB4 TB4 TB4 TB4 TB4 TB3 TB3 TB3 TB3 TB3 TB3 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB3 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB3 TB3 TB3 TB3 TB3 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB3 TB2 TB2 TB2 TB2 TB2 TB3 TB3 TB3 TB3 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB3 TB2 TB3 TB3 TB3 TB3 TB2 TB2 TB2 TB1 TB1 TB1 TB1 TB1 TB4 TB4 TB4 TB4 TB4 TB1 TB1 TB3 TB3 TB2 TB1 TB1 TB2 TB2 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB2 TB4 TB4 TB4 TB4 TB4 TB1 SSL -3.600 SSL -3.600 SSL -3.600 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.550 PIT LIFT -5.250 PIT LIFT -5.250 SSL -3.550 TB1 TB1 SSL -3.550 SSL -3.550 SSL -3.550 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.650 SSL -3.550 SSL -3.600 TB3 TB3 SSL -3.550 SSL -3.600 SSL -3.650 PROYEK PEKERJAAN PEMBANGUNAN RUMAH SAKIT PROVINSI BALI JL. BYPASS NGURAH RAI, SANUR, DENPASAR, BALI KONSULTAN PERENCANA KONTRAKTOR CONSTRUCTION & INVESTMENT KONSULTAN MANAJEMEN KONSTRUKSI DIPERIKSA Ir. Yusuf Munawar Team Leader PENANGGUNG JAWAB MK DISETUJUI TGL DIPERIKSA TGL DIGAMBAR TGL S.E.M : Engineer : Drafter : REFERENSI SKALA NO. GAMBAR REVISI JUDUL GAMBAR REVISI No TGL PARAF JUNANI SIHOL SILALAHI EKO SUSILO BLOK B BLOK C BLOK A1 BLOK A2 1. Penambahan Tie Beam TB1 22/10/15
Transcript
Page 1: S.1.001-Pondasi, Lt. Basement-R2 LayoutA (1).pdf

RQ

PO

NM

LK

JI

HG

FE

DC

BA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

K1K1

K1K1

K1K1

K1

K1AK1A

K1AK1A

K1AK1A

K1A

K5K5

K5K5

K1K1

K2K2

K2K2

K2K2

K2K2

K2K2

K2 K2 K2 K2 K2

K2 K2 K2 K2 K2

K2 K2 K2 K2 K2

K2 K2 K2 K2 K2

K2 K2 K2 K2 K2

K1AK1A

K1A

K1A

K1A

K1AK1A

K1AK1A

K1AK1A

K1A

K1K1

K1K1

K1K1

K1

K8K8K8 K2

K2K2

K2K2

K2K2

K2K2

K2K2

K1A

K1A

K3K3

K1AK1A

K1AK1A

K1AK1A

K1A

K1K1

K1K1

K1K1

K1

K2 K2 K2

K2 K2 K2 K2K2

K2K2

K2K2

K2K2

K2K2

K2K2

K2K2

K3 K3

CL

K8K8

K8K8

K1AK1A

K1AK1A

K1AK1A

K1A

K1K1

K1K1

K1K1

K1

K2K2

K2K2

K2K2

K2K2

K2K2

K2K2

K2K2K3 K3

K3K3

K1AK1A

K1AK1A

K1AK1A

K1K1

K1K1

K1K1

K1

K7AK7A

K7AK7A

K7AK7A

K7AK7A

K7K7K1

K1AK1A

K1AK1A

K1K1

K1K1

K1K1

K6K6

K6K6

CL

K6K6

K6K6

K1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1TB1

TB1

TB1

TB1TB1

TB1

TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1

TB1

TB1TB1

TB1TB1

TB1

TB1TB1

TB1TB1

TB1

TB3

TB3

TB3

TB3

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB3

TB3

TB4

TB4

TB4

TB4

TB4

TB4

TB3

TB3

TB3

TB3

TB3

TB3

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB3

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4TB3

TB3 TB3 TB3 TB3

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB3

TB2

TB2

TB2

TB2

TB2

TB3

TB3

TB3

TB3

TB4

TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB4

TB1 TB1

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB3

TB2

TB3

TB3

TB3

TB3

TB2

TB2

TB2

TB1

TB1

TB1

TB1

TB1

TB4

TB4

TB4

TB4

TB4

TB1

TB1

TB3

TB3

TB2

TB1

TB1

TB2

TB2

TB1TB1

TB1TB1

TB1TB1

TB1TB1

TB1TB1

TB1TB1

TB1TB1

TB1

TB2

TB4

TB4 TB4 TB4

TB4

TB1

SSL -3.600

SSL -3.600

SSL -3.600

SSL -3.550

SSL -3.550

SSL -3.550SSL -3.550

SSL -3.550

SSL -3.550

SSL -3.550

SSL -3.550

PIT LIFT-5.250

PIT LIFT-5.250

SSL -3.550

TB1

TB1

SSL -3.550

SSL -3.550

SSL -3.550

SSL -3.650SSL -3.650

SSL -3.650SSL -3.650

SSL -3.650

SSL -3.650SSL -3.650

SSL -3.650

SSL -3.650

SSL -3.650

SSL -3.650

SSL -3.650

SSL -3.550

SSL -3.600

TB3

TB3

SSL -3.550

SSL -3.600

SSL -3.650

PROYEK

PEKERJAAN PEMBANG

UNANRUM

AH SAKIT PROVINSI BALIJL. BYPASS NG

URAH RAI, SANUR, DENPASAR, BALI

KONSULTAN PERENCANA

KONTRAKTORCO

NS

TRU

CTIO

N & IN

VESTM

ENT

KONSULTAN MANAJEM

EN KONSTRUKSI

DIPERIKSA

Ir. Yusuf Munaw

arTeam

Leader

PENANGGUNG JAW

AB MK

DISETUJUITGLDIPERIKSATGLDIGAM

BARTGL

S.E.M :

Engineer :

Drafter :

REFERENSISKALA

NO. GAM

BARREVISI

JUDUL GAM

BAR

REVISINo

TGLPARAF

JUNANI

SIHOL SILALAHI

EKO SUSILO

BLOK BBLOK C

BLOK A1BLOK A2

1.Penam

bahan Tie Beam TB1

22/10/15

Recommended