SAC500 Transmission Project
Sacramento Municipal Utility District (SMUD)
Western Area Power Administration – Sierra Nevada Region (WASN)
Feb 2015 - SMUD Board approved agreements to evaluate the feasibility of jointly developing a new 500 kV transmission project with the Western Area Power Administration. The agreements allow initiation of environmental review and to begin regional transmission review activities.
SAC500 Transmission Project
Captain Jack (BPA)
500 kV Existing
230 kV Existing
Legend
Table Mountain (PG&E)
Malin (BPA)
Maxwell (TANC)
Cottonwood (PG&E)
Olinda (Western)
Tesla (PG&E)
Round Mountain (PG&E)
Tracy (TANC)
Hurley
O’Banion (Western)
Elverta (Western)
Elverta
SMUD
Project Overview
•Joint project between SMUD & WASN •Construct ~50 miles, 500 kV transmission line from near Maxwell to near O'Banion & 500/230 kV transformer at O'Banion.
• Configure the new Maxwell switchyard to “double bus, double breaker”
Project Objectives / Benefits:
• Carbon footprint reduction
• Increased flexibility to access low carbon and renewable generation
• Meeting SMUD load serving capability for 2024 and beyond
• Improve system reliability locally and regionally
• Less reliance on SMUD’s thermal generation fleet
• More independence, preserves local decision making
Base Case Assumptions:
• WECC 2024HS • Table Mt. – Rio Oso 230 kV reconductor• Palermo – Rio Oso 230 kV line reconductor• South of Palermo Transmission project, which
consists of reconductoring the southern portion of the Palermo-Rio Oso 115 kV lines #1 & #2 and the Palermo-Pease-Rio Oso 115 kV lines
• DWR RAS unavailable for COI N-S N-2 Contingency
COI Impacts:
Study Results:• Provides thermal loading relief on the limiting
elements• Improves reactive power support to the
northern California transmission grid
COI Impacts:
Contingency / Loading
COI Flow (MW) NCH TMS DLO RM-TM #1 SLO
Pre - Project
4800 70% TM – RIO OSO (111%) RM-TM #2 (99%)
Post - Project
4800 70% TM – RIO OSO (109%) RM-TM #2 (99%)
COI Impacts:
Reactive Margin (MVAR)
Base Case Contingency ELVERTAS 230
OBANION 230
MALIN 500TABLE MT
500TRACY
500
Pre - Project
2024hs-3353-BASE.sav
CptJ-Olinda-slo-ns
478 479 >1000 >1000 >1000
MPDCI-NS-bipole
551 549 >1000 >1000 >1000
PaloVerde-g2-RAS
389 391 >1000 >1000 >1000
Post – Project
2024hs-3353-MAOB.sav
CptJ-Olinda-slo-ns
812 901 >1000 >1000 >1000
MPDCI-NS-bipole
909 >1000 >1000 >1000 >1000
PaloVerde-g2-RAS
703 780 >1000 >1000 >1000
Other transmission alternatives were evaluated:
Transmission Alternatives:
AlternativeLSC
Increase (MW)
Line Length
(mi)
Loss Savings
(MW)
CVP Flow Reduction
(MW)
Cost Estimate
($M)
1 Maxwell – O’Banion 500kV 364 44 19 295 $250
2 Tracy – SMUD Area 500kV 364 43 21 270 $330
3 Tracy – SMUD Area 230kV 254 43 17 179 <$330
4 Loop Table Mtn. – Tesla into O’Banion 290 < 1 0 331 $77
5 Solano - SMUD 230kV 316 40 2 192 $250
Conclusions:
• More expensive to construct• Unable to meet the project objectives• Requires significant upgrades of existing facilities• Infeasible due to space and zoning concerns
Transmission Alternatives:
• Invitation to WECC members to be part of the SAC500 Project Coordination Review Group
• Contacts:– SMUD: Craig Cameron – (916) 732-5363
Patrick Truong – (916) 732-5267
– WAPA: Kirk Sornborger – (916) 353-4063
WECC Project Review Group:
Contingency
COI Flow (MW) NCH R. Mtn – Table Mtn TM – VD SLO
Existing System
4800 60% RM – TM (97%)
4800 70% RM – TM (97%)
4680 80% RM – TM (99%) Pease-E. Marysville (96%)
4615 90% RM – TM (98%) Pease-E. Marysville (99%)
4373 100% RM – TM (94%) Pease-E. Marysville (99%)
Post-Project 2021 System
4800 60% RM – TM (90%) Pease-E. Marysville (<90%)
4800 70% RM – TM (95%) Pease-E. Marysville (<90%)
4682 80% RM – TM (96%) Pease-E. Marysville (<90%)
4617 90% RM – TM (95%) Pease-E. Marysville (<90%)
4372 100% RM – TM (91%) Pease-E. Marysville (<90%)
MW
BASE MAOB DIFF
COI 4763 4766 3
PACIFIC DC INTERTIE (PDCI) 3100 3100 0
NORTHERN - SOUTHERN CALIFORNIA 3141 3142 1
Bellota-Rancho Seco 230kV: 270.53 199.5 -71.03
Camanch-Rancho Seco 230kV: 265.03 194.33 -70.7
Gold Hill - Lake 230: 167.76 127.06 -40.7
Elverta 230kV Bus Tie: 223.28 188.96 -34.32
Tracy - Hurley #1 230: 257.99 190.77 -67.22
Tracy - Hurley #2 230: 264.01 195.81 -68.2
Folsom - OrangeVale 230: 180.31 155.4 -24.91
Folsom - Lake 230: -68.37 -1.76 -66.61
Maxwell - O’Banion 500: 413.68 413.68
Round MT - COTWD 230 #1: 94.27 86.98 -7.29
Tesla - Tracy 230 #1: 49.62 39.65 -9.97
Tesla - Tracy 230 #2: 49.62 39.65 -9.97
Tracy 500/230 kV Bnk #1 423.45 364.43 -59.02
Tracy 500230 kV Bnk #2 423.45 364.43 -59.02
Keswick - O’Banion 230 #1: 249.9 209.22 -40.68
Keswick - Flanagan 230 #1: -81.81 -81.2 -0.61
Hurley - Procter 230 #1: -159.56 -83.81 -75.75