Stay Cable Replacementof the Luling Bridge
2013 Louisiana Transportation ConferenceFebruary 20, 2013, Baton Rouge, LA
Armin MehrabiBridge Engineering Solutions
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
2/47
Hale Boggs (Luling) Bridge
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
3/47
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
4/47
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
5/47
Statement of Problem
Rusting and water leakage in anchorages
Cracking/splitting of cable cover pipes
Signs of compromise in cables safetyIn 2002, LADOTD initiated a project for
Structural Evaluation of the Stay Cables
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
6/47
Old Stay CablesParallel Wire System
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
7/47
Deck and Cross Girder
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
8/47
Lower
Anchorage
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
9/47
Upper
Anchorage
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
10/47
Project TeamInspection through Construction (2002-2012)
LADOTD, Paul Fossier, Project Manager,
Alan Weber, Project Engineer- Construction
CTLGroup, Inspection-Design
BES, Armin Mehrabi, Project manager forInspection-Design, Field Engineer for
Construction Support
TranSystems, Inspection-Repair DesignABMB, Traffic Control Design-Plans
IBT, Design-Construction Support
Kiewit-Louisiana, Construction
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
11/47
Inspection, Condition Rating, and
Life-Cycle-Cost Analysis
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
12/47
Assessment of Overall Integrity
Difference between design and measured profile
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
NEI-TE
NEI-TW
NEI-BE
NEI-BW
NEII-T
NEII-B
NEIII-T
NEIII-B
NEIV-TE
NEIV-TW
NEIV-BE
NEIV-BW
NEV-TE
NEV-TW
NEV-BE
NEV-BW
NEVI-T
NEVI-B
Force(Kips)
Measured Force
Design Force
Cable Force Measurement
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
13/47
Inspection
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
14/47
Cable Free Length Inspection
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
15/47
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
16/47
Inspection findings
Damage Severity Levels
Severity Level Status Description
1 Satisfactory Minor deterioration and anomalies noted
2 Poor Deterioration of the protective elements and
potential for degradation. Cables with thislevel of damages need to be routinelymonitored and corrective action needs tobe planned.
3 Critical Deterioration or potential for deterioration ofthe main tension elements (steel wires)
exists. Action (repair) is necessary. Cableswith this level of damages shall be closelymonitored until repairs are applied.
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
17/47
Severity Level 3 - Critical, Damage Examples
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
18/47
Summary
40 out of 72 cables were rated critical
All cables had at least damage Level 2
Increasing rate of deterioration was evidentTimely corrective action was needed
Based on a Life-Cycle-Cost Analysis, publicsafety concerns, and importance of thebridge, LADOTD decided to replace all cables
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
19/47
Cable Replacement Design,and Construction
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
20/47
Cable Replacement Design
Develop a cost effective design.
Minimize impact on traffic.
Analyze for live load, wind force, and
construction load effects.
Objectives:
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
21/47
Replacement Cable Design
Selected cable systemParallel Strand System withIndividually Greased Sheathed Seven-wire
Strands Encased in HDPE Cover Pipe
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
22/47
Replacement cable design
Parallel strand, preferred system
Larger anchorage and cable envelope
Require modifications to existing structure
Increase wind load Change aerodynamic characteristics
Old Cables; 103 to 307, wiresNew Cables; 23,45,57,67, 0.62 strands
Additional 24 reference strand for follow-up
inspections
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
23/47
Temporary cable design
Need for Temporary cables
Uncertainty in cable condition
Large cable group spacingNeed to maintain traffic w/o load limits
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
24/47
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
25/47
Temporary Cables
C t ti S
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
26/47
Construction SequenceInstall Temporary Cables
C t ti S
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
27/47
Construction SequenceDetension and lower cable
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
28/47
Construction SequenceDetension and lower cable
C t ti S
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
29/47
Construction SequenceModification of Anchorage Zones
C t ti S
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
30/47
Construction SequenceModification of Anchorage Zones
Cable Group Old cables New Cables
I 6.3 8.8II 6.3 7.8
III 6.3 7.8
IV 4.3 6.4V 6.3 7.8
VI 7.1 9.8
Cables Outer Diameter in Inches
Constr ction Seq ence
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
31/47
Construction SequenceModification of Anchorage Zones
Construction Sequence
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
32/47
Construction SequenceModification of Anchorage Zones
Construction Sequence
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
33/47
Construction SequenceModification of Anchorage Zones
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
34/47
Construction SequenceWeld PE Pipe
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
35/47
Construction SequenceHoist PE Pipe
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
36/47
Construction SequenceHoist PE Pipe
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
37/47
Construction SequenceInstall Strand and Stress
L E d d A h
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
38/47
Lower Ends and Anchorages
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
39/47
Upper Ends and Anchorages
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
40/47
Modeling and Structural Analysis
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
41/47
Maintenance of Traffic
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
42/47
Design for Peripherals
Cable vibration suppression measures
C bl Vib ti S i M
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
43/47
Cable Vibration Suppression Measures
C bl Vib ti S i M
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
44/47
Cable Vibration Suppression Measures
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
45/47
Summary
Inspection performed 2002-2006
Cable replacement design 2007-8
Construction project bid February 2009Construction began September 2009
Zone 1 completed February 2011
All Cables replaced September 2012
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
46/47
7/29/2019 S58_Stay Cable Replacement of the Luling Bridge_LTC2013
47/47
Questions?