S20 – March Checklist H&SMR03
Health & Safety Risk
Management System
Ensure no tasks are being undertaken without appropriate risk assessments and safe systems of work in place.
Non-compliancetransferred ontomanagement
Item Checked action plan
Consultation and communication
Is there a safety representative on site? Yes O No O Yes O No O
Has a safety meeting been held in the last three months? Yes O No O Yes O No O
Are minutes posted on the site notice board? Yes O No O Yes O No O
Have employees carried out a site inspection and produced a report in the last three months? Yes O No O Yes O No O
Is a response to the report on the site notice board? Yes O No O Yes O No O
Lighting
Is there adequate lighting around the static plant? Yes O No O Yes O No O
Are all items of mobile plant correctly lit? Yes O No O Yes O No O
Haul roads
Is haul road edge protection in place? Yes O No O Yes O No O
Are haul roads correctly gritted? Yes O No O Yes O No O
Is the condition of surfaces free of ruts and potholes? Yes O No O Yes O No O
Are the gradients suitable? Yes O No O Yes O No O
Signatures
Responsible manager Date Comment
...................................................................................... ............... .......................................................................