44
Contents of section 14: Instruments. Chapter 1-Pictures of Instruments, land mark boards and accessories used in this project. 1.1-Pictures of some of the Instruments used in RCS – CRS – CRTS – MV – MN. -Picture 1: MPSDR. -Picture 2: MPSDR Track. -Picture 3: MPSDR Track cross section: -Picture 4: The supporting devises of MPSDR. -Picture 5: Inverted U stand of MPSDR; -Picture 6: Ground survey meter. -Picture 7: Axis meter sensor plate; -Picture 8: Magnet mounted over the Axis meter sensor plate. -Picture 9: Change of direction of the magnet as the carrying vehicles changes its direction of movement (Axis). -Picture 10: Touch sensor type Axis meter. -Picture 11: Air sensor type Axis meter. -Picture 12: Infra red ray sensor type Axis meter. -Picture 13: Axis meter, Speedometer, Converter, CPU, Monitor assembly. -Picture 14: Axis meter memory graph. -Picture 15: Axis meter memory graph utilization. -Picture 16: Plain river survey level meter. -Picture 17: The components of the hill side boat level meter. -Picture 18: Tank fluid measurer with marker floating object. -Picture 19: Tape tubes. -Picture 20: The components of the sea side boat level meter. -Picture 21: Pre filled fluid technique for Plain river survey level meter. -Picture 22: Rapid survey level meter. -Picture 23: Sailor of the Rapid survey level meter. -Picture 24: Land survey level meter - hill side and sea side level meter fluid column placed together. -Picture 25: Land survey level meter - Sea side level meter fluid column moved 1 kilometre towards the sea side from the hill side fluid column.
Transcript
Page 1: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Contents of section 14: Instruments.Chapter 1-Pictures of Instruments, land mark boards and accessories used in this project.1.1-Pictures of some of the Instruments used in RCS – CRS – CRTS – MV – MN.-Picture 1: MPSDR.-Picture 2: MPSDR Track.-Picture 3: MPSDR Track cross section:-Picture 4: The supporting devises of MPSDR.-Picture 5: Inverted U stand of MPSDR;-Picture 6: Ground survey meter.-Picture 7: Axis meter sensor plate;-Picture 8: Magnet mounted over the Axis meter sensor plate.-Picture 9: Change of direction of the magnet as the carrying vehicles changes its direction of movement (Axis).-Picture 10: Touch sensor type Axis meter.-Picture 11: Air sensor type Axis meter.-Picture 12: Infra red ray sensor type Axis meter.-Picture 13: Axis meter, Speedometer, Converter, CPU, Monitor assembly.-Picture 14: Axis meter memory graph.-Picture 15: Axis meter memory graph utilization.-Picture 16: Plain river survey level meter.-Picture 17: The components of the hill side boat level meter.-Picture 18: Tank fluid measurer with marker floating object.-Picture 19: Tape tubes.-Picture 20: The components of the sea side boat level meter.-Picture 21: Pre filled fluid technique for Plain river survey level meter.-Picture 22: Rapid survey level meter.-Picture 23: Sailor of the Rapid survey level meter.-Picture 24: Land survey level meter - hill side and sea side level meter fluid column placed together.-Picture 25: Land survey level meter - Sea side level meter fluid column moved 1 kilometre towards the sea side from the hill side fluid column.-Picture 26: Land survey level meter - Sea side level meter fluid column moved 2 kilometres towards the sea side from the hill side fluid column.-Picture 27: Flow meter.-Picture 28: River scanning.-Picture 29: Level measurer in the river.-Picture 30: Fall’s height measuring instrument.

Page 2: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

-Picture 31: Aerial tube system of fall’s height measuring instrument.-Picture 32: The front portion of the aerial tube system.-Picture 33: Internal organization of the Aerial tube system.-Picture 34: Falls height measuring tape:-Picture 35: Camera case.-Picture 36: Land tube with Level Measuring Pipes.-Picture 37: Graphical presentation of the digital data of the river X.

Views to make this ‘World’ developed and this ‘Earth’ as the lovely place for every ‘Human’.

SECTION 14INSTRUMENTS

Few things for our work, to make it easy, accurate and quick;

Section 14: Instruments.

Chapter 1: Pictures of Instruments, land mark boards and accessories used in this project.

1.1: Pictures of some of the Instruments used in RCS – CRS – CRTS – MV – MN.

Page 3: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 1: MPSDR.

Page 4: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 2: MPSDR Track.

Page 5: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 3: MPSDR Track cross section:

Page 6: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 4: The supporting devises of MPSDR.

Page 7: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 5: Inverted U stand of MPSDR;

Page 8: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.
Page 9: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 6: Ground survey meter.

Page 10: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 7: Axis meter sensor plate;

Page 11: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 8: Magnet mounted over the Axis meter sensor plate.

Page 12: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 9: Change of direction of the magnet as the carrying vehicles changes its direction of movement

(Axis).

Page 13: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 10: Touch sensor type Axis meter.

Page 14: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 11: Air sensor type Axis meter.

Page 15: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 12: Infra red ray sensor type Axis meter.

Page 16: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 13: Axis meter, Speedometer, Converter, CPU, Monitor assembly.

Page 17: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 14: Axis meter memory graph .

Page 18: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 15: Axis meter memory graph utilization.

Page 19: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 16: Plain river survey level meter .

Page 20: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 17: The components of the hill side boat level meter.

Page 21: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 18: Tank fluid measurer with marker floating object .

Page 22: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 19: Tape tubes .

Page 23: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 20: The components of the sea side boat level meter.

Picture 21: Pre filled fluid technique for Plain river survey level meter.

Page 24: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.
Page 25: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 22: Rapid survey level meter.

Page 26: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 23: Sailor of the Rapid survey level meter.

Page 27: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 24: Land survey level meter - hill side and sea side level meter fluid column placed together.

Page 28: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 25: Land survey level meter - Sea side level meter fluid column moved 1 kilometre towards the sea side from the hill side fluid column.

Page 29: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 26: Land survey level meter - Sea side level meter fluid column moved 2 kilometres towards the sea side from the hill side fluid column.

Page 30: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 27: Flow meter.

Page 31: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 28: River scanning.

Page 32: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 29: Level measurer in the river.

Page 33: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 30: Fall’s height measuring instrument.

Page 34: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 31: Aerial tube system of fall’s height measuring instrument.

Page 35: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 32: The front portion of the aerial tube system.

Page 36: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 33: Internal organization of the Aerial tube system.

Page 37: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 34: Falls height measuring tape:

Page 38: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 35: Camera case.

Page 39: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 36: Land tube with Level Measuring Pipes.

Page 40: S14c1 chapter 1-pictures of instruments, land mark boards and accessories used in this project.

Picture 37: Graphical presentation of the digital data of the river X.