EXTERNAL 2020-07-10 | CIS PETROCHEMICALS CONFERENCE Sadara Project – Main Automation Contract Lowering complexity, improving competitiveness and fostering collaboration Swarandeep Singh, VP, Global Chemicals and Refining Lead
Transcript
Page 1: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

EXTERNAL

2020-07-10 | CIS PETROCHEMICALS CONFERENCE

Sadara Project – Main Automation ContractLowering complexity, improving competitiveness and fostering collaborationSwarandeep Singh, VP, Global Chemicals and Refining Lead

Page 2: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—Critical success factors

July 10, 2020 2

Main Automation Contractor (MAC)

Safety, security, health and environment

Continuity of project teams

Global work practices and standards

Owner collaboration

Simulation for testing and training

Integrated execution centers

Local presence and focus on life cycle costs

Page 3: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—Sadara

July 10, 2020 3

Page 4: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

Source: Google Maps

Sadara project

July 10, 2020 4

Most ambitious petrochemical project ever undertaken

Page 5: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

Graphs: IOGP Safety performance indicators – 2018 data1 Safety Instrumented System

Best in class safety performance

July 10, 2020 5

Total Recordable Injury Rate (TRIR) end of January 2016 was 0.033 “far exceeding” global industrial standards for a project of this size and scopeABB’s multi-dimensional contribution to safety performance:– Safe Products - Integrated Process Control Systems including SIS1

components– Safe Designs – Safely operate, mitigate disturbances and shutdown– Safe Workforce – Safety culture aligned with Sadara, implemented in

ABB offices and at Site

Leave it better than you found it

Page 6: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

Image: Sadara

Unprecedented size and scope

July 10, 2020 6

Creating value through chemistryUS$20 Billion investmentFirst complex to crack Naphtha in Saudi ArabiaLargest chemicals complex ever constructed in a single phase– 26 integrated world scale plants with over 3 million metric tons of capacityDifferentiated product slate– 14 out of the 26 plants are new to Saudi ArabiaConstruction began in 3Q 2011– First products in 2015– Full production in 2017Total project– 18 800xA safety and automation system, over 150,000 IOs– 40 operator consoles across 5 control operator buildings– Foundation field bus

Page 7: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

Page 8: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

1PE: Polyethylene; PO: Propylene Oxide; PMDI: Polymeric diphenylmethane diisocyanate; TDI: Toluene diisocyanate; EO: Ethylene Oxide; PG: Propylene GlycolAll capacities indicated in KTA

Key process units and technologies

July 10, 2020 8

Game changer in chemicals

Technology licensors of international repute and experience:– Dow (PE, PO, PMDI, TDI, EO, PG)1

– Technip (Mixed Feed Cracker)– GTC Technologies (Aromatics)– ThyssenKrupp Uhde (Chlorine)– Espanola (Nitric acid)– Noram (MonoNitroBenzene)– Josef Meissner (DiNitroToulene)– Formox (Formaline)– KBR (Aniline)

1500

400

280

134

375220

416 316 400

250 153

200

360

390

400

70

208

400

Page 9: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—Power and Automation from ABB

July 10, 2020 9

Main Automation Process Control, Safety, Code Validation, Operator Training Simulation, Interfaces

Terminal ManagementAutomation of bulk inventory; tank farms, packaging and transport

Operations ManagementMobility and electronic shift operations management

InstrumentationAdvanced flow and level measurement technology

Analytical Systems and Emissions MonitoringProcess analysers

Distribution TransformersMain power distribution

Drives SystemsVariable frequency drive systems

Page 10: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

Only major EPCs are listed above

15 EPCs, 8 countries, One ABB

July 10, 2020 10

TDA

TDI (7)

HNO3

MNB

Aniline

PMDI (8)

Formaline

PMD(A)I

Chlorine (3)

Brine HCU

CA

Olefins (1)MFC

Aromatics (2)

ExtractHydro

HDPE

Plastics (11,12,13,14)

Elastomers

Sol. PE

Sol. PE

SDL (17)

Site Dev

UPI (15, 16)

Util Infra

Power

DNTBGE

EO & Derivatives (4,5,6)

