  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    1/47

    Stay Cable Replacementof the Luling Bridge

    2013 Louisiana Transportation ConferenceFebruary 20, 2013, Baton Rouge, LA

    Armin MehrabiBridge Engineering Solutions

    [email protected]

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    2/47

    Hale Boggs (Luling) Bridge

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    3/47

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    4/47

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    5/47

    Statement of Problem

    Rusting and water leakage in anchorages

    Cracking/splitting of cable cover pipes

    Signs of compromise in cables safetyIn 2002, LADOTD initiated a project for

    Structural Evaluation of the Stay Cables

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    6/47

    Old Stay CablesParallel Wire System

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    7/47

    Deck and Cross Girder

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    8/47

    Lower

    Anchorage

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    9/47

    Upper

    Anchorage

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    10/47

    Project TeamInspection through Construction (2002-2012)

    LADOTD, Paul Fossier, Project Manager,

    Alan Weber, Project Engineer- Construction

    CTLGroup, Inspection-Design

    BES, Armin Mehrabi, Project manager forInspection-Design, Field Engineer for

    Construction Support

    TranSystems, Inspection-Repair DesignABMB, Traffic Control Design-Plans

    IBT, Design-Construction Support

    Kiewit-Louisiana, Construction

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    11/47

    Inspection, Condition Rating, and

    Life-Cycle-Cost Analysis

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    12/47

    Assessment of Overall Integrity

    Difference between design and measured profile

    0.00

    200.00

    400.00

    600.00

    800.00

    1000.00

    1200.00

    1400.00

    NEI-TE

    NEI-TW

    NEI-BE

    NEI-BW

    NEII-T

    NEII-B

    NEIII-T

    NEIII-B

    NEIV-TE

    NEIV-TW

    NEIV-BE

    NEIV-BW

    NEV-TE

    NEV-TW

    NEV-BE

    NEV-BW

    NEVI-T

    NEVI-B

    Force(Kips)

    Measured Force

    Design Force

    Cable Force Measurement

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    13/47

    Inspection

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    14/47

    Cable Free Length Inspection

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    15/47

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    16/47

    Inspection findings

    Damage Severity Levels

    Severity Level Status Description

    1 Satisfactory Minor deterioration and anomalies noted

    2 Poor Deterioration of the protective elements and

    potential for degradation. Cables with thislevel of damages need to be routinelymonitored and corrective action needs tobe planned.

    3 Critical Deterioration or potential for deterioration ofthe main tension elements (steel wires)

    exists. Action (repair) is necessary. Cableswith this level of damages shall be closelymonitored until repairs are applied.

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    17/47

    Severity Level 3 - Critical, Damage Examples

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    18/47

    Summary

    40 out of 72 cables were rated critical

    All cables had at least damage Level 2

    Increasing rate of deterioration was evidentTimely corrective action was needed

    Based on a Life-Cycle-Cost Analysis, publicsafety concerns, and importance of thebridge, LADOTD decided to replace all cables

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    19/47

    Cable Replacement Design,and Construction

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    20/47

    Cable Replacement Design

    Develop a cost effective design.

    Minimize impact on traffic.

    Analyze for live load, wind force, and

    construction load effects.

    Objectives:

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    21/47

    Replacement Cable Design

    Selected cable systemParallel Strand System withIndividually Greased Sheathed Seven-wire

    Strands Encased in HDPE Cover Pipe

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    22/47

    Replacement cable design

    Parallel strand, preferred system

    Larger anchorage and cable envelope

    Require modifications to existing structure

    Increase wind load Change aerodynamic characteristics

    Old Cables; 103 to 307, wiresNew Cables; 23,45,57,67, 0.62 strands

    Additional 24 reference strand for follow-up

    inspections

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    23/47

    Temporary cable design

    Need for Temporary cables

    Uncertainty in cable condition

    Large cable group spacingNeed to maintain traffic w/o load limits

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    24/47

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    25/47

    Temporary Cables

    C t ti S

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    26/47

    Construction SequenceInstall Temporary Cables

    C t ti S

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    27/47

    Construction SequenceDetension and lower cable

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    28/47

    Construction SequenceDetension and lower cable

    C t ti S

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    29/47

    Construction SequenceModification of Anchorage Zones

    C t ti S

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    30/47

    Construction SequenceModification of Anchorage Zones

    Cable Group Old cables New Cables

    I 6.3 8.8II 6.3 7.8

    III 6.3 7.8

    IV 4.3 6.4V 6.3 7.8

    VI 7.1 9.8

    Cables Outer Diameter in Inches

    Constr ction Seq ence

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    31/47

    Construction SequenceModification of Anchorage Zones

    Construction Sequence

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    32/47

    Construction SequenceModification of Anchorage Zones

    Construction Sequence

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    33/47

    Construction SequenceModification of Anchorage Zones

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    34/47

    Construction SequenceWeld PE Pipe

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    35/47

    Construction SequenceHoist PE Pipe

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    36/47

    Construction SequenceHoist PE Pipe

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    37/47

    Construction SequenceInstall Strand and Stress

    L E d d A h

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    38/47

    Lower Ends and Anchorages

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    39/47

    Upper Ends and Anchorages

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    40/47

    Modeling and Structural Analysis

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    41/47

    Maintenance of Traffic

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    42/47

    Design for Peripherals

    Cable vibration suppression measures

    C bl Vib ti S i M

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    43/47

    Cable Vibration Suppression Measures

    C bl Vib ti S i M

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    44/47

    Cable Vibration Suppression Measures

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    45/47

    Summary

    Inspection performed 2002-2006

    Cable replacement design 2007-8

    Construction project bid February 2009Construction began September 2009

    Zone 1 completed February 2011

    All Cables replaced September 2012

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    46/47

  • 7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013

    47/47