EOA

EAE

Polys

PO & Derivatives (9,10)Polys

PG

Daelim - KR

JGC- S

A

Jacobs - UK

Daelim - KRDaelim - KR

FW - TH

FLUO

R - U

S

Daewoo - SA

DOW - US

Tecnicas - ES

TDI

PO

EO ISS

Fluor – US/UK

PAK (19)

Tank Farm

FW - UK

Tecnimont - IT

Tecn

icas -

ES

FLUOR - UK

Page 11: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—A global ABB team leveraging local presence

July 10, 2020 11

Oslo, NO

Boros, SE

Shanghai, CN

Bangalore, IN

St. Neots, UK

Riyadh, SA

Houston, US

Helsinki, FI

Orchestrating people, process and technologies across continents

Project split

Global supply chain organizationEstablishing frame/ strategic agreements early in the projectIntegrating critical sub-suppliers into planning and execution

Boston, US

Madrid, ES

Materials (65%)Services (35%)

Page 12: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

FEED: Front End Design Engineering LTSA: Long Term Service Agreement CRT: Creditor Reliability TestEPC: Engineering, Procurement, Construction C&SU: Commissioning and Start Up

Project Timeline

July 10, 2020 12

Cra

cker

Fina

l Inv

estm

ent

Dec

isio

n

2H 2011

Con

stru

ctio

n be

gins

2013 2015 2016 2017

Fina

ncia

l clo

se

Firs

t Pro

duct

(P

E)

Rem

aini

ng p

lant

s

FEED EPC

C&SU

Rem

iani

g pl

ants

2012 2018

Cra

cker

CRT

s

2019 2020 2021

LTSA

Rem

aini

ng P

Os

Cra

cker

PO

2014

Page 13: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

1 Piping and Instrumentation Diagrams 2 Process Control Strategy Documents 3 Input | Output4 Heat and Material Balance 5 Unit-based Control (State-based Control) 6 Smart Plant Instrumentation

Project workflow

July 10, 2020 13

Getting it right first time

EPC DeliverablesP&IDs1

PCSDs2

IO3 listsProcess data, H&MB4

Software and Hardware Design

Owner DeliverablesFunctional specifications, standards (Licensor’s…)…

FEED DeliverablesHardware typical(s)Software typical(s) (UBC5)Methods | Tools (SPI6)Standard function blocks Standard libraries

Configuration/ Fabrication Testing/ Acceptance

OWNER

ABB EPC

ABB

OWNER

ABB EPC

Objectives

Once-through, high quality configuration and fabrication with minimum rework

No undefined requirements when Software and Hardware specifications are complete

No compromise on safety and quality in design

› › ›

› ›

Page 14: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—Project management framework

July 10, 2020 14

Characteristics

– A formal project management process is in place and is applied consistently across all projects

– The process is business-focused and addresses the full lifecycle of the project

– Projects move through the process in a series of controlled steps

– Control is assured by the need to meet defined objectives agreed with all major stakeholders and by detailed scrutiny of recommendations and risks and a formal decision review at the end of each step in the process

– Objectives and performance are benchmarked against external industry

Key to managing global projects

Delivering value through quality decisions

4.1 Mobilization and planning 4.2 Basic design 4.3 Detailed

engineering4.4 Fabrication and test

4.5 Installation and mechanical completion

4.6 Commissioning 4.7 Close out

Page 15: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack

—Delivering world class projects

July 10, 2020 15

Synchronized execution approach

Manageable, Measurable, and Attainable

Planning and governance

Resource management

Standards and controls

Execution capability

Technical capability

Ensuring timely, and uniform sharing of information, decisions and areas of risks and concerns Clarifying accountability, decision-making authority, and escalation paths

Continuity of resources during all phases of project executionFormal and consistent relocation policies facilitate employee movement

A single, standard project methodology, promotes traceability throughout—from requirements to testing to deliveryStrong advocacy and promotion of the standards

Safe and predictable delivery of world

class projects

Page 16: Sadara Project – Main Automation ContractImage: Sadara Unprecedented size and scope July 10, 2020 6 Creating value through chemistry US$20 Billion investment First complex to crack